CN205012217U - Overpass vase mound formwork support unites structure - Google Patents

Overpass vase mound formwork support unites structure Download PDF

Info

Publication number
CN205012217U
CN205012217U CN201520724340.9U CN201520724340U CN205012217U CN 205012217 U CN205012217 U CN 205012217U CN 201520724340 U CN201520724340 U CN 201520724340U CN 205012217 U CN205012217 U CN 205012217U
Authority
CN
China
Prior art keywords
template
upper bracket
lower carriage
bent cap
curved section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520724340.9U
Other languages
Chinese (zh)
Inventor
姚军
褚新法
柳淑波
冉平
郭志奇
成水武
冯杰
林雷洪
杜云飞
陈舟舟
段群苗
周一勤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Communication Engineering Construction Group Co Ltd
Original Assignee
Ningbo Communication Engineering Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Communication Engineering Construction Group Co Ltd filed Critical Ningbo Communication Engineering Construction Group Co Ltd
Priority to CN201520724340.9U priority Critical patent/CN205012217U/en
Application granted granted Critical
Publication of CN205012217U publication Critical patent/CN205012217U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses an overpass vase mound formwork support unites structure, belong to city overpass vase mound construction field, its structure includes the straightway template top installation lower carriage of pouring the straightway pier stud, reach the curve segment formwork support who sets up on the lower carriage and be used for the curve segment form setting, pour the curve segment template top of curve segment pier stud again and installing the support, and set up on the upper bracket and be used for bent cap side formwork support and the bent cap of bent cap form setting at the bottom of formwork support, through designing the just perfect construction that realizes the vase mound of ability of application method that above -mentioned formwork support combination structure and coupling phase were answered, and this kind of formwork support combination structure need not occupy great construction region space when the construction, favourable construction vehicle is current, still has the simple structure, high durability and convenient use, structure safety, the economical rationality, embody the standardization, advantages such as standardized construction, the present invention has higher economical benefit and social benefit.

Description

Viaduct vase pier falsework co-ordinative construction
Technical field
The utility model relates to a kind of urban viaduct vase pier construction field, specifically refers to viaduct vase pier falsework co-ordinative construction.
Background technology
In modern large small city, congested in traffic, building is intensive, and street is difficult to widen, therefore when carrying out urban viaduct design, first the impact on view should be considered, secondly, while the detailing requiments considering structure self and requirement of strength, also need the design focusing on bridge, be placed on extrusion position to the Beautification design of structure, and coordinate with surrounding enviroment unification, combine together. as far as possibleMechanical Builds and each spot size ratio should be coordinated mutually, and girder construction unfolds smoothness, are particular about its line style, and infrastructure is succinctly light and handy, and permeability is good, thus make viaduct become the beautiful scenery together in city.
At present, viaduct superstructure generally uses the beam bridge structure such as case beam or T beam, pattern is flat, dull, the bridge pier of substructure will play important effect to beautifying viaduct, and profile can bear the load of superstructure similar in appearance to the vase pier of vase, can reserve enough spaces again to ground level road, under the superstructure that viaduct that is narrow, that constrain is heavy, more seem attractive in appearance, smooth, spacious, allow people be rich in active, slim and graceful and pure and fresh sensation, therefore be widely used.
Vase pier is a kind of more special pillarwork, is made up of linear grace, lightly very thin queen post and bent cap, and structure makes a big difference with open side type entity pier stud or queen post pier stud.The vase pier reinforcing bar content that gathers is high, curve deformed bar quantity and joint many, constructing operation process is numerous and diverse, construction and operation stage force-bearing situation complicated, for outward appearance and inherent quality requirement very high.Just because of these particularity, existing vase pier construction generally needs to set up floor stand, constructing operation personnel carry out pier stud and capping beam template, reinforcement installation operation and bent cap prestressed stretch-draw on floor stand, and floor stand is also as the load-carrying members of outer outstanding curve pier stud and Coping Construction simultaneously.And setting up of floor stand needs basement process, with the generation avoiding support sedimentation to cause pier stud and bent cap crack, and floor stand occupies larger construction area space, affects Construction traffic and passes through, unfavorable construction operation.
Simultaneously, the construction method that existing open side type entity pier stud or two columned pier bent cap combine without rack template support, as pre-buried method, Hold Hoop method, suspension method etc. are not suitable for the construction of vase pier, its major defect is: pre-buried method need arrange through the shaped steel of pier stud or arrange bracket on pier stud in pier stud, using the supporter as template and support, there is larger damage to pier stud, also affect attractive in appearance; Hold Hoop method installs anchor ear at the suitable position of pier stud and make it to clamp with pier stud, utilize the frictional force between anchor ear and pier stud that template and bent cap weight supporting are reached pier stud, this is difficult to provide enough frictional force to transmit load safely for very thin vase pier pier stud, also can damage the concrete on pier stud surface and affect attractive in appearance; Suspension method needs pre-buried shaped steel in pier stud, there is provided suspension force with support shuttering and bent cap weight by pre-buried shaped steel, and the cross section of vase pier pier stud is little, the reinforcing bar of pier stud own gathers, it is again curved profile, be difficult to the embedding space that shaped steel is provided, and the stressed pier stud that may make of shaped steel produces crack, unfavorable structural safety.And; single with regard to pier stud construction; namely without the pier stud of bent cap; some entity height piers or Hollow High Pier adopt without support sliding formwork or over-form construction usually; also the way setting up operating platform in template is had; but this ease of Use platform bearer ability is low, is not also suitable for the construction of the tiny curve pier stud of vase pier, because vase pier also being arranged bent cap support needed for bent cap and Coping Construction and having the bent cap stretch-draw prestressing force equipment of larger working load.
Summary of the invention
Technical problem to be solved in the utility model is to overcome the defect of prior art and provides the viaduct vase pier falsework co-ordinative construction of a kind of simple structure, easy to use, structural safety, economical rationality.
Technical problem of the present utility model is achieved through the following technical solutions:
A kind of viaduct vase pier falsework co-ordinative construction, comprise cushion cap, build two pier studs being connected on cushion cap and build the bent cap be connected between two pier studs, described every root pier stud is all be made up of straightway pier stud and curved section pier stud, this straightway pier stud is built shaping by the straight-line segment template be arranged on cushion cap, this curved section pier stud is built shaping by the curved section template be connected in straight-line segment template, this bent cap is by building shaping across the capping beam template be connected in two curved section templates, between the straight-line segment template top of two described pier studs, lower carriage is installed, this lower carriage is provided with two curved section templates, support is installed between two described curved section die head, this upper bracket is provided with the bent cap side falsework and bent cap soffit formwork support installed for described capping beam template.
Described lower carriage comprises lower carriage crossbeam, many lower carriage pull bars, lower carriage longeron, lower carriage platform and lower carriage railing, described lower carriage crossbeam is the i iron that two levels are placed in two straight-line segment template top outer, the top outer of lower carriage crossbeam and straight-line segment template is connected to each other, many described lower carriage pull bars are connected on lower carriage crossbeam by the preformed hole tension at straight-line segment template top, described lower carriage longeron is many and lays and be fixed on the channel-section steel on lower carriage crossbeam, described lower carriage platform is connect the steel plate be arranged on lower carriage longeron, described lower carriage railing is enclose the frame type railing being arranged on lower carriage platform periphery, anti-falling screen is wrapped up outside this lower carriage railing.
Described upper bracket comprises upper bracket collet, upper bracket crossbeam, many upper bracket pull bars, upper bracket longeron, upper bracket platform and upper bracket railing, described upper bracket collet is arranged on outside curved section die head and does supporting role for upper bracket crossbeam, described upper bracket crossbeam is the i iron that two levels are placed in outside two curved section die head, many described upper bracket pull bars are connected on upper bracket crossbeam by the preformed hole tension of curved section die head, described upper bracket longeron is many and lays and be fixed on the channel-section steel on upper bracket crossbeam, described upper bracket platform is connect the steel plate be arranged on upper bracket longeron, described upper bracket railing is enclose the frame type railing being arranged on upper bracket platform periphery, anti-falling screen is wrapped up outside this upper bracket railing.
Multiple medium-height trestle is provided with between described upper bracket and lower carriage.
Described capping beam template comprises bent cap facade template, bent cap side template and bent cap soffit formwork, described bent cap facade template is facade strip, bottom support is on upper bracket, described bent cap side template is rectangle, be provided with the bent cap side falsework installed and support outside it, this bent cap side falsework is arranged on upper bracket, and described bent cap soffit formwork facade is arch, be provided with the bent cap soffit formwork support installed and support bottom it, this bent cap soffit formwork support installing is on upper bracket.
Described straight-line segment template is assembled by 2 ~ 4 pieces of straight tubular constructions of the hollow be connected to each other, and this straight-line segment template bottom is arranged on cushion cap, straight-line segment template top junction curve section template.
Described curved section template is assembled by 2 ~ 4 pieces of curved hollow tubular constructions be connected to each other, this curved section template bottom connects straight-line segment template, curved section template top connection cover beam forms, outside curved section template, be provided with the curved section falsework installed and support, this curved section falsework is arranged on lower carriage.
Described vase pier side arranges for the upper and lower terraced cage of constructing operation person walks, this terraced cage is the rectangular frame that steel material is made, anti-falling screen is wrapped up outside ladder cage, be provided with in ladder cage and spiraled to top the ladder extended by bottom, be provided with locking movable pulley bottom ladder cage, terraced cage side is just provided with dodge gate to the position of lower carriage and upper bracket.
Described bent cap be by capping beam template with bent cap cage of reinforcement and concreting shaping, these bent cap placed on top bridge deck, bent cap facade is elongated, and the bottom surface of bent cap between two pier studs is set to arcuate surface, and two outside cantilevers stretching out two pier studs respectively outward of bent cap are rectangular; Described cushion cap be by cushion cap template with cushion cap reinforcing bar and concreting shaping, the embedded bar of pier stud reserved by this cushion cap reinforcing bar; Described straightway pier stud be by straight-line segment template with straightway cage of reinforcement and concreting shaping; Described curved section pier stud be by curved section template with curved section cage of reinforcement and concreting shaping; Described cushion cap, straightway pier stud, curved section pier stud and bent cap form the vase pier of viaduct jointly.
Compared with prior art, the utility model devises a kind of falsework co-ordinative construction being applied to the construction of urban viaduct vase pier, it mainly installs lower carriage at the straight-line segment template top of building straightway pier stud, and to be arranged on lower carriage and for the curved section falsework of curved section model sheetinstallat, support is installed again at the curved section die head of building curved section pier stud, and to be arranged on upper bracket and the bent cap side falsework installed for capping beam template and bent cap soffit formwork support, by designing above-mentioned falsework co-ordinative construction and just perfect can realizing the construction of vase pier in conjunction with corresponding using method, and this falsework co-ordinative construction does not need to occupy larger construction area space when constructing, favourable Construction traffic passes through, and there is simple structure, easy to use, structural safety, economical rationality, embody standardization, the advantages such as standardized construction, therefore there is higher economic benefit and social benefit.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the A direction view of Fig. 1.
Fig. 3 is the structural representation of terraced cage.
Fig. 4 is vase pier Application Example structural representation.
Fig. 5 is using method flow chart of the present utility model.
Detailed description of the invention
To elaborate again to the utility model embodiment by above-mentioned accompanying drawing below.
As shown in Fig. 1 ~ Fig. 5, 1. cushion cap, 11. cushion cap reinforcing bars, 2. pier stud, 21. straightway pier studs, 22. straightway cage of reinforcement, 23. curved section pier studs, 24. curved section cage of reinforcement, 3. bent cap, 31. bent cap cage of reinforcement, 4. capping beam template, 41. bent cap soffit formwork supports, 42. bent cap facade templates, 43. bent cap soffit formworks, 44. bent cap side falseworks, 45. bent cap side templates, 5. upper bracket, 51. upper bracket pull bars, 52. upper bracket platforms, 53. upper bracket railings, 54. upper bracket longerons, 55. upper bracket crossbeams, 56. upper bracket collets, 6. curved section falsework, 7. curved section template, 8. lower carriage, 81. lower carriage platforms, 82. lower carriage railings, 83. lower carriage longerons, 84. lower carriage crossbeams, 85. lower carriage pull bars, 9. straight-line segment template, 10. terraced cage.
Viaduct vase pier falsework co-ordinative construction, relate to a kind of form of construction work for building viaduct vase pier, and it mainly comprises the falsework co-ordinative construction shown in Fig. 1, Fig. 2 and these two parts of falsework co-ordinative construction using method shown in Fig. 5.
The vase pier structure of described viaduct is by cushion cap 1, builds two pier studs 2 being connected on cushion cap and build the bent cap 3 be connected between two pier studs and form.
Wherein, cushion cap 1 is reinforced concrete structure, and its underpart is pile foundation, cushion cap 1 is for connecting pile foundation and two pier studs 2, can arrange cushion cap template, colligation cushion cap reinforcing bar 11 after pile foundation completes, then shaping with concreting, cushion cap reinforcing bar 11 need reserve the embedded bar of pier stud 2.
The dimensional structure of two pier studs 2 is identical, all be made up of the straightway pier stud 21 of bottom and the curved section pier stud 23 on top, be connected with cushion cap 1 bottom this straightway pier stud 21, curved section pier stud 23 top is connected with bent cap 3, and two curved section pier studs 23 are for opposing and be bent outwardly setting, therefore the profile that two pier studs 2 design on cushion cap 1 is lightly attractive in appearance, and straightway pier stud 21 be by be arranged on straight-line segment template 9 on cushion cap 1 with straightway cage of reinforcement 22 and concreting shaping, curved section pier stud 23 be by be connected to curved section template 7 in straight-line segment template 9 with curved section cage of reinforcement 24 and concreting shaping.
Described bent cap 3 be by across the capping beam template 4 be connected in two curved section templates 7 with bent cap cage of reinforcement 31 and concreting shaping, be connected with curved section pier stud 23 top of two pier studs 2 bottom bent cap 3, bent cap 3 placed on top bridge deck, bent cap 3 facade is elongated, be set to arcuate surface in the bottom surface of bent cap 3 between two pier studs 2 to promote aesthetic property, two outside cantilevers stretching out two pier studs 2 respectively outward of bent cap 3 are rectangular.
Above-mentioned cushion cap reinforcing bar 11, straightway cage of reinforcement 22, curved section cage of reinforcement 24 and bent cap cage of reinforcement 31 are all topmost stressed members, in order to ensure the quality of products and convenient construction, in factory by according to cushion cap 1, pier stud 2 is different with the profile of bent cap 3 and correspondingly make shaping, appointed part is winched to by loop wheel machine after being transported to job site by transport vehicle again, cushion cap reinforcing bar 11, use reinforced bar sleeve to be interconnected between straightway cage of reinforcement 22 and curved section cage of reinforcement 24, bent cap cage of reinforcement 31 and curved section cage of reinforcement 24 top use steel wire lashing firm.
Above-mentioned cushion cap template, straight-line segment template 9, curved section template 7, capping beam template 4 build the concrete mould of these formation vase pier shaped members of cushion cap 1, pier stud 2 and bent cap 3 for correspondence, and design according to the exact shape of pier stud 2 and bent cap 3, be steel, be made by template material, section steel material and connector.
Above-mentioned concrete is the primary structural material of vase pier, is transported to job site by batching plant's mixing transport vehicle, and pump truck is pumped in straight-line segment template 9, in curved section template 7 and in capping beam template 4 builds, solidifies to form vase pier structure.
Described straight-line segment template 9 is the straight tubular construction of hollow, and at short transverse linear uniform section, cross section is identical with the cross sectional shape of straightway pier stud 21, and interior sectional dimension is identical with the cross section of straightway pier stud 21; The straight tubular construction of straight-line segment template 9 hollow assembles by 2 ~ 4 pieces, and be beneficial to assembling and remove, this assembly type multi-section structure, the height often saved is all determined by the overall height of straight-line segment template 9, often saves between adjacent straight-line segment template 9 and is connected firmly with bolt.
Described curved section template 7 is curved hollow tubular construction, and identical with curved section pier stud 23 profile in short transverse, cross section is identical with the cross sectional shape of curved section pier stud 23, and interior sectional dimension is identical with the cross section of curved section pier stud 23; It is assemble by 2 ~ 4 pieces that curved section template 7 bends tubular construction, and be beneficial to assembling and remove, this assembly type multi-section structure, the height often saved is all determined by the overall height of curved section template 7, often saves between adjacent curved section template 7 and is connected firmly with bolt.
Described capping beam template 4 comprises bent cap facade template 42, bent cap side template 45 and bent cap soffit formwork 43; Wherein, bent cap facade template 42 is facade strip, and in short transverse, the short transverse of sectional dimension and bent cap 3 is measure-alike, and bottom support is on the upper bracket longeron 54 of upper bracket 5; Bent cap side template 45 is rectangle, and interior sectional dimension is identical with the cross section of curved section pier stud 23, and outside is provided with the bent cap side falsework 44 installed and support, and this bent cap side falsework is arranged on the upper bracket longeron 54 of upper bracket 5 by bolt; Bent cap soffit formwork 43 facade is arch, distance between length dimension with two curved section pier stud 23 tops is identical, width is identical with bent cap 3 bottom width, be provided with the bent cap soffit formwork support 41 installed and support in the bottom of bent cap soffit formwork 43, this bent cap soffit formwork support is arranged on the upper bracket longeron 54 of upper bracket 5 by bolt.
Be provided with lower carriage 8 between two described straight-line segment template 9 tops, this lower carriage is provided with the curved section falsework 6 installed for two curved section templates 7; Described lower carriage 8 comprises lower carriage crossbeam 84, many lower carriage pull bars 85, lower carriage longeron 83, lower carriage platform 81 and lower carriage railings 82; Wherein, lower carriage crossbeam 84 is that the i iron of two levels extends along the direction of two pier studs 2 and is placed in two straight-line segment template 9 top outer, specifically be placed in the steel members of straight-line segment template 9, the inboard width of two i iron is identical with the external dimensions of straight-line segment template 9, the outside of i iron and straight-line segment template 9 uses bolt to be connected firmly, two i iron re-use many lower carriage pull bars 85 and connect, these many lower carriage pull bars are connected on lower carriage crossbeam 84 by the preformed hole tension at straight-line segment template 9 top, and are strained by lower carriage crossbeam 84 firmly; Lower carriage longeron 83 is the many channel-section steels being laid on lower carriage crossbeam 84, and these many channel-section steels and lower carriage crossbeam 84 are bolted firmly; Lower carriage platform 81 is connect the steel plate be arranged on lower carriage longeron 83, and this steel plate is connected firmly by bolt and lower carriage longeron 83, and the size of lower carriage platform 81 meets the operation instructions for use of constructing operation personnel, small-sized machine and instrument etc.; The frame type railing that lower carriage railing 82 forms for steel pipe, bolt is used to be arranged on lower carriage longeron 83 and lower carriage platform 81, and enclosing the periphery being arranged on lower carriage platform 81, wrapping up anti-falling screen outside lower carriage railing 82, is the use that personnel's construction safety and protection small article fall.
Described upper bracket 5 is arranged between two curved section template 7 tops, and it comprises upper bracket collet 56, upper bracket crossbeam 55, many upper bracket pull bars 51, upper bracket longeron 54, upper bracket platform 52 and upper bracket railings 53; Wherein, upper bracket collet 56 is arranged on curved section template 7 top outer, and this upper bracket collet 56 side is connected with bolt with curved section template 7, bottom upper bracket collet 56 end face supporting upper bracket crossbeam 55, plays the effect of fixing upper bracket crossbeam 55; Upper bracket crossbeam 55 is that the i iron of two levels extends along the direction of two pier studs 2 and is placed in two curved section template 7 top outer, specifically be placed in the steel members of curved section template 7, the inboard width of two i iron is identical with the external dimensions of curved section template 7, the outside of i iron and curved section template 7 uses bolt to be connected firmly, two i iron re-use many upper bracket pull bars 51 and connect, these many upper bracket pull bars 51 are connected on upper bracket crossbeam 55 by the preformed hole tension at curved section template 7 top, and are strained by upper bracket crossbeam 55 firmly; Upper bracket longeron 54 is the many channel-section steels being laid on upper bracket crossbeam 55, and these many channel-section steels and upper bracket crossbeam 55 are bolted firmly; Upper bracket platform 52 is connect the steel plate be arranged on upper bracket longeron 54, and this steel plate is connected firmly by bolt and upper bracket longeron 54, and the size of upper bracket platform 52 meets the operation instructions for use of constructing operation personnel, small-sized machine and instrument etc.; The frame type railing that upper bracket railing 53 forms for steel pipe, bolt is used to be arranged on upper bracket longeron 54 and upper bracket platform 52, and enclosing the periphery being arranged on upper bracket platform 52, wrapping up anti-falling screen outside upper bracket railing 53, is the use that personnel's construction safety and protection small article fall.
In the middle of lower carriage 8 and upper bracket 5 also can according to the overall height of vase pier and constructing operation convenient and increase multiple medium-height trestle, this medium-height trestle and lower carriage 8, upper bracket 5 project organization are similar.
Lower carriage 8 and upper bracket 5 is arrived for the ease of constructing operation personnel, can arrange as shown in Figure 3 with the terraced cage 10 that steel material makes in vase pier side, this terraced cage is the fixed step for upper and lower two rack platforms of constructing operation person walks, and profile is quadra, outside parcel anti-falling screen, be provided with in ladder cage 10 and spiraled to top the ladder extended by bottom, width and the height of every step ladder are advisable with convenient construction operating personnel going up or down stairway, spiraling of ladder mainly extends to opposite direction after a direction extends again, its number is the progression of terraced cage, the progression of ladder cage is depending on the height of two rack platforms, can be customized according to demand by special producer, ladder cage is an independent device, locking movable pulley is provided with bottom it, removable near or away from two rack platforms, every grade of terraced cage place, namely just dodge gate is provided with to the position of lower carriage 8 and upper bracket 5, for constructing operation personnel turnover.
Viaduct vase pier falsework co-ordinative construction has corresponding using method, and constructs according to step shown in Fig. 5:
Step one, formulation vase pier falsework co-ordinative construction constructure scheme:
1. designing and calculating falsework co-ordinative construction, according to design feature and the quality requirement of vase pier, in conjunction with constructing operation operation, analyze the stressing conditions of construction stage load and structure, design viaduct vase pier falsework co-ordinative construction, by the force and deformation data of finite element software calculated line section template, curved section template, lower carriage, upper bracket, need meet the static stress and distortion requirement of structural element, the associated components of making and rigging support co-ordinative construction, and be up to the standards;
2. reserved, the concreting of cushion cap reinforcing bar 11, the embedded bar that pier stud reserved by cushion cap reinforcing bar is treated to be connected with the straightway cage of reinforcement 22 of pier stud 2;
3. pier stud straightway cage of reinforcement 22, curved section cage of reinforcement 24 and bent cap cage of reinforcement 31 is made;
Step 2, two straightway pier stud constructions:
1. the straightway cage of reinforcement 22 of straightway pier stud 21 is lifted, and use straight screw sleeve connection with the embedded bar that pier stud reserved by cushion cap reinforcing bar 11, the installation site of straightway cage of reinforcement 22 must be up to the standards, and the quality of connection of the reinforced bar sleeve that the embedded bar that straightway cage of reinforcement 22 reserves pier stud with cushion cap reinforcing bar 11 is connected also must be up to the standards;
2. polylith straight-line segment template 9 is hung in straightway pier stud 21 place at cushion cap 1 top with loop wheel machine, and use bolt to connect polylith straight-line segment template 9 successively, accurately, form firm straight-line segment template structure, the installation quality of straight-line segment template 9 must be up to the standards in position adjustment;
3. use pump truck pumping of concrete in straight-line segment template 9, health one week, treats that concrete strength reaches more than 70% of design strength and can carry out lower step construction;
Step 3, cage 10 to straightway pier stud 21 place of ramp, locking movable pulley fixed ladder cage location carries out constructing operation with the upper descending stair cage of convenient construction operating personnel;
Step 4, installation lower carriage:
1. loop wheel machine hangs in two i iron as lower carriage crossbeam 84, bolt is used to be connected with the top outer of straight-line segment template 9 on lower carriage crossbeam, again by the preformed hole of many lower carriage pull bars 85 through straight-line segment template 9 top, and the lower carriage pull bar 85 screwed on lower carriage crossbeam 84, fixedly secure lower carriage crossbeam 84 in the top of straight-line segment template 9;
2. on lower carriage crossbeam 84, lay the many channel-section steels as lower carriage longeron 83, and use bolt to be connected with lower carriage crossbeam 84 in many channel-section steels;
3. on many channel-section steels of lower carriage longeron 83, lay the steel plate as lower carriage platform 81, and use bolt to be connected with lower carriage longeron 83 steel plate;
4. the frame type railing that forms for steel pipe of lower carriage railing 82, bolt is used to be connected on lower carriage longeron 83 and lower carriage platform 81, and enclose the periphery being arranged on lower carriage platform 81, outside parcel anti-falling screen, be the use that personnel's construction safety and protection small article fall;
5. installation curve section falsework 6, this curved section falsework is installed and is supported curved section template 7, is fixed by bolts on lower carriage longeron 83 bottom curved section falsework 6;
Step 5, two pier stud curved section constructions:
1. the curved section cage of reinforcement 24 of curved section pier stud 23 is lifted, straight screw sleeve connection is used with the straightway cage of reinforcement 22 of having constructed, the installation site of curved section cage of reinforcement 24 must be up to the standards, and curved section cage of reinforcement 24 also must be up to the standards with the quality of connection of the reinforced bar sleeve that the straightway cage of reinforcement 22 of having constructed is connected;
2. polylith curved section template 7 loop wheel machine is hung in straight-line segment template 9 top, and use bolt to connect polylith curved section template 7 successively, accurately, form firm curved section formwork structure, the installation quality of curved section template 7 must be up to the standards in position adjustment;
3. use pump truck pumping of concrete in curved section template 7, health one week, treats that concrete strength reaches more than 70% of design strength and can carry out lower step construction;
Step 6, install support:
1. loop wheel machine hangs in two i iron as upper bracket crossbeam 55, bolt is used to be connected with the top outer of curved section template 7 on upper bracket crossbeam, again by the preformed hole of many upper bracket pull bars 51 through curved section template 7 top, and the upper bracket pull bar 51 screwed on upper bracket crossbeam 55, fixedly secure upper bracket crossbeam 55 in the top of curved section template 7;
2. on upper bracket crossbeam 55, lay the many channel-section steels as upper bracket longeron 54, and use bolt to be connected with upper bracket crossbeam 55 in many channel-section steels;
3. on many channel-section steels of upper bracket longeron 54, lay the steel plate as upper bracket platform 52, and use bolt to be connected with upper bracket longeron 54 steel plate;
4. the frame type railing that forms for steel pipe of upper bracket railing 53, bolt is used to be arranged on upper bracket longeron 54 and upper bracket platform 52, and enclose the periphery being arranged on upper bracket platform 52, outside parcel anti-falling screen, be the use that personnel's construction safety and protection small article fall;
5. mounting cover side template support 44, is fixed by bolts on upper bracket longeron 54 bottom bent cap side falsework;
6. mounting cover beam bottom mother plate support 41, bent cap soffit formwork frame bottom bolt is arranged on upper bracket longeron 54;
Step 7, Coping Construction:
1. mounting cover beam bottom mother plate 43 on mounting cover side template 45, bent cap soffit formwork support 41 on bent cap side falsework 44 respectively, upper bracket longeron 54 is installed bent cap facade template 42, and bent cap side template 45, bent cap soffit formwork 43 and bent cap facade template 42 jointly form capping beam template 4 and installation quality must be up to the standards;
2. in bent cap side template 45, bent cap soffit formwork 43 and bent cap facade template 42, hang in bent cap cage of reinforcement 31 with loop wheel machine, accurately, bent cap cage of reinforcement 31 and curved section cage of reinforcement 24 top use steel wire lashing firm, and installation quality must be up to the standards in position adjustment;
3. use pump truck pumping of concrete in capping beam template 4, health one week, treats that concrete strength reaches more than 70% of design strength and can carry out lower step construction;
Step 8, according to install opposite sequence remove successively capping beam template 4, upper bracket 5, curved section template 7, lower carriage 8 and straight-line segment template 9 and concentrate place, through the maintaining Later Zhou Dynasty, one of the Five Dynasties forward to next vase pier use.
The utility model also by a concrete Application Example table and composition graphs 4 be described further.
Vase pier Application Example table
Embodiment described in the utility model is only not used in restriction scope of the present utility model for illustration of the utility model.Should be understood that those skilled in the art can make various changes or modifications the utility model, and these equivalent form of values fall within the application's appended claims limited range equally after the content of having read the utility model instruction in addition.

Claims (9)

1. a viaduct vase pier falsework co-ordinative construction, comprise cushion cap (1), build two pier studs (2) being connected on cushion cap and build the bent cap (3) be connected between two pier studs, described every root pier stud (2) is all be made up of straightway pier stud (21) and curved section pier stud (23), this straightway pier stud (21) is built shaping by the straight-line segment template (9) be arranged on cushion cap (1), this curved section pier stud (23) is built shaping by the curved section template (7) be connected in straight-line segment template (9), this bent cap (3) is by building shaping across the capping beam template (4) be connected on two curved section templates (7), it is characterized in that, between straight-line segment template (9) top described in two, lower carriage (8) is installed, this lower carriage is provided with the curved section falsework (6) installed for described two curved section templates (7), support (5) is installed between two described curved section template (7) tops, this upper bracket is provided with the bent cap side falsework (44) and bent cap soffit formwork support (41) installed for described capping beam template (4).
2. viaduct vase pier falsework co-ordinative construction according to claim 1, it is characterized in that described lower carriage (8) comprises lower carriage crossbeam (84), many lower carriage pull bars (85), lower carriage longeron (83), lower carriage platform (81) and lower carriage railing (82), described lower carriage crossbeam (84) is the i iron that two levels are placed in two straight-line segment template (9) top outer, lower carriage crossbeam (84) is connected to each other with the top outer of straight-line segment template (9), many described lower carriage pull bars (85) are connected on lower carriage crossbeam (84) by the preformed hole tension at straight-line segment template (9) top, described lower carriage longeron (83) is laid and is fixed on the channel-section steel on lower carriage crossbeam (84) for many, described lower carriage platform (81) is arranged on the steel plate on lower carriage longeron (83) for connection, described lower carriage railing (82) is arranged on the peripheral frame type railing of lower carriage platform (81) for enclosing, this lower carriage railing (82) outside parcel anti-falling screen.
3. viaduct vase pier falsework co-ordinative construction according to claim 1, it is characterized in that described upper bracket (5) comprises upper bracket collet (56), upper bracket crossbeam (55), many upper bracket pull bars (51), upper bracket longeron (54), upper bracket platform (52) and upper bracket railing (53), described upper bracket collet (56) is arranged on curved section template (7) top outer and does supporting role for upper bracket crossbeam (55), described upper bracket crossbeam (55) is the i iron that two levels are placed in two curved section template (7) top outer, many described upper bracket pull bars (51) are connected on upper bracket crossbeam (55) by the preformed hole tension at curved section template (7) top, described upper bracket longeron (54) is laid and is fixed on the channel-section steel on upper bracket crossbeam (55) for many, described upper bracket platform (52) is arranged on the steel plate on upper bracket longeron (54) for connection, described upper bracket railing (53) is arranged on the peripheral frame type railing of upper bracket platform (52) for enclosing, this upper bracket railing (53) outside parcel anti-falling screen.
4. viaduct vase pier falsework co-ordinative construction according to claim 1, is characterized in that being provided with multiple medium-height trestle between described upper bracket (5) and lower carriage (8).
5. viaduct vase pier falsework co-ordinative construction according to claim 1, it is characterized in that described capping beam template (4) comprises bent cap facade template (42), bent cap side template (45) and bent cap soffit formwork (43), described bent cap facade template (42) is facade strip, bottom support is on upper bracket (5), described bent cap side template (45) is rectangle, the bent cap side falsework (44) installed and support is provided with outside it, this bent cap side falsework (44) is arranged on upper bracket (5), described bent cap soffit formwork (43) facade is arch, the bent cap soffit formwork support (41) installed and support is provided with bottom it, this bent cap soffit formwork support installing is on upper bracket (5).
6. viaduct vase pier falsework co-ordinative construction according to claim 1, it is characterized in that described straight-line segment template (9) is assembled by 2 ~ 4 pieces of straight tubular constructions of the hollow be connected to each other, this straight-line segment template (9) bottom is arranged on cushion cap (1), straight-line segment template (9) top junction curve section template (7).
7. viaduct vase pier falsework co-ordinative construction according to claim 1, it is characterized in that described curved section template (7) is assembled by 2 ~ 4 pieces of curved hollow tubular constructions be connected to each other, this curved section template (7) bottom connects straight-line segment template (9), curved section template (7) top connection cover beam forms (4), be provided with in curved section template (7) outside the curved section falsework (6) installed and support, this curved section falsework is arranged on lower carriage (8).
8. viaduct vase pier falsework co-ordinative construction according to claim 1, it is characterized in that described vase pier side arranges for the upper and lower terraced cage (10) of constructing operation person walks, this terraced cage is the rectangular frame that steel material is made, anti-falling screen is wrapped up outside ladder cage, be provided with in ladder cage (10) and spiraled to top the ladder extended by bottom, ladder cage (10) bottom is provided with locking movable pulley, and terraced cage side is just provided with dodge gate to the position of lower carriage (8) and upper bracket (5).
9. viaduct vase pier falsework co-ordinative construction according to claim 1, it is characterized in that described bent cap (3) be by capping beam template (4) with bent cap cage of reinforcement (31) and concreting shaping, this bent cap (3) placed on top bridge deck, bent cap (3) facade is elongated, the bottom surface that bent cap (3) is positioned between two pier studs (2) is set to arcuate surface, and two outside cantilevers stretching out two pier studs (2) respectively outward of bent cap (3) are rectangular; Described cushion cap (1) be by cushion cap template with cushion cap reinforcing bar (11) and concreting shaping, the embedded bar of the reserved pier stud (2) of this cushion cap reinforcing bar (11); Described straightway pier stud (21) be by straight-line segment template (9) with straightway cage of reinforcement (22) and concreting shaping; Described curved section pier stud (23) be by curved section template (7) with curved section cage of reinforcement (24) and concreting shaping; Described cushion cap (1), straightway pier stud (21), curved section pier stud (23) and bent cap (3) form the vase pier of viaduct jointly.
CN201520724340.9U 2015-09-18 2015-09-18 Overpass vase mound formwork support unites structure Expired - Fee Related CN205012217U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520724340.9U CN205012217U (en) 2015-09-18 2015-09-18 Overpass vase mound formwork support unites structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520724340.9U CN205012217U (en) 2015-09-18 2015-09-18 Overpass vase mound formwork support unites structure

