CN105568870B - For the triangle hanging basket method cantilever device and its construction method of cross-line bridge construction - Google Patents

For the triangle hanging basket method cantilever device and its construction method of cross-line bridge construction Download PDF

Info

Publication number
CN105568870B
CN105568870B CN201510985782.3A CN201510985782A CN105568870B CN 105568870 B CN105568870 B CN 105568870B CN 201510985782 A CN201510985782 A CN 201510985782A CN 105568870 B CN105568870 B CN 105568870B
Authority
CN
China
Prior art keywords
bracket
triangle
entablature
hanging basket
crossbeam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510985782.3A
Other languages
Chinese (zh)
Other versions
CN105568870A (en
Inventor
陈小丽
王欢
关天仕
谢曼嘉
傅荣华
陈小珠
欧伟宾
陈凯斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Guanyue Highway and Bridge Co Ltd
Original Assignee
Guangdong Guanyue Highway and Bridge Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Guanyue Highway and Bridge Co Ltd filed Critical Guangdong Guanyue Highway and Bridge Co Ltd
Priority to CN201510985782.3A priority Critical patent/CN105568870B/en
Publication of CN105568870A publication Critical patent/CN105568870A/en
Application granted granted Critical
Publication of CN105568870B publication Critical patent/CN105568870B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • E01D21/10Cantilevered erection
    • E01D21/105Balanced cantilevered erection

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of triangle hanging basket method cantilever device and its construction method for cross-line bridge construction, which includes:Anchoring shelf bracket, anchoring shelf bracket include many tripods, one bar straight flange for being anchored at Main Pier of Bridges pier shaft side by anchor rib, another straight flange along the horizontal forward extension in direction away from main pier pier shaft side, many tripods arranged for interval arranged side by side;Anchoring shelf bracket is also included for being arranged on below tripod and the support bracket that jacking is supported is formed on the bottom to tripod, supports bracket to be connected on Main Pier of Bridges pier shaft by anchor rib;Platform bracket, platform bracket are used for the gravity for accepting other components;Bottom basket component;Anchorage element is lifted, anchorage element connecting bracket platform and bottom basket component is lifted;Walking component, walking component are walked thereon for other components;Template system, template system are poured for bridge.Triangle hanging basket method cantilever device has assembled node few, stress clearly, component be used in turn rate it is high the advantages of.

Description

For the triangle hanging basket method cantilever device and its construction method of cross-line bridge construction
Technical field
The present invention relates to a kind of triangle hanging basket method cantilever device and its construction method for cross-line bridge construction.
Background technology
Cast-in-place cantilever method refers to arrange work platformses in bridge pier both sides, evenly mixed to span centre cantilever pouring cement paragraph by paragraph Solidifying soil beam body, and apply prestressed construction method paragraph by paragraph.Cast-in-place cantilever method capital equipment is a pair walking Hanging Baskets, Hanging Basket It is linked to be overall beam section in stretch-draw anchor and with pier shaft and moves, assembling reinforcement, formwork erection, casting concrete, applies prestressing force All carry out thereon.After completing this section of construction, symmetrical one sections of each movement forward of Hanging Basket carries out down a pair of beam sections and constructs, in proper order Move ahead, until cantilever beam section is poured and completed.
Existing Suspension by cradle method device assembly node is more, and workman carries out construction inconvenience in high-altitude, and installation and removal are needed A large amount of man-hours are wanted, has delayed construction speed, thus also reduced component and be used in turn rate.
The content of the invention
It is an object of the invention to provide a kind of triangle hanging basket method cantilever device for cross-line bridge construction.
The technical scheme that the present invention solves above-mentioned technical problem is as follows:A kind of triangle hanging basket method for cross-line bridge construction is hanged Device is poured, which includes:Platform bracket, the platform bracket are used for the gravity for accepting other components;Bottom basket component;Lift anchoring structure Part, the lifting anchorage element connecting bracket platform and bottom basket component;Walking component, the walking component exist for other components Walk thereon;Template system, the template system are poured for bridge.
The triangle hanging basket method cantilever device for being used for cross-line bridge construction as above of the invention, further, the bracket is put down Platform includes:Triangle crossbeam, column, front tension bar, back stay, front entablature, rear entablature, transverse link and horizontal brace;
Triangle crossbeam is connected with uprights vertical;Front tension bar and back stay connection column and triangle crossbeam;Front entablature passes through Front suspender belt is connected with bottom basket component, and cantilever system weight is transferred to triangle crossbeam;Entablature is by back strap and bottom basket structure afterwards Part connects, and cantilever system weight is transferred to triangle crossbeam;Transverse link connects two adjacent columns, strengthens between two columns Stability;Laterally brace connection transverse link and rear entablature, strengthen stability in the large.
The triangle hanging basket method cantilever device for being used for cross-line bridge construction as above of the invention, further, the bottom basket structure Part includes:Front sill, rear sill and distribution beam;
Front sill is connected with front entablature by front suspender belt, and power is transferred to triangle crossbeam;Hang after sill passes through afterwards Band is connected with rear entablature, and power is transferred to triangle crossbeam;Sill is connected with front sill by distribution beam afterwards.
The triangle hanging basket method cantilever device for being used for cross-line bridge construction as above of the invention, further, the lifting anchor Gu component includes:Before front suspender belt, back strap, side form support before suspender belt, interior bracket after suspender belt, side form support rear suspension bar, interior bracket Suspension rod and rear short steeve;
Entablature and front sill before front suspender belt connection;Entablature and rear sill after back strap connection;Before side form support Entablature and outer side mold nose girder before suspender belt connection;The front entablature of suspender belt connection and interior side form nose girder before interior bracket;After side form support Suspension rod, interior bracket rear suspension bar connection outer side mold nose girder and interior side form nose girder;Sill and box beam base plate after short steeve connects afterwards, will Cantilever system load force is transferred to the box beam for having poured.
The triangle hanging basket method cantilever device for being used for cross-line bridge construction as above of the invention, further, the walking structure Part includes:Aisle beam, interior backform nose girder, outer side mold outrigger;
Aisle beam is anchored on box beam top board, used as Hanging Basket walking track;In interior backform nose girder is driven in hanging basket advancing Mould is moved along;Outer side mold outrigger drives outer side mold to be moved along in hanging basket advancing;.
The triangle hanging basket method cantilever device for being used for cross-line bridge construction as above of the invention, further, also including protection Component, which includes:Anti- river bottom protection basket crossbeam and anti-river bottom protection basket longeron;
The load-bearing rod member of anti-river bottom protection basket crossbeam anti-river bottom protection basket when being across construction of the highway;Anti- river bottom protection basket longeron is used to strengthen protection The rigidity of bottom basket.
The triangle hanging basket method cantilever device for being used for cross-line bridge construction as above of the invention, further, the anchor rib One end be embedded in the Main Pier of Bridges pier shaft in the other end protrude horizontally up, also include for the external part phase with the anchor rib The spacing pressing plate for coordinating.
The triangle hanging basket method cantilever device for being used for cross-line bridge construction as above of the invention, further, the anchor rib Two rows are arranged at the pre-connection tripod of Main Pier of Bridges pier shaft side respectively, the two rows anchor rib is respectively positioned at described three The both sides of one straight flange of corner bracket, the two ends of the spacing pressing plate are respectively arranged with through hole, the end of the anchor rib external part Pass from the through hole and be connected with stop nut.
The triangle hanging basket method cantilever device for being used for cross-line bridge construction as above of the invention, further, the support cattle Offer the through hole for passing through for anchor rib for a pair on lower limb, one end of the anchor rib is embedded in another in the Main Pier of Bridges pier shaft End protrudes horizontally up, and the end that protrudes horizontally up of the anchor rib is connected with stop nut in its end from after the through hole.The support The back side of bracket is formed with spacing block set, is reserved with the groove for spacing block set insertion in Main Pier of Bridges pier shaft side, The both sides for supporting bracket are welded with cross spacing plate.
For the construction method of the triangle hanging basket method cantilever device of cross-line bridge construction, the assembled process of described device is successively For:The aisle beam of hoisting running device, lifting triangle crossbeam, rear entablature, lifting transverse link and horizontal brace, before lifting on Crossbeam, suspender belt, back strap before installing lift front sill, rear sill, and laying web, distribution beam lift the bottom of template system Mould, lifts the inner membrance and walking beam of template system, suspension rod and lifts outboard template, walks cross girders, suspension rod.
Web is box beam bottom web distribution beam, is the ribbed stiffener of bed die, strengthens bed die rigidity.Aisle beam is Hanging Basket walking Track, triangle hanging basket fulcrum fall in orbit, jack pushing tow fulcrum during traveling Hanging Basket, and fulcrum sliding on track girder is advanced. Walk cross girders and be called nose girder, interior nose girder and outer nose girder, interior nose girder drives in suspended basket inner formwork system to move forward, and makees when pouring box beam For internal model spandrel girder;Outer nose girder drives outer side mold to move forward in suspended basket, as outer side mold spandrel girder when pouring box beam.
The invention has the beneficial effects as follows:
Anchoring shelf bracket easy construction in triangle hanging basket method cantilever device of the present invention is quick, and bracket stress clearly, is fitted Wide with property, material can have enough to meet the need, and affect less to pier shaft section.By the bracket that is anchored on pier shaft and anchor rib by tripod Be anchored on pier shaft, form freely supported structure, then platform bracket is set up on tripod, so as to realize pouring for 0,1# blocks.It is main Primary structure member is wanted to support bracket, tripod is Force transmission partses.0# blocks vertical load will be produced vertical after tripod transmission Load and overturning moment, vertical load are born by bracket, and the lateral load that overturning moment is produced is resisted by pier shaft and upper anchor rib, Tripod lower limb lower limb withstands pier shaft, and upper anchor rib tension, so as to form freely supported structure, reaches whole system balance.
Triangle hanging basket method cantilever device has assembled node few, convenient to assemble and disassemble, and clearly, it is high that component is used in turn rate to stress Advantage.
Description of the drawings
By the detailed description made in conjunction with the following drawings, the present invention above-mentioned and/or other in terms of and advantage will become Become apparent from and be easier to understand, these accompanying drawings are simply schematic, are not intended to limit the present invention, wherein:
Fig. 1 for an embodiment of the present invention the triangle hanging basket method cantilever device for cross-line bridge construction front entablature and Schematic cross-section at front sill;
Fig. 2 for an embodiment of the present invention the triangle hanging basket method cantilever device for cross-line bridge construction rear entablature and Schematic cross-section at sill afterwards;
Fig. 3 is the schematic cross-section of the front entablature with rear entablature of an embodiment of the present invention;
Structural representations of the Fig. 4 for the anchoring shelf bracket of an embodiment of the present invention;
Fig. 5 is the front view of anchoring shelf bracket in Fig. 4;
Fig. 6 is the vertical profile diagram of anchoring shelf bracket in Fig. 4;
Fig. 7 is the A portions enlarged drawing in Fig. 5;
Fig. 8 is the B portions enlarged drawing in Fig. 6;
Fig. 9 is the construction method schematic flow sheet of the triangle hanging basket method cantilever device for cross-line bridge construction.
In accompanying drawing, the list of parts representated by each label is as follows:
1st, triangle crossbeam, 2, column, 3, pull bar, 4, front entablature, 5, rear entablature, 6, front sill, 7, rear sill, 8th, transverse link, 9, horizontal brace, 10, tripod, 11, bracket, 12, platform bracket, 13, pier shaft, 14, anchor rib, 15, spiral shell Mother, 16, groove, 17, cross spacing plate, 18, spacing pressing plate, 19, laterally couple, 20, shellfish thunder crossbeam.
Specific embodiment
Hereinafter, the reality of the triangle hanging basket method cantilever device for cross-line bridge construction of the present invention is described with reference to the accompanying drawings Apply example.
The embodiment that here is recorded is the specific specific embodiment of the present invention, for illustrating the design of the present invention, It is explanatory and exemplary, should not be construed as the restriction to embodiment of the present invention and the scope of the invention.Except here record Implement exception, those skilled in the art can also be based on the application claims and description disclosure of that using aobvious and Other technical schemes being clear to, these technical schemes include any obvious using making for the embodiment recorded to here The technical scheme of substitutions and modifications.
The accompanying drawing of this specification is schematic diagram, aids in illustrating the design of the present invention, it is schematically indicated the shape of each several part And its mutual relation.Note that for the ease of clearly showing the structure of each part of the embodiment of the present invention, between each accompanying drawing Do not draw according to identical ratio.Identical reference marker is used to represent identical part.
Fig. 1 illustrates the triangle hanging basket method cantilever device for cross-line bridge construction of an embodiment of the present invention, and which includes:
Platform bracket, the platform bracket are used for the gravity for accepting other components;The platform bracket includes:Triangle crossbeam 1st, column 2, pull bar 3(Including front tension bar and back stay), front entablature 4, rear entablature 5, transverse link 8 and horizontal brace 9;Three Angle crossbeam is connected with uprights vertical;Front tension bar and back stay connection column and triangle crossbeam;Front entablature passes through front suspender belt and bottom Basket component connects, and cantilever system weight is transferred to triangle crossbeam;Entablature is connected with bottom basket component by back strap afterwards, will be outstanding Pour system weight and be transferred to triangle crossbeam;Transverse link connects two adjacent columns, strengthens stability between two columns;Laterally Brace connects transverse link and rear entablature, strengthens stability in the large.
Bottom basket component;The bottom basket component includes:Front sill 6, rear sill 7 and distribution beam;Front sill is by front Suspender belt is connected with front entablature, and power is transferred to triangle crossbeam;Sill is connected with rear entablature by back strap afterwards, and power is passed It is handed to triangle crossbeam;Sill is connected with front sill by distribution beam afterwards.
Lift anchorage element, the lifting anchorage element connecting bracket platform and bottom basket component;The lifting anchorage element Including:Suspender belt before suspender belt, interior bracket before front suspender belt, back strap, side form support, side form support rear suspension bar, interior bracket rear suspension bar and Short steeve afterwards;Entablature and front sill before front suspender belt connection;Entablature and rear sill after back strap connection;Before side form support Entablature and outer side mold nose girder before suspender belt connection;The front entablature of suspender belt connection and interior side form nose girder before interior bracket;After side form support Suspension rod, interior bracket rear suspension bar connection outer side mold nose girder and interior side form nose girder;Sill and box beam base plate after short steeve connects afterwards, will Cantilever system load force is transferred to the box beam for having poured.
Walking component, the walking component are walked thereon for other components;The walking component includes:Aisle beam, Interior backform nose girder, outer side mold outrigger;Aisle beam is anchored on box beam top board, used as Hanging Basket walking track;Interior backform nose girder is hung Internal model is driven to be moved along when basket moves forward;Outer side mold outrigger drives outer side mold to be moved along in hanging basket advancing.
Template system, the template system are poured for bridge.
In the triangle hanging basket method cantilever device for cross-line bridge construction of the above embodiment of the present invention, triangle hanging basket method is hanged Pouring device also includes guard member, and which includes:Anti- river bottom protection basket crossbeam and anti-river bottom protection basket longeron;Anti- river bottom protection basket crossbeam is to apply across highway The load-bearing rod member of man-hour anti-river bottom protection basket;Anti- river bottom protection basket longeron is used for the rigidity for strengthening anti-river bottom protection basket.
As shown in figure 9, be the construction method schematic flow sheet of the triangle hanging basket method cantilever device for cross-line bridge construction, institute The assembled process for stating device is followed successively by:The aisle beam of hoisting running device, lifting triangle crossbeam, rear entablature, lifting laterally connect Bar and horizontal brace, lift front entablature, and suspender belt, back strap before installing lift front sill, rear sill, lay web, divide With beam, the bed die of template system is lifted, lift the inner membrance and walking beam of template system, suspension rod and lift outboard template, walk cross girders, hang Bar.
The invention has the beneficial effects as follows:Triangle hanging basket method cantilever device is few with assembled node, and convenient to assemble and disassemble, stress is bright Really, component be used in turn rate it is high the advantages of.
Certain section of high speed roadbed filled soil quality is larger, more based on high embankment.Embankment embankment highest point reaches 36m, and excavation is high Side slope is up to 63m, wherein the side slope more than 30m just has at 21.The project Bridge quantity is more, completely crosses over national highway 5 times, Construction risk is larger.2,000 multi-disc Precast T-Beams are had completely, point 3 precasting yards are prefabricated.The main pier of wherein certain overbridge highly reaches 40m, the construction of floor stand method are unsuitable for the construction of its 0# block and 1# blocks.For the triangle hanging basket method cantilever device of cross-line bridge construction Also include:Anchoring shelf bracket, anchoring shelf bracket include many tripods, and a straight flange of the tripod is used for by anchor Gu muscle is anchored at Main Pier of Bridges pier shaft side, another straight flange of the tripod is along the direction away from the main pier pier shaft side Horizontal forward extension, many tripods arranged for interval arranged side by side;Anchoring shelf bracket is also included for being arranged on the triangle The support bracket that jacking is supported is formed below frame and to the bottom of the tripod, the support bracket is connected to by anchor rib On the Main Pier of Bridges pier shaft;
According to Fig. 4-8, the anchoring shelf bracket in the present invention, including many tripods 10, support bracket 11 and supports Body panel 12.
Wherein, a straight flange of tripod 10 is used to be anchored at 13 side of Main Pier of Bridges pier shaft, triangle by anchor rib 14 Another straight flange of frame 10 is spaced cloth side by side along the horizontal forward extension in direction away from main 13 side of pier pier shaft, many tripods 10 Put.Can be used as preferably:Laterally connection 19 can be added between tripod 10 on 13 face of same pier shaft, tripod 10 is improved horizontal To rigidity, laterally 19 integral prefabricated installations of connection, are connected on tripod 10.
Support bracket 11 to be arranged on below tripod 10 and jacking is formed to the bottom of tripod 10 to support, support bracket 11 It is connected on Main Pier of Bridges pier shaft 13 by anchor rib 14.Support and a pair are offered on bracket 11 for leading to that anchor rib 14 is passed through Hole, during one end of the anchor rib 14 is embedded in the Main Pier of Bridges pier shaft 13, the other end is protruded horizontally up, the anchor rib 14 Protrude horizontally up end stop nut 15 is connected with its end from after the through hole.
Can be used as preferably:The back side of bracket 11 is supported to be formed with spacing block set, it is pre- in 13 side of Main Pier of Bridges pier shaft The groove 16 for spacing block set insertion is left, and cross spacing plate 17 is welded with the both sides for supporting bracket 11, is carried 2 lateral stability of high bracket.
Setting up above many spaced apart tripods 10 arranged side by side has platform bracket 12, the bottom of platform bracket 12 and three Another straight flange of corner bracket 10 forms connection.
Can be used as preferably:One end of the anchor rib 14 is embedded in other end water in the Main Pier of Bridges pier shaft 13 It is flattened go out, also include the spacing pressing plate 18 for being engaged with the external part of the anchor rib 14.The two of the spacing pressing plate 18 End is respectively arranged with through hole, and the end of 14 external part of the anchor rib passes from the through hole and is connected with stop nut.
Can be preferably as further:Aforementioned anchor rib 14 is respectively in the pre-connection three of 13 side of Main Pier of Bridges pier shaft At corner bracket 10 formed two rows, two row's anchor ribs 14 respectively positioned at tripod 10 a straight flange both sides, the two of spacing pressing plate 18 End is respectively arranged with through hole, and the end of anchor rib 14 passes from through hole and is connected with stop nut.It is of course also possible to use its His structure but equally tripod 10 can be anchored at the anchor structure on 13 side of Main Pier of Bridges pier shaft.
When being constructed by anchoring shelf bracket in embodiment one, comprise the following steps:
Step 1:Preburied component.When 13 final section of Main Pier of Bridges pier shaft is constructed, the present invention is calculated according to design drawing The height of middle anchoring shelf bracket, is accurately positioned out anchor rib 14 in the pre-buried position in space of pier shaft 13, and carries out pre-buried.
Pre-buried steel box is provided with bracket 2 for forming reserved groove 16 intending installing, while internal support need to be added, is prevented Only steel box deformation in concreting process, steel cassette bottom portion need to add bar-mat reinforcement, strengthen concrete local compressive resistance, pre-buried anchoring Muscle 14 ensures straight and perpendicular to pier shaft 13.
Step 2:Bracket 2 is installed.Pour in final section pier shaft 13 and finish after form removal exposes reserved groove 16, remove Steel box inner support, clears up hole slot, then carries out bracket 2 and install, and the through hole and its back of the body passed through for anchor rib 14 is offered on bracket 2 Face is formed with spacing block set.Bracket 2 is single to weigh about 60kg, and manual type or tower crane auxiliary can be adopted to install.
