CN110172912A - A kind of solid pier capping beam processing construction method - Google Patents

A kind of solid pier capping beam processing construction method Download PDF

Info

Publication number
CN110172912A
CN110172912A CN201910379816.2A CN201910379816A CN110172912A CN 110172912 A CN110172912 A CN 110172912A CN 201910379816 A CN201910379816 A CN 201910379816A CN 110172912 A CN110172912 A CN 110172912A
Authority
CN
China
Prior art keywords
thin
construction method
pvc pipe
support bracket
rod iron
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910379816.2A
Other languages
Chinese (zh)
Inventor
张清利
刘秉祥
曾建华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUBEI PROVINCIAL ROAD & BRIDGE Co Ltd
Original Assignee
HUBEI PROVINCIAL ROAD & BRIDGE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUBEI PROVINCIAL ROAD & BRIDGE Co Ltd filed Critical HUBEI PROVINCIAL ROAD & BRIDGE Co Ltd
Priority to CN201910379816.2A priority Critical patent/CN110172912A/en
Publication of CN110172912A publication Critical patent/CN110172912A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

A kind of solid pier capping beam of the present invention processes construction method, comprising the following steps: step S1 installs punching rod iron, and set up hanging seat using punching rod iron in the pre-buried pvc pipe in the top of Thin-Wall Piers in pvc pipe;Step S2 installs triangle support bracket based on hanging seat, distribution beam and bracket is installed on triangle support bracket;Step S3 lifts by crane installation bed die, the structure based on Thin-Wall Piers, to arrange bed die mounting process using crane.The present invention is by using pre-buried pvc pipe, one through-hole for running through Thin-Wall Piers is set at the top of Thin-Wall Piers, punching rod iron is passed through into pvc pipe, sets up triangle support bracket at the both ends of punching rod iron, it is formed and is supported using triangle support bracket, distribution beam is installed and bracket sets up low mould and side template, carries out pouring concrete, to form solid pier capping beam, compared with traditional construction method, its construction technology is simpler, and repeatability is strong, is conducive to operating personnel and skillfully grasps;Element factory metaplasia needed for short construction period produces, and quality is easy to guarantee.

Description

A kind of solid pier capping beam processing construction method
Technical field
The present invention relates to technical field of bridge construction, process construction method more particularly, to a kind of solid pier capping beam.
Background technique
During building bridge, when pouring pier cap beam generally using the construction method for setting up bracket, this method is needed The ground of frame bottom is reinforced, and to set up quantity more for bent cap lower bracket.Accordingly, there exist long in time limit, fund throwings Enter big disadvantage.Meanwhile when for unfavorable geological condition, it is commonly encountered Earth cave, bracket is easily caused to settle and deform Pouring quality that is serious and influencing pier cap beam, while security risk is brought in the process to bridge construction.
Summary of the invention
The present invention provides a kind of solid pier capping beam processing construction method, to take when solving and pouring pier cap beam in the prior art If the bracket Non-uniform Settlement deformation influence pier cap beam quality that bracket has that long in time limit, capital investment is big, sets up.
According to an aspect of the invention, there is provided a kind of solid pier capping beam processes construction method, comprising the following steps:
Step S1 installs punching rod iron, and utilize punching steel in the pre-buried pvc pipe in the top of Thin-Wall Piers in the pvc pipe Stick sets up hanging seat;
Step S2, based on the hanging seat install triangle support bracket, on the triangle support bracket install distribution beam and Bracket;
Step S3 lifts by crane installation bed die, the structure based on Thin-Wall Piers, to arrange bed die mounting process using crane;
Step S4 installs side template based on the end template, constructs safeguard structure, carry out pouring concrete and maintenance.
On the basis of above scheme preferably, the plan-position deviation of the pvc pipe is less than or equal to 5mm, and the pvc pipe Height error be less than or equal to 5mm.
On the basis of above scheme preferably, the pre-buried spacer bar by Thin-Wall Piers of the pvc pipe is and described to position Spacer bar is welded in the pier shaft main reinforcement of the Thin-Wall Piers.
On the basis of above scheme preferably, the both ends of the punching rod iron are equipped with coarse thread, and the punching rod iron Both ends pass through the hanging seat and by nut with fixation.
On the basis of above scheme preferably, the triangle support bracket is welded by two panels triangle skeleton by transverse beam At, and outrigger is welded on the triangle support bracket, and the length of the outrigger is bigger than the bent cap width of the Thin-Wall Piers.
On the basis of above scheme preferably, further comprising the steps of S5, when the intensity that step S4 pours concrete reaches 2.5Mpa Afterwards, demoulding is carried out, and is low mould, bracket and distribution beam, triangle support bracket, punching steel according to the sequence of demoulding described in sequencing Stick and hanging seat.
On the basis of above scheme preferably, in the step S3, release agent is coated on the low mould.
A kind of solid pier capping beam of the invention processes construction method, by using pre-buried pvc pipe, at the top of Thin-Wall Piers One through-hole for running through Thin-Wall Piers is set, punching rod iron is passed through into pvc pipe, sets up triangle load-bearing branch at the both ends of punching rod iron Frame is formed using triangle support bracket and is supported, and installs distribution beam and bracket sets up low mould and side template, carry out pouring concrete, thus Form solid pier capping beam.
A kind of solid pier capping beam of the invention processes construction method, and construction technology is simpler, with traditional construction method It compares, construction technology is simpler, and repeatability is strong, is conducive to operating personnel and skillfully grasps;Component needed for short construction period The factorial production, quality are easy to guarantee.
Detailed description of the invention
Fig. 1 is the flow chart that solid pier capping beam of the invention processes construction method;
Structural schematic diagram of the Fig. 2 between punching rod iron and hanger of the invention;
Fig. 3 is the structure chart of triangle support bracket of the invention;
Fig. 4 is the portion the A enlarged drawing of Fig. 3 of the invention.
Specific embodiment
With reference to the accompanying drawings and examples, specific embodiments of the present invention will be described in further detail.Implement below Example is not intended to limit the scope of the invention for illustrating the present invention.
Referring to Fig. 1, and combine shown in Fig. 2, Fig. 3 and Fig. 4, the present invention provides a kind of solid pier capping beams to process construction party Method, comprising the following steps:
Step S1 installs punching rod iron 10, and utilize punching in the pre-buried pvc pipe in the top of Thin-Wall Piers in the pvc pipe Rod iron 10 sets up hanging seat 20;
Step S2 installs triangle support bracket 40 based on the hanging seat 20, the installing point on the triangle support bracket 40 With beam and bracket;
Step S3 lifts by crane installation bed die, the structure based on Thin-Wall Piers, to arrange bed die mounting process using crane;
Step S4 installs side template based on the end template, constructs safeguard structure, carry out pouring concrete and maintenance.
A kind of solid pier capping beam of the invention processes construction method, by using pre-buried pvc pipe, at the top of Thin-Wall Piers One through-hole for running through Thin-Wall Piers is set, punching rod iron 10 is passed through into pvc pipe, sets up triangle load-bearing at the both ends of punching rod iron 10 Bracket 40 is formed using triangle support bracket 40 and is supported, and installs distribution beam and bracket sets up low mould and side template, poured Concrete, to form solid pier capping beam.
A kind of solid pier capping beam of the invention processes construction method, and construction technology is simpler, with traditional construction method It compares, construction technology is simpler, and repeatability is strong, is conducive to operating personnel and skillfully grasps;Component needed for short construction period The factorial production, quality are easy to guarantee.
In order to guarantee that triangle bearing frame is harmonious to the active force of Thin-Wall Piers, the plan-position deviation of pvc pipe of the invention Less than or equal to 5mm, and the height error of pvc pipe is less than or equal to 5mm, thus the levelness to guarantee pvc pipe.
In order to further ensure that deviation does not occur in casting process for pvc pipe, i.e., for installing punching in guarantee Thin-Wall Piers The active force of rod iron 10 is harmonious, and the pre-buried spacer bar by Thin-Wall Piers of pvc pipe of the invention is to position, and spacer bar It is welded in the pier shaft main reinforcement of Thin-Wall Piers, as shown in Figure 2.
In a preferred embodiment of the invention, the both ends of punching rod iron 10 of the invention are equipped with coarse thread, and punching steel The both ends of stick 10 pass through the hanging seat 20 and by nut 30 with fixation.
And in order to guarantee the stability of triangle support bracket 40, triangle support bracket 40 is by two panels triangle skeleton by two panels Triangle skeleton is welded to form an entirety by transverse beam, and wherein monolithic triangular shape skeleton is welded by fashioned iron.And And dismantle for convenience, outrigger 41 is welded on triangle support bracket, and the length of outrigger 41 is than the lid of the Thin-Wall Piers Beam width is big.
That is two panels triangle skeleton clear span is 5cm wider than Thin-Wall Piers pier shaft, concentrates at front end " 7 font " for stress Position carries out patch weldering using steel plate to guarantee the safety of steel construction, so that 40 firm welding of triangle support bracket.
Triangle skeleton is installed using crane, " 7 font " suspended end is hung on innovation rod iron hanging seat 20, the support of lower part Beam is fitted in Thin-Wall Piers, and pier shaft provides reaction of bearing, and suspended end is fitted closely with wall built-up needs, therefore uses steel plate to the two Between gap fill up.
Further, the invention also includes following steps S5, after the intensity that step S4 pours concrete reaches 2.5Mpa, carry out Demoulding, and be low mould, bracket and distribution beam, triangle support bracket 40, punching rod iron 10 according to the sequence of demoulding described in sequencing With hanging seat 20.And demoulding for convenience, the present invention in step s3, are coated with release agent on low mould.
Finally, the present processes are only preferable embodiment, it is not intended to limit the scope of the present invention.It is all Within the spirit and principles in the present invention, any modification, equivalent replacement, improvement and so on should be included in protection of the invention Within the scope of.

Claims (7)

1. a kind of solid pier capping beam processes construction method, which comprises the following steps:
Step S1 installs punching rod iron, and utilize punching rod iron frame in the pre-buried pvc pipe in the top of Thin-Wall Piers in the pvc pipe If hanging seat;
Step S2 installs triangle support bracket based on the hanging seat, distribution beam and bracket is installed on the triangle support bracket;
Step S3 lifts by crane installation bed die, the structure based on Thin-Wall Piers, to arrange bed die mounting process using crane;
Step S4 installs side template based on the end template, constructs safeguard structure, carry out pouring concrete and maintenance.
2. a kind of solid pier capping beam as described in claim 1 processes construction method, which is characterized in that the plane of the pvc pipe Position deviation is less than or equal to 5mm, and the height error of the pvc pipe is less than or equal to 5mm.
3. a kind of solid pier capping beam as described in claim 1 processes construction method, which is characterized in that the pvc pipe is pre-buried logical The spacer bar in Thin-Wall Piers is crossed to position, and the spacer bar is welded in the pier shaft main reinforcement of the Thin-Wall Piers.
4. a kind of solid pier capping beam as described in claim 1 processes construction method, which is characterized in that the two of the punching rod iron End is equipped with coarse thread, and the both ends of the punching rod iron pass through the hanging seat and by nut with fixation.
5. a kind of solid pier capping beam as described in claim 1 processes construction method, which is characterized in that the triangle support bracket It is welded by two panels triangle skeleton by transverse beam, and is welded with outrigger on the triangle support bracket, and described chosen The length of beam is bigger than the bent cap width of the Thin-Wall Piers.
6. a kind of solid pier capping beam as described in claim 1 processes construction method, which is characterized in that further comprising the steps of S5 carries out demoulding after the intensity that step S4 pours concrete reaches 2.5Mpa, and is low according to the sequence of demoulding described in sequencing Mould, bracket and distribution beam, triangle support bracket, punching rod iron and hanging seat.
7. a kind of solid pier capping beam as described in claim 1 processes construction method, which is characterized in that in the step S3, institute It states and is coated with release agent on low mould.
CN201910379816.2A 2019-05-04 2019-05-04 A kind of solid pier capping beam processing construction method Pending CN110172912A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910379816.2A CN110172912A (en) 2019-05-04 2019-05-04 A kind of solid pier capping beam processing construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910379816.2A CN110172912A (en) 2019-05-04 2019-05-04 A kind of solid pier capping beam processing construction method

Publications (1)

Publication Number Publication Date
CN110172912A true CN110172912A (en) 2019-08-27

Family

ID=67690449

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910379816.2A Pending CN110172912A (en) 2019-05-04 2019-05-04 A kind of solid pier capping beam processing construction method

Country Status (1)

Country Link
CN (1) CN110172912A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110700102A (en) * 2019-10-12 2020-01-17 重庆建工建筑产业技术研究院有限公司 Construction method of prestressed steel structure front-pull rear-lock cast-in-place platform
CN111021252A (en) * 2019-12-13 2020-04-17 湖北省路桥集团有限公司 Construction method of bent cap core rod penetrating hanging rack formwork supporting system
CN111321674A (en) * 2020-03-30 2020-06-23 山西省交通规划勘察设计院有限公司 Support bracket for bridge engineering and construction method thereof
CN112411383A (en) * 2020-11-11 2021-02-26 重庆城建控股(集团)有限责任公司 Large cantilever concrete bent cap few-embedded-part assembled bracket and construction method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0735214A1 (en) * 1995-03-30 1996-10-02 Bartolome Lliteras Alzamora A device to facilitate the shuttering of concrete bands and lintels
CN102286925A (en) * 2011-07-08 2011-12-21 四川路航建设工程有限责任公司 Bridge single column pier assembled box bracket system and mounting method thereof
CN203530855U (en) * 2013-10-25 2014-04-09 赤峰宏基建筑(集团)有限公司 Device for bridge capping beam construction by using steel bars through simple supporting method
EP2261430B1 (en) * 2009-06-10 2016-04-06 LO Rakenne Oy Constructing an overhang
CN207537889U (en) * 2017-08-18 2018-06-26 中交四公局第一工程有限公司 Long span bent cap, construction of beam bed die support mould bases
CN109468953A (en) * 2018-10-22 2019-03-15 广西路桥工程集团有限公司 A kind of T-type construction method of bent cap

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0735214A1 (en) * 1995-03-30 1996-10-02 Bartolome Lliteras Alzamora A device to facilitate the shuttering of concrete bands and lintels
EP2261430B1 (en) * 2009-06-10 2016-04-06 LO Rakenne Oy Constructing an overhang
CN102286925A (en) * 2011-07-08 2011-12-21 四川路航建设工程有限责任公司 Bridge single column pier assembled box bracket system and mounting method thereof
CN203530855U (en) * 2013-10-25 2014-04-09 赤峰宏基建筑(集团)有限公司 Device for bridge capping beam construction by using steel bars through simple supporting method
CN207537889U (en) * 2017-08-18 2018-06-26 中交四公局第一工程有限公司 Long span bent cap, construction of beam bed die support mould bases
CN109468953A (en) * 2018-10-22 2019-03-15 广西路桥工程集团有限公司 A kind of T-type construction method of bent cap

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
孟善宝: "剪力棒法在市政高墩盖梁上的应用概述", 《科技创新导报》 *
程群等: "《依山而建高落差倾斜建筑关键施工技术》", 31 December 2016, 武汉大学出版社 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110700102A (en) * 2019-10-12 2020-01-17 重庆建工建筑产业技术研究院有限公司 Construction method of prestressed steel structure front-pull rear-lock cast-in-place platform
CN110700102B (en) * 2019-10-12 2024-01-09 重庆建工建筑产业技术研究院有限公司 Construction method of pre-stress steel structure front-pull rear-lock cast-in-situ platform
CN111021252A (en) * 2019-12-13 2020-04-17 湖北省路桥集团有限公司 Construction method of bent cap core rod penetrating hanging rack formwork supporting system
CN111321674A (en) * 2020-03-30 2020-06-23 山西省交通规划勘察设计院有限公司 Support bracket for bridge engineering and construction method thereof
CN111321674B (en) * 2020-03-30 2021-07-20 山西省交通规划勘察设计院有限公司 Support bracket for bridge engineering and construction method thereof
CN112411383A (en) * 2020-11-11 2021-02-26 重庆城建控股(集团)有限责任公司 Large cantilever concrete bent cap few-embedded-part assembled bracket and construction method thereof

Similar Documents

Publication Publication Date Title
CN110172912A (en) A kind of solid pier capping beam processing construction method
CN106906955B (en) Shear wall integral prefabricated reinforcement mesh structure and construction method thereof
CN103306206B (en) A kind of construction method adopting thin-wall hollow high-pier reinforcement bar support fixing of the forming frame reinforcing bar
CN103255717A (en) Method for constructing hit-preventing wall
JP2008274586A (en) Pillar head construction method
CN202706332U (en) Steel reinforced concrete composite structure post bracket
CN105586833A (en) Construction method for integrally forming large cast-in-place thin-wall high pier through stiff skeleton reinforcement cage
CN109914244A (en) A kind of weak support system and its operating method poured suitable for high tower steel reinforced concrete combination crossbeam Steel Structure Installation and bottom, concrete roof
CN208884362U (en) A kind of Construction of continuous beam bracket
CN102277836B (en) Construction method of tilting concrete tower base
JP2010037725A (en) Method for constructing column capital section of pc bridge
CN201962608U (en) Adjustable viaduct concrete anti-collision guardrail template supporting device
CN104047233B (en) Method for construction of continuous beam linear segment without floor stand
CN105780922A (en) Construction method for segmental formwork hoisting system of large-span steel reinforced concrete transfer truss
CN106894345A (en) Continuous beam end bay closing device and method
CN206800800U (en) Horizontal reinforcement distance piece
CN105839538A (en) Construction method and structure for rigid frame bridge cast-in-situ section non-welded support
CN108797380B (en) Suspension construction device and construction method for suspension irrigation continuous beam bracket
CN101368372A (en) Bearing support
CN103921347B (en) Precast T-Beam floor reinforcing bar, prestress pipe are fixed draw and insert-type and are installed mould bases
CN106567538A (en) Positioning mold for bathroom concrete flanges
CN206015523U (en) The built-in steel anchor beam accurate positioning device of free-standing Sarasota
CN203765784U (en) Fixed drawing-inserting type installing mould frame for prefabricated T-beam rib plate reinforcing steel bar and pre-stressed pipeline
CN209114883U (en) Column reinforcing bar, position apparatus for form
CN209816675U (en) A assembled bracket for construction of 0# piece of rectangle mound

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190827