Content of the invention
The technical problem to be solved is to overcome the defect of prior art and provides a kind of simple structure, use
Convenience, structure safety, the overpass vase pier falsework co-ordinative construction of economical rationality and using method.
The technical problem of the present invention is achieved through the following technical solutions:
A kind of overpass vase pier falsework co-ordinative construction, including cushion cap, pours two pier studs being connected on cushion cap
And pouring the bent cap being connected between two pier studs, every described pier stud is all by straightway pier stud and curved section pier stud structure
Become, this straightway pier stud is to pour shaping by the straight-line segment template being arranged on cushion cap, this curved section pier stud is straight by being connected to
Curved section template in line segment template pours shaping, and this bent cap is by the capping beam template being coupled across in two curved section templates
Pour shaping, lower carriage is installed between the described straight-line segment template top of two pier studs, this lower carriage is provided with two curves
Section template, installs upper bracket between two described curved section die head, this upper bracket is provided with for described capping beam template peace
The bent cap side falsework of dress and bent cap bed die board mount.
Described lower carriage includes lower carriage crossbeam, many lower carriage pull bars, lower carriage longeron, lower carriage platform and lower
Frame railing, described lower carriage crossbeam is two I-steel being horizontally placed at two straight-line segment template top outer, and lower carriage is horizontal
Beam is interconnected with the top outer of straight-line segment template, and many described lower carriage pull bars pass through the reserved of straight-line segment template top
Hole tension is connected on lower carriage crossbeam, and described lower carriage longeron is many and lays and be fixed on the groove on lower carriage crossbeam
Steel, described lower carriage platform is steel plate on lower carriage longeron for the connect setting, and described lower carriage railing is to enclose to set installation
In the frame-type railing of lower carriage platform periphery, outside this lower carriage railing, wrap up anti-falling screen.
Described upper bracket include upper bracket collet, upper bracket crossbeam, many upper bracket pull bars, upper bracket longeron, upper
Body panel and upper bracket railing, described upper bracket collet is arranged on outside curved section die head so that upper bracket crossbeam props up
Support acts on, and described upper bracket crossbeam is two I-steel being horizontally placed at outside two curved section die head, and described is many
Root upper bracket pull bar is connected on upper bracket crossbeam by the tension of the preformed hole of curved section die head, described upper bracket longeron
Lay and be fixed on the channel-section steel on upper bracket crossbeam for many, described upper bracket platform is connect setting on upper bracket longeron
Steel plate, described upper bracket railing be enclose set be arranged on upper bracket platform periphery frame-type railing, outside this upper bracket railing
Anti-falling screen is wrapped up in side.
It is provided with multiple medium-height trestles between described upper bracket and lower carriage.
Described capping beam template includes bent cap facade template, bent cap side template and bent cap end template, described bent cap facade
Template is facade strip, and bottom is supported on upper bracket, and described bent cap side template is rectangle, is provided with installation and supports outside it
Bent cap side falsework, this bent cap side falsework is arranged on upper bracket, and described bent cap end template facade is arch, its
Bottom is provided with installs the bent cap bed die board mount supporting, and this bent cap bed die board mount is arranged on upper bracket.
Described straight-line segment template is to be assembled by the straight tubular construction of hollow of 2 ~ 4 pieces of interconnections, this straightway mould
Plate bottom is arranged on cushion cap, straight-line segment template top junction curve section template.
Described curved section template is to be assembled by the curved hollow tubular construction of 2 ~ 4 pieces of interconnections, this curved section
Template bottom connects straight-line segment template, and curved section template top connects capping beam template, is provided with installation outside curved section template
The curved section falsework of support, this curved section falsework is arranged on lower carriage.
For the upper and lower ladder cage of constructing operation person walks, this ladder cage is made up of steel material for described vase pier side setting
Rectangular frame, outside ladder cage wrap up anti-falling screen, be provided with the ladder of extension of spiraling from bottom to top in ladder cage, ladder cage bottom sets
There is locking movable pulley, ladder cage side is just provided with dodge gate to the position of lower carriage and upper bracket.
Described bent cap is to be molded with bent cap framework of steel reinforcement and concreting by capping beam template, this bent cap placed on top
Floorings, bent cap facade is elongated, and the bottom surface that bent cap is located between two pier studs is set to arcuate surface, outside two difference of bent cap
The outside cantilever stretching out two pier studs is rectangular;Described cushion cap is to be become with concreting with cushion cap reinforcing bar by cushion cap template
Type, the embedded bar of pier stud reserved by this cushion cap reinforcing bar;Described straightway pier stud is with straightway reinforcing bar by straight-line segment template
Skeleton and concreting shaping;Described curved section pier stud is with curved section framework of steel reinforcement and concrete by curved section template
Pour shaping;Described cushion cap, straightway pier stud, curved section pier stud and bent cap collectively form the vase pier of overpass.
A kind of using method of overpass vase pier falsework co-ordinative construction, it comprises the steps:
Step one, formulation vase pier falsework co-ordinative construction arrangement and method for construction:
1. calculation template support co-ordinative construction, the design feature according to vase pier and quality requirement are designed, in conjunction with construction behaviour
Make operation, the stressing conditions of analysis construction stage load and structure, design overpass vase pier falsework co-ordinative construction, pass through
Finite element software calculates straight-line segment template, curved section template, lower carriage, the stress of upper bracket and deformation data, need to meet structure
The stress of component and deformation requirements, make and rigging support co-ordinative construction associated components, and check qualified;
2. cushion cap reinforcing bar reserve, casting concrete, cushion cap reinforcing bar reserve pier stud embedded bar treat the straightway with pier stud
Framework of steel reinforcement connects;
3. pier stud straightway framework of steel reinforcement, curved section framework of steel reinforcement and bent cap framework of steel reinforcement are made;
Step 2, two straightway pier stud constructions:
1. lift the straightway framework of steel reinforcement of straightway pier stud, and the embedded bar reserving pier stud with cushion cap reinforcing bar uses steel
Muscle sleeve connection, the installation site of straightway framework of steel reinforcement must check qualified, straightway framework of steel reinforcement reserved pier with cushion cap reinforcing bar
It is qualified that the quality of connection of the reinforced bar sleeve that the embedded bar of post is connected also must be checked;
2. polylith straight-line segment template loop wheel machine is hung at the straightway pier stud at cushion cap top, and be sequentially connected using bolt
Polylith straight-line segment template, position adjustment accurately, forms firm straight-line segment template structure, the installation quality of straight-line segment template must inspection
It is qualified to test;
3. using in pump truck pump concrete to straight-line segment template, health one week, treat that concrete strength reaches design strength
More than 70% can carry out lower step construction;
, to straightway pier stud, locking movable pulley fixed ladder cage location is with convenient construction operator for step 3, mobile ladder cage
Ladder cage carries out constructing operation to member up and down;
Step 4, installation lower carriage:
1. loop wheel machine hangs in two I-steel as lower carriage crossbeam, by outside the top with straight-line segment template for the lower carriage crossbeam
Side uses bolt connection, more lower carriage pull bars is passed through the preformed hole at straight-line segment template top, and screws lower carriage crossbeam
On lower carriage pull bar, fixedly secure lower carriage crossbeam in the top of straight-line segment template;
2. it is provided as the many channel-section steels for lower carriage longeron on lower carriage crossbeam upper berth, and by many channel-section steels and lower carriage crossbeam
Using bolt connection;
3. the many channel-section steel upper berths in lower carriage longeron are provided as the steel plate for lower carriage platform, and steel plate is indulged with lower carriage
Beam uses bolt connection;
4. the frame-type railing that lower carriage railing forms for steel pipe, using being bolted to lower carriage longeron and lower
On body panel, and enclose and set the periphery being arranged on lower carriage platform, anti-falling screen is wrapped up in outside, be personnel's construction safety and protection is small-sized
Object falls and is used;
5. installation curve section falsework, this curved section falsework is installed and is supported curved section template, and curved section template is propped up
Frame bottom is fixed by bolts on lower carriage longeron;
Step 5, two pier stud curved section constructions:
1. lift the curved section framework of steel reinforcement of curved section pier stud, the straightway framework of steel reinforcement completing uses reinforcing bar with constructing
Sleeve connection, the installation site of curved section framework of steel reinforcement must inspection qualified, curved section framework of steel reinforcement and the straight line completing of having constructed
It is qualified that the quality of connection of the reinforced bar sleeve that section framework of steel reinforcement is connected also must be checked;
2. polylith curved section template loop wheel machine is hung in straight-line segment template top, and be sequentially connected polylith curve using bolt
Section template, position adjustment accurately, forms firm curved section formwork structure, and the installation quality palpus inspection of curved section template is qualified;
3. using in pump truck pump concrete to curved section template, health one week, treat that concrete strength reaches design strength
More than 70% can carry out lower step construction;
Step 6, installation upper bracket:
1. loop wheel machine hangs in two I-steel as upper bracket crossbeam, by outside the top with curved section template for the upper bracket crossbeam
Side uses bolt connection, more upper bracket pull bars is passed through the preformed hole of curved section die head, and screws upper bracket crossbeam
On upper bracket pull bar, fixedly secure upper bracket crossbeam in the top of curved section template;
2. it is provided as the many channel-section steels for upper bracket longeron on upper bracket crossbeam upper berth, and by many channel-section steels and upper bracket crossbeam
Using bolt connection;
3. the many channel-section steel upper berths in upper bracket longeron are provided as the steel plate for upper bracket platform, and steel plate is indulged with upper bracket
Beam uses bolt connection;
4. the frame-type railing that upper bracket railing forms for steel pipe, is arranged on upper bracket longeron and upper using bolt
On body panel, and enclose and set the periphery being arranged on upper bracket platform, anti-falling screen is wrapped up in outside, be personnel's construction safety and protection is small-sized
Object falls and is used;
5. bent cap side falsework is installed, bent cap side falsework bottom is fixed by bolts on upper bracket longeron;
6. bent cap bed die board mount is installed, bent cap end template frame bottom bolt is arranged on upper bracket longeron;
Step 7, Coping Construction:
1. bent cap side template is installed respectively on bent cap side falsework, bent cap bed die is installed on bent cap bed die board mount
Plate, installs bent cap facade template, bent cap side template, bent cap end template and bent cap facade template collectively form on upper bracket longeron
Capping beam template and installation quality must inspection qualified;
2. bent cap framework of steel reinforcement, position are hung in loop wheel machine in bent cap side template, bent cap end template and bent cap facade template
Adjustment is accurate, and bent cap framework of steel reinforcement and curved section framework of steel reinforcement top use steel wire lashing firmly, and it is qualified that installation quality must be checked;
3. using in pump truck pump concrete to capping beam template, health one week, treat that concrete strength reaches design strength
More than 70% can carry out lower step construction;
Step 8, remove capping beam template, upper bracket, curved section template, lower carriage and straight successively according to the opposite sequence installed
Line segment template simultaneously concentrates placement, goes to next vase pier through the maintaining Later Zhou Dynasty, one of the Five Dynasties and uses.
Compared with prior art, the present invention devises a kind of falsework connection being applied to the construction of urban viaduct vase pier
Close structure, it is mainly installed lower carriage at the straight-line segment template top pouring straightway pier stud and is arranged on lower carriage simultaneously
For the curved section falsework of curved section model sheetinstallat, then install in the curved section die head pouring curved section pier stud
Frame and the bent cap side falsework being arranged on upper bracket and installing for capping beam template and bent cap bed die board mount, by setting
Count above-mentioned falsework co-ordinative construction and just perfect can realize the construction of vase pier with reference to corresponding using method, and this
Plant falsework co-ordinative construction and using method to be not required to occupy larger construction area space in construction, favourable Construction traffic leads to
OK, and also there is simple structure, easy to use, structure safety, economical rationality, the advantages of embody regulation and standardization and construct,
Therefore there is higher economic benefit and social benefit.
Specific embodiment
By above-mentioned accompanying drawing, the embodiment of the present invention will be elaborated again below.
As shown in Fig. 1 ~ Fig. 5,1. cushion cap, 11. cushion cap reinforcing bars, 2. pier stud, 21. straightway pier studs, 22. straightway reinforcing bars
Frame, 23. curved section pier studs, 24. curved section frameworks of steel reinforcement, 3. bent cap, 31. bent cap frameworks of steel reinforcement, 4. capping beam template, 41. bent caps
Bed die board mount, 42. bent cap facade templates, 43. bent cap end templates, 44. bent cap side falseworks, 45. bent cap side templates, 5. go up
Support, 51. upper bracket pull bars, 52. upper bracket platforms, 53. upper bracket railings, 54. upper bracket longerons, 55. upper bracket crossbeams,
56. upper bracket collets, 6. curved section falsework, 7. curved section template, 8. lower carriage, 81. lower carriage platforms, 82. lower carriages
Railing, 83. lower carriage longerons, 84. lower carriage crossbeams, 85. lower carriage pull bars, 9. straight-line segment template, 10. ladder cage.
Overpass vase pier falsework co-ordinative construction and using method, relate to one kind and are used for building overpass vase pier
Form of construction work, it mainly includes the falsework co-ordinative construction shown in falsework co-ordinative construction and Fig. 5 shown in Fig. 1, Fig. 2
This two parts of using method.
The vase pier structure of described overpass is by cushion cap 1, pours two pier studs 2 being connected on cushion cap and pour connection
Bent cap 3 between two pier studs is constituted.
Wherein, cushion cap 1 is reinforced concrete structure, and its underpart is pile foundation, and cushion cap 1 is used for connecting pile foundation and two pier studs 2,
Cushion cap template, colligation cushion cap reinforcing bar 11 can be set after the completion of pile foundation, be then molded with concreting, cushion cap reinforcing bar 11 needs
The embedded bar of reserved pier stud 2.
The dimensional structure of two pier studs 2 is identical, is all the curved section pier on straightway pier stud 21 by bottom and top
Post 23 is constituted, and this straightway pier stud 21 bottom is connected with cushion cap 1, and curved section pier stud 23 top is connected with bent cap 3, and two
Individual curved section pier stud 23 is opposite and is bent outwardly setting, therefore the profile that two pier studs 2 design on cushion cap 1 is lightly attractive in appearance, and
Straightway pier stud 21 is to be become with concreting with straightway framework of steel reinforcement 22 by the straight-line segment template 9 being arranged on cushion cap 1
Type, curved section pier stud 23 is with curved section framework of steel reinforcement 24 and coagulation by the curved section template 7 being connected in straight-line segment template 9
Soil pours shaping.
Described bent cap 3 is with bent cap framework of steel reinforcement by the capping beam template 4 being coupled across in two curved section templates 7
31 and concreting shaping, bent cap 3 bottom is connected with curved section pier stud 23 top of two pier studs 2, bent cap 3 placed on top
Floorings, bent cap 3 facade is elongated, and it is attractive in appearance to be lifted that the bottom surface being located between two pier studs 2 in bent cap 3 is set to arcuate surface
Property, two outside cantilevers overhanging two pier studs 2 respectively of bent cap 3 are rectangular.
Above-mentioned cushion cap reinforcing bar 11, straightway framework of steel reinforcement 22, curved section framework of steel reinforcement 24 and bent cap framework of steel reinforcement 31 are all
Topmost stressed member, in order to ensure quality and convenient construction, by the profile according to cushion cap 1, pier stud 2 and bent cap 3 in factory
Different and correspondingly make shaping, then be transported to behind job site by transport vehicle appointed part is hung to by loop wheel machine, cushion cap reinforcing bar 11,
Be connected with each other using reinforced bar sleeve between straightway framework of steel reinforcement 22 and curved section framework of steel reinforcement 24, bent cap framework of steel reinforcement 31 with bent
Line segment framework of steel reinforcement 24 top uses steel wire lashing firm.
Above-mentioned cushion cap template, straight-line segment template 9, curved section template 7, capping beam template 4 are to pour cushion cap 1, pier for correspondence
Post 2 and the mould of these composition vase pier shaped member concrete of bent cap 3, and entered according to the exact shape of pier stud 2 and bent cap 3
Row design, is steel, is made by template material, section steel material and connector.
Above-mentioned concrete is the primary structural material of vase pier, is transported to job site, pump truck by batching plant's mixing transport vehicle
It is pumped in straight-line segment template 9, pour in curved section template 7 and in capping beam template 4, solidify to form vase pier structure.
Described straight-line segment template 9 is the straight tubular construction of hollow, in short transverse linear uiform section, section and straightway
The cross sectional shape of pier stud 21 is identical, and inner section size is identical with the section of straightway pier stud 21;Straight-line segment template 9 hollow straight tube shape
Structure is to be assembled by 2 ~ 4 pieces, and beneficial to assembling and dismounting, this assembly type multi-section structure, the height often saving is all by straight line
The total height of section template 9 determines, often saves and is connected between adjacent straight-line segment template 9 firmly.
Described curved section template 7 is curved hollow tubular construction, identical with curved section pier stud 23 profile in short transverse,
Section is identical with the cross sectional shape of curved section pier stud 23, and inner section size is identical with the section of curved section pier stud 23;Curved section mould
Plate 7 bending tubular construction is to be assembled by 2 ~ 4 pieces, beneficial to assembling and dismounting, this assembly type multi-section structure, the height often saving
It is all to be determined by the total height of curved section template 7, often save and be connected between adjacent curved section template 7 firmly.
Described capping beam template 4 includes bent cap facade template 42, bent cap side template 45 and bent cap end template 43;Wherein, cover
Beam facade template 42 is facade strip, and short transverse inner section size is equivalently-sized with the short transverse of bent cap 3, and bottom supports
On the upper bracket longeron 54 of upper bracket 5;Bent cap side template 45 is rectangle, the section phase of inner section size and curved section pier stud 23
With outside is provided with installs the bent cap side falsework 44 supporting, and this bent cap side falsework is arranged on upper bracket 5 by bolt
On upper bracket longeron 54;Bent cap end template 43 facade be arch, between length dimension and two curved section pier stud 23 tops away from
From identical, width is identical with bent cap 3 bottom width, is provided with the bottom of bent cap end template 43 and installs the bent cap end template supporting and prop up
Frame 41, this bent cap bed die board mount is arranged on the upper bracket longeron 54 of upper bracket 5 by bolt.
Between two described straight-line segment template 9 tops, lower carriage 8 is installed, this lower carriage is provided with for two curved sections
The curved section falsework 6 that template 7 is installed;Described lower carriage 8 include lower carriage crossbeam 84, many lower carriage pull bars 85, under
Support longeron 83, lower carriage platform 81 and lower carriage railing 82;Wherein, lower carriage crossbeam 84 is the I-steel of two levels along two
The direction extension of root pier stud 2 is placed in two straight-line segment template 9 top outer, is specifically placed in the shaped steel portion of straight-line segment template 9
On part, the inboard width of two I-steel is identical with the external dimensions of straight-line segment template 9, and I-steel is outer with straight-line segment template 9
Side uses bolt connection firmly, and two I-steel reuse many lower carriage pull bars 85 and connect, and this many lower carriage pull bars pass through
The preformed hole tension at straight-line segment template 9 top is connected on lower carriage crossbeam 84, and lower carriage crossbeam 84 is strained firm;Lower
Frame longeron 83 is the many channel-section steels being laid on lower carriage crossbeam 84, and this many channel-section steels are bolted with lower carriage crossbeam 84
Firmly;Lower carriage platform 81 is steel plate on lower carriage longeron 83 for the connect setting, and this steel plate passes through bolt and lower carriage longeron
83 are connected firmly, and what the size of lower carriage platform 81 met constructing operation personnel, small-sized machine and instrument etc. operates with requirement;
The frame-type railing that lower carriage railing 82 forms for steel pipe, is arranged on lower carriage longeron 83 and lower carriage platform using bolt
On 81, and enclose and set the periphery being arranged on lower carriage platform 81, lower carriage railing 82 outside parcel anti-falling screen, is personnel's construction safety
Fall with protection small article and be used.
Described upper bracket 5 is arranged between two curved section template 7 tops, and it includes upper bracket collet 56, upper bracket
Crossbeam 55, many upper bracket pull bars 51, upper bracket longeron 54, upper bracket platform 52 and upper bracket railing 53;Wherein, upper bracket bottom
Support 56 is arranged on curved section template 7 top outer, and this upper bracket collet 56 side is connected with curved section template 7, upper
Frame collet 56 top surface supports upper bracket crossbeam 55 bottom, plays the effect of fixing upper bracket crossbeam 55;Upper bracket crossbeam 55 is two
The I-steel of root level is placed in two curved section template 7 top outer along the direction extension of two pier studs 2, is specifically placed in song
In the steel members of line segment template 7, the inboard width of two I-steel is identical with the external dimensions of curved section template 7, I-steel
Use bolt connection firmly with the outside of curved section template 7, two I-steel reuse many upper bracket pull bars 51 and connect, and this is many
Root upper bracket pull bar 51 is connected on upper bracket crossbeam 55 by the tension of the preformed hole at curved section template 7 top, and by upper bracket
Crossbeam 55 tension is firm;Upper bracket longeron 54 be the many channel-section steels being laid on upper bracket crossbeam 55, this many channel-section steels with upper
Frame crossbeam 55 is bolted firmly;Upper bracket platform 52 is steel plate on upper bracket longeron 54 for the connect setting, this steel plate
Be connected firmly with upper bracket longeron 54 by bolt, the size of upper bracket platform 52 meet constructing operation personnel, small-sized machine and
Instrument etc. operate with requirement;The frame-type railing that upper bracket railing 53 forms for steel pipe, is arranged on using bolt
On support longeron 54 and upper bracket platform 52, and enclose and set the periphery being arranged on upper bracket platform 52, upper bracket railing 53 outside bag
Wrap up in anti-falling screen, be personnel's construction safety and protection small article falls and is used.
In the middle of lower carriage 8 and upper bracket 5 also can according to the total height of vase pier and constructing operation convenient and increase multiple in
Support, this medium-height trestle is similar with lower carriage 8, upper bracket 5 design structure.
Reach lower carriage 8 and upper bracket 5 for the ease of constructing operation personnel, can arrange as shown in Figure 3 in vase pier side
The ladder cage 10 being made with steel material, this ladder cage is the fixed step for upper and lower two rack platforms of constructing operation person walks,
Profile is quadra, and anti-falling screen is wrapped up in outside;It is provided with the ladder of extension of spiraling from bottom to top, every step ladder in ladder cage 10
Width and height be advisable with convenient construction operating personnel's going up or down stairway, the spiraling mainly after direction extends again of ladder
Extend to opposite direction, its number is the series of ladder cage, and the series of ladder cage, can be by special depending on the height of two rack platforms
Producer customizes as desired, and ladder cage is a single device, and its bottom is provided with locking movable pulley, be moved close to or away from
Two rack platforms, at every grade of ladder cage, are just provided with dodge gate to the position of lower carriage 8 and upper bracket 5, for constructing operation personnel
Turnover.
