CN109914244A - A kind of weak support system and its operating method poured suitable for high tower steel reinforced concrete combination crossbeam Steel Structure Installation and bottom, concrete roof - Google Patents

A kind of weak support system and its operating method poured suitable for high tower steel reinforced concrete combination crossbeam Steel Structure Installation and bottom, concrete roof Download PDF

Info

Publication number
CN109914244A
CN109914244A CN201910342186.1A CN201910342186A CN109914244A CN 109914244 A CN109914244 A CN 109914244A CN 201910342186 A CN201910342186 A CN 201910342186A CN 109914244 A CN109914244 A CN 109914244A
Authority
CN
China
Prior art keywords
steel
web
bracket
support
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910342186.1A
Other languages
Chinese (zh)
Other versions
CN109914244B (en
Inventor
徐国挺
唐中波
伏冠西
陈勉
胡盼
刘红成
魏圣
涂飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SICHUAN LUQIAO HUADONG BUILDING CO Ltd
Original Assignee
SICHUAN LUQIAO HUADONG BUILDING CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SICHUAN LUQIAO HUADONG BUILDING CO Ltd filed Critical SICHUAN LUQIAO HUADONG BUILDING CO Ltd
Priority to CN201910342186.1A priority Critical patent/CN109914244B/en
Publication of CN109914244A publication Critical patent/CN109914244A/en
Application granted granted Critical
Publication of CN109914244B publication Critical patent/CN109914244B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Rod-Shaped Construction Members (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The weak support system and its operating method that the invention discloses a kind of to pour suitable for high tower steel reinforced concrete combination crossbeam Steel Structure Installation and bottom, concrete roof;The following steps are included: (1) beam steel web bracket is installed when implementation;(2) beam steel web is installed;(3) system transform is carried;(4) underplate concrete pours;(5) installation of top plate inner support and support arm are removed;(6) concrete roof pours;(7) inner support is removed;This support system compares traditional high tower steel reinforced concrete combination overarm brace system advantage are as follows: 1) undertakes the construction loads such as concrete gravity by beam steel web, support arm only considers beam steel web gravity load and crowd's construction loads, greatly reduces the steel using amount of support system.2) bracket workload greatly reduces, and saves manually, shortens the construction period.

Description

One kind being suitable for high tower steel reinforced concrete combination crossbeam Steel Structure Installation and bottom, concrete roof The weak support system and its operating method poured
Technical field
The present invention relates to high tower steel reinforced concrete combination construction of beam fields, and in particular to one kind is suitable for high tower steel reinforced concrete combination crossbeam The weak support system and its operating method that Steel Structure Installation and bottom, concrete roof pour.
Background technique
Currently, the support system in domestic high tower steel reinforced concrete combination crossbeam conventional construction usually considers the self weight of beam steel web And the load of concrete gravity etc., and the support arm of weak support system only considers the self weight of beam steel web and crowd's construction loads, The loads such as concrete are undertaken by beam steel web itself.Relative to the support system of traditional construction, this support system has The advantages that material saves, process is simple, short time limit.
Summary of the invention
Therefore, in order to solve above-mentioned deficiency, the present invention provides a kind of suitable for high tower steel reinforced concrete combination crossbeam steel construction herein The weak support system and its operating method that installation and bottom, concrete roof pour.This support system compares traditional high tower steel reinforced concrete knot Close overarm brace system advantage are as follows: 1) undertake the construction loads such as concrete gravity by beam steel web, support arm only considers cross Joist steel web gravity load and crowd's construction loads, greatly reduce the steel using amount of support system.2) bracket workload greatly reduces, It saves manually, shortens the construction period.
The invention is realized in this way constructing a kind of suitable for high tower steel reinforced concrete combination crossbeam Steel Structure Installation and bottom, top plate The weak support system of concreting, it is characterised in that: the support system includes beam steel web bracket and bottom plate hanging bracket;
Wherein, beam steel web bracket includes steel pipe post, the horizontal horizontal-associate of column, lateral I-steel, unloading Sand Bucket, support pad steel case A, longitudinal I-steel, I-shaped gooseneck, I-steel longitudinal direction distribution beam, I-steel transverse distribution beam and steel plate bed die;
The steel pipe post vertically uses ring flange to connect, and its each steel pipe post is connected as entirety with the horizontal horizontal-associate of column, Lateral I-steel is installed, installation unloads husky cylinder and support pad steel case A on lateral I-steel, by unloading husky cylinder and branch on steel pipe post Steel case A is padded as uninstalling system, then longitudinal I-steel is installed on support pad steel case A, I-shaped then is installed on longitudinal I-steel Gooseneck, then I-steel longitudinal direction distribution beam and I-steel transverse distribution beam are installed on I-shaped gooseneck, laterally divide in I-steel With beam upper berth steel loading plate bed die;
Wherein, bottom plate hanging bracket includes I-steel outrigger, support pad steel case B and fining twisted steel;First on crossbeam steel construction top I-steel outrigger is installed in portion, and support pad steel case B is installed on I-steel outrigger, corresponding pre- from I-steel outrigger and support pad steel case B Fining twisted steel is worn under boxing out, up through the support pad steel case A installed under I-shaped gooseneck on the downside of steel plate bed die and crossbeam, and Backing plate, nut and locking nut are installed at the support pad steel case at the top and bottom of fining twisted steel, make top outrigger and lower part Lateral I-steel forms entirety.
A kind of operating method poured suitable for high tower steel reinforced concrete combination crossbeam Steel Structure Installation and bottom, concrete roof, It is characterized in that;Implement as follows;
Step 1: it the installation of beam steel web bracket: is designed by only consideration beam steel web gravity load and crowd's construction loads Bracket, the bracket include steel pipe post, the horizontal horizontal-associate of column, lateral I-steel, unloading Sand Bucket, support pad steel case A, longitudinal I-shaped Steel, I-shaped gooseneck, I-steel longitudinal direction distribution beam, I-steel transverse distribution beam and steel plate bed die;All components are processed in advance It makes, be ready to;Steel pipe post is installed first, and column vertically uses ring flange to connect, and its each column is connected as with lateral It is whole, after the completion of column construction, lateral I-steel is installed, installation on it unloads husky cylinder, support pad steel case as uninstalling system, then Longitudinal I-steel is installed, then I-shaped gooseneck is installed, then twice distribution beam in length and breadth is installed, steel plate bed die of mating formation;
Step 2: the installation of beam steel web: after bracket is set up, segmental hoisting beam steel web;It measures and puts first on bed die Sample beam steel web plane position, then according to sequence intermediate behind first both sides, segmentation installation beam steel web installs a Duan Heng Joist steel web is welded with the last period beam steel web after adjusting plan-position and vertical degree, is installed to diaphragm plate position It sets, diaphragm plate is first installed, so circulation is until all beam steel webs are installed;
