CN105178199A - Pier column construction method and pier column template - Google Patents

Pier column construction method and pier column template Download PDF

Info

Publication number
CN105178199A
CN105178199A CN201510674954.5A CN201510674954A CN105178199A CN 105178199 A CN105178199 A CN 105178199A CN 201510674954 A CN201510674954 A CN 201510674954A CN 105178199 A CN105178199 A CN 105178199A
Authority
CN
China
Prior art keywords
pier
pier stud
pier column
phase
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510674954.5A
Other languages
Chinese (zh)
Inventor
韦新华
刘剑
赵波
陈伟
叶晓巍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongyifeng Construction Group Co Ltd
Original Assignee
Zhongyifeng Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongyifeng Construction Group Co Ltd filed Critical Zhongyifeng Construction Group Co Ltd
Priority to CN201510674954.5A priority Critical patent/CN105178199A/en
Publication of CN105178199A publication Critical patent/CN105178199A/en
Pending legal-status Critical Current

Links

Abstract

The invention discloses a pier column construction method and a pier column template. The pier column construction method comprises the following steps: firstly, intensely processing and manufacturing hoops and framework ribs as steel bar semi-finished products in a factory, meanwhile conducting bearing platform construction, conveying the steel bar semi-finished products to a construction site, binding into a pier column steel bar cage, conducting integral hoisting, then mounting a pedestrian crawling ladder and an operating platform, and then finishing pier column concrete pouring. The pier column template comprises first relative plates and second relative plates, the splicing parts of the two side edges of the first relative plates and the second relative plates adopt the bent design, and the first relative plates and the second relative plates are fixed through diagonal draw bars. Through the improvement of the conventional pier column construction process, the pier column construction method provided by the invention has the characteristics of improving construction efficiency, shortening construction period, reducing material loss, controlling construction quality, being high in safety, decreasing cost and increasing benefit.

Description

A kind of pier stud construction method and Pier Formwork
Technical field
The present invention relates to a kind of pier stud construction method, and for the Pier Formwork of this pier stud construction method.
Background technology
Along with socio economic situation enters new normality, the competition between enterprise is abnormal fierce, and infrastructure development project execution control difficulty strengthens.The labor cost of project construction constantly rises, the estimated cost more and more transparence of engineering monomer, enterprise security increased risk, and profit point declines.Therefore, in project construction process, more and more need to carry out improvement and bring new ideas to various traditional construction technology, improve operating efficiency, reduce labour intensity, improve mechanization degree, reduce cost of labor, to be reached for the object of enterprise's cost efficiency.
Traditional pier stud working procedure is, after bearing platform construction is complete, needs first to set up scaffold, then colligation pier stud reinforcing bar, and last formwork erection is built.Above-mentioned working procedure is constructed successively due to cushion cap, scaffold, pier stud reinforcing cage, duration is longer, and due to pier stud reinforcing cage need on cushion cap, carry out colligation, pier stud reinforcing bar is made to be exposed to outdoor for a long time, have impact on the quality of pier stud reinforcing bar, take the working procedure tearing scaffold open in addition loaded down with trivial details, consumption labour cost and material are rented with taking again, and on scaffold, operation is also pure in certain danger.Therefore, need to improve traditional pier stud working procedure.
Summary of the invention
Goal of the invention of the present invention is to provide a kind of pier stud construction method and Pier Formwork, by the improvement to traditional pier stud working procedure, improves efficiency of construction, shorten construction period, reduce spillage of material, control construction quality, and have that safety is high, the feature of cost efficiency.
To achieve the above object of the invention, the technical solution used in the present invention is: a kind of pier stud construction method, comprises the steps:
(1) in factory, concentrated processing making stirrup and skeleton muscle, as reinforcing bar semiproduct, carry out bearing platform construction simultaneously;
(2) reinforcing bar semiproduct are transported to job site, colligation becomes pier stud reinforcing cage;
(3) by pier stud reinforcing bar cage hoisting on cushion cap, and to fix with cushion cap;
(4) splice Pier Formwork, lift the Pier Formwork spliced, be inserted in pier stud reinforcing cage;
(5) in Pier Formwork side, People's Bank of China's cat ladder is installed, at Pier Formwork top fitting operation platform, around described operating platform, is provided with guardrail;
(6) pier stud concrete is built;
(7) remove Pier Formwork, People's Bank of China's cat ladder and operating platform, complete pier stud pouring construction.
In technique scheme, numerical-control bending machine in described step (1), is adopted to carry out the making of stirrup and skeleton muscle.
In technique scheme, in described step (3), adopt total powerstation by the setting-out of pier stud sideline in cushion cap template, and with fine rule pull-out pier stud ground appearance profile, as the reference line that pier stud reinforcing cage is installed.
In technique scheme, in described step (3), the suspension centre of reinforcing bar cage hoisting is positioned at 1/3 long place of reinforcing cage, and mount type steel spreader during lifting, described suspender is symmetrical arranged suspension ring.
In technique scheme, in described step (3), described reinforcing cage and cushion cap are welded and fixed.
A kind of Pier Formwork, for the pier stud construction method of claim 1, comprise first-phase to plate and second-phase to plate, described first-phase is curved design to plate dual-side and second-phase to plate stitching portion, and described first-phase is reinforced by diagonal member plate plate and second-phase.
Further technical scheme, described first-phase is provided with web frame to plate and second-phase to the plate back side.
Because technique scheme is used, the present invention compared with prior art has following advantages:
1. pier stud skeleton of the present invention adopts overall batch production making shaping, carry out colligation on ground and become reinforcing cage, have that the bar material proportion of goods damageds are low, processing precision of reinforcing steel bar is high, crudy is convenient to control, manufacturing speed is fast, little and reduce the feature of labour intensity by weather effect.
2. the present invention processes pier stud reinforcing cage, synchronously can carry out, shorten construction period with bearing platform construction, and can according to site operation schedule requirement, have bad luck reinforcing bar when selecting to install to on-the-spot colligation, decrease the open-assembly time of pier stud reinforcing bar in outdoor, ensure that the quality of pier stud reinforcing bar.
3. pier stud reinforcing cage of the present invention is shaping at floor manufacture, and relative to traditional colligation aloft, the appearance and size of pier stud easily controls to put in place, guarantees foot stall steel tendon protective layer thickness qualification rate.
4. the present invention arranges People's Bank of China's cat ladder and operating platform on Pier Formwork, decreases the working procedure that scaffold is torn in traditional taking open, saves scaffold and takes the labour cost of tearing open and material is rented with expense, meanwhile, avoid the construction safety risk of operation on scaffold.
5. Pier Formwork of the present invention is after pier stud has been built, convenient disassembly, can not destroy the globality of pier stud, and first-phase is curved design to plate dual-side and second-phase to plate stitching portion, can effective mortar leakage prevention.
Accompanying drawing explanation
Fig. 1 is construction method flow chart of the present invention in embodiment one.
Fig. 2 is Pier Formwork structural representation of the present invention in embodiment one.
Wherein: 1, first-phase is to plate; 2, second-phase is to plate; 3, diagonal member.
Detailed description of the invention
Below in conjunction with drawings and Examples, the invention will be further described:
Embodiment one: shown in Figure 1, a kind of pier stud construction method, comprises the steps:
(1) in factory, concentrated processing making stirrup and skeleton muscle, as reinforcing bar semiproduct, carry out cushion cap reinforcing bar and model sheetinstallat simultaneously;
(2) reinforcing bar semiproduct are transported to job site, colligation becomes pier stud reinforcing cage;
(3) by pier stud reinforcing bar cage hoisting on cushion cap, and to fix with cushion cap;
(4) splice Pier Formwork, lift the Pier Formwork spliced, be inserted in pier stud reinforcing cage;
(5) in Pier Formwork side, People's Bank of China's cat ladder is installed, at Pier Formwork top fitting operation platform, around described operating platform, is provided with guardrail;
(6) pier stud concrete is built;
(7) remove Pier Formwork, People's Bank of China's cat ladder and operating platform, complete pier stud pouring construction.
In the present embodiment, for ensureing the machining accuracy of stirrup and skeleton muscle, adopt numerical-control bending machine to carry out the making of stirrup and skeleton muscle in described step (1), reduce stirrup error, enhance productivity, reinforcement welding adopts carbon dioxide gas arc welding.
In described step (2), adopt flat car to be transported to job site stirrup and skeleton muscle, indeformable for ensureing in hoisting process, the main muscle of pier stud adopts spot welding to be connected with stirrup, drag hook muscle, need in reinforcing cage, establish reinforcing bar Reinforced Hoop or use section steel reinforcement.
For convenience of follow-up model sheetinstallat, require higher to fabrication of reinforcing cage, inspection should be carried out in reinforcing cage process of binding, guarantee that main muscle is straight, nothing distortion, the each external surface of reinforcing cage stirrup at grade, without warpage and protruding phenomenon, simultaneously, cushion cap face part drag hook muscle once to be inserted bottom reinforcing cage and stirrup is not first installed, until reinforcing cage pre-buried to cushion cap after carry out again this part stirrup is installed.
In described step (3), adopt total powerstation by the setting-out of pier stud sideline in cushion cap template, and pull out pier stud ground appearance profile with fine rule, as the reference line that pier stud reinforcing cage is installed, conflict with cushion cap top layer reinforcement location in pier stud reinforcing cage installation process, cushion cap reinforcing bar should be adjusted in advance, reserve pier stud reinforcement location, after placement of cage of reinforcing bar, recover cushion cap surfacing steel bar.
The suspension centre of reinforcing bar cage hoisting is positioned at 1/3 long place of reinforcing cage, and mount type steel spreader during lifting, described suspender is symmetrical arranged suspension ring, makes the overall uniform force of cage body, prevents reinforcing cage to be out of shape and solder joint sealing-off.
The pier stud profile good according to setting-out, installation in position reinforcing cage, then reinforcing cage and the main muscle firm welding of cushion cap surface layer, for preventing from, reinforcing cage top adopts draws the method for establishing cable wind rope to reinforce.
Shown in Figure 2, a kind of Pier Formwork, for the pier stud construction method of claim 1, comprise first-phase to plate 1 and second-phase to plate 2, described first-phase is curved design to plate dual-side and second-phase to plate stitching portion, and described first-phase is reinforced by diagonal member plate plate and second-phase.
Described first-phase is provided with web frame to plate and second-phase to the plate back side.
Described Pier Formwork adopts crane integral hoisting, manually controls Pier Formwork with hawser in both direction during lifting, Pier Formwork sling liftoff after, adjustment sling length, to consistent, guarantees that Pier Formwork is vertically, is then inserted in reinforcing cage.

Claims (7)

1. a pier stud construction method, is characterized in that, comprises the steps:
(1) in factory, concentrated processing making stirrup and skeleton muscle, as reinforcing bar semiproduct, carry out bearing platform construction simultaneously;
(2) reinforcing bar semiproduct are transported to job site, colligation becomes pier stud reinforcing cage;
(3) by pier stud reinforcing bar cage hoisting on cushion cap, and to fix with cushion cap;
(4) splice Pier Formwork, lift the Pier Formwork spliced, be inserted in pier stud reinforcing cage;
(5) in Pier Formwork side, People's Bank of China's cat ladder is installed, at Pier Formwork top fitting operation platform, around described operating platform, is provided with guardrail;
(6) pier stud concrete is built;
(7) remove Pier Formwork, People's Bank of China's cat ladder and operating platform, complete pier stud pouring construction.
2. a kind of pier stud construction method according to claim 1, is characterized in that: adopt numerical-control bending machine to carry out the making of stirrup and skeleton muscle in described step (1).
3. a kind of pier stud construction method according to claim 1, it is characterized in that: in described step (3), adopt total powerstation by the setting-out of pier stud sideline in cushion cap template, and with fine rule pull-out pier stud ground appearance profile, as the reference line that pier stud reinforcing cage is installed.
4. a kind of pier stud construction method according to claim 1, is characterized in that: in described step (3), and the suspension centre of reinforcing bar cage hoisting is positioned at 1/3 long place of reinforcing cage, and mount type steel spreader during lifting, described suspender is symmetrical arranged suspension ring.
5. a kind of pier stud construction method according to claim 1, is characterized in that: in described step (3), described reinforcing cage and cushion cap are welded and fixed.
6. a Pier Formwork, for the pier stud construction method of claim 1, it is characterized in that: comprise first-phase to plate and second-phase to plate, described first-phase is curved design to plate dual-side and second-phase to plate stitching portion, and described first-phase is reinforced by diagonal member plate plate and second-phase.
7. a kind of Pier Formwork according to claim 6, is characterized in that: described first-phase is provided with web frame to plate and second-phase to the plate back side.
CN201510674954.5A 2015-10-19 2015-10-19 Pier column construction method and pier column template Pending CN105178199A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510674954.5A CN105178199A (en) 2015-10-19 2015-10-19 Pier column construction method and pier column template

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510674954.5A CN105178199A (en) 2015-10-19 2015-10-19 Pier column construction method and pier column template

Publications (1)

Publication Number Publication Date
CN105178199A true CN105178199A (en) 2015-12-23

Family

ID=54900589

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510674954.5A Pending CN105178199A (en) 2015-10-19 2015-10-19 Pier column construction method and pier column template

Country Status (1)

Country Link
CN (1) CN105178199A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106049288A (en) * 2016-06-27 2016-10-26 广州市第二市政工程有限公司 Graded casting construction method for cast-in-place annular cantilever pier stud
CN106121220A (en) * 2016-07-05 2016-11-16 中国十七冶集团有限公司 Face the construction method of the template of limit reinforced column, reinforcing bar
CN107460829A (en) * 2017-09-05 2017-12-12 方菱桥隧模架(福州)有限公司 Bridge pier punching block installs protector and its installation method
CN108018782A (en) * 2017-12-20 2018-05-11 上海市机械施工集团有限公司 The construction method of overhead box beam concrete column
CN111172877A (en) * 2019-12-31 2020-05-19 北京市市政一建设工程有限责任公司 Pier stud guiding and limiting device and pier stud assembling method
CN111321673A (en) * 2020-03-23 2020-06-23 五冶集团上海有限公司 Bridge cylindrical pier template, assembling method and construction method of bridge cylindrical pier
CN111677189A (en) * 2020-06-12 2020-09-18 中电建南方建设投资有限公司 Upright post construction method
CN112647425A (en) * 2020-12-03 2021-04-13 中建六局土木工程有限公司 Integral hoisting construction method for pier stud reinforcement cage

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020030608A (en) * 2000-10-19 2002-04-25 신훈 repair method of being injured bridge pier
KR20060084240A (en) * 2005-01-19 2006-07-24 전미선 Device of bridge pier mould construction and methed thereof
CN201634998U (en) * 2009-12-10 2010-11-17 吴真珍 Template of pier column of bridge
CN203229865U (en) * 2013-04-23 2013-10-09 中交路桥华南工程有限公司 Clamping-groove type bridge pier shaft steel bar positioning device
CN104278638A (en) * 2014-09-30 2015-01-14 中交二航局第四工程有限公司 Quick-splicing and slab staggering prevention tenon-and-mortise type template
CN204225483U (en) * 2014-11-14 2015-03-25 国家电网公司 GIS pier aluminium alloy fixed shape template system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020030608A (en) * 2000-10-19 2002-04-25 신훈 repair method of being injured bridge pier
KR20060084240A (en) * 2005-01-19 2006-07-24 전미선 Device of bridge pier mould construction and methed thereof
CN201634998U (en) * 2009-12-10 2010-11-17 吴真珍 Template of pier column of bridge
CN203229865U (en) * 2013-04-23 2013-10-09 中交路桥华南工程有限公司 Clamping-groove type bridge pier shaft steel bar positioning device
CN104278638A (en) * 2014-09-30 2015-01-14 中交二航局第四工程有限公司 Quick-splicing and slab staggering prevention tenon-and-mortise type template
CN204225483U (en) * 2014-11-14 2015-03-25 国家电网公司 GIS pier aluminium alloy fixed shape template system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
方靓: "支架施工技术在公路桥梁工程中的应用", 《建筑施工》 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106049288A (en) * 2016-06-27 2016-10-26 广州市第二市政工程有限公司 Graded casting construction method for cast-in-place annular cantilever pier stud
CN106049288B (en) * 2016-06-27 2017-12-29 广州市第二市政工程有限公司 A kind of cast-in-place annular is encorbelmented pier stud gradation pouring construction method
CN106121220A (en) * 2016-07-05 2016-11-16 中国十七冶集团有限公司 Face the construction method of the template of limit reinforced column, reinforcing bar
CN106121220B (en) * 2016-07-05 2018-08-17 中国十七冶集团有限公司 Face the template of side reinforced column, the construction method of reinforcing bar
CN107460829A (en) * 2017-09-05 2017-12-12 方菱桥隧模架(福州)有限公司 Bridge pier punching block installs protector and its installation method
CN107460829B (en) * 2017-09-05 2023-06-30 方菱桥隧模架(福州)有限公司 Bridge pier steel mould installation protection device and installation method thereof
CN108018782A (en) * 2017-12-20 2018-05-11 上海市机械施工集团有限公司 The construction method of overhead box beam concrete column
CN111172877A (en) * 2019-12-31 2020-05-19 北京市市政一建设工程有限责任公司 Pier stud guiding and limiting device and pier stud assembling method
CN111321673A (en) * 2020-03-23 2020-06-23 五冶集团上海有限公司 Bridge cylindrical pier template, assembling method and construction method of bridge cylindrical pier
CN111677189A (en) * 2020-06-12 2020-09-18 中电建南方建设投资有限公司 Upright post construction method
CN112647425A (en) * 2020-12-03 2021-04-13 中建六局土木工程有限公司 Integral hoisting construction method for pier stud reinforcement cage

Similar Documents

Publication Publication Date Title
CN105178199A (en) Pier column construction method and pier column template
CN104695337B (en) Self-lifting sliding and turnover construction system and construction method
CN203188121U (en) Cast-in-place bridge floor suspending mold of half-through or through arch bridge
CN102900024B (en) Using method for overturning die plate for large-scale concrete structure and
CN105908902A (en) Positioning frame for prefabricated pier column reinforcing bar cages and construction method of pier column reinforcing bar cages
CN102877637A (en) Method for implementing operating platform in bottom wall construction of cantilever beam
CN107524087A (en) A kind of prefabricated box girder hoisting construction technology
CN203795311U (en) Multi-leg high pier and slip form construction device
CN102561196A (en) Turnover construction process of high-pier forms
CN104453228A (en) Construction method of large-span super-large-section steel plate wall beam
CN208363461U (en) A kind of segmented steel reinforced concrete assembling stair
CN205329640U (en) " T " supports symmetrical sliding formwork construction structures
CN105370027B (en) The construction method of steel supporting platform structure is integrally lifted in high-rise hanging structure
CN107285200A (en) A kind of high large-span truss integral translation construction method for hanging
CN106284086A (en) A kind of method utilizing electronic climbing apparatus to pour into a mould high pier stud
CN106592446A (en) Assembling construction method of precast segmental balanced cantilever with side-span wet joints
CN208441458U (en) Dismantle self-bearing type steel bar truss floor support plate
CN102383376B (en) Ground moulding and integral hoisting method for large-tonnage steel bar bound finished product member
CN104131635A (en) Method and platform for constructing peripheral shear wall of prefabricated staircase
CN203924652U (en) The operation platform of periphery shear wall between a kind of precast stair
CN103669219B (en) Many limbs height pier is with sliding construction equipment
CN111778856A (en) Construction method of main tower steel bar
CN105019655B (en) A kind of construction method of casting concrete beam
CN212799252U (en) Pre-buried wire rope cover hoisting ring structure
CN211646037U (en) Connecting structure for closure section of swivel continuous beam

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20151223

RJ01 Rejection of invention patent application after publication