Overpass vase pier falsework co-ordinative construction has corresponding using method, and constructs according to step shown in Fig. 5:
Step one, formulation vase pier falsework co-ordinative construction arrangement and method for construction:
1. calculation template support co-ordinative construction, the design feature according to vase pier and quality requirement are designed, in conjunction with construction behaviour
Make operation, the stressing conditions of analysis construction stage load and structure, design overpass vase pier falsework co-ordinative construction, pass through
Finite element software calculates straight-line segment template, curved section template, lower carriage, the stress of upper bracket and deformation data, need to meet structure
The stress of component and deformation requirements, make and rigging support co-ordinative construction associated components, and check qualified;
2. cushion cap reinforcing bar 11 reserve, casting concrete, cushion cap reinforcing bar reserve pier stud embedded bar treat the straight line with pier stud 2
Section framework of steel reinforcement 22 connects;
3. pier stud straightway framework of steel reinforcement 22, curved section framework of steel reinforcement 24 and bent cap framework of steel reinforcement 31 are made;
Step 2, two straightway pier stud constructions:
1. lift the straightway framework of steel reinforcement 22 of straightway pier stud 21, and reserve the embedded bar of pier stud with cushion cap reinforcing bar 11
Using straight screw sleeve connection, the installation site of straightway framework of steel reinforcement 22 must inspection qualified, straightway framework of steel reinforcement 22 and cushion cap
Reinforcing bar 11 reserve the reinforced bar sleeve that the embedded bar of pier stud is connected quality of connection also must check qualified;
2. polylith straight-line segment template 9 is hung at the straightway pier stud 21 at cushion cap 1 top with loop wheel machine, and using bolt successively
Connect polylith straight-line segment template 9, position adjustment accurately, forms firm straight-line segment template structure, the installation matter of straight-line segment template 9
It is qualified that amount must be checked;
3. using in pump truck pump concrete to straight-line segment template 9, health one week, treat that concrete strength reaches design strength
More than 70% can carry out lower step construction;
, to straightway pier stud 21, locking movable pulley fixed ladder cage location is grasped with convenient construction for step 3, mobile ladder cage 10
Make the upper and lower ladder cage of personnel and carry out constructing operation;
Step 4, installation lower carriage:
1. loop wheel machine hangs in two I-steel as lower carriage crossbeam 84, by the top of lower carriage crossbeam and straight-line segment template 9
Using bolt connection outside portion, then by many lower carriage pull bars 85 pass through straight-line segment template 9 top preformed hole, and screw down prop up
Lower carriage pull bar 85 on frame crossbeam 84, fixedly secures lower carriage crossbeam 84 in the top of straight-line segment template 9;
2. it is provided as the many channel-section steels for lower carriage longeron 83 on lower carriage crossbeam 84 upper berth, and by many channel-section steels and lower carriage
Crossbeam 84 uses bolt connection;
3. the many channel-section steel upper berths in lower carriage longeron 83 are provided as the steel plate for lower carriage platform 81, and by steel plate with lower
Frame longeron 83 uses bolt connection;
4. the frame-type railing that lower carriage railing 82 forms for steel pipe, using being bolted to lower carriage longeron 83 He
On lower carriage platform 81, and enclose and set the periphery being arranged on lower carriage platform 81, anti-falling screen is wrapped up in outside, be personnel's construction safety and
Protection small article falls and is used;
5. installation curve section falsework 6, this curved section falsework is installed and is supported curved section template 7, curved section template
Support 6 bottom is fixed by bolts on lower carriage longeron 83;
Step 5, two pier stud curved section constructions:
1. lift the curved section framework of steel reinforcement 24 of curved section pier stud 23, the straightway framework of steel reinforcement 22 completing makes with constructing
With straight screw sleeve connection, the installation site of curved section framework of steel reinforcement 24 must inspection qualified, curved section framework of steel reinforcement 24 is constructed with
It is qualified that the quality of connection of the reinforced bar sleeve that the straightway framework of steel reinforcement 22 completing is connected also must be checked;
2. polylith curved section template 7 is hung in straight-line segment template 9 top with loop wheel machine, and it is bent to be sequentially connected polylith using bolt
Line segment template 7, position adjustment accurately, forms firm curved section formwork structure, and the installation quality of curved section template 7 must close in inspection
Lattice;
3. using in pump truck pump concrete to curved section template 7, health one week, treat that concrete strength reaches design strength
More than 70% can carry out lower step construction;
Step 6, installation upper bracket:
1. loop wheel machine hangs in two I-steel as upper bracket crossbeam 55, by the top of upper bracket crossbeam and curved section template 7
Using bolt connection outside portion, then by many upper bracket pull bars 51 pass through curved section template 7 top preformed hole, and screw prop up
Upper bracket pull bar 51 on frame crossbeam 55, fixedly secures upper bracket crossbeam 55 in the top of curved section template 7;
2. it is provided as the many channel-section steels for upper bracket longeron 54 on upper bracket crossbeam 55 upper berth, and by many channel-section steels and upper bracket
Crossbeam 55 uses bolt connection;
3. the many channel-section steel upper berths in upper bracket longeron 54 are provided as the steel plate for upper bracket platform 52, and by steel plate with upper
Frame longeron 54 uses bolt connection;
4. the frame-type railing that upper bracket railing 53 forms for steel pipe, is arranged on upper bracket longeron 54 He using bolt
On upper bracket platform 52, and enclose and set the periphery being arranged on upper bracket platform 52, anti-falling screen is wrapped up in outside, be personnel's construction safety and
Protection small article falls and is used;
5. bent cap side falsework 44 is installed, bent cap side falsework bottom is fixed by bolts on upper bracket longeron 54;
6. bent cap bed die board mount 41 is installed, bent cap end template frame bottom bolt is arranged on upper bracket longeron 54;
Step 7, Coping Construction:
1. bent cap side template 45 is installed respectively on bent cap side falsework 44, bent cap is installed on bent cap bed die board mount 41
End template 43, installs bent cap facade template 42 on upper bracket longeron 54, and bent cap side template 45, bent cap end template 43 and bent cap stand
Face die plate 42 collectively forms capping beam template 4 and installation quality palpus inspection is qualified;
2. hang in bent cap framework of steel reinforcement with loop wheel machine in bent cap side template 45, bent cap end template 43 and bent cap facade template 42
31, accurately, bent cap framework of steel reinforcement 31 and curved section framework of steel reinforcement 24 top use steel wire lashing firmly, installation quality for position adjustment
It is qualified to check;
3. using in pump truck pump concrete to capping beam template 4, health one week, treat that concrete strength reaches design strength
More than 70% can carry out lower step construction;
Step 8, according to install opposite sequence remove capping beam template 4, upper bracket 5, curved section template 7, lower carriage 8 successively
With straight-line segment template 9 and concentrate placement, go to next vase pier through the maintaining Later Zhou Dynasty, one of the Five Dynasties and use.
The present invention also can be described further by a specific Application Example table and with reference to Fig. 4.
Vase pier Application Example table
Embodiment of the present invention is only illustrative of the invention and is not intended to limit the scope of the invention.Additionally should manage
Solution, after having read the content of present invention instruction, those skilled in the art can make various changes or modifications to the present invention, this
A little equivalent form of values equally fall within the application appended claims limited range.