Step 3: carrying system transform: after beam steel web is installed, had sizable rigidity, by beam steel abdomen Plate undertakes underplate concrete gravity load as bearing structure, and support arm (beam steel web bracket) unloading turns rack bearing It is changed to the carrying of beam steel web;
Bottom plate hanging bracket includes I-steel outrigger, support pad steel case B and fining twisted steel;
First cross rail top install I-steel outrigger, on it install support pad steel case, from preformed hole under wear fining twisted steel, directly The support pad steel case installed under steel web downside I-shaped gooseneck and crossbeam is extremely passed through, and is installed at the support pad steel case of top and bottom Nut and locking nut make the lateral I-steel of top outrigger and lower part form entirety, further according to bottom plate load to finish rolling screw thread Steel applies prestressing force, undertakes support arm distribution beam system load on outrigger, and pass to steel structure beam, while to crossbeam Steel web bracket carries out falling the separation of Liang Yugang web, completes the conversion of carrying system;
Step 4: underplate concrete pours: after carrying system converts, according to design and code requirement mounting base reinforcing bar and Prestress pipe, and casting concrete;
Step 5: the installation of top plate inner support and support arm are removed: after underplate concrete has some strength, and completing prestressing force After construction, set up continuous brackets on bottom plate, button tubular stent or bowl fastening type bracket can be used in bracket, according to code requirement into Row is set up, and the wooden back side and plank sheathing is arranged according to concrete absolute altitude on top;Support arm (including beam steel web bracket is removed simultaneously With bottom plate hanging bracket);
Step 6: concrete roof pours: after inner support is installed, installing roof steel bar and prestress pipe, and pour mixed Solidifying soil;
Step 7: inner support is removed: being had some strength to concrete roof, and after completing pre-stress construction, is removed inner support.
The present invention has the advantage that the invention discloses one kind be suitable for high tower steel reinforced concrete combination crossbeam Steel Structure Installation and The weak support system and its operating method that bottom, concrete roof pour;The following steps are included: (1) beam steel web branch when implementation Frame installation;(2) beam steel web is installed;(3) system transform is carried;(4) underplate concrete pours;(5) top plate inner support is installed It is removed with support arm;(6) concrete roof pours;(7) inner support is removed;This support system compares traditional high tower steel reinforced concrete and combines cross Boom support system advantage are as follows: 1) undertake the construction loads such as concrete gravity by beam steel web, support arm only considers beam steel Web gravity load and crowd's construction loads, greatly reduce the steel using amount of support system.2) bracket workload greatly reduces, and saves Manually, it shortens the construction period.
Detailed description of the invention
Fig. 1 is weak support system whole implementation elevational schematic view;
Fig. 2 is weak support system whole implementation side schematic view;
Fig. 3 is bottom plate hanging bracket elevational schematic view;
Fig. 4 is bottom plate hanging bracket sectional schematic diagram.
Specific embodiment
Below in conjunction with attached drawing 1- Fig. 4, the present invention is described in detail, technical solution in the embodiment of the present invention into Row clearly and completely describes, it is clear that described embodiments are only a part of the embodiments of the present invention, rather than whole realities Apply example.Based on the embodiments of the present invention, those of ordinary skill in the art are obtained without making creative work Every other embodiment, shall fall within the protection scope of the present invention.
The present invention provides one kind by improvement herein and mixes suitable for high tower steel reinforced concrete combination crossbeam Steel Structure Installation and bottom, top plate The weak support system that solidifying soil pours, the support system include beam steel web bracket and bottom plate hanging bracket;
Wherein, beam steel web bracket includes steel pipe post 1, the horizontal horizontal-associate 2 of column, lateral I-steel 3, unloading Sand Bucket 4, support pad Steel case A5, longitudinal I-steel 6, I-shaped gooseneck 7, I-steel longitudinal direction distribution beam 8, I-steel transverse distribution beam 9 and steel plate bed die 10;
The steel pipe post 1 is vertically connected using ring flange, and with the horizontal horizontal-associate 2 of column is connected as its each steel pipe post 1 whole Body installs lateral I-steel 3 on steel pipe post 1, and installation unloads husky cylinder 4 and support pad steel case A5 on lateral I-steel 3, by unloading Husky cylinder 4 and support pad steel case A5 are as uninstalling system, then longitudinal I-steel 6 is installed on support pad steel case A5, then in longitudinal I-shaped I-shaped gooseneck 7 is installed on steel 6, then I-steel longitudinal direction distribution beam 8 and I-steel transverse distribution beam are installed on I-shaped gooseneck 7 9, in 9 upper berth steel loading plate bed die 10 of I-steel transverse distribution beam;
Wherein, bottom plate hanging bracket includes I-steel outrigger 11, support pad steel case B12 and fining twisted steel 13;First in beam steel I-steel outrigger 11 is installed at the top of structure 14, support pad steel case B12 is installed on I-steel outrigger 11, from I-steel outrigger 11 and branch Fining twisted steel 13 is worn under in the corresponding preformed hole of pad steel case B12, up through 10 downside I-shaped gooseneck of steel plate bed die and cross The support pad steel case A5 installed under beam, and backing plate, nut and lock are installed at the support pad steel case of 13 top and bottom of fining twisted steel Tight nut makes the lateral I-steel of top outrigger and lower part form entirety.
A kind of operating method poured suitable for high tower steel reinforced concrete combination crossbeam Steel Structure Installation and bottom, concrete roof, is pressed Implement according to such as under type;
Step 1: beam steel web bracket installation;It is designed by only consideration beam steel web gravity load and crowd's construction loads Bracket, the bracket include steel pipe post 1, the horizontal horizontal-associate 2 of column, lateral I-steel 3, unloading Sand Bucket 4, support pad steel case A5, longitudinal direction I-steel 6, I-shaped gooseneck 7, I-steel longitudinal direction distribution beam 8, I-steel transverse distribution beam 9 and steel plate bed die 10;All components Shift to an earlier date processing and fabricating, be ready to;Steel pipe post is installed first, column vertically uses ring flange to connect, and with lateral that it is each Column is connected as entirety, after the completion of column construction, installs lateral I-steel, installation on it unloads husky cylinder, support pad steel case conduct Uninstalling system, then longitudinal I-steel is installed, then I-shaped gooseneck is installed, then twice distribution beam in length and breadth is installed, steel plate bottom of mating formation Mould;
Step 2: beam steel web installation;After bracket is set up, segmental hoisting beam steel web;It measures and puts first on bed die Sample beam steel web plane position, then according to sequence intermediate behind first both sides, segmentation installation beam steel web installs a Duan Heng Joist steel web is welded with the last period beam steel web after adjusting plan-position and vertical degree, is installed to diaphragm plate position It sets, diaphragm plate is first installed, so circulation is until all beam steel webs are installed;
Step 3: carrying system transform;After beam steel web is installed, has sizable rigidity, by beam steel abdomen Plate undertakes underplate concrete gravity load as bearing structure, and support arm (beam steel web bracket) unloading turns rack bearing It is changed to the carrying of beam steel web;
Bottom plate hanging bracket includes I-steel outrigger 11, support pad steel case B12 and fining twisted steel 13;
First cross rail top install I-steel outrigger, on it install support pad steel case, from preformed hole under wear fining twisted steel, directly The support pad steel case installed under steel web downside I-shaped gooseneck and crossbeam is extremely passed through, and is installed at the support pad steel case of top and bottom Nut and locking nut make the lateral I-steel of top outrigger and lower part form entirety, further according to bottom plate load to finish rolling screw thread Steel applies prestressing force, undertakes support arm distribution beam system load on outrigger, and pass to steel structure beam, while to crossbeam Steel web bracket carries out falling the separation of Liang Yugang web, completes the conversion of carrying system;
Step 4: underplate concrete pours: after carrying system converts, according to design and code requirement mounting base reinforcing bar and Prestress pipe, and casting concrete;
Step 5: the installation of top plate inner support and support arm are removed: after underplate concrete has some strength, and completing prestressing force After construction, set up continuous brackets on bottom plate, button tubular stent or bowl fastening type bracket can be used in bracket, according to code requirement into Row is set up, and the wooden back side and plank sheathing is arranged according to concrete absolute altitude on top;Support arm (including beam steel web bracket is removed simultaneously With bottom plate hanging bracket);
Step 6: concrete roof pours: after inner support is installed, installing roof steel bar and prestress pipe, and pour mixed Solidifying soil;
Step 7: inner support is removed: being had some strength to concrete roof, and after completing pre-stress construction, is removed inner support.
The present invention provides one kind herein and pours suitable for high tower steel reinforced concrete combination crossbeam Steel Structure Installation and bottom, concrete roof Weak support system.Weak support system material saves, process is simple, short time limit.The present invention compares traditional technological advantage are as follows:
1) loads such as concrete gravity are undertaken by beam steel web itself, support arm only consider crossbeam steel truss girder gravity load and Crowd's construction loads greatly reduces the steel using amount of support system.
2) bracket workload greatly reduces, and saves manually, shortens the construction period.
The foregoing description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, of the invention It is not intended to be limited to the embodiments shown herein, and is to fit to and the principles and novel features disclosed herein phase one The widest scope of cause.

Claims (2)

1. a kind of weak support system poured suitable for high tower steel reinforced concrete combination crossbeam Steel Structure Installation and bottom, concrete roof, Be characterized in that: the support system includes beam steel web bracket and bottom plate hanging bracket;
Wherein, beam steel web bracket includes steel pipe post (1), the horizontal horizontal-associate of column (2), lateral I-steel (3), unloading Sand Bucket (4), support pad steel case A(5), longitudinal I-steel (6), I-shaped gooseneck (7), I-steel longitudinal direction distribution beam (8), I-steel laterally point With beam (9) and steel plate bed die (10);
The steel pipe post (1) is vertically connected using ring flange, and is connected its each steel pipe post (1) with the horizontal horizontal-associate of column (2) It is connected in entirety, lateral I-steel (3) is installed on steel pipe post (1), installation unloads husky cylinder (4) and branch on lateral I-steel (3) Pad steel case A(5), by unloading husky cylinder (4) and support pad steel case A(5) be used as uninstalling system, then in support pad steel case A(5) on installation longitudinal direction I-steel (6) then installs I-shaped gooseneck (7) on longitudinal I-steel (6), then installs I-shaped on I-shaped gooseneck (7) Steel longitudinal direction distribution beam (8) and I-steel transverse distribution beam (9), in I-steel transverse distribution beam (9) upper berth steel loading plate bed die (10);
Wherein, bottom plate hanging bracket includes I-steel outrigger (11), support pad steel case B(12) and fining twisted steel (13);Exist first I-steel outrigger (11) are installed at the top of crossbeam steel construction (14), support pad steel case B(12 is installed on I-steel outrigger (11)), from work Word steel outrigger (11) and support pad steel case B(12) in corresponding preformed hole under wear fining twisted steel (13), up through steel plate bed die (10) the support pad steel case A(5 that installs under downside I-shaped gooseneck and crossbeam), and the branch at the top and bottom of fining twisted steel (13) It pads and backing plate, nut and locking nut is installed at steel case, the lateral I-steel of top outrigger and lower part is made to form entirety.
2. a kind of operating method poured suitable for high tower steel reinforced concrete combination crossbeam Steel Structure Installation and bottom, concrete roof, special Sign is;Implement as follows;
Step 1: beam steel web bracket installation;It is designed by only consideration beam steel web gravity load and crowd's construction loads Bracket, the bracket include steel pipe post (1), the horizontal horizontal-associate of column (2), lateral I-steel (3), unloading Sand Bucket (4), support pad steel case A(5), longitudinal I-steel (6), I-shaped gooseneck (7), I-steel longitudinal direction distribution beam (8), I-steel transverse distribution beam (9) and steel Plate bed die (10);All components shift to an earlier date processing and fabricating, are ready to;Steel pipe post is installed first, column vertically uses ring flange Connection, and its each column is connected as entirety with lateral, after the completion of column construction, lateral I-steel is installed, installation is unloaded on it It carries that husky cylinder, support pad steel case is as uninstalling system, then longitudinal I-steel is installed, then installation I-shaped gooseneck, then install in length and breadth two Road distribution beam, steel plate bed die of mating formation;
Step 2: beam steel web installation;After bracket is set up, segmental hoisting beam steel web;It measures and puts first on bed die Sample beam steel web plane position, then according to sequence intermediate behind first both sides, segmentation installation beam steel web installs a Duan Heng Joist steel web, after adjusting plan-position and vertical degree, with the last period
Beam steel web is welded, and is installed to tabula Board position, is first installed diaphragm plate, and so circulation is until all beam steel abdomens Plate is installed;
Step 3: carrying system transform;After beam steel web is installed, has sizable rigidity, by beam steel abdomen Plate undertakes underplate concrete gravity load as bearing structure, and support arm (beam steel web bracket) unloading turns rack bearing It is changed to the carrying of beam steel web;
Bottom plate hanging bracket includes I-steel outrigger (11), support pad steel case B(12) and fining twisted steel (13);
First cross rail top install I-steel outrigger, on it install support pad steel case, from preformed hole under wear fining twisted steel, directly The support pad steel case installed under steel web downside I-shaped gooseneck and crossbeam is extremely passed through, and is installed at the support pad steel case of top and bottom Nut and locking nut make the lateral I-steel of top outrigger and lower part form entirety, further according to bottom plate load to finish rolling screw thread Steel applies prestressing force, undertakes support arm distribution beam system load on outrigger, and pass to steel structure beam, while to crossbeam Steel web bracket carries out falling the separation of Liang Yugang web, completes the conversion of carrying system;
Step 4: underplate concrete pours;After carrying system converts, according to design and code requirement mounting base reinforcing bar and Prestress pipe, and casting concrete;
Step 5: the installation of top plate inner support and support arm are removed;After underplate concrete has some strength, and complete prestressing force After construction, set up continuous brackets on bottom plate, button tubular stent or bowl fastening type bracket can be used in bracket, according to code requirement into Row is set up, and the wooden back side and plank sheathing is arranged according to concrete absolute altitude on top;Support arm (including beam steel web bracket is removed simultaneously With bottom plate hanging bracket);
Step 6: concrete roof pours;After inner support is installed, roof steel bar and prestress pipe are installed, and pour mixed Solidifying soil;
Step 7: inner support is removed;Have some strength to concrete roof, and after completing pre-stress construction, removes inner support.
CN201910342186.1A 2019-04-26 2019-04-26 Weak bracket system suitable for high-tower reinforced concrete combined beam steel structure installation and bottom and top plate concrete pouring and operation method thereof Active CN109914244B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910342186.1A CN109914244B (en) 2019-04-26 2019-04-26 Weak bracket system suitable for high-tower reinforced concrete combined beam steel structure installation and bottom and top plate concrete pouring and operation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910342186.1A CN109914244B (en) 2019-04-26 2019-04-26 Weak bracket system suitable for high-tower reinforced concrete combined beam steel structure installation and bottom and top plate concrete pouring and operation method thereof

Publications (2)

Publication Number Publication Date
CN109914244A true CN109914244A (en) 2019-06-21
CN109914244B CN109914244B (en) 2023-12-05

Family

ID=66978471

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910342186.1A Active CN109914244B (en) 2019-04-26 2019-04-26 Weak bracket system suitable for high-tower reinforced concrete combined beam steel structure installation and bottom and top plate concrete pouring and operation method thereof

Country Status (1)

Country Link
CN (1) CN109914244B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110965474A (en) * 2019-11-28 2020-04-07 中铁广州工程局集团有限公司 Construction method of cable tower cross beam
CN111335166A (en) * 2020-03-09 2020-06-26 浙江交工集团股份有限公司 Construction method using self-bearing structure as temporary support
CN112323640A (en) * 2020-11-10 2021-02-05 中交二公局第三工程有限公司 Construction method for temporary cable-stayed corrugated steel web bridge through closure of web in advance
CN113356055A (en) * 2021-07-19 2021-09-07 中铁二院工程集团有限责任公司 Suspension bridge tower and construction method thereof
CN116411517A (en) * 2023-02-18 2023-07-11 中国铁建港航局集团有限公司 Concrete beam bracket-free integral lifting construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100820299B1 (en) * 2007-05-15 2008-04-08 삼성물산 주식회사 Temporary structure and precast concrete beam of pylon setting method using the bracket
CN101210418A (en) * 2007-12-25 2008-07-02 赵志茹 Non-floor-bracket construction method for suspension bridge tower frame cross beam
ES2424774A1 (en) * 2012-04-02 2013-10-08 Ulma C Y E, S. Coop Movable structure suitable for supporting a formwork of a new bridge section in cantilever
CN107401121A (en) * 2017-07-24 2017-11-28 中交第二航务工程局有限公司 A kind of beam prefabricated cast-in-place design and construction methods of U
CN207277197U (en) * 2017-07-13 2018-04-27 山西路桥建设集团有限公司 A kind of operating platform suitable for the installation of high pier Wavelike steel webplate cantilever
CN210177367U (en) * 2019-04-26 2020-03-24 四川路桥华东建设有限责任公司 Weak support system suitable for installation of steel structure of high tower steel-concrete combined beam

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100820299B1 (en) * 2007-05-15 2008-04-08 삼성물산 주식회사 Temporary structure and precast concrete beam of pylon setting method using the bracket
CN101210418A (en) * 2007-12-25 2008-07-02 赵志茹 Non-floor-bracket construction method for suspension bridge tower frame cross beam
ES2424774A1 (en) * 2012-04-02 2013-10-08 Ulma C Y E, S. Coop Movable structure suitable for supporting a formwork of a new bridge section in cantilever
CN207277197U (en) * 2017-07-13 2018-04-27 山西路桥建设集团有限公司 A kind of operating platform suitable for the installation of high pier Wavelike steel webplate cantilever
CN107401121A (en) * 2017-07-24 2017-11-28 中交第二航务工程局有限公司 A kind of beam prefabricated cast-in-place design and construction methods of U
CN210177367U (en) * 2019-04-26 2020-03-24 四川路桥华东建设有限责任公司 Weak support system suitable for installation of steel structure of high tower steel-concrete combined beam

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
孙启祥;吴杰;刁琥;: "轨道交通钢-砼叠合梁砼顶板无支架法施工技术", 中国科技信息, no. 08 *
贾立峰;王子相;: "双边主梁式组合梁斜拉桥设计关键技术", 公路, no. 05 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110965474A (en) * 2019-11-28 2020-04-07 中铁广州工程局集团有限公司 Construction method of cable tower cross beam
CN111335166A (en) * 2020-03-09 2020-06-26 浙江交工集团股份有限公司 Construction method using self-bearing structure as temporary support
CN112323640A (en) * 2020-11-10 2021-02-05 中交二公局第三工程有限公司 Construction method for temporary cable-stayed corrugated steel web bridge through closure of web in advance
CN112323640B (en) * 2020-11-10 2023-11-07 中交二公局第三工程有限公司 Construction method for temporary cable-stayed corrugated steel web bridge advanced closure web
CN113356055A (en) * 2021-07-19 2021-09-07 中铁二院工程集团有限责任公司 Suspension bridge tower and construction method thereof
CN116411517A (en) * 2023-02-18 2023-07-11 中国铁建港航局集团有限公司 Concrete beam bracket-free integral lifting construction method

Also Published As

Publication number Publication date
CN109914244B (en) 2023-12-05

Similar Documents

Publication Publication Date Title
CN109914244A (en) A kind of weak support system and its operating method poured suitable for high tower steel reinforced concrete combination crossbeam Steel Structure Installation and bottom, concrete roof
CN107401113B (en) Stiff skeleton straining beam structure and construction method built in a kind of high pier
CN105113388B (en) Formwork and bracket combining structure of vase pier of viaduct and application method
CN105350454B (en) Steel arch rib outer wrapped concrete construction method for steel trussed arch bridge
CN108729353A (en) A kind of General reinforced cage binding moulding bed
CN107653781A (en) Big steel pipe truss and construction method for bent cap cast-in-place construction
CN105649213B (en) A kind of construction method of intensive cloth muscle area large-scale steel structure built-in fitting
CN108978471A (en) A kind of support device and its installation method increasing cable-stayed bridge abnormity Sarasota rigidity
CN107012889A (en) The construction method and piping lane construction template component of piping lane
CN205636474U (en) Assembled bracket structure
CN109736206A (en) Wavelike steel webplate continuous bridge end bay closes up cast-in-place support structure and construction method
CN110172912A (en) A kind of solid pier capping beam processing construction method
CN106592867A (en) Construction method of reinforced concrete beam
CN105780922A (en) Construction method for segmental formwork hoisting system of large-span steel reinforced concrete transfer truss
CN103469735A (en) Method for mounting curve ultrahigh hollow column plate type pier top solid section template
CN107882328A (en) The construction method of large span steel truss overhung construction
CN104594635B (en) A kind of high-storey building frame structure construction method
CN105442453A (en) Construction method for suspension bridge tower crossbeam combination support
CN106939557B (en) A kind of pin-connected panel bracket casting platform of brace support
CN102936953B (en) Construction method of a bridging-arm stiffened steel structure template
CN207452684U (en) Stiff skeleton straining beam structure built in high pier
CN208152105U (en) A kind of walls concrete horizontal construction joint steel plate for sealing water fixed structure
CN104847111B (en) Construction method for coupling beam between shear wall limbs
CN105370027A (en) Construction method for integrally lifted and supported steel platform structure in high-rise suspended structure
CN205224073U (en) Mould is fixed to contact net

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant