CN103921347B - Precast T-Beam floor reinforcing bar, prestress pipe are fixed draw and insert-type and are installed mould bases - Google Patents

Precast T-Beam floor reinforcing bar, prestress pipe are fixed draw and insert-type and are installed mould bases Download PDF

Info

Publication number
CN103921347B
CN103921347B CN201410173986.2A CN201410173986A CN103921347B CN 103921347 B CN103921347 B CN 103921347B CN 201410173986 A CN201410173986 A CN 201410173986A CN 103921347 B CN103921347 B CN 103921347B
Authority
CN
China
Prior art keywords
mould bases
rib
vertical
ribs
stopper slot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410173986.2A
Other languages
Chinese (zh)
Other versions
CN103921347A (en
Inventor
钱叶琳
常乃坤
陈卫卫
刘晓义
戴正辰
李健
王文建
王贺华
汪正杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Road and Bridge Engineering Group Co Ltd
Original Assignee
Anhui Road and Bridge Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Road and Bridge Engineering Group Co Ltd filed Critical Anhui Road and Bridge Engineering Group Co Ltd
Priority to CN201410173986.2A priority Critical patent/CN103921347B/en
Publication of CN103921347A publication Critical patent/CN103921347A/en
Application granted granted Critical
Publication of CN103921347B publication Critical patent/CN103921347B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B17/00Details of, or accessories for, apparatus for shaping the material; Auxiliary measures taken in connection with such shaping

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Abstract

The invention discloses a kind of Precast T-Beam floor reinforcing bar, prestress pipe fix draw and insert-type install mould bases, pedestal arrange two longitudinal ribs and be connected the cross rib of longitudinal rib as bed die frame, bed die frame being established reinforcing bar stopper slot; Vertical main mould bases is containing vertical vertical rib and the horizontal ribs being connected to vertical rib top, and each vertical rib establishes circular pull through hole; Horizontal bar is installed mould bases and insert through hole outside vertical main mould bases; Vertical muscle location utilizes the stopper slot in bed die frame and horizontal ribs to realize; Operative's platform and vertical main mould bases are rigidly connected; Prestress pipe positioning bar installs mould bases according to pipeline longitudinal coordinate sequentially built, with prestress pipe limit rib stopper slot reference numeral on bed die frame; Framework of steel reinforcement Integral hoisting frame makes English truss, along the uniform suspension ring of lower edge.After carcasing completes, pull off horizontal bar and mould bases is installed, with gantry crane multipoint hoisting to T girder prefabricated pedestal.This mould bases have make simple, with low cost, use safety, the feature such as efficient, easy to operate.

Description

Precast T-Beam floor reinforcing bar, prestress pipe are fixed draw and insert-type and are installed mould bases
Technical field:
The present invention relates to technical field of bridge construction, specifically a kind of Precast T-Beam floor reinforcing bar, prestress pipe are fixed draw and insert-type and are installed mould bases, are applicable to the installation of Precast T-Beam floor reinforcing bar and prestress pipe.
Background technology:
Prestressed reinforced concrete T beam because of have bearing capacity high, be applicable to the advantages such as the strong and construction technology of various span bridge, shock resistance is relatively simple and extensive use in Bridges in Our Country design.In construction, in the construction of particularly Long span T beam, because T beam floor framework of steel reinforcement is long, high, narrow, direct colligation on pedestal, the very difficult controls such as the straight degree of framework of steel reinforcement, the spacing of reinforcing bar.Stressed, the durability of accuracy on beam of the straight degree of T beam reinforcement cages, bar spacing, protective layer thickness, particularly prestress pipe location affect very large.Given this, under construction standardization, the background that becomes more meticulous, T beam floor reinforcing bar, prestress pipe are installed and are adopted that to install mould bases imperative.
Summary of the invention:
For overcoming the defect of prior art, the object of the present invention is to provide a kind of fixed, disposable complete after recycle, until T beam of the same type is constructed complete T beam floor reinforcing bar, prestress pipe install mould bases.This installs mould bases and can locate prestress pipe fast, accurately in construction, coordinates circular high-strength mortar cushion block, T beam floor thickness of protection tier fraction can be made all to reach more than 98%.
The die-filling frame of intrinsic safety designs especially for the installation of T beam floor reinforcing bar, prestress pipe, have safe, efficient, easy to operate, improve feature, particularly Long span, the deck-molding T beam more than more than 2 meters such as quality, advantage is more obvious.
Technical solution problem of the present invention adopts following technical scheme:
Precast T-Beam floor reinforcing bar, prestress pipe are fixed draw and insert-type and are installed mould bases, and it comprises:
Be fixedly installed on the fixing bed die frame on concrete bed, described fixing bed die frame is made up of horizontally disposed two parallel longitudinal ribs and the spaced many cross ribs be connected laterally between two longitudinal ribs, on each described longitudinal rib, interval is equidistantly provided with longitudinal rib stopper slot along its length, equally, on each described cross rib, interval is equidistantly provided with cross rib stopper slot along its length;
The sidepiece of a described longitudinal rib is installed with multiple vertical main mould bases wherein, the length direction of multiple vertical main mould bases longitudinally rib is equidistantly intervally arranged, each described vertical main mould bases is connected in connecting rod between two vertical ribs by two vertical ribs vertically arranged and transverse direction and forms, and the length direction of described connecting rod is parallel with the length direction of described cross rib;
Two vertical ribs of each described vertical main mould bases are provided with the through hole that multiple level is offered from top to bottom, the draw and insert-type horizontal bar arranging " E " font installs mould bases, and three horizontal bars being up and down parallel to the horizontal bar installation mould bases of described cross rib are inserted in the through hole of described vertical rib;
Be installed with horizontal ribs at the top of the vertical rib of a row of the close longitudinal rib of multiple vertical main mould bases, the length direction of described horizontal ribs is parallel with the length direction of described longitudinal rib, and in described horizontal ribs, interval is equidistantly provided with horizontal ribs stopper slot along its length; Described horizontal ribs stopper slot is corresponding with described longitudinal rib stopper slot in the vertical direction position;
Operating platform is installed with in the outside portion of the vertical rib of a row away from longitudinal rib of multiple vertical main mould bases.
Compared with the prior art, beneficial effect of the present invention is embodied in:
The present invention installs mould bases while having the straight degree of guarantee T beam floor framework of steel reinforcement, bar spacing, prestress pipe accurate positioning, also has:
The present invention greatly reduces the safety factor in skeleton process of binding.Fixed installation mould bases effectively ensure that the monolithic stability in tie with reinforcing bar process, has stopped because strong wind, unexpected push-and-pull cause the risk of toppling.Fixing operating platform, had both had the effect ensureing to install mould bases rigidity, in turn ensure that safety during operator's ascend operation;
