CN110886488A - An intelligent integrated high-rise building machine - Google Patents
An intelligent integrated high-rise building machine Download PDFInfo
- Publication number
- CN110886488A CN110886488A CN201911033221.8A CN201911033221A CN110886488A CN 110886488 A CN110886488 A CN 110886488A CN 201911033221 A CN201911033221 A CN 201911033221A CN 110886488 A CN110886488 A CN 110886488A
- Authority
- CN
- China
- Prior art keywords
- plate
- wall
- formwork
- platform
- connecting plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 claims abstract description 117
- 238000009415 formwork Methods 0.000 claims abstract description 99
- 230000001681 protective effect Effects 0.000 claims abstract description 40
- 230000007246 mechanism Effects 0.000 claims description 23
- 229910000831 Steel Inorganic materials 0.000 claims description 14
- 239000010959 steel Substances 0.000 claims description 14
- 230000003014 reinforcing effect Effects 0.000 claims description 13
- 238000005096 rolling process Methods 0.000 claims description 5
- 230000006835 compression Effects 0.000 claims description 4
- 238000007906 compression Methods 0.000 claims description 4
- 238000005034 decoration Methods 0.000 claims description 4
- 238000009435 building construction Methods 0.000 claims 10
- 229910001294 Reinforcing steel Inorganic materials 0.000 claims 1
- 238000007789 sealing Methods 0.000 claims 1
- 238000013461 design Methods 0.000 abstract description 31
- 238000003825 pressing Methods 0.000 abstract description 11
- 230000001360 synchronised effect Effects 0.000 abstract description 3
- 238000000034 method Methods 0.000 description 29
- 230000008569 process Effects 0.000 description 19
- 239000000463 material Substances 0.000 description 15
- 238000005266 casting Methods 0.000 description 11
- 238000006243 chemical reaction Methods 0.000 description 11
- 238000010586 diagram Methods 0.000 description 8
- 230000002787 reinforcement Effects 0.000 description 6
- 239000007921 spray Substances 0.000 description 4
- 239000000428 dust Substances 0.000 description 3
- 238000005259 measurement Methods 0.000 description 3
- 238000000465 moulding Methods 0.000 description 3
- 238000012546 transfer Methods 0.000 description 3
- 239000002699 waste material Substances 0.000 description 3
- 230000008901 benefit Effects 0.000 description 2
- 230000009194 climbing Effects 0.000 description 2
- 238000009826 distribution Methods 0.000 description 2
- 239000000945 filler Substances 0.000 description 2
- 230000005484 gravity Effects 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 230000002035 prolonged effect Effects 0.000 description 2
- 238000007711 solidification Methods 0.000 description 2
- 230000008023 solidification Effects 0.000 description 2
- 239000010935 stainless steel Substances 0.000 description 2
- 229910001220 stainless steel Inorganic materials 0.000 description 2
- 230000001629 suppression Effects 0.000 description 2
- 238000004078 waterproofing Methods 0.000 description 2
- 239000002023 wood Substances 0.000 description 2
- 229910000838 Al alloy Inorganic materials 0.000 description 1
- 241000264877 Hippospongia communis Species 0.000 description 1
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 description 1
- 229910052782 aluminium Inorganic materials 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000004035 construction material Substances 0.000 description 1
- 230000003247 decreasing effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000011120 plywood Substances 0.000 description 1
- 238000004080 punching Methods 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 238000009418 renovation Methods 0.000 description 1
- 230000000391 smoking effect Effects 0.000 description 1
- 230000007306 turnover Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/06—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
- E04G11/08—Forms, which are completely dismantled after setting of the concrete and re-built for next pouring
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/06—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
- E04G11/08—Forms, which are completely dismantled after setting of the concrete and re-built for next pouring
- E04G11/12—Forms, which are completely dismantled after setting of the concrete and re-built for next pouring of elements and beams which are mounted during erection of the shuttering to brace or couple the elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G17/00—Connecting or other auxiliary members for forms, falsework structures, or shutterings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G17/00—Connecting or other auxiliary members for forms, falsework structures, or shutterings
- E04G17/005—Strips for covering joints between form sections, e.g. to avoid burring or spilling of laitance
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G17/00—Connecting or other auxiliary members for forms, falsework structures, or shutterings
- E04G17/06—Tying means; Spacers ; Devices for extracting or inserting wall ties
- E04G17/075—Tying means, the tensional elements of which are fastened or tensioned by other means
- E04G17/0751—One-piece elements
- E04G17/0752—One-piece elements fully recoverable
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/02—Conveying or working-up concrete or similar masses able to be heaped or cast
- E04G21/06—Solidifying concrete, e.g. by application of vacuum before hardening
- E04G21/063—Solidifying concrete, e.g. by application of vacuum before hardening making use of vibrating or jolting tools
- E04G21/065—Solidifying concrete, e.g. by application of vacuum before hardening making use of vibrating or jolting tools acting upon the shuttering
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/166—Landings, receiving platforms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/32—Safety or protective measures for persons during the construction of buildings
- E04G21/3204—Safety or protective measures for persons during the construction of buildings against falling down
- E04G21/3219—Means supported by the building wall, e.g. security consoles
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
本发明提供一种智能集成高层建筑造楼机,包括顶层施工平台,在所述顶层施工平台的下端面沿其周向上设置有外挂防护施工平台、内挂防护施工平台,外挂防护施工平台和内挂防护施工平台之间设置有连接在顶层施工平台的大模板体系,大模板体系包括墙体内侧模板、墙体外侧模板、止流板旋转连接件、止流板,止流板旋转连接件包括上连接板、下连接板;及压紧杆件,压紧杆件上端连接内侧模板,下端连接止流板。通过止流板设计可以实现楼板滞后墙柱同层同步混凝土浇注施工,从而实现内墙模板形成大模板体系,给施工机械化带来无限空间。The invention provides an intelligent integrated high-rise building building machine, which comprises a top-level construction platform, and a lower end surface of the top-level construction platform is provided with an externally-mounted protective construction platform, an internal-mounted protective construction platform, an externally-mounted protective construction platform and an internal-mounted protective construction platform along its circumferential direction. There is a large formwork system connected to the top construction platform between the hanging protective construction platforms. The large formwork system includes the formwork inside the wall, the formwork outside the wall, the flow stopper rotating connection piece, and the flow stopper plate. The flow stopper rotating connection piece includes an upper connecting plate, a lower connecting plate; and a pressing rod, the upper end of the pressing rod is connected with the inner formwork, and the lower end is connected with the stop plate. Through the design of the stop plate, the synchronous concrete pouring construction of the floor lag behind the wall column on the same floor can be realized, so that the inner wall formwork can be formed into a large formwork system, which brings infinite space for construction mechanization.
Description
技术领域technical field
本发明涉及高层房建墙体混凝土浇筑用多功能施工平台,具体涉及一种高层建筑用可以携带附着振动器的大模板、液压布料机、动臂吊、混凝土养护、内外多层施工用防护平台的多功能顶升智能集成造楼机(施工平台)。The invention relates to a multifunctional construction platform for concrete pouring of high-rise building walls, in particular to a large formwork, hydraulic placing machine, boom crane, concrete maintenance, and a protective platform for inner and outer multi-layer construction that can carry an attached vibrator for high-rise buildings. The multi-functional jacking intelligent integrated building machine (construction platform).
背景技术Background technique
目前建筑业房建施工中当遇到要楼板滞后墙柱混凝土浇注时,采用在两处混凝土分段处加钢丝网进行拦截。如遇大量施工需求时会消耗大量人工及物料,同时因增加施工工序导致施工时间加长.At present, when the floor slab is lagging behind the wall column concrete pouring in the construction of the building industry, steel wire mesh is used to intercept the two concrete sections. In case of a large number of construction needs, it will consume a lot of labor and materials, and at the same time, the construction time will be prolonged due to the increase of construction procedures.
发明内容SUMMARY OF THE INVENTION
本发明针对现有技术的不足,提供一种智能集成高层建筑造楼机,通过止流板设计可以实现楼板滞后墙柱同层同步混凝土浇注施工,从而实现内墙模板形成大模板体系,给施工机械化带来无限空间。Aiming at the deficiencies of the prior art, the invention provides an intelligent integrated high-rise building building machine. Through the design of the stop plate, the floor slab lags behind the wall column and the same layer of synchronous concrete pouring construction, so that the inner wall formwork can form a large formwork system, which is convenient for construction. Mechanization brings infinite space.
为实现上述目的,本发明提供如下技术方案:一种智能集成高层建筑造楼机,该造楼机包括顶层施工平台、外挂防护施工平台、内挂防护施工平台、外墙大模板、内墙大模板、液压布料机、动臂吊、液压顶升动力机构、混凝土养护系统、喷雾降尘系统、附着移动卫生间实施、智能管理控制系统、完成层临边安全防护等实施。In order to achieve the above purpose, the present invention provides the following technical solutions: an intelligent integrated high-rise building building machine, the building building machine includes a top construction platform, an external protective construction platform, an internal hanging protective construction platform, a large formwork for an outer wall, and a large inner wall. Formwork, hydraulic placing machine, boom crane, hydraulic jacking power mechanism, concrete maintenance system, spray dust suppression system, implementation of attached mobile toilets, intelligent management and control system, completion layer edge safety protection, etc.
顶层施工平台,顶层施工平台是由主梁、次梁、平台梁、平台板、防护栏杆等组装而成。在所述施工平台的下端面沿其周向上设置有外挂防护施工平台、内挂防护施工平台,The top construction platform is composed of main beams, secondary beams, platform beams, platform slabs, and protective railings. The lower end face of the construction platform is provided with an externally hanging protective construction platform and an internal hanging protective construction platform along its circumferential direction,
外挂施工平台包括可供施工的若干层施工平台层,扎钢筋平台、混凝土浇注平台、外墙模板退模合模加固平台、外墙装修平台等,平台和外墙间全封闭和/或半封闭,平台外侧用开孔不大于6MM钢网全封闭防护给施工人员提供全方位的安全防护空间,同时可以有效控制高空物料坠落的危险事故。The external construction platform includes several layers of construction platforms available for construction, steel reinforcement platform, concrete pouring platform, external wall formwork stripping and formwork reinforcement platform, external wall decoration platform, etc., fully enclosed and/or semi-enclosed between the platform and the external wall , The outer side of the platform is fully enclosed with a steel mesh with an opening of no more than 6MM to provide construction personnel with a full range of safety protection space, and can effectively control the dangerous accident of falling materials from high altitudes.
外挂施工平台可用螺栓固定在智能集成化高层建筑用造楼机的外侧主梁、次梁和/或平台梁上,随同智能集成化高层建筑用造楼机同步顶升。也可用卷扬机构挂在造楼机的外侧主、次梁上,同造楼机同步顶升,也可用卷扬机构单独上升或下降,The external construction platform can be bolted to the outer main beam, secondary beam and/or platform beam of the intelligent integrated high-rise building building machine, and is lifted synchronously with the intelligent integrated high-rise building building machine. The hoisting mechanism can also be used to hang on the main and secondary beams on the outside of the building machine, to be lifted synchronously with the building machine, or the hoisting mechanism can be used to raise or lower independently.
内挂施工平台包括可供施工的若干层施工平台层,扎钢筋平台、混凝土浇注平台、内墙模板退模合模加固平台,平台和墙体间半封闭,内挂施工平台可用螺栓固定在智能集成化高层建筑用造楼机的内侧主梁、次梁和/或平台梁上,随同智能集成化高层建筑用造楼机同步顶升。The built-in construction platform includes several layers of construction platforms available for construction, a steel-reinforced platform, a concrete pouring platform, and an inner wall formwork stripping and formwork reinforcement platform. The platform and the wall are semi-closed, and the built-in construction platform can be bolted to the intelligent The inner main beam, secondary beam and/or platform beam of the building machine for integrated high-rise buildings are lifted synchronously with the building machine for intelligent integrated high-rise buildings.
外挂防护施工平台和内挂防护施工平台之间设置有连接在工作平台的大模板体系,A large formwork system connected to the working platform is set between the external hanging protective construction platform and the internal hanging protective construction platform.
大模板体系包括墙体内侧模板、墙体外侧模板、对拉杆、定位销,The large formwork system includes the formwork inside the wall, the formwork outside the wall, the tie rod, the positioning pin,
当浇注外墙时:When pouring exterior walls:
墙体內侧模板的外端面具有第一背楞,第一背楞上具有与第一定位孔,The outer end face of the formwork on the inner side of the wall has a first back ridge, and the first back ridge is provided with a first positioning hole,
墙体外侧模板的外端面具有第二背楞,第二背楞上具有与第四定位孔,The outer end surface of the outer formwork of the wall has a second back ridge, and the second back ridge is provided with a fourth positioning hole,
对拉杆,对拉杆上具有间隔设置的第二定位孔、第三定位孔,第二定位孔与所述的第一定位孔同轴线,第三定位孔与所述的第四定位孔同轴线,For the pull rod, there are second positioning holes and third positioning holes arranged at intervals on the pull rod. The second positioning hole is coaxial with the first positioning hole, and the third positioning hole is coaxial with the fourth positioning hole. Wire,
定位销,定位销包括第一定位销、第二定位销,第一定位销安装在第一、第二定位孔内,第二定位销安装在第三、第四定位孔内,The positioning pin includes a first positioning pin and a second positioning pin, the first positioning pin is installed in the first and second positioning holes, and the second positioning pin is installed in the third and fourth positioning holes,
在第三定位孔指向第二定位孔的对拉杆轴向上,对拉杆倾斜向上依次穿过第二背楞、第一背楞。In the axial direction of the pair of tie rods where the third positioning hole points to the second positioning hole, the pair of tie rods pass through the second back ridge and the first back ridge in sequence in an inclined upward direction.
在上述方案的基础上,作为优选,在自第三定位孔指向第二定位孔的对拉杆轴向上,对拉杆的直径变小,端部具有钢丝绳,On the basis of the above solution, preferably, in the axial direction of the opposite tie rod from the third positioning hole to the second positioning hole, the diameter of the opposite tie rod becomes smaller, and the end has a wire rope,
对拉杆的材质为不锈钢或镀锌件,The material of the tie rod is stainless steel or galvanized parts,
第一定位销以及第二定位销端部具有钢丝绳,The ends of the first positioning pin and the second positioning pin are provided with wire ropes,
第一、二、三、四定位孔均为长方形矩形通孔,The first, second, third and fourth positioning holes are all rectangular through holes.
第一定位销以及第二定位销均为长方形扁钢材质,The first positioning pin and the second positioning pin are made of rectangular flat steel.
当浇注内墙时:When pouring interior walls:
内墙浇注都用內侧模板和内侧模板加固,对拉杆水平依次穿过内侧模板上的背楞。其它同外墙浇注方法,The inner wall is reinforced with the inner formwork and the inner formwork, and the tie rods horizontally pass through the back corrugation on the inner formwork in turn. Other casting methods are the same as the external wall,
在上述方案的基础上,作为优选,在大模板的上方与顶层施工平台下方设置用于混凝土养护的喷雾系统,用于降尘的喷雾系统,On the basis of the above scheme, preferably, a spray system for concrete curing and a spray system for dust reduction are arranged above the large formwork and below the top construction platform.
在上述方案的基础上,作为优选,在施工平台上方设置卫生间、茶水间、吸烟区、工具箱、设备操作间。On the basis of the above scheme, preferably, toilets, pantries, smoking areas, tool boxes and equipment operation rooms are arranged above the construction platform.
在上述方案的基础上,作为优选,还包括止流板旋转连接件、止流板,止流板旋转连接件包括上连接板、下连接板,上连接板和下连接板之间铰接且在上连接板和下连接件接触时密封配合,上连接板上端固定在墙体内侧模板下端;On the basis of the above solution, preferably, it also includes a stopper rotating connection piece and a stopper plate, and the stopper plate rotation connection piece includes an upper connection plate and a lower connection plate, and the upper connection plate and the lower connection plate are hinged and connected between When the upper connecting plate and the lower connecting piece are in contact with each other, they are sealed and matched, and the upper end of the upper connecting plate is fixed on the lower end of the formwork inside the wall;
止流板下端面为平面,在墙体内侧模板向内方向上,止流板具有第一端、第二端,第一端与下连接板下端固定连接;及The lower end face of the stop plate is flat, and in the inward direction of the inner formwork of the wall, the stop plate has a first end and a second end, and the first end is fixedly connected with the lower end of the lower connecting plate; and
一用于将上连接板和下连接板相对转动后位置固定的压紧杆件,压紧杆件上端连接内侧模板,下端连接止流板。A pressing rod for fixing the position after the upper connecting plate and the lower connecting plate are rotated relative to each other, the upper end of the pressing rod is connected with the inner template, and the lower end is connected with the stop plate.
在上述方案的基础上,作为优选,墙体内侧模板向内方向的端面上具有竖向立杆,竖向立杆上具有若干个销钉孔,销钉穿过销钉孔及压紧杆件上端的孔,On the basis of the above solution, preferably, there is a vertical pole on the end face of the inner wall formwork in the inward direction, and the vertical pole has a number of pin holes, the pins pass through the pin holes and the holes at the upper end of the compression rod ,
止流板上具有与压紧杆件相连接的连接部,连接部上具有销钉孔,销钉穿过销钉孔及压紧杆件下端的孔,The stop plate is provided with a connecting part connected with the pressing rod, the connecting part is provided with a pin hole, the pin passes through the pin hole and the hole at the lower end of the pressing rod,
上连接板向内方向的端面上具有上加强筋,下连接板向内方向的端面上具有下加强筋,上加强筋下端与下加强筋上端具有在竖向上相背设置的坡面,An upper reinforcing rib is arranged on the inward end face of the upper connecting plate, a lower reinforcing rib is arranged on the inward end face of the lower connecting plate, and the lower end of the upper reinforcing rib and the upper end of the lower reinforcing rib are provided with slopes arranged opposite to each other in the vertical direction.
上连接板、下连接板之间通过钢琴铰链铰接,The upper connecting plate and the lower connecting plate are hinged through piano hinges,
上连接板与内侧模板一体成型,下连接板与止流板一体成型。The upper connecting plate and the inner template are integrally formed, and the lower connecting plate and the flow stop plate are integrally formed.
在上述方案的基础上,作为优选,在所述的墙体内侧模板和/或墙体外侧模板上安装振动器。On the basis of the above solution, preferably, a vibrator is installed on the inner wall formwork and/or the wall outer formwork.
在上述方案的基础上,作为优选,振动器为变频振动器,变频振动器的参数:电机功率为1.5KW--5.5KW,220V或380V电压。On the basis of the above scheme, preferably, the vibrator is a frequency conversion vibrator, and the parameters of the frequency conversion vibrator: the motor power is 1.5KW--5.5KW, and the voltage is 220V or 380V.
在上述方案的基础上,作为优选,墙体内模板和/或墙体外模板的外端面设置有倾角传感器,倾角传感器固定安装在所述的背楞上,On the basis of the above scheme, preferably, an inclination sensor is provided on the outer end face of the formwork in the wall and/or the formwork outside the wall, and the inclination sensor is fixedly installed on the back ridge,
倾角传感器电性连接报警装置或混凝土浇注设备的控制开关,The inclination sensor is electrically connected to the alarm device or the control switch of the concrete pouring equipment,
倾角传感器还电性连接报警装置,报警装置为语音报警器或蜂鸣器。The inclination sensor is also electrically connected to an alarm device, and the alarm device is a voice alarm or a buzzer.
在上述方案的基础上,作为优选,与墙体上需要悬挂防护网对应的墙体内侧模板上的临边侧安装有丝套,丝杆穿过墙体内侧模板与丝套螺纹连接,On the basis of the above scheme, preferably, a wire sleeve is installed on the limb side of the formwork on the inner side of the wall corresponding to the protective net that needs to be hung on the wall, and the screw rod passes through the formwork on the inner side of the wall and is threadedly connected with the wire sleeve,
丝套轴向上的内端面与模板接触配合,The inner end face of the wire sleeve in the axial direction is in contact with the template,
丝套为盲孔式丝套。The wire sleeve is a blind hole type wire sleeve.
在上述方案的基础上,作为优选,在所述工作平台的上端面设置有导轨,在所述的导轨上安装有可沿该导轨运动的底座,On the basis of the above solution, preferably, a guide rail is provided on the upper end face of the working platform, and a base that can move along the guide rail is installed on the guide rail,
底座与所述的导轨之间通过可拆式连接件固定连接,The base and the guide rail are fixedly connected by detachable connectors,
底座上连接有在可拆式连接件拆下后驱动底座沿导轨运动的驱动机构。The base is connected with a driving mechanism for driving the base to move along the guide rail after the detachable connecting piece is removed.
在上述方案的基础上,作为优选,导轨为两根并行的导轨,底座与所述的导轨之间滚动配合,On the basis of the above solution, preferably, the guide rails are two parallel guide rails, and the base and the guide rails are in rolling fit,
底座包括支撑板以及设置在支撑板下端面两侧的移动导向板,导轨位于移动导向板之间,可拆式连接件为螺丝,螺丝穿过所述的支撑板与导轨固定连接,导轨有两条,支撑板底部具有四个滚轮小车,每个导轨上安装两个滚轮小车,The base includes a support plate and a moving guide plate arranged on both sides of the lower end face of the support plate. The guide rail is located between the moving guide plates. The detachable connecting piece is a screw. The screw passes through the support plate and is fixedly connected to the guide rail. The guide rail has two There are four roller trolleys at the bottom of the support plate, two roller trolleys are installed on each guide rail,
滚轮小车包括固定在底部的连接板,连接板两端向下延伸有第一侧板、第二侧板,连接板中部向下延伸有中间板,第一侧板、第二侧板、中间板构成滚轮架,第一侧板、第二侧板和中间板之间均设置有滚轮,滚轮轴由第一侧板外侧穿过第一侧板、滚轮、中间板、滚轮、第二侧板后伸出并由滚轮销轴将滚轮轴在轴向上与滚轮架固定配合,滚轮轴与滚轮轴线重合,滚轮的侧面突出滚轮架的下端,The roller trolley includes a connecting plate fixed on the bottom, two ends of the connecting plate extend downward with a first side plate and a second side plate, and a middle plate extends downward in the middle of the connecting plate. The first side plate, the second side plate and the middle plate A roller frame is formed, a roller is arranged between the first side plate, the second side plate and the middle plate, and the roller shaft passes through the first side plate, the roller, the middle plate, the roller, and the second side plate from the outside of the first side plate. The roller shaft is extended and fixedly matched with the roller frame in the axial direction by the roller pin shaft. The roller shaft coincides with the axis of the roller. The side of the roller protrudes from the lower end of the roller frame.
驱动机构为卷扬机,卷扬机和底座之间通过牵引钢丝绳连接,The driving mechanism is a hoist, and the hoist and the base are connected by a traction wire rope.
还包括悬臂支撑小车,悬臂支撑小车底部的滚轮小车放置在导轨上,且悬臂支撑小车位于驱动机构和底座之间。It also includes a cantilever support trolley, the roller trolley at the bottom of the cantilever support trolley is placed on the guide rail, and the cantilever support trolley is located between the drive mechanism and the base.
还包括与造楼机配套带龙门吊的卸料平台,用于周转下层施工物料。It also includes an unloading platform with a gantry crane matched with the building machine, which is used to transfer the lower construction materials.
与现有技术相比,本发明的有益效果是:Compared with the prior art, the beneficial effects of the present invention are:
1、通过第一、二、三、四定位孔的设计,使得墙体内、外大模板在固定时,可进行向内、向外两个方向同时定位,其定位结果准备,无需二次调节。比传统的方法提高施工质量和施工效率。1. Through the design of the first, second, third, and fourth positioning holes, when the large formwork inside and outside the wall is fixed, it can be positioned inward and outward at the same time, and the positioning results are prepared without secondary adjustment. . Compared with traditional methods, the construction quality and construction efficiency are improved.
2、通过对拉杆自由端自第二背楞外侧倾斜向上依次穿过第二背楞、第一背楞的设计,使得混凝土浇注在墙体内模板和墙体外模板的墙体上形成一个倾斜向上的通孔,雨水不会沿着该通孔进入墙体内部,起到防水的目的。2. Through the design that the free end of the tie rod is inclined upward from the outside of the second back ridge and passes through the second back ridge and the first back ridge in turn, the concrete is poured on the wall of the inner wall formwork and the outer wall formwork to form a slope. With the upward through hole, rainwater will not enter the interior of the wall along the through hole, which serves the purpose of waterproofing.
3、采用轴向上直径变小的设计,便于直接将对拉杆打出墙体,无需增加PVC管这一耗材。3. Adopting the design of decreasing diameter in the axial direction, it is convenient to directly punch the tie rod out of the wall without adding PVC pipe as a consumable.
4、通过钢丝绳的设计,可将对拉杆、第一定位销以及第二定位销悬挂在墙体内模板或墙体外模板上,避免使用过程中其掉落。避免高空坠物危险事故发生,以及材料丢失造成浪费。同时减少找材料的人工浪费。4. Through the design of the steel wire rope, the tie rod, the first locating pin and the second locating pin can be hung on the formwork in the wall or the formwork outside the wall, so as to prevent them from falling during use. Avoid the occurrence of dangerous accidents of falling objects and waste caused by loss of materials. At the same time, the labor waste of finding materials is reduced.
5、通过止流板的设计,可以免除钢丝网的设置,无需此道工艺。止流板与顶撑模板之间形成狭小空间可以有效阻止混凝土流淌,直接浇注有效节约材料和人工。5. Through the design of the stop plate, the setting of the wire mesh can be avoided, and this process is not required. The narrow space formed between the stop plate and the top support formwork can effectively prevent the concrete from flowing, and direct pouring can effectively save materials and labor.
6、通过止流板的设计,可以实现楼板滞后墙柱同层同步混凝土浇注施工,从而实现内墙模板形成大模板体系,可以连接顶层施工平台同步顶升。6. Through the design of the flow stop plate, the synchronous concrete pouring construction of the floor lag behind the wall column can be realized, so that the inner wall formwork can form a large formwork system, which can be connected to the top construction platform to be lifted synchronously.
7、通过止流板的设计,以止流板外端作为水平靠山,可以实现同层楼板水平浇注成型高度控制在±5MM优质质量范围之内。7. Through the design of the flow stop plate, the outer end of the flow stop plate is used as the horizontal backing, so that the height of the horizontal casting of the same floor slab can be controlled within the range of ±5MM high-quality quality.
8、通过止流板的设计,机械化施工器械拖棒可以以止流板外端作为水平靠山进行楼板面机械施工。8. Through the design of the stop plate, the tow bar of the mechanized construction equipment can use the outer end of the stop plate as the horizontal backer to carry out the mechanical construction of the floor surface.
9、通过止流板的设计,混凝土浇注完成后止流板可以作为施工人员通行过道,可以有效避免混凝土未成型前施工人员走在混凝土上留下深浅不一的脚印。9. Through the design of the stop plate, after the concrete is poured, the stop plate can be used as a passage for the construction personnel, which can effectively prevent the construction personnel from leaving different footprints on the concrete before the concrete is formed.
10、通利用变频振动的振动与混凝土浇注时其自身的重力因素,使得浇注后的砼流动性、可塑性增加,构件密实度提高,成型快,质量可大幅度提高。10. By using the vibration of variable frequency vibration and its own gravity factor during concrete pouring, the fluidity and plasticity of the poured concrete are increased, the compactness of the components is improved, the forming is fast, and the quality can be greatly improved.
11、通利用变频振动器附着在模板上的定位设置,使得解决无人振动施工方案成为可行,同时解决人工振动不到位导致混凝土成型有空洞、蜂窝的质量问题,同时又减少用工。11. The use of frequency conversion vibrators attached to the template makes it feasible to solve the unmanned vibration construction scheme, and at the same time solve the quality problem of voids and honeycombs in concrete molding due to insufficient artificial vibration, and at the same time reduce labor.
12、通过倾角传感器设计,可及时通过其观察模板的偏移角度,保证浇注中墙体的偏移在误差允许的范围内。12. Through the design of the inclination sensor, the deviation angle of the template can be observed in time through it to ensure that the deviation of the wall during casting is within the allowable error range.
13、通过声音或蜂鸣器的警示,提醒及时去修正模板位置。13. Through the sound or buzzer warning, remind to correct the template position in time.
14、通过倾角传感器设计,使得解决无人测量施工方案成为可行,大大提高测量效率减少人为测量误差,从而减少用工。14. Through the design of the inclination sensor, it is feasible to solve the unmanned measurement construction plan, which greatly improves the measurement efficiency and reduces human measurement errors, thereby reducing labor.
15、通过增加导轨设计,在导轨可固定在造楼机平台上,将动臂吊和/或布料机固定在底座上,底座可沿导轨运动(滑动或滚动配合),及可拆式连接件及驱动机构相配合,进而实现动臂吊和/或布料机可在工作过程中可根据需要进行水平移动,便于进行作业,避免传统方式的动臂吊只能通过吊装方式进行上下加水平运动,同时带来的费时、费力及转换成本高等问题。15. By adding guide rail design, the guide rail can be fixed on the building machine platform, the boom crane and/or the placing machine can be fixed on the base, the base can move along the guide rail (sliding or rolling fit), and detachable connectors In combination with the driving mechanism, the boom crane and/or the placing machine can move horizontally as needed during the working process, which is convenient for operation, and avoids that the traditional boom crane can only move up and down and horizontally through the hoisting method. At the same time, it brings problems such as time-consuming, laborious and high conversion cost.
16、通过增加导轨设计,在超长宽度建筑项目上无须配置多台动臂吊和/或布料机,即可满足建筑施工所需的物料垂直输送。同时因动臂吊安装在携带可供水平移动导轨的可自行顶升的造楼机平台上,与造楼机配套施工无须再配置附墙塔吊。进而有效避免每年高频发生的塔吊倾覆事故。16. By adding guide rail design, it is not necessary to configure multiple boom cranes and/or placing machines on super-long-width construction projects to meet the vertical transportation of materials required for construction. At the same time, because the boom crane is installed on the platform of the building machine that can be lifted by itself with the guide rail for horizontal movement, it is not necessary to configure the tower crane attached to the wall when it is matched with the building machine. This can effectively avoid the tower crane overturning accidents that occur frequently every year.
17、通过移动导向板位于导轨两侧,其与导轨之间间隙配合(微小),起到导向作用,螺丝作为可拆式连接件进行固定,便于拆卸、再固定重复工作以适用于不同工位。17. By moving the guide plate on both sides of the guide rail, it has a clearance fit (small) with the guide rail to play a guiding role. The screw is fixed as a detachable connector, which is convenient for disassembly, re-fixation and repeated work to be suitable for different stations. .
18、由于布料机\动臂吊悬臂较长,在转移过程中为避免机体倾覆,通过悬臂支撑小车使悬臂保持水平以便于进行水平运动。18. Due to the long cantilever of the distributing machine/boom crane, in order to avoid the overturning of the body during the transfer process, the cantilever is supported by the cantilever to keep the cantilever horizontal to facilitate horizontal movement.
19、通过外挂施工防护平台的设计,外挂施工平台可用螺栓固定在造楼机的外侧主梁、次梁和/或平台梁上,随同造楼机同步顶升,与传统附着升降脚手架相比,因为没有防倾覆的三层附墙机构要求,相比可以提供更多的施工平台满足各个工种所须要施工平台层。19. Through the design of the external construction protection platform, the external construction platform can be bolted to the outer main beam, secondary beam and/or platform beam of the building machine, and is lifted synchronously with the building machine. Compared with the traditional attached lifting scaffold, Because there is no three-layer wall-attaching mechanism for anti-overturning, more construction platforms can be provided to meet the construction platform layers required by various types of work.
20、通过外挂施工防护平台的设计,外挂施工平台可用螺栓固定在造楼机的外侧主梁、次梁和/或平台梁上,与传统附着升降脚手架相比,因为是挂在主架体上没有外墙附着机构,所以绝对杜绝外架的倾覆和坠落的安全事故发生。20. Through the design of the external construction protection platform, the external construction platform can be bolted to the outer main beam, secondary beam and/or platform beam of the building machine. Compared with the traditional attached lifting scaffold, it is hung on the main frame body. There is no external wall attachment mechanism, so the overturning and falling safety accidents of the external frame are absolutely prevented.
21、通过外挂施工防护平台的设计,也可用卷扬机构挂在造楼机的外侧主、次梁上单独上升或下降,与传统附着升降脚手架相比,传统附着升降脚手架只能上升到顶后再下降的施工工艺。本外挂施工防护平台在流水施工过程中可以把最下层施工平台分体出来,单独上升或下降,可以满足外墙装修流程施工需求。21. Through the design of the external construction protection platform, the hoisting mechanism can also be hung on the outer main and secondary beams of the building machine to rise or fall independently. Compared with the traditional attached lifting scaffold, the traditional attached lifting scaffold can only be raised to the top and then lowered. construction process. The external construction protection platform can be separated from the bottom construction platform during the process of flowing construction, and can be raised or lowered independently, which can meet the construction requirements of the exterior wall decoration process.
22、完成层的临边安全防护:通过丝套与丝杆的设计,在浇注件如墙体等,在浇注时,可在其内部嵌入丝套,浇注完成后,通过转动丝杆即可取下丝杆,需要临边防护时,只需要将防护网上的螺纹件螺接至丝套即可,其重复利用,可以实现预埋丝套位置的标准化,进而可以实现防护网标准化的生产。同时,安装防护网时也无需对墙体进行二次施工。接触配合的优势在于,可避免浇注过程中,混凝土在丝套和模板之间的间隙处固化,导致后期取下丝杆难度增大,容易损坏浇注件如墙体的问题。丝杆不突出丝杆轴向上的外端面,可避免浇注过程中,混凝土在丝杆上固化,使得丝杆嵌入混凝土,导致后期取下丝杆难度增大,容易损坏浇注件如墙体的问题。22. The edge safety protection of the finished layer: Through the design of the wire sleeve and the screw rod, the wire sleeve can be embedded in the pouring part such as the wall when pouring. After the pouring is completed, the screw can be removed by turning the screw rod. When the screw rod needs to be protected at the edge, it only needs to screw the threaded parts on the protective net to the wire sleeve, and its reuse can realize the standardization of the position of the embedded wire sleeve, and then can realize the standardized production of the protective net. At the same time, there is no need for secondary construction of the wall when installing the protective net. The advantage of contact fit is that it can prevent the concrete from solidifying at the gap between the wire sleeve and the formwork during the pouring process, which makes it more difficult to remove the lead screw in the later stage, and it is easy to damage the casting parts such as walls. The screw does not protrude from the outer end face of the screw in the axial direction, which can avoid the concrete curing on the screw during the pouring process, so that the screw is embedded in the concrete, which makes it more difficult to remove the screw later, and it is easy to damage the casting parts such as the wall. question.
附图说明Description of drawings
图1是止流板合模的示意图;Fig. 1 is the schematic diagram of flow stopper mold clamping;
图2是止流板退模的示意图;Fig. 2 is the schematic diagram of the flow stop plate demoulding;
图3是墙体外侧模板和墙体内侧模板之间通过对拉杆固定的示意图;Figure 3 is a schematic diagram of fixing between the formwork on the outside of the wall and the formwork on the inside of the wall by a pair of tie rods;
图4是墙体内侧模板上安装振动器的示意图;Fig. 4 is the schematic diagram of the vibrator installed on the formwork inside the wall;
图5是动臂吊和导轨的配合示意图;Figure 5 is a schematic diagram of the cooperation of the boom crane and the guide rail;
图6是导轨和底座的配合示意图;Figure 6 is a schematic diagram of the cooperation of the guide rail and the base;
图7是导轨和卷扬机的配合示意图;Figure 7 is a schematic diagram of the cooperation of the guide rail and the hoist;
图8是丝套和墙体内侧模板的配合示意图。Figure 8 is a schematic diagram of the cooperation between the wire sleeve and the inner formwork of the wall.
具体实施方式Detailed ways
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.
现有的高层房建混凝土墙体浇注多用散拼木模板和/或散拼铝合金模板,外架防护多用双排脚手架或附着式升降脚手架,吊运周转建筑(钢筋)材料、模板支架、施工工具等用附墙塔吊,混凝土布料用手拉的移动式布料机和手动捣振,整个操作过程复杂,浪费劳力、不易控制质量。同时,耗材众多增加成本,且整个施工过程存在重大安全隐患。Existing high-rise building concrete wall pouring multi-use scattered wood formwork and/or scattered aluminum alloy formwork, outer frame protection multi-purpose double-row scaffolding or attached lifting scaffolding, hoisting turnover building (rebar) materials, formwork supports, construction Wall-mounted tower cranes for tools, hand-pulled mobile distributing machines and manual tamping for concrete distribution are complicated, labor-intensive, and difficult to control quality. At the same time, many consumables increase the cost, and there are major safety hazards in the entire construction process.
在本申请的技术方案中,工作平台固定在导轨上,导轨由支撑靴支撑并由驱动油缸驱动导轨向上运动,支撑靴、导轨、驱动油缸及其与工作平台的配合关系在我司已申请专利中详细公开,具体专利为:CN2018216126376,爬升系统,CN2018111571743,爬升式料台等,因此,在本文中不再赘述。In the technical solution of this application, the working platform is fixed on the guide rail, the guide rail is supported by the support shoe and the guide rail is driven by the driving oil cylinder to move upward. The specific patents are: CN2018216126376, climbing system, CN2018111571743, climbing material table, etc. Therefore, they will not be repeated in this article.
造楼机包括顶层施工平台、外挂防护施工平台、内挂防护施工平台、外墙大模板、内墙大模板、液压布料机、动臂吊、液压顶升动力机构、混凝土养护系统、喷雾降尘系统、附着移动卫生间实施、智能管理控制系统、完成层临边安全防护等实施。Building machine includes top construction platform, external protective construction platform, internal protective construction platform, large external wall formwork, large internal wall formwork, hydraulic placing machine, boom crane, hydraulic jacking power mechanism, concrete curing system, spray dust suppression system , Attached to the implementation of mobile toilets, intelligent management and control systems, and complete layer edge security protection.
顶层施工平台,顶层施工平台是由主梁、次梁、平台梁、平台板、防护栏杆等组装而成。在所述施工平台的下端面沿其周向上设置有外挂防护施工平台、内挂防护施工平台,The top construction platform is composed of main beams, secondary beams, platform beams, platform slabs, and protective railings. The lower end face of the construction platform is provided with an externally hanging protective construction platform and an internal hanging protective construction platform along its circumferential direction,
外挂施工平台包括可供施工的若干层施工平台层,扎钢筋平台、混凝土浇注平台、外墙模板退模合模加固平台、外墙装修平台等,平台和外墙间全封闭和/或半封闭,平台外侧用开孔不大于6MM钢网全封闭防护给施工人员提供全方位的安全防护空间,同时可以有效控制高空物料坠落的危险事故。The external construction platform includes several layers of construction platforms available for construction, steel reinforcement platform, concrete pouring platform, external wall formwork stripping and formwork reinforcement platform, external wall decoration platform, etc., fully enclosed and/or semi-enclosed between the platform and the external wall , The outer side of the platform is fully enclosed with a steel mesh with an opening of no more than 6MM to provide construction personnel with a full range of safety protection space, and can effectively control the dangerous accident of falling materials from high altitudes.
外挂施工平台可用螺栓固定在智能集成化高层建筑用造楼机的外侧主梁、次梁和/或平台梁上,随同智能集成化高层建筑用造楼机同步顶升。也可用卷扬机构挂在造楼机的外侧主、次梁上,同造楼机同步顶升,也可用卷扬机构单独上升或下降,The external construction platform can be bolted to the outer main beam, secondary beam and/or platform beam of the intelligent integrated high-rise building building machine, and is lifted synchronously with the intelligent integrated high-rise building building machine. The hoisting mechanism can also be used to hang on the main and secondary beams on the outside of the building machine, to be lifted synchronously with the building machine, or the hoisting mechanism can be used to raise or lower independently.
内挂施工平台包括可供施工的若干层施工平台层,扎钢筋平台、混凝土浇注平台、内墙模板退模合模加固平台,平台和墙体间半封闭,内挂施工平台可用螺栓固定在智能集成化高层建筑用造楼机的内侧主梁、次梁和/或平台梁上,随同智能集成化高层建筑用造楼机同步顶升。The built-in construction platform includes several layers of construction platforms available for construction, a steel-reinforced platform, a concrete pouring platform, and an inner wall formwork stripping and formwork reinforcement platform. The platform and the wall are semi-closed, and the built-in construction platform can be bolted to the intelligent The inner main beam, secondary beam and/or platform beam of the building machine for integrated high-rise buildings are lifted synchronously with the building machine for intelligent integrated high-rise buildings.
请参阅图1-8,由于现有的混凝土墙体浇注用模板及对拉杆,对拉杆通常为螺纹通丝,通过螺母锁紧墙体的内、外模板,固定后需重新测量内、外模板之间的距离以保证墙体的厚度,操作过程复杂,浪费劳力、不易控制质量,设计了一种智能集成化高层建筑用造楼机,其包括工作平台,在所述工作平台的下端面沿其周向上设置有外挂防护施工平台、内挂防护施工平台,Please refer to Figure 1-8. Due to the existing concrete wall casting formwork and tie rods, the tie rods are usually threaded through wires, and the inner and outer formwork of the wall are locked by nuts. After fixing, the inner and outer formwork need to be re-measured The distance between them is to ensure the thickness of the wall, the operation process is complicated, labor is wasted, and it is difficult to control the quality. An intelligent integrated building machine for high-rise buildings is designed, which includes a working platform. It is provided with an external protective construction platform and an internal protective construction platform in the circumferential direction.
外挂防护施工平台和内挂防护施工平台之间设置有连接在工作平台的大模板体系,A large formwork system connected to the working platform is set between the external hanging protective construction platform and the internal hanging protective construction platform.
大模板体系包括墙体内侧模板1、墙体外侧模板2、对拉杆3、定位销,The large formwork system includes
墙体內侧模板的外端面具有第一背楞,第一背楞上具有与第一定位孔4,The outer end face of the formwork on the inner side of the wall has a first back ridge, and the first back ridge is provided with a first positioning hole 4,
墙体外侧模板的外端面具有第二背楞,第二背楞上具有与第四定位孔7,The outer end face of the outer formwork of the wall has a second back ridge, and the second back ridge is provided with a fourth positioning hole 7,
对拉杆,对拉杆上具有间隔设置的第二定位孔5、第三定位孔6,第二定位孔与所述的第一定位孔同轴线,第三定位孔与所述的第四定位孔同轴线,For the pull rod, there are second positioning holes 5 and third positioning holes 6 arranged at intervals on the pull rod. The second positioning hole is coaxial with the first positioning hole, and the third positioning hole and the fourth positioning hole. coaxial line,
定位销,定位销包括第一定位销9、第二定位销8,第一定位销安装在第一、第二定位孔内,第二定位销安装在第三、第四定位孔内,Positioning pin, the positioning pin includes a
在第三定位孔指向第二定位孔的对拉杆轴向上,对拉杆倾斜向上依次穿过第二背楞、第一背楞。In the axial direction of the pair of tie rods where the third positioning hole points to the second positioning hole, the pair of tie rods pass through the second back ridge and the first back ridge in sequence in an inclined upward direction.
通过第一、二、三、四定位孔的设计,使得墙体内、外大模板在固定时,可进行向内、向外两个方向同时定位,其定位结果准确,无需二次调节。Through the design of the first, second, third and fourth positioning holes, the inner and outer large formwork of the wall can be positioned inward and outward at the same time when the wall is fixed, and the positioning result is accurate without secondary adjustment.
通过对拉杆在第三定位孔指向第二定位孔的对拉杆轴向上倾斜向上依次穿过第二背楞、第一背楞的设计,使得混凝土浇注在墙体内模板和墙体外模板的墙体上形成一个倾斜向上的通孔,雨水不会沿着该通孔进入墙体内部,起到防水的目的。Through the design that the tie rods are inclined upward in the axial direction of the third positioning hole pointing to the second positioning hole and pass through the second back ridge and the first back ridge in turn, the concrete is poured into the wall inner formwork and the wall outer formwork. A through hole inclined upward is formed on the wall, and rainwater will not enter the interior of the wall along the through hole, so as to achieve the purpose of waterproofing.
其中,在自第三定位孔指向第二定位孔的对拉杆轴向上,对拉杆的直径变小,端部具有钢丝绳,Wherein, in the axial direction of the tie rod from the third positioning hole to the second positioning hole, the diameter of the tie rod becomes smaller, and the end has a wire rope,
对拉杆的材质为不锈钢或镀锌件,The material of the tie rod is stainless steel or galvanized parts,
第一定位销以及第二定位销端部具有钢丝绳,The ends of the first positioning pin and the second positioning pin are provided with wire ropes,
第一、二、三、四定位孔均为长方形矩形通孔,The first, second, third and fourth positioning holes are all rectangular through holes.
第一定位销以及第二定位销均为长方形扁钢材质。The first positioning pin and the second positioning pin are made of rectangular flat steel.
本方案的设计针对常规非变直径对拉杆在浇注时需要在对拉杆上套设PVC管以便于取出对拉杆,而采用轴向上直径变小的设计,便于直接将对拉杆打出墙体,无需增加PVC管这一耗材。对拉杆、第一定位销以及第二定位销端部具有钢丝绳,通过钢丝绳的设计,可将对拉杆、第一定位销以及第二定位销悬挂在墙体内模板或墙体外模板上,避免使用过程中其掉落。The design of this scheme is aimed at the fact that the conventional non-variable diameter tie rod needs to be set with a PVC pipe on the tie rod to facilitate the removal of the tie rod, and the design with a smaller diameter in the axial direction is convenient for directly punching the tie rod out of the wall without the need for Add PVC pipe as a consumable. The ends of the tie rod, the first locating pin and the second locating pin have steel wire ropes. Through the design of the steel wire rope, the tie rod, the first locating pin and the second locating pin can be hung on the formwork in the wall or the formwork outside the wall, avoiding It falls off during use.
另,由于目前建筑业房建施工中当遇到要楼板滞后墙柱混凝土浇注时,采用在两处混凝土分段处加钢丝网进行拦截。如遇大量施工需求时会消耗大量人工及物料,同时因增加施工工序导致施工时间加长。为满足楼板滞后墙体同层同步施工的方法需求,在上述的方案基础上,通过以下设计,包括止流板旋转连接件、止流板10,止流板旋转连接件包括上连接板11、下连接板12,上连接板和下连接板之间铰接且在上连接板下端和下连接件上端接触时密封配合为合模状态,反之为退模状态,上连接板上端固定在墙体内侧模板下端;In addition, due to the fact that in the current construction of housing construction in the construction industry, when the floor slab lags behind the wall and column concrete pouring, steel wire mesh is used to intercept the two concrete sections. In case of a large number of construction needs, it will consume a lot of labor and materials, and at the same time, the construction time will be prolonged due to the increase of construction procedures. In order to meet the requirements of the method for the simultaneous construction of the floor and the wall on the same floor, on the basis of the above-mentioned scheme, the following designs are adopted, including the flow stopper rotating connector and the
止流板下端面为平面,在墙体内侧模板向内方向上,止流板具有第一端13、第二端14,第一端与下连接板下端固定连接;及The lower end face of the stop plate is flat, and in the inward direction of the inner formwork of the wall, the stop plate has a
一用于将上连接板和下连接板相对转动后位置固定的压紧杆件15,压紧杆件上端连接内侧模板,下端连接止流板。A
止流板可相对内侧模板转动,且转动后位置由压紧杆件进行固定,且在上连接板和下连接件接触时密封配合,通过止流板的设计,可以免除钢丝网的设置,无需此道工艺,止流板与顶撑模板之间形成狭小空间可以有效阻止混凝土流淌,直接浇注有效节约材料和人工,可以实现楼板滞后墙柱同层同步混凝土浇注施工,从而实现内墙模板形成大模板体系,给施工机械化带来无限空间。同时,压紧杆件用于固定上连接板和下连接板相对转动后位置,无需拆下止流板,即可实现退模,且止流板随内侧模板一同运至下一个施工区域,节约材料和人工。止流板外端作为水平靠山,给机械化施工拖棒提供平台,同时可以实现同层楼板水平浇注成型高度控制在±5MM优质质量范围之内。通过止流板的设计,混凝土浇注完成后止流板可以作为施工人员通行过道,可以有效避免混凝土未成型前施工人员走在混凝土上留下深浅不一的脚印。The stop plate can be rotated relative to the inner formwork, and the position after the rotation is fixed by the pressing rod, and when the upper connecting plate and the lower connecting piece are in contact with each other, they are sealed and matched. In this process, a narrow space is formed between the stop plate and the top support formwork, which can effectively prevent the concrete from flowing, and the direct pouring can effectively save materials and labor. The formwork system brings infinite space to construction mechanization. At the same time, the pressing rod is used to fix the relative rotation position of the upper connecting plate and the lower connecting plate. The mold release can be realized without removing the stop plate, and the stop plate is transported to the next construction area together with the inner formwork, saving energy. materials and labor. The outer end of the stop plate is used as a horizontal backer to provide a platform for the mechanized construction tow bar, and at the same time, the horizontal casting molding height of the same floor can be controlled within the range of ±5MM high-quality quality. Through the design of the stop plate, the stop plate can be used as a passage for the construction personnel after the concrete is poured, which can effectively prevent the construction personnel from leaving different footprints on the concrete before the concrete is formed.
更具体的,墙体内侧模板向内方向的端面上具有竖向立杆16,竖向立杆上具有若干个销钉孔17,销钉穿过销钉孔及压紧杆件上端的孔,More specifically, a
止流板上具有与压紧杆件相连接的连接部,连接部上具有销钉孔,销钉穿过销钉孔及压紧杆件下端的孔,The stop plate is provided with a connecting part connected with the pressing rod, the connecting part is provided with a pin hole, the pin passes through the pin hole and the hole at the lower end of the pressing rod,
上连接板向内方向的端面上具有上加强筋18,下连接板向内方向的端面上具有下加强筋19,上加强筋下端与下加强筋上端具有在竖向上相背设置的坡面,An upper reinforcing
上连接板、下连接板之间通过钢琴铰链铰接,The upper connecting plate and the lower connecting plate are hinged through piano hinges,
上连接板与内侧模板一体成型,下连接板与止流板一体成型。上加强筋下端与下加强筋上端具有在竖向上相背设置的坡面,在保证上、下连接板强度的同时可最大限度满足下端向上旋转。通过销钉连接,可以实现快速、准确、有效连接,竖向立杆上具有若干个销钉孔,可以快速实现调节。竖向立杆具体采用均匀等距冲孔,可以满足任意工况下连接需求。一体成型无需二次装配。The upper connecting plate and the inner template are integrally formed, and the lower connecting plate and the flow stop plate are integrally formed. The lower end of the upper reinforcing rib and the upper end of the lower reinforcing rib have slope surfaces arranged opposite to each other in the vertical direction, which can satisfy the upward rotation of the lower end to the maximum extent while ensuring the strength of the upper and lower connecting plates. Fast, accurate and effective connection can be achieved through pin connection, and there are several pin holes on the vertical pole, which can quickly realize adjustment. The vertical poles are punched with uniform and equal distances, which can meet the connection requirements under any working conditions. One-piece molding does not require secondary assembly.
再,在所述的墙体内侧模板和/或墙体外侧模板上安装振动器20。Then, the
振动器为变频振动器,变频振动器的参数:电机功率为1.5KW--3.5KW,220V或380V电压。The vibrator is a frequency conversion vibrator, the parameters of the frequency conversion vibrator: the motor power is 1.5KW--3.5KW, 220V or 380V voltage.
墙体内模板和/或墙体外模板的外端面设置有倾角传感器,倾角传感器固定安装在所述的背楞上,The inner wall formwork and/or the outer end face of the outer wall formwork is provided with an inclination sensor, and the inclination sensor is fixedly installed on the back ridge,
倾角传感器电性连接报警装置或混凝土浇注设备的控制开关,The inclination sensor is electrically connected to the alarm device or the control switch of the concrete pouring equipment,
倾角传感器还电性连接报警装置,报警装置为语音报警器或蜂鸣器。The inclination sensor is also electrically connected to an alarm device, and the alarm device is a voice alarm or a buzzer.
墙体外或内侧模板的面板为钢板或铝板或木质胶合板或塑料模板;背楞;背楞分竖向、横向背楞,背楞型材亦用铝质也可用钢质,外形可以是角形、矩形也可是U形。The panel of the formwork on the outside or inside of the wall is steel plate or aluminum plate or wood plywood or plastic formwork; back corrugation; back corrugation is divided into vertical and horizontal back corrugation. It can also be U-shaped.
振动器,振动器固定安装在电机座上,电机座固定安装在第一或第二背楞21上。The vibrator is fixedly installed on the motor base, and the motor base is fixedly installed on the first or second back corrugated 21 .
其中,振动器为变频振动器、振动电机。Among them, the vibrator is a frequency conversion vibrator and a vibration motor.
针对墙体模板进行浇注,墙体进行浇注前,在其模板的背楞上安装变频振动器,利用变频振动器的振动与混凝土浇注时其自身的重力因素,使得浇注后的砼流动性、可塑性增加,构件质量、密实度提高,成型快。For the pouring of the wall formwork, before the wall is poured, a variable frequency vibrator is installed on the back of the formwork, and the vibration of the variable frequency vibrator and its own gravity factor during concrete pouring are used to make the poured concrete fluidity and plasticity. increase, the quality and compactness of the components are improved, and the forming is fast.
其中,通过将变频振动器安装在背楞上而不是直接安装在模板上,可避免变频振动器直接小区域接触模板,振动集中,在振动过程中拉坏模板,同时,可将变频振动器的振动通过背楞进行扩散,扩大振动范围。Among them, by installing the frequency conversion vibrator on the back corrugation instead of directly on the template, it can avoid the frequency conversion vibrator directly contacting the template in a small area, the vibration is concentrated, and the template is damaged during the vibration process. The vibration is diffused through the back corrugation to expand the vibration range.
变频振动器的型号根据墙体的具体尺寸进行振动器的型号与数量进行配置,如采用:电机功率为1.5KW--3.5KW,220V或380V电压,有效振动范围在1m-2.5m,在该数据的基础上,可依据具体模板进行型号的变更进行替换。The model of the frequency conversion vibrator is configured according to the specific size of the wall. For example, the motor power is 1.5KW--3.5KW, 220V or 380V voltage, and the effective vibration range is 1m-2.5m. On the basis of the data, the model can be changed and replaced according to the specific template.
其中,电机座和背楞之间通过直钩螺栓固定连接,更稳固。Among them, the connection between the motor base and the back corrugation is fixed by straight hook bolts, which is more stable.
模板的外端面设置有倾角传感器。The outer end face of the template is provided with an inclination sensor.
为进一步保证浇注结果的准确性,通过倾角传感器设计,倾角传感器为现有成熟技术,其广泛应用于精密设备的角度偏移,输出实时的角度信号,将其应用于本领域的墙体模板上,可及时通过其观察模板的偏移角度,保证浇注中墙体的偏移在误差允许的范围内。In order to further ensure the accuracy of the casting results, through the design of the inclination sensor, the inclination sensor is an existing mature technology, which is widely used in the angle offset of precision equipment, outputs real-time angle signals, and applies it to the wall formwork in this field. , the offset angle of the template can be observed in time through it to ensure that the offset of the wall during casting is within the allowable error range.
倾角传感器电性连接报警装置或混凝土浇注设备的控制开关,为进一步进行自动化控制,可通过倾角传感器预设阈值,在偏移量超出改阈值时,传递电信号至控制开关,对混凝土浇注设备进行断电,该功能可仅为断电功能,即断电后需人工再次启动。The inclination sensor is electrically connected to the alarm device or the control switch of the concrete pouring equipment. For further automatic control, the inclination sensor can preset a threshold value. When the offset exceeds the threshold value, an electrical signal is transmitted to the control switch, and the concrete pouring equipment can be controlled. Power off, this function can only be a power off function, that is, it needs to be manually restarted after power off.
为进一步保证整修的及时性,再断电功能的基础上,在通过以下设计:倾角传感器还电性连接报警装置,报警装置为语音报警器或蜂鸣器,通过声音或蜂鸣器的警示,提醒及时去修正模板位置。In order to further ensure the timeliness of the renovation, on the basis of the power-off function, the following design is adopted: the tilt sensor is also electrically connected to the alarm device, the alarm device is a voice alarm or a buzzer, and the sound or buzzer warns, Remind to correct the template position in time.
再,为保证在工作平台上的布料机和悬臂吊等可以更有效率的工作,在所述工作平台的上端面设置有导轨22,在所述的导轨上安装有可沿该导轨运动的底座,Furthermore, in order to ensure that the placing machine and the cantilever crane on the working platform can work more efficiently, a
底座与所述的导轨之间通过可拆式连接件固定连接,The base and the guide rail are fixedly connected by detachable connectors,
底座上连接有在可拆式连接件拆下后驱动底座沿导轨运动的驱动机构。The base is connected with a driving mechanism for driving the base to move along the guide rail after the detachable connecting piece is removed.
通过增加导轨设计,在使用时,将动臂吊或布料机等固定在底座上,底座可沿导轨运动(滑动或滚动配合),及可拆式连接件及驱动机构相配合,进而实现动臂吊或布料机可在工作过程中可根据需要进行水平移动,便于进行作业,避免传统方式的动臂吊或布料机只能通过吊装方式进行上下运动带来的费时、费力及转换成本高等问题。By adding a guide rail design, when in use, a boom crane or a distributing machine is fixed on the base, and the base can move along the guide rail (sliding or rolling fit), and cooperate with the detachable connector and the driving mechanism to realize the boom The crane or placing machine can move horizontally as needed during the working process, which is convenient for operation and avoids the time-consuming, laborious and high conversion cost problems caused by the traditional boom crane or placing machine that can only move up and down through the hoisting method.
更具体的,导轨为两根并行的导轨,底座与所述的导轨之间滚动配合,More specifically, the guide rails are two parallel guide rails, and the base and the guide rails are in rolling fit.
底座包括支撑板23以及设置在支撑板下端面两侧的移动导向板24,导轨位于移动导向板之间,可拆式连接件为螺丝,螺丝穿过所述的支撑板与导轨固定连接,导轨有两条,支撑板底部具有四个滚轮小车,每个导轨上安装两个滚轮小车,导轨具体可采用两条工字梁。The base includes a
滚轮小车包括固定在底部的连接板25,连接板两端向下延伸有第一侧板26、第二侧板27,连接板中部向下延伸有中间板28,第一侧板、第二侧板、中间板构成滚轮架,第一侧板、第二侧板和中间板之间均设置有滚轮29,滚轮轴30由第一侧板外侧穿过第一侧板、滚轮、中间板、滚轮、第二侧板后伸出并由滚轮销轴将滚轮轴在轴向上与滚轮架固定配合,滚轮轴与滚轮轴线重合,滚轮的侧面突出滚轮架的下端,The roller trolley includes a connecting
驱动机构为卷扬机31,卷扬机和底座之间通过牵引钢丝绳32连接,其中,驱动机构也可采用人力等其他方式替代。The driving mechanism is a hoist 31, and the hoist and the base are connected by a
还包括悬臂支撑小车,悬臂支撑小车底部的滚轮小车放置在导轨上,且悬臂支撑小车位于驱动机构和底座之间。由于动臂吊或布料机悬臂较长,在转移过程中为避免悬臂不水平,通过悬臂支撑小车使悬臂保持水平以便于进行水平运动。It also includes a cantilever support trolley, the roller trolley at the bottom of the cantilever support trolley is placed on the guide rail, and the cantilever support trolley is located between the drive mechanism and the base. Due to the long cantilever of the boom crane or the placing machine, in order to avoid the cantilever being out of level during the transfer process, the cantilever is supported by the trolley to keep the cantilever horizontal to facilitate horizontal movement.
为更好的将导轨适用于布料机,设置与所述导轨并行设置的布料管,布料管上具有若干个用于与混凝土布料机进料口相连接的出料口,通过布料管的设计,使得在混凝土布料机移动至其需求工位时,均有与混凝土布料机进料口相对应的出料口,使用时,仅需要将混凝土布料机进料口与对应的出料口相连接,其他进料口封闭,即可实现对该工位进行布料施工,在更换至下一工位时,仅需要更改出料口与对应进料口连接(其他通过盖子封闭)能在快速水平移动混凝土布料机的同时,无需移动布料管,即可实现再次对接,节约时间,工作效率高。In order to better apply the guide rail to the placing machine, a distribution pipe arranged in parallel with the guide rail is set up. So that when the concrete placing machine moves to its required station, there is a discharge port corresponding to the feeding port of the concrete placing machine. When using it, only the feeding port of the concrete placing machine needs to be connected with the corresponding discharge port. When other feed ports are closed, the material can be constructed in this station. When changing to the next station, only the connection between the discharge port and the corresponding feed port needs to be changed (others are closed by the cover), and the concrete can be moved horizontally quickly and horizontally. At the same time as the distributing machine, it can be connected again without moving the distributing tube, saving time and high work efficiency.
由于在房建过程中,N+1层混凝土浇注后,要对N层所有临边进行防护,需要在墙体内侧安装防护网或防护栏杆形成临边防护。现有的做法是,在窗口、阳台、电梯门洞、楼梯边左右或上下两侧的墙体上打孔安装彭胀螺丝用于安装固定防护网或护栏,这一过程需要对墙体进行打孔做二次施工,施工过程中会对墙体产生破坏,产生额外工作量,造成浪费。同时因施工的工人技术水平不一,造成防护栏安装高低不齐,也形成不了标准化。Because in the process of house construction, after the N+1 layer concrete is poured, to protect all the edges of the N layer, it is necessary to install protective nets or protective railings on the inside of the wall to form edge protection. The existing practice is to drill holes on the walls of windows, balconies, elevator door openings, left and right or upper and lower sides of the stairs to install expansion screws for installing fixed protective nets or guardrails. This process requires drilling holes in the walls. Doing secondary construction will cause damage to the wall during the construction process, resulting in extra workload and waste. At the same time, due to the different technical levels of construction workers, the installation of guardrails is uneven, and standardization cannot be formed.
因此,与墙体上需要悬挂防护网对应的墙体内侧模板上的临边侧安装有丝套33,丝杆34穿过墙体内侧模板上的通孔与丝套螺纹连接,通过丝套与丝杆的设计,在浇注件如墙体等,在浇注时,可在大模板上定位一次性开洞嵌入丝套,浇注完成后,通过转动丝杆即可取下丝杆,需要临边防护时,只需要将防护网或防护栏杆上的螺纹件螺接至丝套即可,其重复利用,可以实现预埋丝套位置的标准化,进而可以实现防护网、防护栏杆标准化的生产。同时,安装防护网时也无需对墙体进行二次施工。Therefore, a
丝套轴向上的内端面与模板接触配合,接触配合的优势在于,可避免浇注过程中,混凝土在丝套和模板之间的间隙处固化,导致后期取下丝杆难度增大,容易损坏浇注件如墙体的问题。The inner end face of the wire sleeve in the axial direction is in contact with the formwork. The advantage of the contact fit is that it can avoid the curing of the concrete in the gap between the wire sleeve and the formwork during the pouring process, which makes it more difficult to remove the screw rod and easy to damage. Problems with cast parts such as walls.
丝套为盲孔式丝套,采用盲孔式丝套可避免浇注过程中,混凝土进入丝套内和丝杆固化,The wire sleeve is a blind hole type wire sleeve. The blind hole type wire sleeve can avoid the concrete entering the wire sleeve and the solidification of the screw during the pouring process.
导致后期取下丝杆难度增大,容易损坏浇注件如墙体的问题。As a result, it is more difficult to remove the screw rod in the later stage, and it is easy to damage the casting parts such as the wall.
丝套为通孔式丝套。The wire sleeve is a through hole type wire sleeve.
对于该类型丝套,有以下几种配合方式:1、丝杆轴向上,丝杆端面与丝套外端面在同一竖直面,丝杆端面也可略突出于丝套外端面,混凝土会浇筑在丝杆端面或突出部分上,但依然可以取出丝杆,2、丝杆端面位于丝套外端面内侧与丝套外端面之间形成间隔,在使用时,可直接使用,混凝土可灌注至丝套内,丝套嵌入更牢固,其中,在其基础上可通过间隔内设置填充件,避免混凝土灌注丝套内与丝杆端面固化,相对于无填充件,更易于取出丝杆。For this type of wire sleeve, there are the following matching methods: 1. The screw shaft is in the axial direction, and the end face of the screw rod and the outer end face of the wire sleeve are in the same vertical plane. It is poured on the end face or protruding part of the screw rod, but the screw rod can still be taken out. 2. The end face of the screw rod is located between the inner side of the outer end face of the wire sleeve and the outer end face of the wire sleeve to form an interval. When in use, it can be used directly, and the concrete can be poured to In the wire sleeve, the wire sleeve is embedded more firmly. On the basis of it, fillers can be arranged in intervals to avoid the solidification of the concrete pouring wire sleeve and the end surface of the screw rod. Compared with no filler parts, it is easier to remove the screw rod.
通孔有若干个,且在模板上呈方形对称分布,通孔的设计适用于所有临边类浇注件。There are several through holes, and they are distributed symmetrically in a square shape on the template. The design of through holes is suitable for all edge casting parts.
通孔有若干个且在模板的长度或高度方向上间隔分布,该方案适用于一侧需要防护的类型,如楼梯、护栏,通孔有若干个,在水平向上向下间隔对称分布。There are several through holes and they are distributed at intervals along the length or height of the formwork. This solution is suitable for types that require protection on one side, such as stairs and guardrails. There are several through holes, which are symmetrically distributed horizontally upward and downward.
对于本领域技术人员而言,显然本发明不限于上述示范性实施例的细节,而且在不背离本发明的精神或基本特征的情况下,能够以其他的具体形式实现本发明。因此,无论从哪一点来看,均应将实施例看作是示范性的,而且是非限制性的,本发明的范围由所附权利要求而不是上述说明限定,因此旨在将落在权利要求的等同要件的含义和范围内的所有变化囊括在本发明内。不应将权利要求中的任何附图标记视为限制所涉及的权利要求。It will be apparent to those skilled in the art that the present invention is not limited to the details of the above-described exemplary embodiments, but that the present invention may be embodied in other specific forms without departing from the spirit or essential characteristics of the invention. Therefore, the embodiments are to be regarded in all respects as illustrative and not restrictive, and the scope of the invention is to be defined by the appended claims rather than the foregoing description, which are therefore intended to fall within the scope of the claims. All changes within the meaning and scope of the equivalents of , are included in the present invention. Any reference signs in the claims shall not be construed as limiting the involved claim.
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911033221.8A CN110886488B (en) | 2019-10-28 | 2019-10-28 | An intelligent integrated high-rise building machine |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911033221.8A CN110886488B (en) | 2019-10-28 | 2019-10-28 | An intelligent integrated high-rise building machine |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110886488A true CN110886488A (en) | 2020-03-17 |
CN110886488B CN110886488B (en) | 2025-01-24 |
Family
ID=69746498
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201911033221.8A Active CN110886488B (en) | 2019-10-28 | 2019-10-28 | An intelligent integrated high-rise building machine |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110886488B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112112415A (en) * | 2020-09-21 | 2020-12-22 | 山东方圆建筑材料有限公司 | Floor building device and working method |
CN114908969A (en) * | 2020-08-21 | 2022-08-16 | 上海欧跃建筑安装工程有限公司 | A method for synchronizing concrete pouring on the same floor of a building machine beam and slab lag wall column |
CN117852843A (en) * | 2024-03-07 | 2024-04-09 | 成都建工第三建筑工程有限公司 | Material management system and method for aerial building machine for high-rise building |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4273766B2 (en) * | 2000-12-08 | 2009-06-03 | 始 矢内 | Form unit for construction of concrete building, manufacturing apparatus therefor, and method for construction of concrete building |
CN203514814U (en) * | 2013-10-11 | 2014-04-02 | 卓越置业集团有限公司 | Overhead building putting-up machine |
CN105220874A (en) * | 2015-09-11 | 2016-01-06 | 杭州江润科技有限公司 | The construction method of basement superelevation exterior wall self-supporting single side formwork system |
CN107893529A (en) * | 2017-11-28 | 2018-04-10 | 中建局集团建设发展有限公司 | Suitable for deep basal pit outer wall of basement PC template systems and its construction method |
KR101939309B1 (en) * | 2018-05-30 | 2019-01-16 | 주식회사 바탕건축사사무소 | External decoration apparatus of building |
JP2019167813A (en) * | 2018-03-22 | 2019-10-03 | 株式会社ナベカヰ | Splash prevention cure system and splash prevention cure method |
CN211313370U (en) * | 2019-10-28 | 2020-08-21 | 上海欧跃建筑安装工程有限公司 | An intelligent integrated high-rise building machine |
-
2019
- 2019-10-28 CN CN201911033221.8A patent/CN110886488B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4273766B2 (en) * | 2000-12-08 | 2009-06-03 | 始 矢内 | Form unit for construction of concrete building, manufacturing apparatus therefor, and method for construction of concrete building |
CN203514814U (en) * | 2013-10-11 | 2014-04-02 | 卓越置业集团有限公司 | Overhead building putting-up machine |
CN105220874A (en) * | 2015-09-11 | 2016-01-06 | 杭州江润科技有限公司 | The construction method of basement superelevation exterior wall self-supporting single side formwork system |
CN107893529A (en) * | 2017-11-28 | 2018-04-10 | 中建局集团建设发展有限公司 | Suitable for deep basal pit outer wall of basement PC template systems and its construction method |
JP2019167813A (en) * | 2018-03-22 | 2019-10-03 | 株式会社ナベカヰ | Splash prevention cure system and splash prevention cure method |
KR101939309B1 (en) * | 2018-05-30 | 2019-01-16 | 주식회사 바탕건축사사무소 | External decoration apparatus of building |
CN211313370U (en) * | 2019-10-28 | 2020-08-21 | 上海欧跃建筑安装工程有限公司 | An intelligent integrated high-rise building machine |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114908969A (en) * | 2020-08-21 | 2022-08-16 | 上海欧跃建筑安装工程有限公司 | A method for synchronizing concrete pouring on the same floor of a building machine beam and slab lag wall column |
CN112112415A (en) * | 2020-09-21 | 2020-12-22 | 山东方圆建筑材料有限公司 | Floor building device and working method |
CN112112415B (en) * | 2020-09-21 | 2022-02-22 | 山东方圆建筑材料有限公司 | Floor building device and working method |
CN117852843A (en) * | 2024-03-07 | 2024-04-09 | 成都建工第三建筑工程有限公司 | Material management system and method for aerial building machine for high-rise building |
Also Published As
Publication number | Publication date |
---|---|
CN110886488B (en) | 2025-01-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202090591U (en) | Lift type climbing formwork of building operations | |
WO2013185277A1 (en) | Constructing method for concrete cylinder of construction steel bar of high-rise steel structure | |
CN110886488A (en) | An intelligent integrated high-rise building machine | |
CN108505645B (en) | CL composite concrete shear wall cast-in-place construction method | |
CN108505644A (en) | CL compound concrete shear wall construction methods | |
CN102661019A (en) | Heat preservation and decoration integrated construction method for outer wall of building | |
CN201962944U (en) | Hydraulic climbing formwork for building construction | |
CN110552502A (en) | Construction method of C-shaped stock yard intermediate retaining wall overhanging platform | |
CN105178604A (en) | Construction method of assembly type superimposed floor slab | |
CN109404010B (en) | Aluminum tunnel mold system and operation method thereof | |
CN111113628B (en) | Construction method for spraying prefabricated T-shaped beam | |
CN103243912B (en) | Multilayer is without plate framework construction method | |
CN211313370U (en) | An intelligent integrated high-rise building machine | |
CN109025275A (en) | A kind of shear wall side regularization stair punching block and installation method | |
CN112359779A (en) | Inclined concrete turnover construction integrated device and construction process thereof | |
CN209723607U (en) | Adjustable entirety stair tread formwork | |
CN104675112A (en) | Steel stair formwork and constructing method for once pouring forming of building staircase | |
CN114197860B (en) | Double-layer climbing formwork system for rapid construction and climbing formwork construction method | |
CN202064281U (en) | Slip form frame | |
CN113216587B (en) | High-rise building outer wall construction operation platform fixing structure and construction method thereof | |
CN110578338A (en) | System capable of moving aluminum alloy template integrally and operation method | |
CN206091283U (en) | Hydraulic pressure is from climbing formula elevartor shaft regularization operation platform | |
CN101457587A (en) | Template mutual-lifting type climbing formwork device and method | |
CN117306861A (en) | BIM technology-based tunnel portal assembly type canopy construction method | |
CN113062222B (en) | Improved construction device and method for roller die of high pier of bridge |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information | ||
CB02 | Change of applicant information |
Country or region after: China Address after: 201109 floor 3, building B, No. 940 Jianchuan Road, Minhang District, Shanghai Applicant after: Nest Technology (Shanghai) Co.,Ltd. Applicant after: Jiangsu Henggui Chuangke Intelligent Technology Co.,Ltd. Address before: Room 3412, building 3, 1700 Gangyan Road, Gangyan Town, Chongming District, Shanghai Applicant before: Shanghai Ouyue construction and Installation Engineering Co.,Ltd. Country or region before: China Applicant before: Jiangsu Henggui Chuangke Construction Engineering Technology Co.,Ltd. |
|
GR01 | Patent grant | ||
GR01 | Patent grant |