CN105113388B - Formwork and bracket combining structure of vase pier of viaduct and application method - Google Patents

Formwork and bracket combining structure of vase pier of viaduct and application method Download PDF

Info

Publication number
CN105113388B
CN105113388B CN201510596197.4A CN201510596197A CN105113388B CN 105113388 B CN105113388 B CN 105113388B CN 201510596197 A CN201510596197 A CN 201510596197A CN 105113388 B CN105113388 B CN 105113388B
Authority
CN
China
Prior art keywords
template
upper bracket
lower carriage
curved section
bent cap
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510596197.4A
Other languages
Chinese (zh)
Other versions
CN105113388A (en
Inventor
姚军
褚新法
柳淑波
冉平
郭志奇
成水武
冯杰
林雷洪
杜云飞
陈舟舟
段群苗
周勤
周一勤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Communication Engineering Construction Group Co Ltd
Original Assignee
Ningbo Communication Engineering Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Communication Engineering Construction Group Co Ltd filed Critical Ningbo Communication Engineering Construction Group Co Ltd
Priority to CN201510596197.4A priority Critical patent/CN105113388B/en
Publication of CN105113388A publication Critical patent/CN105113388A/en
Application granted granted Critical
Publication of CN105113388B publication Critical patent/CN105113388B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a formwork and bracket combining structure of a vase pier of a viaduct and an application method, and belongs to the field of construction of vase piers of urban viaducts. The formwork and bracket combining structure comprises a lower bracket, a curve section formwork bracket, an upper bracket, cover beam side formwork brackets and a cover beam bottom formwork bracket, wherein the lower bracket is mounted at the tops of straight line section formworks for allowing straight line section pier columns to be cast; the curve section formwork bracket is arranged on the lower bracket and used for allowing curve section formworks to be mounted; the upper bracket is mounted at the tops of the curve line section formworks for allowing curve line section pier columns to be cast; the cover beam side formwork brackets and the cover beam bottom formwork bracket are arranged on the upper bracket and used for allowing a cover beam formwork to be mounted. Through the design of the formwork and bracket combining structure and the combination between the formwork and bracket combining structure and a corresponding application method, the construction of the vase pier can be perfectly realized, and the formwork and bracket combining structure and the application method do not need to occupy a large construction region space, so that the pass of construction vehicles is facilitated. The formwork and bracket combining structure further has the advantages of being simple in construction, convenient to use, safe in structure, economical, reasonable and the like, can reflect normalized and standardized construction, and has high economic benefits and high social benefits.

Description

Overpass vase pier falsework co-ordinative construction and using method
Technical field
The present invention relates to a kind of urban viaduct vase pier construction field, specifically refer to overpass vase pier falsework connection Close structure and using method.
Background technology
In the big small city of modernization, congested in traffic, building is intensive, and street is difficult to widen, therefore is carrying out city During city's Viaduct Design, first it is also contemplated that impact to landscape, secondly will in the detailing requiments considering structure itself and intensity While asking, also need to focus on the design of bridge, being placed on extrusion position to the Beautification design of structure, and as far as possible and peripheral edge ring Border is uniformly coordinated, and combines together.Mechanical Builds and each spot size ratio should be mutually coordinated, and girder construction unfolds smoothness, are particular about Its line style, infrastructure is succinctly light and handy, and permeability is good, so that overpass becomes the beautiful scenery together in city.
At present, overpass superstructure generally uses the beam type bridge construction such as box beam or t beam, and pattern is flat, dull, bottom The bridge pier of structure to beautification overpass will play an important role, and profile similar in appearance to vase vase pier can bear top knot The load of structure, can reserve enough spaces to surface road again, under the heavy superstructure of overpass that is narrow, constraining, More seem attractive in appearance, smooth, spacious, allow people be rich in active, slim and graceful and pure and fresh sensation, therefore be widely used.
Vase pier is a kind of special pillarwork of comparison, is made up of linear graceful, lightly very thin queen post and bent cap, Make a big difference with open side type entity pier stud or queen post pier stud in structure.Vase pier reinforcing bar gathers, and content is high, and curve is special-shaped Number of steel bars and joint are many, and constructing operation process is numerous and diverse, and construction and operation stage force-bearing situation are complicated, for outward appearance and inherent matter Amount requires very high.Just because of these particularity, existing vase pier construction generally requires sets up floor stand, constructing operation people Member carries out pier stud and capping beam template, reinforcement installation operation and bent cap prestressed stretch-draw on floor stand, and floor stand is also simultaneously Load-carrying members as outer outstanding curve pier stud and Coping Construction.And setting up of floor stand needs basement process, to avoid propping up Frame sedimentation causes pier stud and the generation in bent cap crack, and floor stand occupies larger construction area space, affects work car Current, unfavorable construction operation.
Meanwhile, the construction method of existing open side type entity pier stud or the no rack template support combination of two columned pier bent cap, such as Pre-buried method, Hold Hoop method, suspension method etc. are not suitable for the construction of vase pier, and its major defect is: pre-buried method need to be arranged in pier stud Bracket is set through the shaped steel of pier stud or on pier stud, using the supporter as template and support, has larger damage to pier stud, Also affect attractive in appearance;Hold Hoop method be pier stud suitable position install anchor ear and be allowed to and pier stud clamping, using between anchor ear and pier stud Frictional force template and bent cap weight supporting are reached pier stud, this is difficult to provide enough frictional force for very thin vase pier pier stud Safely transmit load, also can damage the concrete on pier stud surface and affect attractive in appearance;Suspension method needs pre-buried shaped steel in pier stud, There is provided suspension force with support shuttering and bent cap weight by pre-buried shaped steel, and the section of vase pier pier stud is little, pier stud reinforcing bar itself is close Cloth, is curved profile it is difficult to provide the embedding space of shaped steel again, and the stress of shaped steel may make pier stud produce crack, unfavorable Structure safety.And, for single construction with regard to pier stud, i.e. the pier stud of no bent cap, the high pier of some entities or Hollow High Pier generally adopt No support sliding formwork or over-form construction, also has the way setting up operating platform in template, but this ease of Use platform bearer energy Power is low, is not also suitable for the construction of vase pier tiny curve pier stud, also sets up needed for bent cap and Coping Construction because on vase pier Bent cap support and have the bent cap stretch-draw prestressing force equipment of larger construction loads.
Content of the invention
The technical problem to be solved is to overcome the defect of prior art and provides a kind of simple structure, use Convenience, structure safety, the overpass vase pier falsework co-ordinative construction of economical rationality and using method.
The technical problem of the present invention is achieved through the following technical solutions:
A kind of overpass vase pier falsework co-ordinative construction, including cushion cap, pours two pier studs being connected on cushion cap And pouring the bent cap being connected between two pier studs, every described pier stud is all by straightway pier stud and curved section pier stud structure Become, this straightway pier stud is to pour shaping by the straight-line segment template being arranged on cushion cap, this curved section pier stud is straight by being connected to Curved section template in line segment template pours shaping, and this bent cap is by the capping beam template being coupled across in two curved section templates Pour shaping, lower carriage is installed between the described straight-line segment template top of two pier studs, this lower carriage is provided with two curves Section template, installs upper bracket between two described curved section die head, this upper bracket is provided with for described capping beam template peace The bent cap side falsework of dress and bent cap bed die board mount.
Described lower carriage includes lower carriage crossbeam, many lower carriage pull bars, lower carriage longeron, lower carriage platform and lower Frame railing, described lower carriage crossbeam is two I-steel being horizontally placed at two straight-line segment template top outer, and lower carriage is horizontal Beam is interconnected with the top outer of straight-line segment template, and many described lower carriage pull bars pass through the reserved of straight-line segment template top Hole tension is connected on lower carriage crossbeam, and described lower carriage longeron is many and lays and be fixed on the groove on lower carriage crossbeam Steel, described lower carriage platform is steel plate on lower carriage longeron for the connect setting, and described lower carriage railing is to enclose to set installation In the frame-type railing of lower carriage platform periphery, outside this lower carriage railing, wrap up anti-falling screen.
Described upper bracket include upper bracket collet, upper bracket crossbeam, many upper bracket pull bars, upper bracket longeron, upper Body panel and upper bracket railing, described upper bracket collet is arranged on outside curved section die head so that upper bracket crossbeam props up Support acts on, and described upper bracket crossbeam is two I-steel being horizontally placed at outside two curved section die head, and described is many Root upper bracket pull bar is connected on upper bracket crossbeam by the tension of the preformed hole of curved section die head, described upper bracket longeron Lay and be fixed on the channel-section steel on upper bracket crossbeam for many, described upper bracket platform is connect setting on upper bracket longeron Steel plate, described upper bracket railing be enclose set be arranged on upper bracket platform periphery frame-type railing, outside this upper bracket railing Anti-falling screen is wrapped up in side.
It is provided with multiple medium-height trestles between described upper bracket and lower carriage.
Described capping beam template includes bent cap facade template, bent cap side template and bent cap end template, described bent cap facade Template is facade strip, and bottom is supported on upper bracket, and described bent cap side template is rectangle, is provided with installation and supports outside it Bent cap side falsework, this bent cap side falsework is arranged on upper bracket, and described bent cap end template facade is arch, its Bottom is provided with installs the bent cap bed die board mount supporting, and this bent cap bed die board mount is arranged on upper bracket.
Described straight-line segment template is to be assembled by the straight tubular construction of hollow of 2 ~ 4 pieces of interconnections, this straightway mould Plate bottom is arranged on cushion cap, straight-line segment template top junction curve section template.
Described curved section template is to be assembled by the curved hollow tubular construction of 2 ~ 4 pieces of interconnections, this curved section Template bottom connects straight-line segment template, and curved section template top connects capping beam template, is provided with installation outside curved section template The curved section falsework of support, this curved section falsework is arranged on lower carriage.
For the upper and lower ladder cage of constructing operation person walks, this ladder cage is made up of steel material for described vase pier side setting Rectangular frame, outside ladder cage wrap up anti-falling screen, be provided with the ladder of extension of spiraling from bottom to top in ladder cage, ladder cage bottom sets There is locking movable pulley, ladder cage side is just provided with dodge gate to the position of lower carriage and upper bracket.
Described bent cap is to be molded with bent cap framework of steel reinforcement and concreting by capping beam template, this bent cap placed on top Floorings, bent cap facade is elongated, and the bottom surface that bent cap is located between two pier studs is set to arcuate surface, outside two difference of bent cap The outside cantilever stretching out two pier studs is rectangular;Described cushion cap is to be become with concreting with cushion cap reinforcing bar by cushion cap template Type, the embedded bar of pier stud reserved by this cushion cap reinforcing bar;Described straightway pier stud is with straightway reinforcing bar by straight-line segment template Skeleton and concreting shaping;Described curved section pier stud is with curved section framework of steel reinforcement and concrete by curved section template Pour shaping;Described cushion cap, straightway pier stud, curved section pier stud and bent cap collectively form the vase pier of overpass.
A kind of using method of overpass vase pier falsework co-ordinative construction, it comprises the steps:
Step one, formulation vase pier falsework co-ordinative construction arrangement and method for construction:
1. calculation template support co-ordinative construction, the design feature according to vase pier and quality requirement are designed, in conjunction with construction behaviour Make operation, the stressing conditions of analysis construction stage load and structure, design overpass vase pier falsework co-ordinative construction, pass through Finite element software calculates straight-line segment template, curved section template, lower carriage, the stress of upper bracket and deformation data, need to meet structure The stress of component and deformation requirements, make and rigging support co-ordinative construction associated components, and check qualified;
2. cushion cap reinforcing bar reserve, casting concrete, cushion cap reinforcing bar reserve pier stud embedded bar treat the straightway with pier stud Framework of steel reinforcement connects;
3. pier stud straightway framework of steel reinforcement, curved section framework of steel reinforcement and bent cap framework of steel reinforcement are made;
Step 2, two straightway pier stud constructions:
1. lift the straightway framework of steel reinforcement of straightway pier stud, and the embedded bar reserving pier stud with cushion cap reinforcing bar uses steel Muscle sleeve connection, the installation site of straightway framework of steel reinforcement must check qualified, straightway framework of steel reinforcement reserved pier with cushion cap reinforcing bar It is qualified that the quality of connection of the reinforced bar sleeve that the embedded bar of post is connected also must be checked;
2. polylith straight-line segment template loop wheel machine is hung at the straightway pier stud at cushion cap top, and be sequentially connected using bolt Polylith straight-line segment template, position adjustment accurately, forms firm straight-line segment template structure, the installation quality of straight-line segment template must inspection It is qualified to test;
3. using in pump truck pump concrete to straight-line segment template, health one week, treat that concrete strength reaches design strength More than 70% can carry out lower step construction;
, to straightway pier stud, locking movable pulley fixed ladder cage location is with convenient construction operator for step 3, mobile ladder cage Ladder cage carries out constructing operation to member up and down;
Step 4, installation lower carriage:
1. loop wheel machine hangs in two I-steel as lower carriage crossbeam, by outside the top with straight-line segment template for the lower carriage crossbeam Side uses bolt connection, more lower carriage pull bars is passed through the preformed hole at straight-line segment template top, and screws lower carriage crossbeam On lower carriage pull bar, fixedly secure lower carriage crossbeam in the top of straight-line segment template;
2. it is provided as the many channel-section steels for lower carriage longeron on lower carriage crossbeam upper berth, and by many channel-section steels and lower carriage crossbeam Using bolt connection;
3. the many channel-section steel upper berths in lower carriage longeron are provided as the steel plate for lower carriage platform, and steel plate is indulged with lower carriage Beam uses bolt connection;
4. the frame-type railing that lower carriage railing forms for steel pipe, using being bolted to lower carriage longeron and lower On body panel, and enclose and set the periphery being arranged on lower carriage platform, anti-falling screen is wrapped up in outside, be personnel's construction safety and protection is small-sized Object falls and is used;
5. installation curve section falsework, this curved section falsework is installed and is supported curved section template, and curved section template is propped up Frame bottom is fixed by bolts on lower carriage longeron;
Step 5, two pier stud curved section constructions:
1. lift the curved section framework of steel reinforcement of curved section pier stud, the straightway framework of steel reinforcement completing uses reinforcing bar with constructing Sleeve connection, the installation site of curved section framework of steel reinforcement must inspection qualified, curved section framework of steel reinforcement and the straight line completing of having constructed It is qualified that the quality of connection of the reinforced bar sleeve that section framework of steel reinforcement is connected also must be checked;
2. polylith curved section template loop wheel machine is hung in straight-line segment template top, and be sequentially connected polylith curve using bolt Section template, position adjustment accurately, forms firm curved section formwork structure, and the installation quality palpus inspection of curved section template is qualified;
3. using in pump truck pump concrete to curved section template, health one week, treat that concrete strength reaches design strength More than 70% can carry out lower step construction;
Step 6, installation upper bracket:
1. loop wheel machine hangs in two I-steel as upper bracket crossbeam, by outside the top with curved section template for the upper bracket crossbeam Side uses bolt connection, more upper bracket pull bars is passed through the preformed hole of curved section die head, and screws upper bracket crossbeam On upper bracket pull bar, fixedly secure upper bracket crossbeam in the top of curved section template;
2. it is provided as the many channel-section steels for upper bracket longeron on upper bracket crossbeam upper berth, and by many channel-section steels and upper bracket crossbeam Using bolt connection;
3. the many channel-section steel upper berths in upper bracket longeron are provided as the steel plate for upper bracket platform, and steel plate is indulged with upper bracket Beam uses bolt connection;
4. the frame-type railing that upper bracket railing forms for steel pipe, is arranged on upper bracket longeron and upper using bolt On body panel, and enclose and set the periphery being arranged on upper bracket platform, anti-falling screen is wrapped up in outside, be personnel's construction safety and protection is small-sized Object falls and is used;
5. bent cap side falsework is installed, bent cap side falsework bottom is fixed by bolts on upper bracket longeron;
6. bent cap bed die board mount is installed, bent cap end template frame bottom bolt is arranged on upper bracket longeron;
Step 7, Coping Construction:
1. bent cap side template is installed respectively on bent cap side falsework, bent cap bed die is installed on bent cap bed die board mount Plate, installs bent cap facade template, bent cap side template, bent cap end template and bent cap facade template collectively form on upper bracket longeron Capping beam template and installation quality must inspection qualified;
2. bent cap framework of steel reinforcement, position are hung in loop wheel machine in bent cap side template, bent cap end template and bent cap facade template Adjustment is accurate, and bent cap framework of steel reinforcement and curved section framework of steel reinforcement top use steel wire lashing firmly, and it is qualified that installation quality must be checked;
3. using in pump truck pump concrete to capping beam template, health one week, treat that concrete strength reaches design strength More than 70% can carry out lower step construction;
Step 8, remove capping beam template, upper bracket, curved section template, lower carriage and straight successively according to the opposite sequence installed Line segment template simultaneously concentrates placement, goes to next vase pier through the maintaining Later Zhou Dynasty, one of the Five Dynasties and uses.
Compared with prior art, the present invention devises a kind of falsework connection being applied to the construction of urban viaduct vase pier Close structure, it is mainly installed lower carriage at the straight-line segment template top pouring straightway pier stud and is arranged on lower carriage simultaneously For the curved section falsework of curved section model sheetinstallat, then install in the curved section die head pouring curved section pier stud Frame and the bent cap side falsework being arranged on upper bracket and installing for capping beam template and bent cap bed die board mount, by setting Count above-mentioned falsework co-ordinative construction and just perfect can realize the construction of vase pier with reference to corresponding using method, and this Plant falsework co-ordinative construction and using method to be not required to occupy larger construction area space in construction, favourable Construction traffic leads to OK, and also there is simple structure, easy to use, structure safety, economical rationality, the advantages of embody regulation and standardization and construct, Therefore there is higher economic benefit and social benefit.
Brief description
Fig. 1 is the structural representation of the present invention.
Fig. 2 is a direction view of Fig. 1.
Fig. 3 is the structural representation of ladder cage.
Fig. 4 is vase pier Application Example structural representation.
Fig. 5 is the using method flow chart of the present invention.
Specific embodiment
By above-mentioned accompanying drawing, the embodiment of the present invention will be elaborated again below.
As shown in Fig. 1 ~ Fig. 5,1. cushion cap, 11. cushion cap reinforcing bars, 2. pier stud, 21. straightway pier studs, 22. straightway reinforcing bars Frame, 23. curved section pier studs, 24. curved section frameworks of steel reinforcement, 3. bent cap, 31. bent cap frameworks of steel reinforcement, 4. capping beam template, 41. bent caps Bed die board mount, 42. bent cap facade templates, 43. bent cap end templates, 44. bent cap side falseworks, 45. bent cap side templates, 5. go up Support, 51. upper bracket pull bars, 52. upper bracket platforms, 53. upper bracket railings, 54. upper bracket longerons, 55. upper bracket crossbeams, 56. upper bracket collets, 6. curved section falsework, 7. curved section template, 8. lower carriage, 81. lower carriage platforms, 82. lower carriages Railing, 83. lower carriage longerons, 84. lower carriage crossbeams, 85. lower carriage pull bars, 9. straight-line segment template, 10. ladder cage.
Overpass vase pier falsework co-ordinative construction and using method, relate to one kind and are used for building overpass vase pier Form of construction work, it mainly includes the falsework co-ordinative construction shown in falsework co-ordinative construction and Fig. 5 shown in Fig. 1, Fig. 2 This two parts of using method.
The vase pier structure of described overpass is by cushion cap 1, pours two pier studs 2 being connected on cushion cap and pour connection Bent cap 3 between two pier studs is constituted.
Wherein, cushion cap 1 is reinforced concrete structure, and its underpart is pile foundation, and cushion cap 1 is used for connecting pile foundation and two pier studs 2, Cushion cap template, colligation cushion cap reinforcing bar 11 can be set after the completion of pile foundation, be then molded with concreting, cushion cap reinforcing bar 11 needs The embedded bar of reserved pier stud 2.
The dimensional structure of two pier studs 2 is identical, is all the curved section pier on straightway pier stud 21 by bottom and top Post 23 is constituted, and this straightway pier stud 21 bottom is connected with cushion cap 1, and curved section pier stud 23 top is connected with bent cap 3, and two Individual curved section pier stud 23 is opposite and is bent outwardly setting, therefore the profile that two pier studs 2 design on cushion cap 1 is lightly attractive in appearance, and Straightway pier stud 21 is to be become with concreting with straightway framework of steel reinforcement 22 by the straight-line segment template 9 being arranged on cushion cap 1 Type, curved section pier stud 23 is with curved section framework of steel reinforcement 24 and coagulation by the curved section template 7 being connected in straight-line segment template 9 Soil pours shaping.
Described bent cap 3 is with bent cap framework of steel reinforcement by the capping beam template 4 being coupled across in two curved section templates 7 31 and concreting shaping, bent cap 3 bottom is connected with curved section pier stud 23 top of two pier studs 2, bent cap 3 placed on top Floorings, bent cap 3 facade is elongated, and it is attractive in appearance to be lifted that the bottom surface being located between two pier studs 2 in bent cap 3 is set to arcuate surface Property, two outside cantilevers overhanging two pier studs 2 respectively of bent cap 3 are rectangular.
Above-mentioned cushion cap reinforcing bar 11, straightway framework of steel reinforcement 22, curved section framework of steel reinforcement 24 and bent cap framework of steel reinforcement 31 are all Topmost stressed member, in order to ensure quality and convenient construction, by the profile according to cushion cap 1, pier stud 2 and bent cap 3 in factory Different and correspondingly make shaping, then be transported to behind job site by transport vehicle appointed part is hung to by loop wheel machine, cushion cap reinforcing bar 11, Be connected with each other using reinforced bar sleeve between straightway framework of steel reinforcement 22 and curved section framework of steel reinforcement 24, bent cap framework of steel reinforcement 31 with bent Line segment framework of steel reinforcement 24 top uses steel wire lashing firm.
Above-mentioned cushion cap template, straight-line segment template 9, curved section template 7, capping beam template 4 are to pour cushion cap 1, pier for correspondence Post 2 and the mould of these composition vase pier shaped member concrete of bent cap 3, and entered according to the exact shape of pier stud 2 and bent cap 3 Row design, is steel, is made by template material, section steel material and connector.
Above-mentioned concrete is the primary structural material of vase pier, is transported to job site, pump truck by batching plant's mixing transport vehicle It is pumped in straight-line segment template 9, pour in curved section template 7 and in capping beam template 4, solidify to form vase pier structure.
Described straight-line segment template 9 is the straight tubular construction of hollow, in short transverse linear uiform section, section and straightway The cross sectional shape of pier stud 21 is identical, and inner section size is identical with the section of straightway pier stud 21;Straight-line segment template 9 hollow straight tube shape Structure is to be assembled by 2 ~ 4 pieces, and beneficial to assembling and dismounting, this assembly type multi-section structure, the height often saving is all by straight line The total height of section template 9 determines, often saves and is connected between adjacent straight-line segment template 9 firmly.
Described curved section template 7 is curved hollow tubular construction, identical with curved section pier stud 23 profile in short transverse, Section is identical with the cross sectional shape of curved section pier stud 23, and inner section size is identical with the section of curved section pier stud 23;Curved section mould Plate 7 bending tubular construction is to be assembled by 2 ~ 4 pieces, beneficial to assembling and dismounting, this assembly type multi-section structure, the height often saving It is all to be determined by the total height of curved section template 7, often save and be connected between adjacent curved section template 7 firmly.
Described capping beam template 4 includes bent cap facade template 42, bent cap side template 45 and bent cap end template 43;Wherein, cover Beam facade template 42 is facade strip, and short transverse inner section size is equivalently-sized with the short transverse of bent cap 3, and bottom supports On the upper bracket longeron 54 of upper bracket 5;Bent cap side template 45 is rectangle, the section phase of inner section size and curved section pier stud 23 With outside is provided with installs the bent cap side falsework 44 supporting, and this bent cap side falsework is arranged on upper bracket 5 by bolt On upper bracket longeron 54;Bent cap end template 43 facade be arch, between length dimension and two curved section pier stud 23 tops away from From identical, width is identical with bent cap 3 bottom width, is provided with the bottom of bent cap end template 43 and installs the bent cap end template supporting and prop up Frame 41, this bent cap bed die board mount is arranged on the upper bracket longeron 54 of upper bracket 5 by bolt.
Between two described straight-line segment template 9 tops, lower carriage 8 is installed, this lower carriage is provided with for two curved sections The curved section falsework 6 that template 7 is installed;Described lower carriage 8 include lower carriage crossbeam 84, many lower carriage pull bars 85, under Support longeron 83, lower carriage platform 81 and lower carriage railing 82;Wherein, lower carriage crossbeam 84 is the I-steel of two levels along two The direction extension of root pier stud 2 is placed in two straight-line segment template 9 top outer, is specifically placed in the shaped steel portion of straight-line segment template 9 On part, the inboard width of two I-steel is identical with the external dimensions of straight-line segment template 9, and I-steel is outer with straight-line segment template 9 Side uses bolt connection firmly, and two I-steel reuse many lower carriage pull bars 85 and connect, and this many lower carriage pull bars pass through The preformed hole tension at straight-line segment template 9 top is connected on lower carriage crossbeam 84, and lower carriage crossbeam 84 is strained firm;Lower Frame longeron 83 is the many channel-section steels being laid on lower carriage crossbeam 84, and this many channel-section steels are bolted with lower carriage crossbeam 84 Firmly;Lower carriage platform 81 is steel plate on lower carriage longeron 83 for the connect setting, and this steel plate passes through bolt and lower carriage longeron 83 are connected firmly, and what the size of lower carriage platform 81 met constructing operation personnel, small-sized machine and instrument etc. operates with requirement; The frame-type railing that lower carriage railing 82 forms for steel pipe, is arranged on lower carriage longeron 83 and lower carriage platform using bolt On 81, and enclose and set the periphery being arranged on lower carriage platform 81, lower carriage railing 82 outside parcel anti-falling screen, is personnel's construction safety Fall with protection small article and be used.
Described upper bracket 5 is arranged between two curved section template 7 tops, and it includes upper bracket collet 56, upper bracket Crossbeam 55, many upper bracket pull bars 51, upper bracket longeron 54, upper bracket platform 52 and upper bracket railing 53;Wherein, upper bracket bottom Support 56 is arranged on curved section template 7 top outer, and this upper bracket collet 56 side is connected with curved section template 7, upper Frame collet 56 top surface supports upper bracket crossbeam 55 bottom, plays the effect of fixing upper bracket crossbeam 55;Upper bracket crossbeam 55 is two The I-steel of root level is placed in two curved section template 7 top outer along the direction extension of two pier studs 2, is specifically placed in song In the steel members of line segment template 7, the inboard width of two I-steel is identical with the external dimensions of curved section template 7, I-steel Use bolt connection firmly with the outside of curved section template 7, two I-steel reuse many upper bracket pull bars 51 and connect, and this is many Root upper bracket pull bar 51 is connected on upper bracket crossbeam 55 by the tension of the preformed hole at curved section template 7 top, and by upper bracket Crossbeam 55 tension is firm;Upper bracket longeron 54 be the many channel-section steels being laid on upper bracket crossbeam 55, this many channel-section steels with upper Frame crossbeam 55 is bolted firmly;Upper bracket platform 52 is steel plate on upper bracket longeron 54 for the connect setting, this steel plate Be connected firmly with upper bracket longeron 54 by bolt, the size of upper bracket platform 52 meet constructing operation personnel, small-sized machine and Instrument etc. operate with requirement;The frame-type railing that upper bracket railing 53 forms for steel pipe, is arranged on using bolt On support longeron 54 and upper bracket platform 52, and enclose and set the periphery being arranged on upper bracket platform 52, upper bracket railing 53 outside bag Wrap up in anti-falling screen, be personnel's construction safety and protection small article falls and is used.
In the middle of lower carriage 8 and upper bracket 5 also can according to the total height of vase pier and constructing operation convenient and increase multiple in Support, this medium-height trestle is similar with lower carriage 8, upper bracket 5 design structure.
Reach lower carriage 8 and upper bracket 5 for the ease of constructing operation personnel, can arrange as shown in Figure 3 in vase pier side The ladder cage 10 being made with steel material, this ladder cage is the fixed step for upper and lower two rack platforms of constructing operation person walks, Profile is quadra, and anti-falling screen is wrapped up in outside;It is provided with the ladder of extension of spiraling from bottom to top, every step ladder in ladder cage 10 Width and height be advisable with convenient construction operating personnel's going up or down stairway, the spiraling mainly after direction extends again of ladder Extend to opposite direction, its number is the series of ladder cage, and the series of ladder cage, can be by special depending on the height of two rack platforms Producer customizes as desired, and ladder cage is a single device, and its bottom is provided with locking movable pulley, be moved close to or away from Two rack platforms, at every grade of ladder cage, are just provided with dodge gate to the position of lower carriage 8 and upper bracket 5, for constructing operation personnel Turnover.
Overpass vase pier falsework co-ordinative construction has corresponding using method, and constructs according to step shown in Fig. 5:
Step one, formulation vase pier falsework co-ordinative construction arrangement and method for construction:
1. calculation template support co-ordinative construction, the design feature according to vase pier and quality requirement are designed, in conjunction with construction behaviour Make operation, the stressing conditions of analysis construction stage load and structure, design overpass vase pier falsework co-ordinative construction, pass through Finite element software calculates straight-line segment template, curved section template, lower carriage, the stress of upper bracket and deformation data, need to meet structure The stress of component and deformation requirements, make and rigging support co-ordinative construction associated components, and check qualified;
2. cushion cap reinforcing bar 11 reserve, casting concrete, cushion cap reinforcing bar reserve pier stud embedded bar treat the straight line with pier stud 2 Section framework of steel reinforcement 22 connects;
3. pier stud straightway framework of steel reinforcement 22, curved section framework of steel reinforcement 24 and bent cap framework of steel reinforcement 31 are made;
Step 2, two straightway pier stud constructions:
1. lift the straightway framework of steel reinforcement 22 of straightway pier stud 21, and reserve the embedded bar of pier stud with cushion cap reinforcing bar 11 Using straight screw sleeve connection, the installation site of straightway framework of steel reinforcement 22 must inspection qualified, straightway framework of steel reinforcement 22 and cushion cap Reinforcing bar 11 reserve the reinforced bar sleeve that the embedded bar of pier stud is connected quality of connection also must check qualified;
2. polylith straight-line segment template 9 is hung at the straightway pier stud 21 at cushion cap 1 top with loop wheel machine, and using bolt successively Connect polylith straight-line segment template 9, position adjustment accurately, forms firm straight-line segment template structure, the installation matter of straight-line segment template 9 It is qualified that amount must be checked;
3. using in pump truck pump concrete to straight-line segment template 9, health one week, treat that concrete strength reaches design strength More than 70% can carry out lower step construction;
, to straightway pier stud 21, locking movable pulley fixed ladder cage location is grasped with convenient construction for step 3, mobile ladder cage 10 Make the upper and lower ladder cage of personnel and carry out constructing operation;
Step 4, installation lower carriage:
1. loop wheel machine hangs in two I-steel as lower carriage crossbeam 84, by the top of lower carriage crossbeam and straight-line segment template 9 Using bolt connection outside portion, then by many lower carriage pull bars 85 pass through straight-line segment template 9 top preformed hole, and screw down prop up Lower carriage pull bar 85 on frame crossbeam 84, fixedly secures lower carriage crossbeam 84 in the top of straight-line segment template 9;
2. it is provided as the many channel-section steels for lower carriage longeron 83 on lower carriage crossbeam 84 upper berth, and by many channel-section steels and lower carriage Crossbeam 84 uses bolt connection;
3. the many channel-section steel upper berths in lower carriage longeron 83 are provided as the steel plate for lower carriage platform 81, and by steel plate with lower Frame longeron 83 uses bolt connection;
4. the frame-type railing that lower carriage railing 82 forms for steel pipe, using being bolted to lower carriage longeron 83 He On lower carriage platform 81, and enclose and set the periphery being arranged on lower carriage platform 81, anti-falling screen is wrapped up in outside, be personnel's construction safety and Protection small article falls and is used;
5. installation curve section falsework 6, this curved section falsework is installed and is supported curved section template 7, curved section template Support 6 bottom is fixed by bolts on lower carriage longeron 83;
Step 5, two pier stud curved section constructions:
1. lift the curved section framework of steel reinforcement 24 of curved section pier stud 23, the straightway framework of steel reinforcement 22 completing makes with constructing With straight screw sleeve connection, the installation site of curved section framework of steel reinforcement 24 must inspection qualified, curved section framework of steel reinforcement 24 is constructed with It is qualified that the quality of connection of the reinforced bar sleeve that the straightway framework of steel reinforcement 22 completing is connected also must be checked;
2. polylith curved section template 7 is hung in straight-line segment template 9 top with loop wheel machine, and it is bent to be sequentially connected polylith using bolt Line segment template 7, position adjustment accurately, forms firm curved section formwork structure, and the installation quality of curved section template 7 must close in inspection Lattice;
3. using in pump truck pump concrete to curved section template 7, health one week, treat that concrete strength reaches design strength More than 70% can carry out lower step construction;
Step 6, installation upper bracket:
1. loop wheel machine hangs in two I-steel as upper bracket crossbeam 55, by the top of upper bracket crossbeam and curved section template 7 Using bolt connection outside portion, then by many upper bracket pull bars 51 pass through curved section template 7 top preformed hole, and screw prop up Upper bracket pull bar 51 on frame crossbeam 55, fixedly secures upper bracket crossbeam 55 in the top of curved section template 7;
2. it is provided as the many channel-section steels for upper bracket longeron 54 on upper bracket crossbeam 55 upper berth, and by many channel-section steels and upper bracket Crossbeam 55 uses bolt connection;
3. the many channel-section steel upper berths in upper bracket longeron 54 are provided as the steel plate for upper bracket platform 52, and by steel plate with upper Frame longeron 54 uses bolt connection;
4. the frame-type railing that upper bracket railing 53 forms for steel pipe, is arranged on upper bracket longeron 54 He using bolt On upper bracket platform 52, and enclose and set the periphery being arranged on upper bracket platform 52, anti-falling screen is wrapped up in outside, be personnel's construction safety and Protection small article falls and is used;
5. bent cap side falsework 44 is installed, bent cap side falsework bottom is fixed by bolts on upper bracket longeron 54;
6. bent cap bed die board mount 41 is installed, bent cap end template frame bottom bolt is arranged on upper bracket longeron 54;
Step 7, Coping Construction:
1. bent cap side template 45 is installed respectively on bent cap side falsework 44, bent cap is installed on bent cap bed die board mount 41 End template 43, installs bent cap facade template 42 on upper bracket longeron 54, and bent cap side template 45, bent cap end template 43 and bent cap stand Face die plate 42 collectively forms capping beam template 4 and installation quality palpus inspection is qualified;
2. hang in bent cap framework of steel reinforcement with loop wheel machine in bent cap side template 45, bent cap end template 43 and bent cap facade template 42 31, accurately, bent cap framework of steel reinforcement 31 and curved section framework of steel reinforcement 24 top use steel wire lashing firmly, installation quality for position adjustment It is qualified to check;
3. using in pump truck pump concrete to capping beam template 4, health one week, treat that concrete strength reaches design strength More than 70% can carry out lower step construction;
Step 8, according to install opposite sequence remove capping beam template 4, upper bracket 5, curved section template 7, lower carriage 8 successively With straight-line segment template 9 and concentrate placement, go to next vase pier through the maintaining Later Zhou Dynasty, one of the Five Dynasties and use.
The present invention also can be described further by a specific Application Example table and with reference to Fig. 4.
Vase pier Application Example table
Embodiment of the present invention is only illustrative of the invention and is not intended to limit the scope of the invention.Additionally should manage Solution, after having read the content of present invention instruction, those skilled in the art can make various changes or modifications to the present invention, this A little equivalent form of values equally fall within the application appended claims limited range.

Claims (8)

1. a kind of overpass vase pier falsework co-ordinative construction, including cushion cap (1), pours two pier studs being connected on cushion cap (2) and pour the bent cap (3) being connected between two pier studs, described every pier stud (2) be all by straightway pier stud (21) and Curved section pier stud (23) is constituted, and this straightway pier stud (21) is to be poured by the straight-line segment template (9) being arranged on cushion cap (1) to build up Type, this curved section pier stud (23) is to pour shaping by the curved section template (7) being connected in straight-line segment template (9), this bent cap (3) It is that shaping is poured it is characterised in that straight described in two by the capping beam template (4) being coupled across on two curved section templates (7) Lower carriage (8) is installed between line segment template (9) top, this lower carriage is provided with to be installed for described two curved section templates (7) Curved section falsework (6), installs upper bracket (5) between two described curved section template (7) tops, this upper bracket is provided with The bent cap side falsework (44) installed for described capping beam template (4) and bent cap bed die board mount (41);Described lower carriage (8) Including lower carriage crossbeam (84), many lower carriage pull bars (85), lower carriage longeron (83), lower carriage platform (81) and lower carriage hurdle Bar (82), described lower carriage crossbeam (84) is two I-steel being horizontally placed at two straight-line segment template (9) top outer, under Rack beam (84) is interconnected with the top outer of straight-line segment template (9), and many described lower carriage pull bars (85) are passed through straight The preformed hole tension at line segment template (9) top is connected on lower carriage crossbeam (84), and described lower carriage longeron (83) is many Lay and be fixed on the channel-section steel on lower carriage crossbeam (84), described lower carriage platform (81) is connect setting in lower carriage longeron (83) steel plate on, described lower carriage railing (82) is to enclose to set the frame-type railing being arranged on lower carriage platform (81) periphery, Anti-falling screen is wrapped up outside this lower carriage railing (82);Described upper bracket (5) includes upper bracket collet (56), upper bracket crossbeam (55), many upper bracket pull bars (51), upper bracket longeron (54), upper bracket platform (52) and upper bracket railing (53), described Upper bracket collet (56) is arranged on curved section template (7) top outer and makees supporting role for upper bracket crossbeam (55), described Upper bracket crossbeam (55) is two I-steel being horizontally placed at two curved section template (7) top outer, upper of described many Frame pull bar (51) is connected on upper bracket crossbeam (55) by the tension of the preformed hole at curved section template (7) top, described upper Frame longeron (54) is the many channel-section steels laid and be fixed on upper bracket crossbeam (55), and described upper bracket platform (52) is to connect It is arranged on the steel plate on upper bracket longeron (54), described upper bracket railing (53) is to enclose to set to be arranged on upper bracket platform (52) outward The frame-type railing enclosing, wraps up anti-falling screen outside this upper bracket railing (53).
2. overpass vase pier falsework co-ordinative construction according to claim 1 is it is characterised in that described upper bracket (5) it is provided with multiple medium-height trestles and lower carriage (8) between.
3. overpass vase pier falsework co-ordinative construction according to claim 1 is it is characterised in that described bent cap mould Plate (4) includes bent cap facade template (42), bent cap side template (45) and bent cap end template (43), described bent cap facade template (42) it is facade strip, bottom is supported on upper bracket (5), described bent cap side template (45) is rectangle, is provided with outside it The bent cap side falsework (44) supporting is installed, this bent cap side falsework (44) is arranged on upper bracket (5), described bent cap End template (43) facade is arch, and its bottom is provided with installs bent cap bed die board mount (41) supporting, this bent cap bed die board mount It is arranged on upper bracket (5).
4. overpass vase pier falsework co-ordinative construction according to claim 1 is it is characterised in that described straightway Template (9) is to be assembled by the straight tubular construction of hollow of 2 ~ 4 pieces of interconnections, and this straight-line segment template (9) bottom is arranged on holds On platform (1), straight-line segment template (9) top junction curve section template (7).
5. overpass vase pier falsework co-ordinative construction according to claim 1 is it is characterised in that described curved section Template (7) is to be assembled by the curved hollow tubular construction of 2 ~ 4 pieces of interconnections, and this curved section template (7) bottom connects straight Line segment template (9), curved section template (7) top connects capping beam template (4), is provided with installation and supports outside curved section template (7) Curved section falsework (6), this curved section falsework is arranged on lower carriage (8).
6. overpass vase pier falsework co-ordinative construction according to claim 1 is it is characterised in that described vase pier Side setting is for the upper and lower ladder cage (10) of constructing operation person walks, the rectangular frame that this ladder cage is made for steel material, ladder cage Outside parcel anti-falling screen, is provided with the ladder of extension of spiraling from bottom to top, ladder cage (10) bottom is provided with locking in ladder cage (10) Movable pulley, ladder cage side is just provided with dodge gate to the position of lower carriage (8) and upper bracket (5).
7. overpass vase pier falsework co-ordinative construction according to claim 1 is it is characterised in that described bent cap (3) It is to be molded with bent cap framework of steel reinforcement (31) and concreting by capping beam template (4), this bent cap (3) placed on top floorings, Bent cap (3) facade is elongated, and the bottom surface that bent cap (3) is located between two pier studs (2) is set to arcuate surface, two of bent cap (3) The outside cantilever overhanging two pier studs (2) respectively is rectangular;Described cushion cap (1) is with cushion cap reinforcing bar by cushion cap template (11) it is molded with concreting, the embedded bar of pier stud (2) reserved by this cushion cap reinforcing bar (11);Described straightway pier stud (21) It is to be molded with straightway framework of steel reinforcement (22) and concreting by straight-line segment template (9);Described curved section pier stud (23) It is to be molded with curved section framework of steel reinforcement (24) and concreting by curved section template (7);Described cushion cap (1), straightway Pier stud (21), curved section pier stud (23) and bent cap (3) collectively form the vase pier of overpass.
8. a kind of using method of overpass vase pier falsework co-ordinative construction it is characterised in that this using method include as follows Step:
Step one, formulation vase pier falsework co-ordinative construction arrangement and method for construction:
1. calculation template support co-ordinative construction, the design feature according to vase pier and quality requirement are designed, in conjunction with constructing operation work Sequence, the stressing conditions of analysis construction stage load and structure, design overpass vase pier falsework co-ordinative construction, by limited Meta software calculates straight-line segment template, curved section template, lower carriage, the stress of upper bracket and deformation data, need to meet structural elements Stress and deformation requirements, make and rigging support co-ordinative construction associated components, and check qualified;
2. cushion cap reinforcing bar reserve, casting concrete, the embedded bar that pier stud reserved by cushion cap reinforcing bar treats and the straightway steel of pier stud (2) Muscles and bones frame (22) connects;
3. pier stud straightway framework of steel reinforcement (22), curved section framework of steel reinforcement (24) and bent cap framework of steel reinforcement (31) are made;
Step 2, two straightway pier stud constructions:
1. the straightway framework of steel reinforcement (22) of lifting straightway pier stud (21), and reserve the pre- of pier stud (2) with cushion cap reinforcing bar (11) Bury reinforcing bar and use straight screw sleeve connection, the installation site of straightway framework of steel reinforcement (22) must check qualified, straightway framework of steel reinforcement (22) quality of connection of the reinforced bar sleeve that the embedded bar reserving pier stud (2) with cushion cap reinforcing bar (11) is connected also must check conjunction Lattice;
2. polylith straight-line segment template (9) is hung in straightway pier stud (21) place at cushion cap top with loop wheel machine, and using bolt successively Connect polylith straight-line segment template (9), position adjustment accurately, forms firm straight-line segment template structure, the peace of straight-line segment template (9) It is qualified that packing quality must be checked;
3. interior using pump truck pump concrete to straight-line segment template (9), health one week, treat that concrete strength reaches design strength More than 70% can carry out lower step construction;
Step 3, mobile ladder cage (10), to straightway pier stud (21) place, lock fixing ladder cage (10) position of movable pulley and are applied with facilitating The upper and lower ladder cage of workman person carries out constructing operation;
Step 4, installation lower carriage:
1. loop wheel machine hangs in two I-steel as lower carriage crossbeam (84), by lower carriage crossbeam (84) and straight-line segment template (9) Top outer use bolt connection, more lower carriage pull bars (85) are passed through the preformed hole at straight-line segment template (9) top, and Screw the lower carriage pull bar (85) on lower carriage crossbeam (84), fixedly secure lower carriage crossbeam (84) in straight-line segment template (9) Top;
2. it is provided as the many channel-section steels for lower carriage longeron (83) on lower carriage crossbeam (84) upper berth, and by many channel-section steels and lower carriage Crossbeam (84) uses bolt connection;
3. the many channel-section steel upper berths in lower carriage longeron (83) are provided as the steel plate for lower carriage platform (81), and by steel plate with lower Frame longeron (83) uses bolt connection;
4. the frame-type railing that lower carriage railing (82) forms for steel pipe, using be bolted to lower carriage longeron (83) and On lower carriage platform (81), and enclose and set the periphery being arranged on lower carriage platform (81), anti-falling screen is wrapped up in outside, be personnel's construction peace Complete and protection small article falls and is used;
5. installation curve section falsework (6), this curved section falsework is installed and is supported curved section template (7), curved section template Support (6) bottom is fixed by bolts on lower carriage longeron (83);
Step 5, two pier stud curved section constructions:
1. the curved section framework of steel reinforcement (24) of lifting curved section pier stud (23), with the straightway framework of steel reinforcement (22) completing of constructing Using straight screw sleeve connection, the installation site of curved section framework of steel reinforcement (24) must inspection qualified, curved section framework of steel reinforcement (24) with It is qualified that the quality of connection of the reinforced bar sleeve that the straightway framework of steel reinforcement (22) completing of having constructed is connected also must be checked;
2. polylith curved section template (7) is hung in straight-line segment template (9) top with loop wheel machine, and it is bent to be sequentially connected polylith using bolt Line segment template (7), position adjustment accurately, forms firm curved section formwork structure, the installation quality of curved section template (7) must inspection It is qualified to test;
3. using interior, the health one week to curved section template (7) of pump truck pump concrete, treat that concrete strength reaches design strength More than 70% can carry out lower step construction;
Step 6, installation upper bracket:
1. loop wheel machine hangs in two I-steel as upper bracket crossbeam (55), by upper bracket crossbeam (55) and curved section template (7) Top outer use bolt connection, more upper bracket pull bars (51) are passed through the preformed hole at curved section template (7) top, and Screw the upper bracket pull bar (51) on upper bracket crossbeam (55), fixedly secure upper bracket crossbeam (55) in curved section template (7) Top;
2. it is provided as the many channel-section steels for upper bracket longeron (54) on upper bracket crossbeam (55) upper berth, and by many channel-section steels and upper bracket Crossbeam (55) uses bolt connection;
3. the many channel-section steel upper berths in upper bracket longeron (54) are provided as the steel plate for upper bracket platform (52), and by steel plate with upper Frame longeron (54) uses bolt connection;
4. the frame-type railing that upper bracket railing (53) forms for steel pipe, using bolt be arranged on upper bracket longeron (54) and On upper bracket platform (52), and enclose and set the periphery being arranged on upper bracket platform (52), anti-falling screen is wrapped up in outside, be personnel's construction peace Complete and protection small article falls and is used;
5. bent cap side falsework (44) is installed, bent cap side falsework bottom is fixed by bolts on upper bracket longeron (54);
Bent cap bed die board mount (41) is 6. installed, bent cap end template frame bottom bolt is arranged on upper bracket longeron (54);
Step 7, Coping Construction:
1. in bent cap side falsework (44) upper bent cap side template (45), bent cap bed die board mount (41) installed, lid is above installed respectively Beam bottom mother plate (43), in upper bracket longeron (54) upper installation bent cap facade template (42), bent cap side template (45), bent cap end template (43) and bent cap facade template (42) collectively form capping beam template (4) and installation quality must inspection qualified;
2. hang in bent cap reinforcing bar with loop wheel machine in bent cap side template (45), bent cap end template (43) and bent cap facade template (42) Frame (31), accurately, bent cap framework of steel reinforcement (31) and curved section framework of steel reinforcement (24) top use steel wire lashing firmly for position adjustment, It is qualified that installation quality must be checked;
3. interior using pump truck pump concrete to capping beam template (4), health one week, treat that concrete strength reaches design strength More than 70% can carry out lower step construction;
Step 8, according to install opposite sequence remove capping beam template (4), upper bracket (5), curved section template (7), lower carriage successively (8) and straight-line segment template (9) concentrate placement, go to next vase pier through the maintaining Later Zhou Dynasty, one of the Five Dynasties and use.
CN201510596197.4A 2015-09-18 2015-09-18 Formwork and bracket combining structure of vase pier of viaduct and application method Active CN105113388B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510596197.4A CN105113388B (en) 2015-09-18 2015-09-18 Formwork and bracket combining structure of vase pier of viaduct and application method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510596197.4A CN105113388B (en) 2015-09-18 2015-09-18 Formwork and bracket combining structure of vase pier of viaduct and application method

Publications (2)

Publication Number Publication Date
CN105113388A CN105113388A (en) 2015-12-02
CN105113388B true CN105113388B (en) 2017-01-25

Family

ID=54661482

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510596197.4A Active CN105113388B (en) 2015-09-18 2015-09-18 Formwork and bracket combining structure of vase pier of viaduct and application method

Country Status (1)

Country Link
CN (1) CN105113388B (en)

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105780664A (en) * 2016-04-25 2016-07-20 周汉林 Novel bridge pier construction process
CN107178037A (en) * 2017-05-31 2017-09-19 中交二公局第工程有限公司 The outer frame connecting structure of trestle vase-shaped column-type pier pier shaft and its construction technology
CN107780343B (en) * 2017-10-25 2020-01-17 永嘉县信达智能设备制造有限公司 Elevated pier cross beam and construction process thereof
CN108755421A (en) * 2018-05-30 2018-11-06 中国五冶集团有限公司 Capping beam construction device and construction method
CN109505234B (en) * 2019-01-07 2020-06-23 海港路桥股份有限公司 Bridge vase pier connecting frame structure and construction method thereof
CN109736206B (en) * 2019-01-28 2023-11-28 宁波交通工程建设集团有限公司 Cast-in-situ bracket structure for bridge side span closure of corrugated steel web continuous beam and construction method
CN110184927A (en) * 2019-05-14 2019-08-30 宁波市政工程建设集团股份有限公司 A kind of Y type pier stud construction method using Bailey bracket
CN112575676B (en) * 2019-09-30 2022-11-11 比亚迪股份有限公司 Track support assembly and construction method thereof
CN112144409A (en) * 2020-09-22 2020-12-29 中交一公局集团有限公司 Vase pier capping beam construction technology
CN113279334B (en) * 2021-05-19 2022-09-27 安徽省路港工程有限责任公司 Construction method of one-step pouring molding system of double-column type vase pier steel template
CN114134813B (en) * 2021-10-28 2024-03-01 中国建筑第六工程局有限公司 Construction method of adjacent existing high-speed vase type pier column protection system
CN114232484B (en) * 2021-12-13 2024-04-12 上海绿地建设(集团)有限公司 Construction method of municipal viaduct bridge crossing heavy traffic road section

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05132964A (en) * 1991-07-17 1993-05-28 Kobe Steel Ltd Anti-corrosive treatment of marine concrete construction
CN101845797A (en) * 2010-05-18 2010-09-29 武汉一冶交通工程有限责任公司 One-step molding method of vase-shaped columnar pier for urban viaduct bridges
CN203700941U (en) * 2014-01-24 2014-07-09 上海千年城市规划工程设计股份有限公司 Vase-shaped bridge pier structure
WO2014193022A1 (en) * 2013-05-30 2014-12-04 Kim Tae Hee Curved y-shaped bridge support comprising pc steel wire
CN104878695A (en) * 2015-05-21 2015-09-02 上海市政建设有限公司 Viaduct cover beam shaping bottom die support and application method thereof
CN205012217U (en) * 2015-09-18 2016-02-03 宁波交通工程建设集团有限公司 Overpass vase mound formwork support unites structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05132964A (en) * 1991-07-17 1993-05-28 Kobe Steel Ltd Anti-corrosive treatment of marine concrete construction
CN101845797A (en) * 2010-05-18 2010-09-29 武汉一冶交通工程有限责任公司 One-step molding method of vase-shaped columnar pier for urban viaduct bridges
WO2014193022A1 (en) * 2013-05-30 2014-12-04 Kim Tae Hee Curved y-shaped bridge support comprising pc steel wire
CN203700941U (en) * 2014-01-24 2014-07-09 上海千年城市规划工程设计股份有限公司 Vase-shaped bridge pier structure
CN104878695A (en) * 2015-05-21 2015-09-02 上海市政建设有限公司 Viaduct cover beam shaping bottom die support and application method thereof
CN205012217U (en) * 2015-09-18 2016-02-03 宁波交通工程建设集团有限公司 Overpass vase mound formwork support unites structure

Also Published As

Publication number Publication date
CN105113388A (en) 2015-12-02

Similar Documents

Publication Publication Date Title
CN105113388B (en) Formwork and bracket combining structure of vase pier of viaduct and application method
CN111254796B (en) Single-side integral hoisting long-span overbridge for multiple railway business lines and construction method
CN107090975B (en) Formwork erecting construction method for ultrahigh large-span concrete cast-in-place beam bailey truss
JP5047680B2 (en) Construction method of continuous viaduct
CN103410320B (en) The tower silo flexibility platform bitubular connects sliding construction method
CN105401679B (en) Heavy grade cast-in-place concrete Sloping roof construction method
CN105568870B (en) For the triangle hanging basket method cantilever device and its construction method of cross-line bridge construction
CN107905114A (en) A kind of construction method of large span Successive interference cancellation
CN108360380A (en) A kind of bridge pier column construction operation platform and its construction method
CN109267491B (en) Movable formwork and construction method thereof
CN111119071A (en) Construction method for assembling precast concrete segment box girder
CN108118620A (en) For the whole self-crawling type integrated platform and its construction method of bridge tower construction
CN211472143U (en) Pier steel form
CN207159827U (en) No. 1 plate installation and positioning structure in No. 0 block of Wavelike steel webplate bridge
CN102277836B (en) Construction method of tilting concrete tower base
CN205012217U (en) Overpass vase mound formwork support unites structure
CN106906750B (en) Multi-functional across the railway line swing bridge girder closing construction mould bases of one kind and its construction method
CN210658035U (en) Draw to one side and hang knot supporting structure
CN207727440U (en) Whole self-crawling type integrated platform for bridge tower construction
CN106639303A (en) Hydraulic climbing formwork frame special for lift
CN109812001A (en) A kind of construction method of Super High bilayer I-steel overhanging support system
CN213174742U (en) Top bracing steel stand structure
CN108797350B (en) Tower column inner and outer stiff skeleton device and construction method thereof
CN103669219B (en) Many limbs height pier is with sliding construction equipment
CN207044363U (en) A kind of new precast beam protection and operating platform

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Lou Shurui

Inventor after: Du Yunfei

Inventor after: Chen Zhouzhou

Inventor after: Duan Qunmiao

Inventor after: Zhou Yiqin

Inventor after: Yao Jun

Inventor after: Chu Xinfa

Inventor after: Liu Shubo

Inventor after: Ran Ping

Inventor after: Guo Zhiqi

Inventor after: Cheng Shuiwu

Inventor after: Feng Jie

Inventor after: Lin Leihong

Inventor before: Yao Jun

Inventor before: Chen Zhouzhou

Inventor before: Duan Qunmiao

Inventor before: Zhou Yiqin

Inventor before: Chu Xinfa

Inventor before: Liu Shubo

Inventor before: Ran Ping

Inventor before: Guo Zhiqi

Inventor before: Cheng Shuiwu

Inventor before: Feng Jie

Inventor before: Lin Leihong

Inventor before: Du Yunfei

CB03 Change of inventor or designer information