Publications (1)

Publication Number Publication Date
CN205012217U true CN205012217U (en) 2016-02-03

Family

ID=55210829

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520724340.9U Expired - Fee Related CN205012217U (en) 2015-09-18 2015-09-18 Overpass vase mound formwork support unites structure

Country Status (1)

Country Link
CN (1) CN205012217U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105113388A (en) * 2015-09-18 2015-12-02 宁波交通工程建设集团有限公司 Formwork and bracket combining structure of vase pier of viaduct and application method
CN105951599A (en) * 2016-05-23 2016-09-21 中交第航务工程局有限公司 High-upright formwork integrated construction technology
CN114960455A (en) * 2022-06-28 2022-08-30 保利长大工程有限公司 Method for preventing and treating cracking of bonding surface of flower vase pier column and cover beam

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105113388A (en) * 2015-09-18 2015-12-02 宁波交通工程建设集团有限公司 Formwork and bracket combining structure of vase pier of viaduct and application method
CN105113388B (en) * 2015-09-18 2017-01-25 宁波交通工程建设集团有限公司 Formwork and bracket combining structure of vase pier of viaduct and application method
CN105951599A (en) * 2016-05-23 2016-09-21 中交第航务工程局有限公司 High-upright formwork integrated construction technology
CN105951599B (en) * 2016-05-23 2018-10-09 中交第一航务工程局有限公司 High column mould bases integrated construction technique
CN114960455A (en) * 2022-06-28 2022-08-30 保利长大工程有限公司 Method for preventing and treating cracking of bonding surface of flower vase pier column and cover beam

Similar Documents

Publication Publication Date Title
CN105113388A (en) Formwork and bracket combining structure of vase pier of viaduct and application method
CN103410320B (en) The tower silo flexibility platform bitubular connects sliding construction method
KR101304262B1 (en) Composite bridge using the tapered i-type girders
CN107905114A (en) A kind of construction method of large span Successive interference cancellation
CN105568870B (en) For the triangle hanging basket method cantilever device and its construction method of cross-line bridge construction
CN205012217U (en) Overpass vase mound formwork support unites structure
CN114770706B (en) Light T-beam prefabrication equipment and prefabrication installation construction method
CN106192717A (en) Bridge steel and concrete mixing section and installation method thereof
CN103352417A (en) Prestressed concrete variable cross-section box girder bridge, movable suspended scaffolding and construction method of prestressed concrete variable cross-section box girder bridge
CN207159827U (en) No. 1 plate installation and positioning structure in No. 0 block of Wavelike steel webplate bridge
CN208122461U (en) The construction equipment of towering structure
CN202466431U (en) Bridge specific model vase pier construction device
CN110042743A (en) The hydraulic climbing die block system of twin legged thin wall hollow pier with synchronize climb construction technology
CN103835238B (en) A kind of high pier cable stayed bridge No. 0 block non-stand construction method and the structure in constructing
JP2001146718A (en) Bridge floor slab projection moving and supporting structure
CN203795315U (en) High pier cable-stayed bridge No.0 block non-bracket construction structure
JP2014227754A (en) Bridge girder and construction method of bridge girder
CN210658035U (en) Draw to one side and hang knot supporting structure
CN107326812A (en) No. 1 plate installation and positioning structure and operating method in No. 0 block of Wavelike steel webplate bridge
CN104453228A (en) Construction method of large-span super-large-section steel plate wall beam
CN106284086A (en) A kind of method utilizing electronic climbing apparatus to pour into a mould high pier stud
JP4516585B2 (en) Internal staircase for building and its construction method
CN207160217U (en) Building frame construction provided with side bar
CN206457971U (en) A kind of prefabricated overlapped hollow plate of prestressing force
CN108797350B (en) Tower column inner and outer stiff skeleton device and construction method thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Lou Shurui

Inventor after: Du Yunfei

Inventor after: Chen Zhouzhou

Inventor after: Duan Qunmiao

Inventor after: Zhou Yiqin

Inventor after: Yao Jun

Inventor after: Chu Xinfa

Inventor after: Liu Shubo

Inventor after: Ran Ping

Inventor after: Guo Zhiqi

Inventor after: Cheng Shuiwu

Inventor after: Feng Jie

Inventor after: Lin Leihong

Inventor before: Yao Jun

Inventor before: Chen Zhouzhou

Inventor before: Duan Qunmiao

Inventor before: Zhou Yiqin

Inventor before: Chu Xinfa

Inventor before: Liu Shubo

Inventor before: Ran Ping

Inventor before: Guo Zhiqi

Inventor before: Cheng Shuiwu

Inventor before: Feng Jie

Inventor before: Lin Leihong

Inventor before: Du Yunfei

CB03 Change of inventor or designer information
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160203