Recycle after this installation mould bases disposal molding, utilization pulls and pushes principle, horizontal bar is installed after mould bases inserts and can be located vertical equity muscle, extract aftershaping framework of steel reinforcement out and mould bases is installed and can depart from completely, overcome installation mould bases in the past and repeatedly pacify the alignment error of tearing open and causing, save and mould bases disassembly and assembly time is installed.
Floor reinforcing bar is installed on installation mould bases, decrease T beam floor reinforcing bar, time that prestress pipe is installed on T beam pedestal, add the utilization rate of precast pedestal, effectively can reduce the production quantity of T beam prefabricated field pedestal, save predefined region floor space, save place, T beam prefabricated field construction cost to a certain extent.
Alleviate difficulty of construction and the labour intensity of workman, substantially increase project progress.The installation mould bases of T beam floor reinforcing bar all near reinforcement shed is installed, then utilizes straddle truck integral hoisting, take full advantage of the plant equipment such as straddle truck, save the manpower of a dead lift reinforcing bar semi-finished product (between from reinforcement shed to T girder prefabricated pedestal).Utilize prestress pipe positioning bar that mould bases is installed and make prestress pipe positioning bar, then directly install, save the artificial time measuring location prestress pipe, add pipeline precision.
This installation mould bases is simple for production, with low cost.For 40 meters long 2.5 meters high T beams, mould bases makes and only needs all kinds of reinforcing bar about 3.5 tons, nut about (pulling hole) 3600,85 meters, 30mm*30mm angle steel and C20 concrete 4.8 side.
Accompanying drawing illustrates:
Fig. 1 is Precast T-Beam floor reinforcing bar of the present invention, prestress pipe is fixed draw and insert-type and installed mould bases overall structure schematic diagram; Fig. 2 A-2C is the left view of concrete bed of the present invention and fixing bed die frame, front view and top view; Fig. 3 is vertical main die carrier structure schematic diagram; Fig. 4 is that horizontal bar installs die carrier structure schematic diagram; Fig. 5 is that vertical muscle installs die carrier structure schematic diagram; Fig. 6 is operative's platform structure schematic diagram; Fig. 7 is that prestress pipe positioning bar installs die carrier structure schematic diagram; Fig. 8 A-8C is the left view of framework of steel reinforcement Integral hoisting frame, front view and top view.
Number in the figure: 1 concrete bed, 2 longitudinal ribs, 21 longitudinal rib stopper slots, 3 cross ribs, 31 cross rib stopper slots, 4 main mould bases, 41 vertical ribs, 42 connecting rods, 43 through holes, 5 horizontal bars install mould bases, 6 horizontal ribs, 61 horizontal ribs stopper slots, 7 operating platforms, 8 prestress pipe positioning bars install mould bases, 81 spacing marks, 9 framework of steel reinforcement Integral hoisting frames, 91 suspension ring.
Below by way of detailed description of the invention, and the invention will be further described by reference to the accompanying drawings.
Detailed description of the invention:
Embodiment: by reference to the accompanying drawings, the Precast T-Beam floor reinforcing bar of the present embodiment, prestress pipe are fixed draw and insert-type and are installed mould bases, and it comprises:
Be fixedly installed on the fixing bed die frame on concrete bed 1, shown in Fig. 1,2, fixing bed die frame is made up of horizontally disposed two parallel longitudinal ribs 2 and the spaced many cross ribs 3 be connected laterally between two longitudinal ribs, on (cross rib spacing is no more than the main muscle of single base plate former material length) each longitudinal rib 2, interval is equidistantly provided with longitudinal rib stopper slot 21 along its length, equally, on each cross rib, interval is equidistantly provided with cross rib stopper slot 31 along its length; Longitudinal rib 2 and the reinforcement welding be embedded on concrete bed 1, cross rib 3 welds with longitudinal rib rib 2.Wherein, the stopper slot on the longitudinal rib 2 of two, left and right is mutually corresponding to be arranged, and notch line is perpendicular to longitudinal rib 2, guarantees that water chestnut muscle, stud (stirrup), prestress pipe positioning bar are accurate in position, T beam base plate place.Cross rib stopper slot 31 guarantees that T beam floor main reinforce position is accurate.
Composition graphs 3-5, multiple vertical main mould bases 4 is installed with at the sidepiece of a wherein longitudinal rib 2 of two longitudinal ribs, the length direction of multiple vertical main mould bases longitudinally rib is by the arrangement of 1.5 meters of intervals, each vertical main mould bases 4 is connected in connecting rod 42 between two vertical ribs by two vertical ribs 41 vertically arranged and transverse direction and forms, and the length direction of connecting rod is parallel with the length direction of cross rib 3; That is, in two vertical ribs of each vertical main mould bases, press close to longitudinal rib for one, another root is away from longitudinal rib, each vertical rib utilizes reinforcement welding firm, two vertical ribs of each vertical main mould bases are provided with the through hole 43 that multiple level is offered from top to bottom, the draw and insert-type horizontal bar arranging " E " font installs mould bases 5, and three horizontal bars being up and down parallel to the horizontal bar installation mould bases of cross rib 2 are inserted in the through hole 43 of described vertical rib; The through hole of each vertical rib is arranged apart from the distance between the upper and lower according to the horizontal longitudinal reinforcement of T beam floor between the upper and lower, sees in a lateral direction, and the draw and insert-type horizontal bar of arbitrary neighborhood two " E " fonts installs mould bases 5 in same level.
Be installed with horizontal ribs 6 at the top of the vertical rib 41 of a row of the close longitudinal rib 2 of multiple vertical main mould bases, the length direction of horizontal ribs is parallel with the length direction of longitudinal rib, and in horizontal ribs, interval is equidistantly provided with horizontal ribs stopper slot 61 along its length; Horizontal ribs stopper slot 61 is corresponding with longitudinal rib stopper slot 21 in the vertical direction position; Guarantee that water chestnut muscle, stud (stirrup), prestress pipe positioning bar are accurate in position, T web place.
Operating platform 7 is installed with in the outside portion of the vertical rib 41 of a row away from longitudinal rib 2 of multiple vertical main mould bases.Vertical rib outside supporting leg and hard surface and vertical main mould bases is rigidly connected, operating platform 7 height is determined according to deck-molding and operative's custom, is as the criterion with safety, handled easily, berm width 0.5 ~ 0.8 meter, and diaphragm plate position disconnects in T beam, in convenient diaphragm plate reinforcing bar colligation, hang away.
Prestress pipe positioning bar as shown in Figure 7 installs mould bases 8.Make by with the water chestnut muscle of longitudinal coordinate, vertical muscle (stirrup) size in this installation mould bases according to prestress pipe longitudinal coordinate, numbering is numbered corresponding with the longitudinal rib stopper slot 21 that bed die frame two longitudinal ribs 2 are arranged according to prestress pipe longitudinal coordinate.Prestress pipe positioning bar is installed mould bases 8 and is arranged spacing mark 81 according to vertical, the lateral coordinates of this ordinate place prestress pipe.After prestressing force positioning bar utilizes hoop bender to complete, contrast prestress pipe positioning bar is installed mould bases 8 and is arranged prestress pipe stopper slot, and deposits by number, uses.Guarantee the accurate of T beam floor prestress pipe position.
Framework of steel reinforcement Integral hoisting frame 9 as shown in Figure 8.Adopt reinforcing bar, angle steel etc. to be made into English truss, truss integral length is suitable with framework of steel reinforcement, can be slightly long.Truss lower edge is installed with oval suspension ring 91, suspension ring 91 are arranged by 1 meter of intervals, suspension ring 91 hole internal diameter can meet the reinforcing bar simultaneously inserting 1 steel strand wires and 1 diameter 32mm, and 91 mouthfuls, suspension ring are towards identical with truss length direction, and inner edge stress point on the same line and parallel in truss.After T beam floor reinforcing bar, prestress pipe installation, utilizing gantry crane to hang this framework of steel reinforcement Integral hoisting frame 9 puts to framework of steel reinforcement, the suspension ring 91 of framework of steel reinforcement Integral hoisting frame 9 lower edge are made to insert framework of steel reinforcement, steel strand wires, reinforcing bar is penetrated in the suspension ring 91 of framework of steel reinforcement Integral hoisting frame 9 lower edge, make framework of steel reinforcement Integral hoisting frame 9 and shaping T beam floor reinforcing bar (comprising installation prestress pipe) be linked to be integral hoisting to corresponding T beam base, guarantee that T beam floor framework of steel reinforcement is indeformable.
In concrete enforcement, utilize the fixing main muscle in bed die frame fixed base plate position and stirrup, utilize fixing vertical main mould bases, draw and insert-type horizontal bar installation mould bases, fixing vertical muscle mould bases to be installed and to fix water chestnut muscle, stirrup (stud), prestress pipe positioning bar in the position at T web place, thus ensure the accuracy of T beam floor reinforcing bar, prestress pipe installation site.By more than, ensure that the installation deviation of T beam floor reinforcing bar is all less than ± the normal value of 10mm; Mould bases is installed to the location of prestress pipe by prestress pipe positioning bar, ensure that prestress pipe position coordinates deviation is less than the normal value of 10mm; The safety of operator's ascend operation is ensure that by regular worker's operating platform; By multipoint hoisting T beam floor framework of steel reinforcement (comprising the prestress pipe of installation) of framework of steel reinforcement Integral hoisting frame, ensure that T beam floor framework of steel reinforcement winches in the process of T beam pedestal indeformable.

Claims (1)

1. Precast T-Beam floor reinforcing bar, prestress pipe are fixed draw and insert-type and are installed mould bases, it is characterized in that comprising:
Be fixedly installed on the fixing bed die frame on concrete bed (1), described fixing bed die frame is made up of horizontally disposed two parallel longitudinal ribs (2) and the spaced many cross ribs (3) be connected laterally between two longitudinal ribs, on each described longitudinal rib (2), interval is equidistantly provided with longitudinal rib stopper slot (21) along its length, equally, on each described cross rib, interval is equidistantly provided with cross rib stopper slot (31) along its length;
The sidepiece of a described longitudinal rib (2) is installed with multiple vertical main mould bases (4) wherein, the length direction of multiple vertical main mould bases longitudinally rib is equidistantly intervally arranged, each described vertical main mould bases (4) is connected in connecting rod (42) between two vertical ribs by two vertical ribs (41) vertically arranged and transverse direction and forms, and the length direction of described connecting rod is parallel with the length direction of described cross rib (3);
Two vertical ribs of each described vertical main mould bases are provided with the through hole (43) that multiple level is offered from top to bottom, the draw and insert-type horizontal bar arranging " E " font installs mould bases (5), and three horizontal bars being up and down parallel to the horizontal bar installation mould bases of described cross rib (2) are inserted in the through hole (43) of described vertical rib;
Horizontal ribs (6) is installed with at the top of the vertical rib (41) of a row of the close longitudinal rib (2) of multiple vertical main mould bases, the length direction of described horizontal ribs is parallel with the length direction of described longitudinal rib, and in described horizontal ribs, interval is equidistantly provided with horizontal ribs stopper slot (61) along its length; Described horizontal ribs stopper slot (61) is corresponding with described longitudinal rib stopper slot (21) in the vertical direction position;
Operating platform (7) is installed with in the outside portion of the vertical rib (41) of a row away from longitudinal rib (2) of multiple vertical main mould bases.
CN201410173986.2A 2014-04-25 2014-04-25 Precast T-Beam floor reinforcing bar, prestress pipe are fixed draw and insert-type and are installed mould bases Active CN103921347B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410173986.2A CN103921347B (en) 2014-04-25 2014-04-25 Precast T-Beam floor reinforcing bar, prestress pipe are fixed draw and insert-type and are installed mould bases

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410173986.2A CN103921347B (en) 2014-04-25 2014-04-25 Precast T-Beam floor reinforcing bar, prestress pipe are fixed draw and insert-type and are installed mould bases

Publications (2)

Publication Number Publication Date
CN103921347A CN103921347A (en) 2014-07-16
CN103921347B true CN103921347B (en) 2016-03-09

Family

ID=51139863

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410173986.2A Active CN103921347B (en) 2014-04-25 2014-04-25 Precast T-Beam floor reinforcing bar, prestress pipe are fixed draw and insert-type and are installed mould bases

Country Status (1)

Country Link
CN (1) CN103921347B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104816380B (en) * 2015-05-13 2017-01-18 中铁建大桥工程局集团第四工程有限公司 Rebar binding framework assembly used in T-shaped beam prefabrication construction process
CN104842449B (en) * 2015-05-17 2017-03-08 天津第一市政公路工程有限公司 Dismountable stationary type reinforcing steel bar skeleton colligation pedestal and its assembling and using method
CN106738308A (en) * 2017-01-17 2017-05-31 中国建筑第七工程局有限公司 Precast T-Beam reinforcing bar molding bed rack system

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1077793A1 (en) * 1982-03-10 1984-03-07 Уфалейский Опытно-Экспериментальный Завод Дорожных Машин Stand for making prestrained 1-section ferroconcrete beams
EP0663274B1 (en) * 1993-12-31 1999-08-04 Hebel Aktiengesellschaft Apparatus for removing the upper waste layer resulting in cutting plastic porous concrete blocks
CN2364076Y (en) * 1999-04-21 2000-02-16 北京市第三市政工程公司构件厂 Accessories of monolithic T-beam steel form for seal of mortar
CN101476288A (en) * 2008-12-08 2009-07-08 中铁十五局集团有限公司 Cast-in-place moving die carrier of T type bridge flange board
CN101492907A (en) * 2008-12-08 2009-07-29 中铁十五局集团有限公司 Cast-in-place construction method for T-shaped bridge flange plate
CN201669773U (en) * 2010-05-04 2010-12-15 杨秋利 Mobile T-beam and I-beam template system
CN201771182U (en) * 2010-05-04 2011-03-23 杨秋利 Fixed T-beam and I-beam templating system
CN203765784U (en) * 2014-04-25 2014-08-13 安徽省路桥工程集团有限责任公司 Fixed drawing-inserting type installing mould frame for prefabricated T-beam rib plate reinforcing steel bar and pre-stressed pipeline

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1077793A1 (en) * 1982-03-10 1984-03-07 Уфалейский Опытно-Экспериментальный Завод Дорожных Машин Stand for making prestrained 1-section ferroconcrete beams
EP0663274B1 (en) * 1993-12-31 1999-08-04 Hebel Aktiengesellschaft Apparatus for removing the upper waste layer resulting in cutting plastic porous concrete blocks
CN2364076Y (en) * 1999-04-21 2000-02-16 北京市第三市政工程公司构件厂 Accessories of monolithic T-beam steel form for seal of mortar
CN101476288A (en) * 2008-12-08 2009-07-08 中铁十五局集团有限公司 Cast-in-place moving die carrier of T type bridge flange board
CN101492907A (en) * 2008-12-08 2009-07-29 中铁十五局集团有限公司 Cast-in-place construction method for T-shaped bridge flange plate
CN201669773U (en) * 2010-05-04 2010-12-15 杨秋利 Mobile T-beam and I-beam template system
CN201771182U (en) * 2010-05-04 2011-03-23 杨秋利 Fixed T-beam and I-beam templating system
CN203765784U (en) * 2014-04-25 2014-08-13 安徽省路桥工程集团有限责任公司 Fixed drawing-inserting type installing mould frame for prefabricated T-beam rib plate reinforcing steel bar and pre-stressed pipeline

Also Published As

Publication number Publication date
CN103921347A (en) 2014-07-16

Similar Documents

Publication Publication Date Title
CN204876586U (en) T roof beam reinforcement fixes a position rack
CN103161126A (en) Road bridge variable section hollow high pier slip-form construction method
CN103306208A (en) Formwork creeping method for novel 1.6 parabola-shaped four-column type hollow variable section high pier
CN104175398B (en) Make the mold and method of prefabricated case beam framework of steel reinforcement
CN110878522B (en) Main tower lower cross beam construction system and construction method
CN103882813A (en) Corbel bracket platform for bridge pier and transverse straining beam synchronous construction and construction method of corbel bracket platform
CN103306206B (en) A kind of construction method adopting thin-wall hollow high-pier reinforcement bar support fixing of the forming frame reinforcing bar
CN204019724U (en) Make the mold of prefabricated case beam framework of steel reinforcement
CN103921347B (en) Precast T-Beam floor reinforcing bar, prestress pipe are fixed draw and insert-type and are installed mould bases
CN106087744A (en) Cable-stayed bridge beams of concrete cable guide pipe supporting and positioning device and method
CN110172912A (en) A kind of solid pier capping beam processing construction method
CN204920239U (en) A child die carrier for making square framework of steel reinforcement
CN210341667U (en) Pier shaft embedded steel bar clamp
CN102777050B (en) Assembly type jig frame for longspan pipe truss roof girder
CN203765784U (en) Fixed drawing-inserting type installing mould frame for prefabricated T-beam rib plate reinforcing steel bar and pre-stressed pipeline
CN206800800U (en) Horizontal reinforcement distance piece
CN110670873B (en) Support system of steel formwork of ultrahigh large-section concrete column and construction method
CN210288124U (en) Prefabricated ligature mould of cast-in-place box girder bottom web reinforcing bar segmentation
CN202148694U (en) Prefabricated T-shaped beam steel bar colligation positioning device
CN215544586U (en) Prefabricated decking reinforcing bar design ligature bed-jig
CN205617664U (en) Prefabricated pier stud locating rack for steel reinforcement cage
CN211171938U (en) Quick distance instrument of stake owner muscle
CN208219546U (en) A kind of pile cover integral inverted hangs bottom system
CN203034692U (en) Cast-in-place reinforced concrete floor negative reinforcement support
CN208280134U (en) A kind of pile foundation construction operation platform device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant