CN106284086A - A kind of method utilizing electronic climbing apparatus to pour into a mould high pier stud - Google Patents

A kind of method utilizing electronic climbing apparatus to pour into a mould high pier stud Download PDF

Info

Publication number
CN106284086A
CN106284086A CN201610760064.0A CN201610760064A CN106284086A CN 106284086 A CN106284086 A CN 106284086A CN 201610760064 A CN201610760064 A CN 201610760064A CN 106284086 A CN106284086 A CN 106284086A
Authority
CN
China
Prior art keywords
template
climbing
pier stud
creeping formwork
high pier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610760064.0A
Other languages
Chinese (zh)
Other versions
CN106284086B (en
Inventor
单慧强
贺月民
翟俊杰
王峻
王治国
段峰
张东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Road And Bridge No2 Engineering Co Ltd
Original Assignee
Shanxi Road And Bridge No2 Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Road And Bridge No2 Engineering Co Ltd filed Critical Shanxi Road And Bridge No2 Engineering Co Ltd
Priority to CN201610760064.0A priority Critical patent/CN106284086B/en
Publication of CN106284086A publication Critical patent/CN106284086A/en
Application granted granted Critical
Publication of CN106284086B publication Critical patent/CN106284086B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

Instant invention overcomes the deficiency that prior art exists, it is provided that a kind of method utilizing electronic climbing apparatus to pour into a mould high pier stud, quickly can pour into a mould high pier stud, overall structure is simple, easy construction, and efficiency is high;The technical scheme used is: a kind of method utilizing electronic climbing apparatus to pour into a mould high pier stud, prepares climbing form system, embedded part system and support body system reserve;Motor-driven chain hoist is installed from creeping formwork;After concreting completes → assembling reinforcement → form removal after move → install the attached wall hanging seat → support body that climbs → template cleaning brush releasing agent → matched moulds → formwork reinforcement, centering, installation hanging seat service sleeve → casting concrete → entrance subsequent cycle;Matched moulds and form removal;The composite can be widely applied to high pier stud and construct field.

Description

A kind of method utilizing electronic climbing apparatus to pour into a mould high pier stud
Technical field
A kind of method utilizing electronic climbing apparatus to pour into a mould high pier stud of the present invention, belongs to high pier stud and constructs technical field.
Background technology
Along with developing rapidly of traffic and being showing improvement or progress day by day of bridge technology, modern bridge gradually develops to large span direction, High for the restriction of landform, landforms at the needs in structure and bridge location, bridge pier high more than hundred meters in Bridge Design and hundreds of meters Sarasota (applying to cable-stayed bridge and suspension bridge) the most rare, construction technology is had higher requirement by this.In the face of so Hollow (or solid) thin-walled structures of height, how to accomplish the high-quality of construction, safe efficient be in modern bridge construction A road difficult problem.The traditional over-form construction method continued to use for a long time has the disadvantage that
(1) operating platform must utilize landing leg hand cradle or the climbing frame that makes separately to be formed, after pier stud construction reach a certain height, Human users is absolutely unsafe, and similar security incident occurs now and then in practice of construction.
(2) handling of template need to rely on crane gear to complete, crane gear hang time many, efficiency is low, template is pacified simultaneously Dress error is relatively big, correction is more difficult, constrains the quality of pier stud construction.
(3) pier stud construction often one sections of rising all must be first with manually connecing high scaffold or promoting climbing frame, operation Efficiency is low, also increases security risk simultaneously.
(4) wind loading rating is relatively low, and for ensureing safety, the actual job time will have a greatly reduced quality.
Authorize the Chinese patent of Publication No. CN102535341A, disclose a kind of high pier construction process of hydraulic climbing form, utilize Hydraulic electric climbing apparatus promotes, the problem solving above-mentioned existence, but hydraulic electric creeping formwork exists in actual applications Self load bearing, dismounting inconvenience, the accessory structure of needs is complicated, the problem that efficiency of construction is low.
Summary of the invention
Instant invention overcomes the deficiency that prior art exists, it is provided that a kind of utilize electronic climbing apparatus to pour into a mould high pier stud Method, can quickly pour into a mould high pier stud, and overall structure is simple, easy construction, and efficiency is high.
In order to solve above-mentioned technical problem, the technical solution used in the present invention is: one utilizes electronic climbing apparatus to pour into a mould The method of high pier stud, performs in the steps below:
The first step: prepare climbing form system, embedded part system and support body system reserve;
Second step: install motor-driven chain hoist from creeping formwork;
First place, scene is carried out smooth, then lay creeping formwork assembly platform, climbing frame climbed rail, column, horizontal up and down Beam, level and diagonal web member are assembled into one, and are arranged on by creeping formwork and have poured on the high pier stud of 12m, then install climbing frame Truss frame for connecting, then set up joint steel pipe, use steel tube scaffold clasp to be held together with climbing frame and steel pipe truss by steel pipe, Inner and outer template is finally installed, pre-splicing good exterior sheathing crane is installed on the template movement device of creeping formwork, mould Plate is held together by the steel pin of diameter 35mm with template movement device, and interior electric expansion bobbin mould needs in a pre-installation Debug errorless after can install;
3rd step: flow process of climbing;
After concreting completes → assembling reinforcement → form removal after move → install the attached wall hanging seat → support body that climbs → template cleaning brush Releasing agent → matched moulds → formwork reinforcement, centering, installation hanging seat service sleeve → casting concrete → entrance subsequent cycle;
4th step: matched moulds and form removal;
One, matched moulds;
Before a, matched moulds, template is cleaned out, brush releasing agent, install embedded part system;
B, the position of measurement module tie rod hole, if conflict with reinforcing bar;
C, by template shift, press close to the surface of concrete;
D, with line pendant or instrumental correction adjust mold plate verticality;
E, template are fixed with truss;
F, put on sleeve pipe, pull bar, tighten every Screw arbor with nut at both-ends;
G, check template are vertical, fasten every horizontal support;
H, casting concrete;
Two, the demoulding;
A, concrete reach intensity 15Mpa rear collapsible die;
B, draw off all through-wall bolts, external corner brace, and extract pull bar out, including oblique angle pull bar;
C, extract gear pin;
D, moving on to position by after template, wherein template can move 500mm, fixes with truss;
Three, climbing frame is removed;
A, with crane first by form removable and hang down;
B, remove the template of more than main platform, main back cord and main back cord diagonal brace, hang down with crane;
C, dismounting motor-driven chain hoist and power distribution equipment;
D, by automatic spraying device remove;
E, operator are positioned to hang and on platform, lower floor's attached wall hanging seat are removed and hung down;
F, sling with crane girder spider and end platform, rise and put suitable height, unload maximum layer attached wall hanging seat;
G, finally dismounting and cat ladder, operator have unloaded suspension hook, have removed attached wall hanging seat, and operator are after cat ladder gets off, then hang Last Pin shelf lower.
Preferably, described climbing form system uses all-steel big shuttering, and described embedded part system includes bolt embedment PVC sleeve pipe, height Strong screw rod and stressed bolt, described support body system include hook connecting base, climbing support, climbing frame fix pin plate, template movement device, Operating platform, guard rail and protection network.
Preferably, described in climb in flowchart process, sleeve pipe is through in the preformed hole of inner and outer template, by hook connecting base High-strength bolt is through in sleeve pipe, by sleeve pipe crimp during to prevent casting concrete;
If the high-strength connecting bolt of hook connecting base and reinforcing bar have conflict, after suitable for reinforcing bar shifting processing, carry out matched moulds;
The electronic control station that climbs has special messenger to operate, and often whether group creeping formwork sets special messenger and keep an eye on and synchronize, and finds asynchronous, adjusts in time;
Creeping formwork climb next layer in place after remove bottom hook connecting base, turnover use;
Creeping formwork climb in place after check that the absolute altitude that climbs is whether consistent, need to be finely adjusted time inconsistent, whole climbing frame is adjusted to same Absolute altitude, errorless after with pin plate, creeping formwork is fixed.
The present invention compared with prior art have the beneficial effect that the present invention by creeping formwork on the basis of former hydraulic climbing formwork Being improved to electronic creeping formwork, its accessory structure and mounting process simplify the most further, quickly can pour into a mould high pier stud, overall knot Structure is simple, easy construction, and efficiency and reliability are high, and speed is fast, failure rate is low.
Detailed description of the invention
A kind of method utilizing electronic climbing apparatus to pour into a mould high pier stud of the present invention, performs in the steps below:
The first step: prepare climbing form system, embedded part system and support body system reserve;
Second step: install motor-driven chain hoist from creeping formwork;
First place, scene is carried out smooth, then lay creeping formwork assembly platform, climbing frame climbed rail, column, horizontal up and down Beam, level and diagonal web member are assembled into one, and are arranged on by creeping formwork and have poured on the high pier stud of 12m, then install climbing frame Truss frame for connecting, then set up joint steel pipe, use steel tube scaffold clasp to be held together with climbing frame and steel pipe truss by steel pipe, Inner and outer template is finally installed, pre-splicing good exterior sheathing crane is installed on the template movement device of creeping formwork, mould Plate is held together by the steel pin of diameter 35mm with template movement device, and interior electric expansion bobbin mould needs in a pre-installation Debug errorless after can install;
3rd step: flow process of climbing;
After concreting completes → assembling reinforcement → form removal after move → install the attached wall hanging seat → support body that climbs → template cleaning brush Releasing agent → matched moulds → formwork reinforcement, centering, installation hanging seat service sleeve → casting concrete → entrance subsequent cycle;
4th step: matched moulds and form removal;
One, matched moulds;
Before a, matched moulds, template is cleaned out, brush releasing agent, install embedded part system;
B, the position of measurement module tie rod hole, if conflict with reinforcing bar;
C, by template shift, press close to the surface of concrete;
D, with line pendant or instrumental correction adjust mold plate verticality;
E, template are fixed with truss;
F, put on sleeve pipe, pull bar, tighten every Screw arbor with nut at both-ends;
G, check template are vertical, fasten every horizontal support;
H, casting concrete;
Two, the demoulding;
A, concrete reach intensity 15Mpa rear collapsible die;
B, draw off all through-wall bolts, external corner brace, and extract pull bar out, including oblique angle pull bar;
C, extract gear pin;
D, moving on to position by after template, wherein template can move 500mm, fixes with truss;
Three, climbing frame is removed;
A, with crane first by form removable and hang down;
B, remove the template of more than main platform, main back cord and main back cord diagonal brace, hang down with crane;
C, dismounting motor-driven chain hoist and power distribution equipment;
D, by automatic spraying device remove;
E, operator are positioned to hang and on platform, lower floor's attached wall hanging seat are removed and hung down;
F, sling with crane girder spider and end platform, rise and put suitable height, unload maximum layer attached wall hanging seat;
G, finally dismounting and cat ladder, operator have unloaded suspension hook, have removed attached wall hanging seat, and operator are after cat ladder gets off, then hang Last Pin shelf lower.
Described climbing form system use all-steel big shuttering, described embedded part system include bolt embedment PVC sleeve pipe, high-strength bolt and Stressed bolt, described support body system include hook connecting base, climbing support, climbing frame fix pin plate, template movement device, operation put down Platform, guard rail and protection network.
Described climb in flowchart process, sleeve pipe is through in the preformed hole of inner and outer template, by the high-strength spiral shell of hook connecting base Bolt is through in sleeve pipe, by sleeve pipe crimp during to prevent casting concrete;
If the high-strength connecting bolt of hook connecting base and reinforcing bar have conflict, after suitable for reinforcing bar shifting processing, carry out matched moulds;
The electronic control station that climbs has special messenger to operate, and often whether group creeping formwork sets special messenger and keep an eye on and synchronize, and finds asynchronous, adjusts in time;
Creeping formwork climb next layer in place after remove bottom hook connecting base, turnover use;
Creeping formwork climb in place after check that the absolute altitude that climbs is whether consistent, need to be finely adjusted time inconsistent, whole climbing frame is adjusted to same Absolute altitude, errorless after with pin plate, creeping formwork is fixed.
Creeping formwork must be fastened seat belts and wear necessary guarding articles when installing embedded part, hanging seat.High-strength bolt connects necessary Tighten.Concrete strength must arrive more than 15MPa, can climb.
Creeping formwork is also improved to electronic creeping formwork on the basis of former hydraulic climbing formwork by the present invention, and its reliability is high, speed is fast, event Barrier rate is low.Stencil design height 4.1m, concreting height 4 meters, for preventing from pouring spillage, wraps under template when pouring every time 100mm and between the structural top edge poured and template sticking two-faced adhesive tape.External mold uses four groups of creeping formworks to climb simultaneously, interior Mould uses electric expansion bobbin mould to climb with electronic climbing frame simultaneously, and inner and outer template uses all-steel big shuttering.
In the present invention, electronic climbing form frame body portion uses shaped steel cancelled structure, support body height overall 9.95m, width 2 meters, creeping formwork Being connected by steel pipe truss and scaffolding steel pipe between support body is an entirety, and creeping formwork support body is provided with the demoulding, template cleaning, is coated with The climb operation platform of brush releasing agent, the top operating platform of matched moulds and bottom.Die head is provided with concreting and reinforcing bar The two-layer operating platform of colligation, climbing form frame body perimeter defense uses totally-enclosed punched-plate steel plate protection network, and total closed height is 11.5m.Exterior sheathing perimeter defense uses safety net and the protection of Dense mesh screen Double all-sealed, and total closed height is 4m.
In the present invention, support body Specifeca tion speeification index is as follows:
Designation Model: DDPM-4.0 motor-driven chain hoist is from creeping formwork;
Support body supporting span :≤3.0 meters (spacing of adjacent embedded part point);
Support body height: 9.9 meters;
Support body width: 2.0m;
The operation number of plies and construction loads: template platform≤1.5kN/m2, hydraulic operation platform≤3kN/m2, end platform≤1.5kN/ m2。
The DDPM-4.0 motor-driven chain hoist related in the present invention is to promote creeping formwork support body by motor-driven chain hoist from climbing of creeping formwork System and realize.The upper end of motor-driven chain hoist is hung on the top cross-bar of creeping formwork, and lower end is hung on the boom hoist cable of climbing frame, steel wire The other end of rope is fixed on the hook connecting base of creeping formwork.The rising shrinking drive creeping formwork support body of motor-driven chain hoist, works as climbing form frame Body climb first (top) hook connecting base time, creeping formwork support body is fixed on this hook connecting base by fixing pin plate, Creeping formwork support body is made to enter into normal duty.Motor-driven chain hoist creeping formwork is mainly by climbing form frame system system, template system, electromotive inverted Chain promotes system, electric control system is constituted.
The safety in production, the modern-style construction measure that relate in the present invention are as follows:
1, construction is required in strict accordance with relevant rule of operation and project security management.
When 2, propping up modulo operation, should there is reliable foothold and face limit safety prevention measure.
3, forbidding to walk on the beam steel that colligation is good during construction, hurting sb.'s feelings in case falling.
4, during form removal, beam slab mould answers block-by-block to dismantle, and must not loosen in flakes, prizes or forget about it.
In the present invention it should be noted that quality problems and processing method as follows:
1, before model sheetinstallat, design drawing and structure drawing, unwrapping wire figure should be familiar with.
2, reasonably selecting model sheetinstallat order, ordinary circumstance lower bolster is installed from bottom to up, in installation process, and can If temporary support holds template, to be installed complete and correct errorless after just fix.
3, model sheetinstallat should be with the work post close fit such as reinforcing bar binding, hydropower installation.
4, template should check in installation process more, notes the sectional dimension of perpendicularity, absolute altitude and each several part.Form joint Should be tight, what gap was big to block up tight.
5, during casting concrete, it should be noted that observe the situation after template load-bearing, find that displacement, tympanites, spillage, support loosen Etc. phenomenon, should adopt an effective measure in time and be processed.
Above embodiments of the invention are explained in detail, but the present invention is not limited to above-described embodiment, in ability In the ken that territory those of ordinary skill is possessed, it is also possible to make various change on the premise of without departing from present inventive concept Change.

Claims (3)

1. one kind utilizes the method that electronic climbing apparatus pours into a mould high pier stud, it is characterised in that perform in the steps below:
The first step: prepare climbing form system, embedded part system and support body system reserve;
Second step: install motor-driven chain hoist from creeping formwork;
First place, scene is carried out smooth, then lay creeping formwork assembly platform, climbing frame climbed rail, column, horizontal up and down Beam, level and diagonal web member are assembled into one, and are arranged on by creeping formwork and have poured on the high pier stud of 12m, then install climbing frame Truss frame for connecting, then set up joint steel pipe, use steel tube scaffold clasp to be held together with climbing frame and steel pipe truss by steel pipe, Inner and outer template is finally installed, pre-splicing good exterior sheathing crane is installed on the template movement device of creeping formwork, mould Plate is held together by the steel pin of diameter 35mm with template movement device, and interior electric expansion bobbin mould needs in a pre-installation Debug errorless after can install;
3rd step: flow process of climbing;
After concreting completes → assembling reinforcement → form removal after move → install the attached wall hanging seat → support body that climbs → template cleaning brush Releasing agent → matched moulds → formwork reinforcement, centering, installation hanging seat service sleeve → casting concrete → entrance subsequent cycle;
4th step: matched moulds and form removal;
One, matched moulds;
Before a, matched moulds, template is cleaned out, brush releasing agent, install embedded part system;
B, the position of measurement module tie rod hole, if conflict with reinforcing bar;
C, by template shift, press close to the surface of concrete;
D, with line pendant or instrumental correction adjust mold plate verticality;
E, template are fixed with truss;
F, put on sleeve pipe, pull bar, tighten every Screw arbor with nut at both-ends;
G, check template are vertical, fasten every horizontal support;
H, casting concrete;
Two, the demoulding;
A, concrete reach intensity 15Mpa rear collapsible die;
B, draw off all through-wall bolts, external corner brace, and extract pull bar out, including oblique angle pull bar;
C, extract gear pin;
D, moving on to position by after template, wherein template can move 500mm, fixes with truss;
Three, climbing frame is removed;
A, with crane first by form removable and hang down;
B, remove the template of more than main platform, main back cord and main back cord diagonal brace, hang down with crane;
C, dismounting motor-driven chain hoist and power distribution equipment;
D, by automatic spraying device remove;
E, operator are positioned to hang and on platform, lower floor's attached wall hanging seat are removed and hung down;
F, sling with crane girder spider and end platform, rise and put suitable height, unload maximum layer attached wall hanging seat;
G, finally dismounting and cat ladder, operator have unloaded suspension hook, have removed attached wall hanging seat, and operator are after cat ladder gets off, then hang Last Pin shelf lower.
A kind of method utilizing electronic climbing apparatus to pour into a mould high pier stud the most according to claim 1, it is characterised in that described Climbing form system uses all-steel big shuttering, and described embedded part system includes bolt embedment PVC sleeve pipe, high-strength bolt and stressed bolt, institute State support body system include hook connecting base, climbing support, climbing frame fix pin plate, template movement device, operating platform, guard rail and Protection network.
A kind of method utilizing electronic climbing apparatus to pour into a mould high pier stud the most according to claim 1, it is characterised in that described Climb in flowchart process, sleeve pipe be through in the preformed hole of inner and outer template, the high-strength bolt of hook connecting base is through in sleeve pipe, By sleeve pipe crimp during to prevent casting concrete;
If the high-strength connecting bolt of hook connecting base and reinforcing bar have conflict, after suitable for reinforcing bar shifting processing, carry out matched moulds;
The electronic control station that climbs has special messenger to operate, and often whether group creeping formwork sets special messenger and keep an eye on and synchronize, and finds asynchronous, adjusts in time;
Creeping formwork climb next layer in place after remove bottom hook connecting base, turnover use;
Creeping formwork climb in place after check that the absolute altitude that climbs is whether consistent, need to be finely adjusted time inconsistent, whole climbing frame is adjusted to same Absolute altitude, errorless after with pin plate, creeping formwork is fixed.
CN201610760064.0A 2016-08-30 2016-08-30 A kind of method that high pier stud is poured into a mould using electronic climbing apparatus Active CN106284086B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610760064.0A CN106284086B (en) 2016-08-30 2016-08-30 A kind of method that high pier stud is poured into a mould using electronic climbing apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610760064.0A CN106284086B (en) 2016-08-30 2016-08-30 A kind of method that high pier stud is poured into a mould using electronic climbing apparatus

Publications (2)

Publication Number Publication Date
CN106284086A true CN106284086A (en) 2017-01-04
CN106284086B CN106284086B (en) 2017-11-28

Family

ID=57675281

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610760064.0A Active CN106284086B (en) 2016-08-30 2016-08-30 A kind of method that high pier stud is poured into a mould using electronic climbing apparatus

Country Status (1)

Country Link
CN (1) CN106284086B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110184938A (en) * 2019-06-11 2019-08-30 中铁七局集团有限公司 High pier is without bracket climbing formwork for construction method
CN111395185A (en) * 2020-03-31 2020-07-10 云南工程建设总承包股份有限公司 System and method for applying electric bridge type scaffold platform to construction of equal-section high pier
CN113047181A (en) * 2021-04-09 2021-06-29 中交路桥华东工程有限公司 Synchronous lifting device for inner and outer molds of hollow pier and construction method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2452182A1 (en) * 1974-11-02 1976-05-06 Dyckerhoff & Widmann Ag Reinforced concrete building climbing formwork system erection - using brackets on climbing frame carriage for formwork deposit during climbing
CN1054112A (en) * 1990-02-19 1991-08-28 四川省桥梁工程公司 Sliding lifted moulding turn-over working device
CN200975103Y (en) * 2006-12-01 2007-11-14 北京星河人施工技术有限责任公司 Hydraulic center top lifting framework apparatus
CN102535341A (en) * 2012-01-04 2012-07-04 浙江永峰模具制造有限公司 Construction process of hydraulic climbing form of high pier
CN103061500A (en) * 2013-01-11 2013-04-24 上海建工集团股份有限公司 Bowstring truss type fully-enclosed hydraulic climbing formwork system and application method for same
CN204418658U (en) * 2014-12-30 2015-06-24 南京道广建筑模板有限公司 Integrated hydraulic creeping formwork periphery protection unit

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2452182A1 (en) * 1974-11-02 1976-05-06 Dyckerhoff & Widmann Ag Reinforced concrete building climbing formwork system erection - using brackets on climbing frame carriage for formwork deposit during climbing
CN1054112A (en) * 1990-02-19 1991-08-28 四川省桥梁工程公司 Sliding lifted moulding turn-over working device
CN200975103Y (en) * 2006-12-01 2007-11-14 北京星河人施工技术有限责任公司 Hydraulic center top lifting framework apparatus
CN102535341A (en) * 2012-01-04 2012-07-04 浙江永峰模具制造有限公司 Construction process of hydraulic climbing form of high pier
CN103061500A (en) * 2013-01-11 2013-04-24 上海建工集团股份有限公司 Bowstring truss type fully-enclosed hydraulic climbing formwork system and application method for same
CN204418658U (en) * 2014-12-30 2015-06-24 南京道广建筑模板有限公司 Integrated hydraulic creeping formwork periphery protection unit

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
何准越等: "高耸烟囱电动升模施工工法", 《中外建筑》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110184938A (en) * 2019-06-11 2019-08-30 中铁七局集团有限公司 High pier is without bracket climbing formwork for construction method
CN111395185A (en) * 2020-03-31 2020-07-10 云南工程建设总承包股份有限公司 System and method for applying electric bridge type scaffold platform to construction of equal-section high pier
CN113047181A (en) * 2021-04-09 2021-06-29 中交路桥华东工程有限公司 Synchronous lifting device for inner and outer molds of hollow pier and construction method thereof

Also Published As

Publication number Publication date
CN106284086B (en) 2017-11-28

Similar Documents

Publication Publication Date Title
CN105971274A (en) Cantilever support frame formwork system and construction method thereof
CN101435276B (en) Hydraulic lifting and positioning device for steel beam at top of silo structure and construction method thereof
CN105113388B (en) Formwork and bracket combining structure of vase pier of viaduct and application method
CN106192758A (en) Construction method for constructing large high pier column by using cantilever formwork
CN105298100B (en) A kind of cylinder building cast-in-place flare structure of superelevation is encorbelmented the construction method of operation platform
CN104695337B (en) Self-lifting sliding and turnover construction system and construction method
CN103635643A (en) Constructing method for concrete cylinder of construction steel bar of high-rise steel structure
CN103410320B (en) The tower silo flexibility platform bitubular connects sliding construction method
CN103422668A (en) Construction method of super-thick large-slope shear wall and hydraulic self-jacking inclined creeping framework thereof
CN108104475B (en) Self-crawling type floor inner concrete cloth equipment and its construction method
CN107100361B (en) Inner support aluminum dipping form device and its installation method are climbed outside a kind of
CN108360380A (en) A kind of bridge pier column construction operation platform and its construction method
CN102912996B (en) Steel tube concrete column high-altitude construction safety protection system
CN113090019A (en) Construction method and construction device for high-rise structure
CN105178199A (en) Pier column construction method and pier column template
CN106284086B (en) A kind of method that high pier stud is poured into a mould using electronic climbing apparatus
CN109989348A (en) Cantilever formwork for concrete construction and construction method thereof
CN109252656B (en) High-rise building climbing template and assembling, pouring and lifting method
CN110886488A (en) Intelligent integrated high-rise building machine
CN105370027B (en) The construction method of steel supporting platform structure is integrally lifted in high-rise hanging structure
CN205012217U (en) Overpass vase mound formwork support unites structure
CN106284997B (en) The big punching block construction method for lifting whole of reinforced concrete chimney
CN209924407U (en) Combined working platform for steel structure high-altitude installation
CN211173029U (en) A liftable platform structure for chimney reinforcement construction
CN209339010U (en) Walking bridge floor faces side barrel structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant