CN202466431U - Bridge specific model vase pier construction device - Google Patents

Bridge specific model vase pier construction device Download PDF

Info

Publication number
CN202466431U
CN202466431U CN2012201129868U CN201220112986U CN202466431U CN 202466431 U CN202466431 U CN 202466431U CN 2012201129868 U CN2012201129868 U CN 2012201129868U CN 201220112986 U CN201220112986 U CN 201220112986U CN 202466431 U CN202466431 U CN 202466431U
Authority
CN
China
Prior art keywords
vase
pier
steel
bridge
pier construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012201129868U
Other languages
Chinese (zh)
Inventor
周欣华
陈汉仕
曾明和
吴秋森
袁利清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Golden Century Engineering Industry Co Ltd
SHENZHEN GUANGYUANDA BUILDING ENGINEERING Co Ltd
SHENZHEN XINGBAN CONSTRUCTION ENGINEERING Co Ltd
Original Assignee
Shenzhen Golden Century Engineering Industry Co Ltd
SHENZHEN GUANGYUANDA BUILDING ENGINEERING Co Ltd
SHENZHEN XINGBAN CONSTRUCTION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Golden Century Engineering Industry Co Ltd, SHENZHEN GUANGYUANDA BUILDING ENGINEERING Co Ltd, SHENZHEN XINGBAN CONSTRUCTION ENGINEERING Co Ltd filed Critical Shenzhen Golden Century Engineering Industry Co Ltd
Priority to CN2012201129868U priority Critical patent/CN202466431U/en
Application granted granted Critical
Publication of CN202466431U publication Critical patent/CN202466431U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a bridge specific model vase pier construction device, which belongs to the technical field of building construction. The device comprises vase pier model splicing templates; steel horizontal frames with H-shaped sections are longitudinally distributed and fixed at intervals on the periphery of the splicing template; and steel studs which are distributed in the horizontal direction at intervals are fixedly connected between adjacent horizontal frames. After the device is combined on a top surface of a constructed bearing platform, a rigid whole body with a pouring cavity is formed, and the distance from one side to the ground can be conveniently adjusted through a jack supported between the bearing platform and H-shaped steel of the horizontal frame at the bottom, so that the perpendicularity can be effectively adjusted and controlled.

Description

The special moulding vase of a kind of bridge pier construction equipment
Technical field
The utility model relates to a kind of Bridge Pier Construction device, and the special moulding vase of especially a kind of bridge pier construction equipment belongs to technical field of building construction.
Background technology
Along with urban construction is fast-developing, the overhead road of city bridge system becomes the important way that makes up multilevel traffic.The vase pier of existing bridge beautiful design enjoys so that the lines flow smoothly to be gazed at.Though be applied to the demand attractive in appearance that viaduct can satisfy special moulding; But because the special building form of construction work of overhead road of city bridge system; Adopt the method for tradition typing punching block support to be difficult to guarantee perpendicularity deviation, therefore need innovate the construction equipment of this type of bridge pier.
Summary of the invention
The purpose of the utility model is: through architecture advances, propose a kind of special moulding vase of the bridge pier construction equipment that can effectively regulate and control verticality.
In order to reach above purpose; The special moulding vase of the bridge of the utility model pier construction equipment has vase pier moulding assembled formwork; Said assembled formwork periphery is intervally arranged up and down and is fixed with the steel horizontal pane that the cross section is a H shape, is fixed with horizontal direction steel stud spaced apart between the adjacent level frame.
Like this; The construction equipment of the utility model is after combination on ten thousand the cushion cap end face of constructing; Constitute one and have the rigid unitary of building the shape chamber; By the jack of top between cushion cap and bottom level frame H shape steel etc., can regulate the road clearance of one of which side easily, thereby effectively regulate and control its verticality.
Description of drawings
Below in conjunction with accompanying drawing the utility model is further described.
Fig. 1 is the structural representation of an embodiment of the utility model.
The specific embodiment
Embodiment one
The special moulding vase of the bridge of present embodiment pier construction equipment basic structure shown in Fig. 1, be structured on the cushion cap 1 by around after assembled formwork 2 amalgamations, constitute the up big and down small vase pier moulding in cross section.Assembled formwork 2 peripheries are intervally arranged up and down and are fixed with the steel horizontal pane 3 that the cross section is a H shape.Be fixed with horizontal direction steel stud 4 spaced apart between the neighbouring horizontal pane, have the rigid unitary of building the shape chamber thereby make this device constitute one.For further agents enhance overall rigidity, also have drag-line 7 tensions of locking nut between the opposite side of horizontal pane 3 through two ends.The ascending changeover portion in corresponding vase pier cross section also is provided with between the neighbouring horizontal pane 3 with stud 4 is connected and is connected horizontal bar 9, plays the effect of further raising integral rigidity.Before the concreting; Can prop up the jack 4 between cushion cap end face and bottom level frame H shape steel by the top; And the cable wire 8 of tractive between top drag-line 7 terminations and bottom surface 6 anchor points; Finely tune the road clearance of vase pier moulding one side easily, (this gap can with the anti-spillage of stalloy filling) thus effectively regulate and control its verticality.
Facts have proved, adopt present embodiment device safety, efficient, cost economy, help to guarantee the construction quality of viaduct vase pier.Behind the casting complete, be easy to form removal, can not damage the smooth outer profile curve of vase pier.

Claims (3)

1. the special moulding vase of bridge pier construction equipment; Has vase pier moulding assembled formwork; It is characterized in that: said assembled formwork periphery is intervally arranged up and down and is fixed with the steel horizontal pane that the cross section is a H shape, is fixed with horizontal direction steel stud spaced apart between the adjacent level frame.
2. the special moulding vase of bridge according to claim 1 pier construction equipment is characterized in that: the cable pull that has locking nut between the opposite side of said horizontal pane through two ends.
3. the special moulding vase of bridge according to claim 2 pier construction equipment is characterized in that: the changeover portion in said vase pier cross section is provided with between the adjacent level frame with stud is connected and is connected horizontal bar.
CN2012201129868U 2012-03-22 2012-03-22 Bridge specific model vase pier construction device Expired - Fee Related CN202466431U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012201129868U CN202466431U (en) 2012-03-22 2012-03-22 Bridge specific model vase pier construction device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012201129868U CN202466431U (en) 2012-03-22 2012-03-22 Bridge specific model vase pier construction device

Publications (1)

Publication Number Publication Date
CN202466431U true CN202466431U (en) 2012-10-03

Family

ID=46914599

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012201129868U Expired - Fee Related CN202466431U (en) 2012-03-22 2012-03-22 Bridge specific model vase pier construction device

Country Status (1)

Country Link
CN (1) CN202466431U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103103930A (en) * 2013-02-01 2013-05-15 北京交通大学 Post-added pre-stress cable strengthening method
CN104846744A (en) * 2015-03-19 2015-08-19 南通大学 Construction method for pouring and forming urban viaduct curve type pier stud in one-off mode
CN110593104A (en) * 2019-09-12 2019-12-20 江苏永联精筑建设集团有限公司 Manufacturing and construction process of vase type cable tower steel formwork
CN111041985A (en) * 2019-11-21 2020-04-21 江苏永联精筑建设集团有限公司 Manufacturing and construction process of vase type cable tower steel formwork
CN113279334A (en) * 2021-05-19 2021-08-20 安徽省路港工程有限责任公司 Construction method of one-step pouring molding system of double-column type vase pier steel template

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103103930A (en) * 2013-02-01 2013-05-15 北京交通大学 Post-added pre-stress cable strengthening method
CN103103930B (en) * 2013-02-01 2016-06-08 北京交通大学 Add preliminary tension drag-line after a kind of and add solid method
CN104846744A (en) * 2015-03-19 2015-08-19 南通大学 Construction method for pouring and forming urban viaduct curve type pier stud in one-off mode
CN104846744B (en) * 2015-03-19 2017-01-11 南通大学 Construction method for pouring and forming urban viaduct curve type pier stud in one-off mode
CN110593104A (en) * 2019-09-12 2019-12-20 江苏永联精筑建设集团有限公司 Manufacturing and construction process of vase type cable tower steel formwork
CN111041985A (en) * 2019-11-21 2020-04-21 江苏永联精筑建设集团有限公司 Manufacturing and construction process of vase type cable tower steel formwork
CN113279334A (en) * 2021-05-19 2021-08-20 安徽省路港工程有限责任公司 Construction method of one-step pouring molding system of double-column type vase pier steel template
CN113279334B (en) * 2021-05-19 2022-09-27 安徽省路港工程有限责任公司 Construction method of one-step pouring molding system of double-column type vase pier steel template

Similar Documents

Publication Publication Date Title
CN202466431U (en) Bridge specific model vase pier construction device
CN102230313B (en) Bridge thin-wall hollow-pier chain block hoisting operation platform and construction method thereof
CN108978471B (en) Supporting device for increasing rigidity of cable-stayed bridge special-shaped cable tower and mounting method thereof
CN103306208A (en) Formwork creeping method for novel 1.6 parabola-shaped four-column type hollow variable section high pier
CN205501791U (en) Two recessed arch integrated configurations of steel binder - entity jib -
CN204282187U (en) A kind of novel Butterfly Arch Bridge
CN105113388A (en) Formwork and bracket combining structure of vase pier of viaduct and application method
CN103255717A (en) Method for constructing hit-preventing wall
CN107905114A (en) A kind of construction method of large span Successive interference cancellation
CN109024298A (en) Construction method of bent cap
CN201634998U (en) Template of pier column of bridge
KR20130068158A (en) Reinforced concrete arch bridge of girder type uniting with superstructure and substructure and its automatic construction method
CN102367653A (en) Support structure for large-span continuous beam construction
CN105568788B (en) Rail track traffic two-wire track girder is embraced in a kind of magnetic suspension
CN204982681U (en) Steel bow member integral translation device
CN203248170U (en) Lining trolley for secondary lining construction of pedestrian crosswalk
CN204098927U (en) Cast anchor hole or switch hole independence lining trolley in tunnel
CN203334190U (en) Thin-wall hollow pillar integral elevation model turning device
CN205276073U (en) Two line track roof beams of rail formula track traffic are embraced in magnetic suspension
CN205012217U (en) Overpass vase mound formwork support unites structure
CN211815595U (en) Lower tower column tension and compression structure for cable tower
CN204151663U (en) A kind of hybrid beam is without dorsal funciculus low-pylon cable-stayed bridge
CN211421171U (en) Cast-in-place utility tunnel movable support platform truck formwork system
CN103195449A (en) Large-span heavy-load open cut tunnel pre-stressed reinforced concrete lining structure
KR100614455B1 (en) Extradosed Bridge and it's construction method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121003

Termination date: 20140322