CN211447283U - Connecting beams of the main building and the podium - Google Patents

Connecting beams of the main building and the podium Download PDF

Info

Publication number
CN211447283U
CN211447283U CN201922016999.XU CN201922016999U CN211447283U CN 211447283 U CN211447283 U CN 211447283U CN 201922016999 U CN201922016999 U CN 201922016999U CN 211447283 U CN211447283 U CN 211447283U
Authority
CN
China
Prior art keywords
main building
steel
column
podium
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922016999.XU
Other languages
Chinese (zh)
Inventor
肖遥
左廷忠
刘火明
张辑
胥路
张悦
陈波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201922016999.XU priority Critical patent/CN211447283U/en
Application granted granted Critical
Publication of CN211447283U publication Critical patent/CN211447283U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

本实用新型涉及一种主楼和裙房的连接梁,包括:水平连接于主楼劲性柱和裙房劲性柱,连接梁包括:水平固定于主楼劲性柱的第一牛腿;水平固定于裙房劲性柱的第二牛腿;水平设于主楼劲性柱和裙房劲性柱之间的型钢,型钢的相对两端对应固定于第一牛腿和第二牛腿;沿着型钢设置的钢筋骨架,钢筋骨架的相对两端凸伸固定于对应的第一牛腿和第二牛腿;浇筑于型钢和钢筋骨架,且固接主楼劲性柱和裙房劲性柱的混凝土结构。提供一种主楼和裙房的连接梁,解决现有技术中主楼与裙房之间的距离过大时为了保证足够的承载力,混凝土结构梁的截面尺寸较大占用空间太大,影响其他结构的施工的问题。

Figure 201922016999

The utility model relates to a connecting beam of a main building and a podium, comprising: a rigid column horizontally connected to the main building and a podium rigid column; the connecting beam comprises: a first corbel that is horizontally fixed to the rigid column of the main building; The second corbel of the podium stiffness column; the section steel horizontally arranged between the main building stiffness column and the podium stiffness column, the opposite ends of the section steel are correspondingly fixed to the first corbel and the second corbel; along the section steel The set steel skeleton, the opposite ends of the steel skeleton are protruding and fixed on the corresponding first corbel and the second corbel; the concrete structure is poured into the profile steel and the steel skeleton, and is fixed to the rigid column of the main building and the rigid column of the podium . A connecting beam between the main building and the podium is provided to solve the problem that when the distance between the main building and the podium is too large in the prior art, in order to ensure sufficient bearing capacity, the cross-sectional size of the concrete structure beam is large and takes up too much space, which affects other structures. construction problems.

Figure 201922016999

Description

主楼和裙房的连接梁Connecting beams of the main building and the podium

技术领域technical field

本实用新型涉及建筑施工领域,尤指一种主楼和裙房的连接梁。The utility model relates to the field of building construction, in particular to a connecting beam of a main building and a podium.

背景技术Background technique

在部分建筑中,主楼和裙房之间的基础结构形式不同,施工的周期也不同步,主楼外架还会占用施工空间。主楼与裙房之间一般通过混凝土结构梁进行连接。当主楼与裙房之间的距离过大,为了保证足够的承载力,混凝土结构梁的截面尺寸较大,占用空间太大,影响其他结构的施工。In some buildings, the basic structure between the main building and the podium is different, the construction period is not synchronized, and the outer frame of the main building will occupy the construction space. The main building and the podium are generally connected by concrete structural beams. When the distance between the main building and the podium is too large, in order to ensure sufficient bearing capacity, the cross-sectional size of the concrete structural beam is large, which takes up too much space and affects the construction of other structures.

实用新型内容Utility model content

本实用新型的目的在于克服现有技术的缺陷,提供一种主楼和裙房的连接梁,解决现有技术中主楼与裙房之间的距离过大时为了保证足够的承载力,混凝土结构梁的截面尺寸较大占用空间太大,影响其他结构的施工的问题。The purpose of this utility model is to overcome the defects of the prior art, provide a connecting beam between the main building and the podium, and solve the problem that when the distance between the main building and the podium in the prior art is too large, in order to ensure sufficient bearing capacity, the concrete structure beam The larger section size takes up too much space and affects the construction of other structures.

实现上述目的的技术方案是:The technical solution to achieve the above purpose is:

本实用新型提供一种主楼和裙房的连接梁,包括:The utility model provides a connecting beam of a main building and a podium, comprising:

水平连接于主楼劲性柱和裙房劲性柱,其特征在于,连接梁包括:It is horizontally connected to the rigid column of the main building and the rigid column of the podium, and is characterized in that the connecting beam includes:

水平固定于主楼劲性柱的第一牛腿;The first corbel fixed horizontally on the rigid column of the main building;

水平固定于裙房劲性柱的第二牛腿;The second corbel fixed horizontally on the podium stiffening column;

水平设于所述主楼劲性柱和所述裙房劲性柱之间的型钢,所述型钢的相对两端对应固定于所述第一牛腿和所述第二牛腿;a section steel horizontally arranged between the main building stiffness column and the podium stiffness column, the opposite ends of the section steel are correspondingly fixed to the first corbel and the second corbel;

沿着所述型钢设置的钢筋骨架,所述钢筋骨架的相对两端凸伸固定于对应的所述第一牛腿和所述第二牛腿;以及A steel bar frame arranged along the profiled steel, the opposite ends of the steel bar frame are protruding and fixed on the corresponding first corbel and the second corbel; and

浇筑于所述型钢和所述钢筋骨架,且固接所述主楼劲性柱和所述裙房劲性柱的混凝土结构。The concrete structure is poured on the shaped steel and the reinforced frame, and is fixedly connected to the rigid column of the main building and the rigid column of the podium.

本实用新型主楼和裙房的连接梁的有益效果:The beneficial effects of the connecting beams of the main building and the podium of the utility model:

本实用新型通过设置第一牛腿和第二牛腿连接型钢并浇筑混凝土,形成连接固定于主楼劲性柱和裙楼劲性柱的连接梁,同时包括了混凝土和型钢的优点,解决了现有技术中主楼与裙房之间的距离过大时为了保证足够的承载力,混凝土结构梁的截面尺寸较大占用空间太大,影响其他结构的施工的问题。By setting the first corbel and the second corbel to connect the profiled steel and pouring concrete, the utility model forms the connecting beam which is connected and fixed to the rigidity column of the main building and the rigidity column of the podium building. In the prior art, when the distance between the main building and the podium is too large, in order to ensure sufficient bearing capacity, the cross-sectional size of the concrete structural beam is large and takes up too much space, which affects the construction of other structures.

本实用新型主楼和裙房的连接梁的进一步改进在于,The further improvement of the connecting beam of the main building and the podium of the present invention is:

所述混凝土结构于所述第一牛腿的靠近端部的位置形成有竖向的施工缝。A vertical construction joint is formed in the concrete structure at a position close to the end of the first corbel.

本实用新型主楼和裙房的连接梁的进一步改进在于,所述主楼劲性柱包括:A further improvement of the connecting beam between the main building and the podium of the present invention is that the rigid column of the main building includes:

立设于地面的主楼钢柱;Steel columns of the main building erected on the ground;

浇筑于所述主楼钢柱的主楼混凝土;the main building concrete poured on the steel columns of the main building;

固定于所述主楼钢柱且适配于所述钢筋骨架的多个套筒,所述钢筋骨架的对应端部插设固定于所述套筒。A plurality of sleeves fixed to the steel column of the main building and adapted to the reinforced frame, the corresponding ends of the reinforced frame are inserted and fixed to the sleeves.

本实用新型主楼和裙房的连接梁的进一步改进在于,所述第一牛腿和所述主楼钢柱焊接固定。A further improvement of the connecting beam between the main building and the podium of the present invention is that the first corbel and the steel column of the main building are welded and fixed.

本实用新型主楼和裙房的连接梁的进一步改进在于,所述裙房劲性柱包括:A further improvement of the connecting beam between the main building and the podium of the present invention is that the podium stiffening column includes:

立设于地面的裙房钢柱;Podium steel columns erected on the ground;

浇筑于所述裙房钢柱的裙房混凝土;The podium concrete poured on the podium steel column;

固定于所述裙房钢柱且适配于所述型钢的搭筋板,所述钢筋骨架的对应端部固定于所述搭筋板上。A rib plate fixed on the skirt steel column and adapted to the profiled steel, and the corresponding ends of the reinforced frame are fixed on the rib plate.

本实用新型主楼和裙房的连接梁的进一步改进在于,所述第二牛腿和所述裙房钢柱焊接固定。A further improvement of the connecting beam between the main building and the podium of the present invention is that the second corbel and the steel column of the podium are welded and fixed.

附图说明Description of drawings

图1为本实用新型主楼和裙房的连接梁安装前的示意图。Fig. 1 is a schematic diagram of the utility model before the connecting beams of the main building and the podium are installed.

图2为本实用新型主楼和裙房的连接梁安装后的示意图。Figure 2 is a schematic diagram of the utility model after the installation of the connecting beams of the main building and the podium.

图3为本实用新型主楼和裙房的连接梁的平面示意图。3 is a schematic plan view of the connecting beams of the main building and the podium of the present invention.

图4为本实用新型主楼和裙房的连接梁的钢筋骨架的示意图。FIG. 4 is a schematic diagram of the steel skeleton of the connecting beam of the main building and the podium of the present invention.

具体实施方式Detailed ways

下面结合附图和具体实施例对本实用新型作进一步说明。The present utility model will be further described below in conjunction with the accompanying drawings and specific embodiments.

参阅图1,显示了本实用新型主楼和裙房的连接梁安装前的示意图。图2为本实用新型主楼和裙房的连接梁安装后的示意图。结合图1和图2所示,本实用新型主楼和裙房的连接梁,水平连接于主楼劲性柱10和裙房劲性柱20,连接梁包括:Referring to Fig. 1, there is shown a schematic diagram of the utility model before the connecting beams of the main building and the podium are installed. Figure 2 is a schematic diagram of the utility model after the installation of the connecting beams of the main building and the podium. 1 and 2, the connecting beam of the main building and the podium of the present utility model is horizontally connected to the rigid column 10 of the main building and the rigid column 20 of the podium, and the connecting beam includes:

水平固定于主楼劲性柱10的第一牛腿30;the first corbel 30 fixed horizontally on the rigid column 10 of the main building;

水平固定于裙房劲性柱20的第二牛腿40;the second corbel 40 horizontally fixed on the podium stiffening column 20;

水平设于主楼劲性柱10和裙房劲性柱20之间的型钢50,型钢50的相对两端对应固定于第一牛腿30和第二牛腿40;The profiled steel 50 is horizontally arranged between the stiffness column 10 of the main building and the stiffness column 20 of the podium, and the opposite ends of the profiled steel 50 are correspondingly fixed to the first corbel 30 and the second corbel 40;

沿着型钢50设置的钢筋骨架60,钢筋骨架60的相对两端凸伸固定于对应的第一牛腿30和第二牛腿40;以及The reinforcing bar frame 60 disposed along the section steel 50, the opposite ends of the reinforcing bar frame 60 are protrudingly fixed to the corresponding first corbel 30 and the second corbel 40; and

浇筑于型钢50和钢筋骨架60,且固接主楼劲性柱10和裙房劲性柱20的混凝土结构。The concrete structure is poured on the section steel 50 and the reinforced frame 60, and is fixed to the rigid column 10 of the main building and the rigid column 20 of the podium.

作为本实用新型主楼和裙房的连接梁的一较佳实施方式,混凝土结构于第一牛腿30的靠近端部的位置形成有竖向的施工缝70。施工缝指的是在混凝土浇筑过程中,因设计要求或施工需要分段浇筑而在先、后浇筑的混凝土之间所形成的接缝。通过对施工缝70出的混凝土面凿毛处理,便于加强和后浇筑的混凝土的固接。同时也解决了如果按照施工缝设置在1/3位置的常规设置原则,会对主楼劲性柱的吊装造成不便的问题。As a preferred embodiment of the connecting beam between the main building and the podium of the present invention, a vertical construction joint 70 is formed on the concrete structure near the end of the first corbel 30 . Construction joint refers to the joint formed between the concrete poured first and last due to design requirements or construction needs to be poured in sections during the concrete pouring process. By chiseling the concrete surface out of the construction joint 70, it is convenient to reinforce and fix the concrete after pouring. At the same time, it also solves the problem of inconvenience to the hoisting of the rigid columns of the main building if the construction joints are set at 1/3 of the conventional setting principle.

作为本实用新型主楼和裙房的连接梁的一较佳实施方式,图3为本实用新型主楼和裙房的连接梁的平面示意图。图4为本实用新型主楼和裙房的连接梁的钢筋骨架的示意图。结合图3和图4所示,主楼劲性柱10包括:立设于地面的主楼钢柱11;浇筑于主楼钢柱11的主楼混凝土12;固定于主楼钢柱11且适配于钢筋骨架60的多个套筒13,钢筋骨架60的对应端部插设固定于套筒13。As a preferred embodiment of the connecting beam of the main building and the podium of the present invention, FIG. 3 is a schematic plan view of the connecting beam of the main building and the podium of the present invention. FIG. 4 is a schematic diagram of the steel skeleton of the connecting beam of the main building and the podium of the present invention. 3 and 4, the main building stiffness column 10 includes: the main building steel column 11 erected on the ground; the main building concrete 12 poured on the main building steel column 11; The plurality of sleeves 13 are inserted and fixed to the sleeves 13 at the corresponding ends of the steel skeleton 60 .

在本实施例中,第一牛腿30和主楼钢柱11焊接固定。In this embodiment, the first corbel 30 and the steel column 11 of the main building are fixed by welding.

作为本实用新型主楼和裙房的连接梁的一较佳实施方式,裙房劲性柱20包括:立设于地面的裙房钢柱21;浇筑于裙房钢柱21的裙房混凝土22;固定于裙房钢柱21且适配于型钢50的搭筋板23,钢筋骨架60的对应端部固定于搭筋板23上。As a preferred embodiment of the connecting beam between the main building and the podium of the present invention, the podium stiffening column 20 includes: a podium steel column 21 erected on the ground; a podium concrete 22 poured on the podium steel column 21; The rib plate 23 fixed on the skirt steel column 21 and adapted to the section steel 50 , and the corresponding end of the steel frame 60 is fixed on the rib plate 23 .

在本实施例中,第二牛腿40和裙房钢柱21焊接固定。In this embodiment, the second corbel 40 and the skirt steel column 21 are fixed by welding.

本实用新型主楼和裙房的连接梁为劲性混凝土结构,是由钢骨架外包钢筋混凝土而形成的一种组合结构。由于配置钢骨架与高强混凝土之间相互约束使劲性混凝土结构能够更有效地发挥型钢和混凝土两种材料各自的优点,克服了钢结构容易发生局部屈曲的缺点,增加了结构和构件的延性,改善了由于高强混凝土本身延性差而带来的不利于抗震的脆性特性;另外,相对于钢筋混凝土结构来说,采用劲性混凝土结构有效地减小了构件的截面尺寸,增大了使用空间,可减少梁柱截面,调节轴压比,提高结构的承载力;相对于钢结构来说,采用劲性混凝土结构节约了钢材用量,降低了造价,改善了防火和防腐性能。The connecting beam of the main building and the podium of the utility model is a rigid concrete structure, which is a composite structure formed by a steel frame covered with reinforced concrete. Due to the mutual restraint between the steel skeleton and the high-strength concrete, the stiffened concrete structure can more effectively exert the respective advantages of the steel and concrete materials, overcome the shortcoming of local buckling of the steel structure, increase the ductility of the structure and components, and improve the Due to the poor ductility of high-strength concrete itself, it is not conducive to the brittle characteristics of earthquake resistance; in addition, compared with reinforced concrete structures, the use of stiff concrete structures effectively reduces the cross-sectional size of components, increases the use space, and can The beam-column section is reduced, the axial compression ratio is adjusted, and the bearing capacity of the structure is improved; compared with the steel structure, the rigid concrete structure saves the amount of steel, reduces the cost, and improves the fire resistance and anti-corrosion performance.

下面对本实用新型主楼和裙房的连接梁的施工步骤作具体说明:The construction steps of the connecting beams of the main building and the podium of the present utility model are described in detail below:

吊装安装主楼劲性柱的钢柱和裙房劲性柱的钢柱,并搭设外架。Hoist and install the steel columns of the main building's rigid columns and the steel columns of the podium's rigid columns, and set up external frames.

主楼与裙房之间的连接梁的跨度大(部分梁的跨度超过14m),按照常规施工缝在1/3位置的设置原则,会对主楼劲性柱的吊装造成不便,为此在主楼劲性柱上仅设置1.2m长的牛腿。The span of the connecting beam between the main building and the podium is large (some beams have a span of more than 14m). According to the principle of setting the conventional construction joints at 1/3 position, it will cause inconvenience to the hoisting of the rigid columns of the main building. Only 1.2m long corbels are set on the sex column.

在主楼劲性钢柱翼缘上焊接多个套筒,用于连接钢筋骨架的纵向主筋。在裙房劲性钢柱翼缘上采用搭筋板进行钢筋骨架的主筋连接,其中搭筋板与型钢的宽度相同,并满足单面焊接10d或双面焊接5d的长度。Weld multiple sleeves on the rigid steel column flange of the main building to connect the longitudinal main bars of the steel frame. On the flange of the podium stiffened steel column, the ribbed plate is used to connect the main reinforcement of the reinforced skeleton.

在主楼施工阶段进行施工缝留置时,在钢梁的正投影截面下方的预留纵向底筋比牛腿短100mm,其余位置主筋相邻错开一个搭接长度预留且最短不少于1200mm,以便于操作。所有预留主筋套丝后用保护帽保护。主楼劲性柱完成浇筑并拆模后,对施工缝进行剔凿并清理干净。During the construction phase of the main building, the reserved longitudinal bottom bars under the orthographic projection section of the steel beams are 100mm shorter than the corbels, and the main bars at the other positions are staggered adjacently by a lap length reserved and the shortest is not less than 1200mm, so that the in operation. All reserved main tendons are protected with protective caps after they are threaded. After the rigid columns of the main building have been poured and the formwork removed, the construction joints shall be chiseled and cleaned up.

裙房施工时,为避开主楼外架的影响,先将型钢吊装至板面,再将型钢从板面至下而上进行吊装定位,待就位后焊接固定。During the construction of the podium, in order to avoid the influence of the outer frame of the main building, the profiled steel is first hoisted to the board surface, and then the profiled steel is hoisted and positioned from the bottom to the top of the board surface, and then welded and fixed after it is in place.

为方便工人操作,裙房梁板支模架采用快拆架进行搭设,梁底预留一步架体,且梁底模暂不安装,同时铺设跳板,作为工人绑扎梁底筋的操作平台。同时铺设楼板底模时,在劲性梁一侧预留出1m的宽度,作为梁底筋安装口,以便梁底筋绑扎。In order to facilitate the operation of the workers, the podium beam slab formwork frame is erected with a quick-release frame, and a one-step frame is reserved at the bottom of the beam, and the bottom formwork of the beam is not installed for the time being. At the same time, when laying the floor bottom formwork, a width of 1m is reserved on one side of the stiff beam as the installation port for the bottom reinforcement of the beam, so that the bottom reinforcement of the beam can be bound.

安装劲性梁面筋及套入所有箍筋,箍筋暂不定位及绑扎,在裙房一侧的主筋在搭筋板上焊接。在面筋底部每隔1m采用钢管将主筋和箍筋架立起来,以便底筋穿入。Install stiff beam gluten and insert all stirrups. The stirrups are not positioned and bound temporarily. The main reinforcement and stirrups are erected by steel pipes at intervals of 1m at the bottom of the gluten, so that the bottom reinforcement can be penetrated.

安装梁腰筋及梁底筋,穿入所有腰筋及纵向底筋后,将所有箍筋按照设计间距进行定位,并绑扎。其中,纵向底筋分为两截,第一段先安装靠主楼直螺纹连接的一侧,再用正反丝套筒连接第二截。第二截末端连接在裙房劲性柱搭筋板上。所有腰筋端部弯折,并将弯折段焊接在钢梁上。所有腰筋和底筋安装完成后,调节箍筋间距,最后进行箍筋绑扎。Install the beam waist bars and beam bottom bars, and after all the waist bars and longitudinal bottom bars are penetrated, position all the stirrups according to the design spacing, and bind them. Among them, the longitudinal bottom rib is divided into two sections, the first section is first installed on the side connected by the straight thread of the main building, and then the second section is connected with a positive and negative wire sleeve. The end of the second section is connected to the stiffening plate of the podium. All waist bars are bent at the ends, and the bent sections are welded to the steel beam. After all the waist bars and bottom bars are installed, adjust the spacing of the stirrups, and finally tie the stirrups.

完成钢筋绑扎后,拆除梁底操作平台跳板,补充剩余一步支撑架,插入可调U托,安装梁底模及背楞就位,整体调节可调U托至设计标高。After completing the binding of steel bars, remove the springboard of the operating platform at the bottom of the beam, supplement the remaining support frame, insert the adjustable U bracket, install the beam bottom mold and the back corrugation in place, and adjust the adjustable U bracket to the design elevation as a whole.

安装连接梁的侧模及预留的楼板底模板,最后绑扎完板筋后,在模板围合的空间内浇筑混凝土,完成施工。Install the side formwork of the connecting beam and the reserved bottom formwork of the floor slab, and finally pour the concrete in the space enclosed by the formwork after binding the slab reinforcement to complete the construction.

本实用新型主楼和裙房的连接梁的有益效果为:The beneficial effects of the connecting beams of the main building and the podium of the utility model are:

本实用新型通过设置第一牛腿和第二牛腿连接型钢并浇筑混凝土,形成连接固定于主楼劲性柱和裙楼劲性柱的连接梁,同时包括了混凝土和型钢的优点,解决了现有技术中主楼与裙房之间的距离过大时为了保证足够的承载力,混凝土结构梁的截面尺寸较大占用空间太大,影响其他结构的施工的问题。By setting the first corbel and the second corbel to connect the profiled steel and pouring concrete, the utility model forms the connecting beam which is connected and fixed to the rigidity column of the main building and the rigidity column of the podium building. In the prior art, when the distance between the main building and the podium is too large, in order to ensure sufficient bearing capacity, the cross-sectional size of the concrete structural beam is large and takes up too much space, which affects the construction of other structures.

以上结合附图实施例对本实用新型进行了详细说明,本领域中普通技术人员可根据上述说明对本实用新型做出种种变化例。因而,实施例中的某些细节不应构成对本实用新型的限定,本实用新型将以所附权利要求书界定的范围作为本实用新型的保护范围。The present invention has been described in detail above with reference to the embodiments of the accompanying drawings, and those of ordinary skill in the art can make various modifications to the present invention according to the above description. Therefore, some details in the embodiments should not be construed to limit the present invention, and the present invention will take the scope defined by the appended claims as the protection scope of the present invention.

Claims (6)

1. The utility model provides a tie-beam of main building and skirt room, horizontal connection are in main building strength nature post and skirt room strength nature post, its characterized in that, the tie-beam includes:
a first bracket horizontally fixed on the stiff column of the main building;
a second bracket horizontally fixed on the rigid column of the skirt house;
the profile steel is horizontally arranged between the main building stiff column and the skirt house stiff column, and two opposite ends of the profile steel are correspondingly fixed on the first bracket and the second bracket;
the two opposite ends of the steel bar framework are convexly extended and fixed on the corresponding first bracket and the second bracket; and
and the concrete structure is poured on the section steel and the steel reinforcement framework and fixedly connected with the main building stiff column and the skirt house stiff column.
2. A coupling beam for main buildings and skirts as claimed in claim 1,
and a vertical construction joint is formed on the concrete structure at the position, close to the end part, of the first bracket.
3. A main building and skirt connection beam as in claim 1 wherein said main building rigid columns comprise:
a main building steel column vertically arranged on the ground;
main building concrete poured on the main building steel column;
and the plurality of sleeves are fixed on the main building steel column and are matched with the steel reinforcement frameworks, and the corresponding end parts of the steel reinforcement frameworks are inserted and fixed in the sleeves.
4. The connecting beam for main building and skirt house according to claim 3, wherein said first bracket and said main building steel column are welded and fixed.
5. A connector beam for main building and skirt house according to claim 1, wherein said skirt house stiffness column comprises:
skirt house steel columns vertically arranged on the ground;
skirt house concrete poured on the skirt house steel column;
and the steel reinforcement framework is fixed on the lap rib plate, and the corresponding end part of the steel reinforcement framework is fixed on the lap rib plate.
6. The connecting beam for main building and skirt house according to claim 5, wherein the second bracket and the skirt house steel column are welded and fixed.
CN201922016999.XU 2019-11-21 2019-11-21 Connecting beams of the main building and the podium Expired - Fee Related CN211447283U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922016999.XU CN211447283U (en) 2019-11-21 2019-11-21 Connecting beams of the main building and the podium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922016999.XU CN211447283U (en) 2019-11-21 2019-11-21 Connecting beams of the main building and the podium

Publications (1)

Publication Number Publication Date
CN211447283U true CN211447283U (en) 2020-09-08

Family

ID=72296113

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922016999.XU Expired - Fee Related CN211447283U (en) 2019-11-21 2019-11-21 Connecting beams of the main building and the podium

Country Status (1)

Country Link
CN (1) CN211447283U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113175087A (en) * 2020-12-08 2021-07-27 中元(厦门)工程设计研究院有限公司 Semi-steel bone beam assembly
CN114673366A (en) * 2022-05-10 2022-06-28 陕西建工机械施工集团有限公司 Sectional steel beam high-altitude bracket-free sectional butt joint installation method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113175087A (en) * 2020-12-08 2021-07-27 中元(厦门)工程设计研究院有限公司 Semi-steel bone beam assembly
CN114673366A (en) * 2022-05-10 2022-06-28 陕西建工机械施工集团有限公司 Sectional steel beam high-altitude bracket-free sectional butt joint installation method

Similar Documents

Publication Publication Date Title
CN214996139U (en) Safe operation platform for overhead large-span steel reinforced concrete beam suspension formwork construction
CN208502236U (en) A kind of edge banding apparatus for concrete floor edge in steel construction
CN107476470A (en) Steel pipe built in assembled and GFRP pipe regeneration concrete compound shear walls and its construction method
CN103469735B (en) The installation method of the formwork of the solid section of the pier top of the hollow column and slab pier with curved superelevation
CN116480133A (en) Formwork support system and method for fair-faced concrete construction with Gaussian curved surfaces in the coastal environment
CN103061503B (en) A ring beam formwork
CN220247339U (en) Novel steel bar truss floor carrier plate free of form removal and construction structure thereof
CN217151150U (en) Overhanging steel truss formwork supporting platform for aluminum mould-full concrete outer wall
CN206319597U (en) A kind of cantilever steel girder erecting device
CN114263275B (en) Construction method for same-layer construction of high-rise assembled steel structure-core tube
CN115538678A (en) Construction method for large-angle overhanging landscape platform side small platform
CN103031949B (en) Arc-shaped main rib template support device
CN205712733U (en) Super-section strengthening concrete conversion beam formwork system
CN209568359U (en) A kind of falsework for the construction of outer-enwraped type Guard fence base
WO2015051551A1 (en) Building and construction method thereof
CN204876577U (en) Building construction system
CN209145255U (en) A kind of external hanging type scaffold being fixed on traditional structure cycle beam or flange
CN209429128U (en) A kind of concrete pouring structure
CN115182482B (en) Construction method of prefabricated hollow wall body without outer frame matching
CN202766974U (en) Bent cap bearing frame without full framing
CN108019040B (en) A construction method for the Bailey frame platform of the transfer floor of a high-rise building
CN116591468A (en) Temporary support device and construction method for a concrete cantilever structure
CN117927011A (en) Construction process of frame structure under aluminum alloy building template system
CN206599881U (en) Integral prefabricated individual layer steel plate concrete combined shear wall
CN215054439U (en) A formwork support structure for pouring a round arched roof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200908

CF01 Termination of patent right due to non-payment of annual fee