CN203795315U - High pier cable-stayed bridge No.0 block non-bracket construction structure - Google Patents
High pier cable-stayed bridge No.0 block non-bracket construction structure Download PDFInfo
- Publication number
- CN203795315U CN203795315U CN201420074988.1U CN201420074988U CN203795315U CN 203795315 U CN203795315 U CN 203795315U CN 201420074988 U CN201420074988 U CN 201420074988U CN 203795315 U CN203795315 U CN 203795315U
- Authority
- CN
- China
- Prior art keywords
- anchor
- load
- bearing
- hanging
- rear anchor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
一种高墩斜拉桥0号块无支架施工结构,涉及高墩斜拉桥施工领域,其包括主塔横梁、承重梁和吊挂系统,所述吊挂系统下端悬挂底模系统和侧模系统。其中,还包括后锚系统和两个垫梁。所述两个垫梁沿横桥向平行铺设,一个铺设于主塔横梁上,另一个铺设于新浇注分节段上,两个垫梁上架设有承重梁。所述后锚系统位于垫梁上方,承重梁一端通过该后锚系统锚固于主塔横梁上,承重梁另一端延伸至主塔横梁外,延伸的承重梁上安装有吊挂系统。采用这种施工结构,无需使用超高超大的钢管立柱支架或钢牛腿托架,也无需利用斜拉索,降低了施工成本及施工要求,解决了对距离地面很高、节段超长的0号块难以施工的问题。
A support-free construction structure for No. 0 block of a high-pier cable-stayed bridge, which relates to the construction field of high-pier cable-stayed bridges, and includes a main tower beam, a load-bearing beam and a hanging system, and the lower end of the hanging system hangs a bottom formwork system and a side formwork system. Among them, the rear anchor system and two pad beams are also included. The two pad beams are laid in parallel along the transverse bridge direction, one is laid on the beam of the main tower, and the other is laid on the newly poured sub-section, and a load-bearing beam is erected on the two pad beams. The rear anchor system is located above the pad beam, one end of the load-bearing beam is anchored to the beam of the main tower through the rear anchor system, and the other end of the load-bearing beam extends to the outside of the beam of the main tower, and a suspension system is installed on the extended load-bearing beam. With this construction structure, there is no need to use super-high and super-large steel pipe column brackets or steel corbel brackets, and there is no need to use cable stays, which reduces construction costs and construction requirements, and solves the problem of high distance from the ground and long sections. Block 0 is difficult to construct.
Description
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420074988.1U CN203795315U (en) | 2014-02-21 | 2014-02-21 | High pier cable-stayed bridge No.0 block non-bracket construction structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420074988.1U CN203795315U (en) | 2014-02-21 | 2014-02-21 | High pier cable-stayed bridge No.0 block non-bracket construction structure |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN203795315U true CN203795315U (en) | 2014-08-27 |
Family
ID=51377544
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201420074988.1U Expired - Lifetime CN203795315U (en) | 2014-02-21 | 2014-02-21 | High pier cable-stayed bridge No.0 block non-bracket construction structure |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN203795315U (en) |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103835238A (en) * | 2014-02-21 | 2014-06-04 | 中铁大桥局股份有限公司 | High-pier cable-stayed bridge zero-number block non-bracket construction method and structure in construction process |
| CN105839541A (en) * | 2016-04-29 | 2016-08-10 | 贵州桥梁建设集团有限责任公司 | Construction method for rigid frame bridge No.0 section non-welding support and structure |
| CN105839538A (en) * | 2016-04-29 | 2016-08-10 | 贵州桥梁建设集团有限责任公司 | Construction method and structure for rigid frame bridge cast-in-situ section non-welded support |
| CN111663379A (en) * | 2020-06-08 | 2020-09-15 | 中国五冶集团有限公司 | Track beam mounting device and mounting method thereof |
| CN116122165A (en) * | 2023-01-07 | 2023-05-16 | 中铁大桥局集团有限公司 | Lifting device and platform lifting method for bridge construction platform |
| CN118186909A (en) * | 2024-01-04 | 2024-06-14 | 中铁广州工程局集团有限公司 | Cable-stayed bridge section construction device adopting temporary cables and construction method thereof |
-
2014
- 2014-02-21 CN CN201420074988.1U patent/CN203795315U/en not_active Expired - Lifetime
Cited By (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103835238A (en) * | 2014-02-21 | 2014-06-04 | 中铁大桥局股份有限公司 | High-pier cable-stayed bridge zero-number block non-bracket construction method and structure in construction process |
| CN103835238B (en) * | 2014-02-21 | 2015-11-18 | 中铁大桥局集团有限公司 | A kind of high pier cable stayed bridge No. 0 block non-stand construction method and the structure in constructing |
| CN105839541A (en) * | 2016-04-29 | 2016-08-10 | 贵州桥梁建设集团有限责任公司 | Construction method for rigid frame bridge No.0 section non-welding support and structure |
| CN105839538A (en) * | 2016-04-29 | 2016-08-10 | 贵州桥梁建设集团有限责任公司 | Construction method and structure for rigid frame bridge cast-in-situ section non-welded support |
| CN111663379A (en) * | 2020-06-08 | 2020-09-15 | 中国五冶集团有限公司 | Track beam mounting device and mounting method thereof |
| CN116122165A (en) * | 2023-01-07 | 2023-05-16 | 中铁大桥局集团有限公司 | Lifting device and platform lifting method for bridge construction platform |
| CN118186909A (en) * | 2024-01-04 | 2024-06-14 | 中铁广州工程局集团有限公司 | Cable-stayed bridge section construction device adopting temporary cables and construction method thereof |
| CN118186909B (en) * | 2024-01-04 | 2025-02-14 | 中铁广州工程局集团有限公司 | A construction device and construction method for a cable-stayed bridge section using temporary cables |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN101660296B (en) | Method for casting concrete 0# block support by continuous beam cantilever | |
| CN203795315U (en) | High pier cable-stayed bridge No.0 block non-bracket construction structure | |
| CN103243658B (en) | The spelling method of cable stayed bridge dragging suspension basket | |
| CN103669226B (en) | River-crossing prestressed concrete continuous beam bridge box girder 0# block support construction method | |
| CN203904851U (en) | Continuous beam side span straight section hanger support system | |
| CN104746435A (en) | Wide-angle Y-shaped pier column construction method | |
| KR20140084107A (en) | Self-Launching Movable Scaffolding System | |
| CN105568870B (en) | For the triangle hanging basket method cantilever device and its construction method of cross-line bridge construction | |
| CN104631333A (en) | Moving hanger frame and method for small cross beam, small longitudinal beam and bridge deck slab cast-in-situ construction of arch bridge | |
| CN102691266B (en) | Construction Method of Superelevation Composite Support in Cast-in-place Section of Side Span of Bridge | |
| CN103147385B (en) | Double-spliced extradosed cable-stayed bridge | |
| CN211815595U (en) | Lower tower column tension and compression structure for cable tower | |
| CN104314013B (en) | Two Cantilever Construction Methods of a kind of pole asymmetrical array beam | |
| CN106592406A (en) | Through tied arch bridge and construction method thereof | |
| CN103628416A (en) | Stiffening girder counter-straining near-pier bracket of suspension bridge | |
| CN105714692A (en) | Cast-in-cantilever beam concrete filled steel tube temporary concretion system | |
| CN211472207U (en) | Suspension beam system for hoisting prefabricated section box girder | |
| CN110820565A (en) | Suspended casting method for corrugated steel web hanging basket | |
| CN104805769B (en) | A kind of self-balancing arc beam cast-in-place support and construction method thereof | |
| CN112726411B (en) | Integral dragging construction method for single-hole large cantilever steel truss girder | |
| CN103835238B (en) | A kind of high pier cable stayed bridge No. 0 block non-stand construction method and the structure in constructing | |
| CN107401125B (en) | Traveling device of mobile trolley and using method | |
| CN110983987B (en) | Construction method of steel-concrete combined beam | |
| CN203654200U (en) | No. 0 block support for box girder of river-crossing prestressed concrete continuous beam bridge | |
| CN205116025U (en) | Hanger device is pour to self -balancing concrete case roof beam and T beam bridge cantilever edge of a wing secondary |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| ASS | Succession or assignment of patent right |
Owner name: GROUP CO., LTD., ZHONGTIE DAQIAO BUREAU Free format text: FORMER OWNER: CHINA ZHONGTIE MAJOR BRIDGE ENGINEERING CO., LTD. Effective date: 20150302 |
|
| C41 | Transfer of patent application or patent right or utility model | ||
| COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 430074 WUHAN, HUBEI PROVINCE TO: 430050 WUHAN, HUBEI PROVINCE |
|
| TR01 | Transfer of patent right |
Effective date of registration: 20150302 Address after: 430050 Hanyang Road, Hanyang District, Hubei, No. 38, No. Patentee after: Group Co., Ltd., Zhongtie Daqiao Bureau Address before: 430074 Hubei province Wuhan Dongxin East Lake New Technology Development Zone Road SBI Venture Street No. 6 Building 12 layer Patentee before: China Zhongtie Major Bridge Engineering Co., Ltd. |
|
| AV01 | Patent right actively abandoned |
Granted publication date: 20140827 Effective date of abandoning: 20151118 |
|
| C25 | Abandonment of patent right or utility model to avoid double patenting |