Bracket 2 is located on anchor rib 14 and by spacing block set insertion reserved groove 16, then by the limit of anchor rib 14 Position nut anchoring.Check whether 2 upper padding plate of bracket is adjacent to preformed groove bottom, whether lower bolster is adjacent to 13 face of pier shaft, if because of pre-buried steel Box causes upper padding plate warpage or lower bolster be adjacent to pier shaft 13 with 13 face out of plumb of pier shaft, then preferentially adjust upper padding plate and be adjacent to groove Bottom, lower bolster are held out against with 13 face of pier shaft by forms such as cushioning steel plates.Check that adjustment tightens anchor rib 14 after errorless again.
Two brackets 2 are connected as into entirety with reinforcing bar after two 2 installations of bracket side by side, while two brackets 2 are pushed up Leveling.Cross spacing plate 17 is welded with after 2 installation of bracket, 2 lateral stability of bracket is improved.
Step 3:Tripod 10 is installed.Tripod 10 is processed by the weldering of work steel group.Each tripod 10 weighs about 2t, installs On 13 two broad side surfaces of pier shaft, two tripods 10 are at least installed in each face, can be according to load scalable tripod 10 Quantity, ensures during installation that symmetrical tripod 10 is force transferring structure, for 0#, 1# block load is passed to bracket 2 and pier shaft 13.Coordinate anchor rib 14 to form anchoring and upper limit nut is screwed in the end of anchor rib 14 by spacing pressing plate 18 form limit Position.Laterally connection 19 can be added between tripod 10 on 13 face of same pier shaft, 10 lateral stiffness of tripod is improved, is laterally coupled 19 integral prefabricated installations, are welded on tripod 10.
Step 4, platform bracket 12 are installed.Tripod 10 lifts shellfish thunder crossbeam 20 on tripod 10 after installing, Cantilever segment lays longeron, flap position laying side crossbeam.Shellfish thunder crossbeam arranges double 16 work bearing beams for 20 times, for striking.0#、 1# blocks two ends cantilever segment respectively arranges one group of three row's monolayer shellfish thunder crossbeam 20 and one group of double monolayer shellfish thunder crossbeam 20, and longeron is adopted The weldering of 10# channel-section steels group is formed, and is arranged in web bottom and base plate bottom, and side crossbeam adopts 36b work steel, side crossbeam to fall within shellfish thunder crossbeam 20 On, on wing plate bottom position shellfish thunder crossbeam 20, left-hand thread one saves 3 meters long 20b channel-section steels, and blending bolt is fixed, and side beam welding is in channel-section steel On, it is ensured that crossbeam is stable.Side form supporting leg is fallen within the crossbeam of side, side crossbeam level, is adjustment box beam longitudinal gradient, need to be by cutting side form Supporting leg mode adjusts longitudinal gradient, supporting leg is welded on the crossbeam of side after the completion of adjustment, it is ensured that side form is stable.
Each technical characteristic of above-mentioned disclosure is not limited to disclosed and further feature combination, and those skilled in the art are also Can according to the purpose of invention carry out between each technical characteristic other combination, to realize that the purpose of the present invention is defined.

Claims (8)

1. a kind of triangle hanging basket method cantilever device for cross-line bridge construction, it is characterised in that include:Anchoring shelf bracket, anchor Gu shelf bracket includes many tripods, a straight flange of the tripod is for being anchored at Main Pier of Bridges pier shaft by anchor rib Side, another straight flange of the tripod along the horizontal forward extension in direction away from the main pier pier shaft side, described many Tripod arranged for interval arranged side by side;Anchoring shelf bracket is also included for being arranged on below the tripod and to the tripod The support bracket that jacking is supported is formed on bottom, and the support bracket is connected on the Main Pier of Bridges pier shaft by anchor rib;Support Body panel, the platform bracket are used for the gravity for accepting other components;Bottom basket component;Lift anchorage element, the lifting anchoring Component connecting bracket platform and bottom basket component;Walking component, the walking component are walked thereon for other components;Template system System, the template system are poured for bridge;
The platform bracket includes:Triangle crossbeam, column, front tension bar, back stay, front entablature, rear entablature, transverse link and Horizontal brace;
Triangle crossbeam is connected with uprights vertical;Front tension bar and back stay connection column and triangle crossbeam;Front entablature is by front hanging Band is connected with bottom basket component, and cantilever system weight is transferred to triangle crossbeam;Entablature is connected with bottom basket component by back strap afterwards Connect, cantilever system weight is transferred to into triangle crossbeam;Transverse link connects two adjacent columns, strengthens stable between two columns Property;Laterally brace connection transverse link and rear entablature, strengthen stability in the large;
The bottom basket component includes:Front sill, rear sill and distribution beam;
Front sill is connected with front entablature by front suspender belt, and power is transferred to triangle crossbeam;Afterwards sill by back strap with Power is transferred to triangle crossbeam by entablature connection afterwards;Sill is connected with front sill by distribution beam afterwards.
2. the triangle hanging basket method cantilever device for cross-line bridge construction according to claim 1, it is characterised in that described to carry Rising anchorage element includes:Suspender belt, side form support rear suspension bar, expelling the toxic substance from the body with tonic before suspender belt, interior bracket before front suspender belt, back strap, side form support Frame rear suspension bar and rear short steeve;
Entablature and front sill before front suspender belt connection;Entablature and rear sill after back strap connection;Suspender belt before side form support Entablature and outer side mold nose girder before connection;The front entablature of suspender belt connection and interior side form nose girder before interior bracket;Side form support rear suspension bar, Interior bracket rear suspension bar connection outer side mold nose girder and interior side form nose girder;Sill and box beam base plate after short steeve connects afterwards, by cantilever System load force is transferred to the box beam for having poured.
3. the triangle hanging basket method cantilever device for cross-line bridge construction according to claim 1, it is characterised in that the row Walking component includes:Aisle beam, interior backform nose girder, outer side mold outrigger;
Aisle beam is anchored on box beam top board, used as Hanging Basket walking track;Interior backform nose girder drives internal model past in hanging basket advancing Front movement;Outer side mold outrigger drives outer side mold to be moved along in hanging basket advancing.
4. the triangle hanging basket method cantilever device for cross-line bridge construction according to claim 1, it is characterised in that also include Guard member, which includes:Anti- river bottom protection basket crossbeam and anti-river bottom protection basket longeron;
The load-bearing rod member of anti-river bottom protection basket crossbeam anti-river bottom protection basket when being across construction of the highway;Anti- river bottom protection basket longeron is used to strengthen anti-river bottom protection basket Rigidity.
5. the triangle hanging basket method cantilever device for cross-line bridge construction according to claim 1, it is characterised in that:The anchor Gu the other end is protruded horizontally up during one end of muscle is embedded in the Main Pier of Bridges pier shaft, also include for stretching out with the anchor rib The spacing pressing plate that end is engaged.
6. the triangle hanging basket method cantilever device for cross-line bridge construction according to claim 5, it is characterised in that:The anchor Gu muscle is arranged to two rows respectively at the pre-connection tripod of Main Pier of Bridges pier shaft side, the two rows anchor rib is respectively positioned at institute The both sides of a straight flange of tripod are stated, the two ends of the spacing pressing plate are respectively arranged with through hole, the anchor rib external part End passes from the through hole and is connected with stop nut.
7. the triangle hanging basket method cantilever device for cross-line bridge construction according to claim 1, it is characterised in that:Described The through hole for passing through for anchor rib for a pair is offered on support bracket, one end of the anchor rib is embedded in the Main Pier of Bridges pier shaft The other end is protruded horizontally up, and the end that protrudes horizontally up of the anchor rib is connected with stop nut in its end from after the through hole;It is described Support the back side of bracket to be formed with spacing block set, be reserved with for the recessed of spacing block set insertion in Main Pier of Bridges pier shaft side Groove, is welded with cross spacing plate in the both sides for supporting bracket.
8. the construction party of the triangle hanging basket method cantilever device for cross-line bridge construction according to any one of claim 1-7 Method, it is characterised in that the assembled process of described device is followed successively by:The aisle beam of hoisting running device, lifting triangle crossbeam, it is rear on Crossbeam, lifting transverse link and horizontal brace, entablature before lifting, suspender belt, back strap before installing, lift front sill, it is rear under Crossbeam, laying web, distribution beam, lifts the bed die of template system, and inner membrance and walking beam, the suspension rod lifting for lifting template system is outer Side template, walk cross girders, suspension rod.
CN201510985782.3A 2015-12-25 2015-12-25 For the triangle hanging basket method cantilever device and its construction method of cross-line bridge construction Active CN105568870B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510985782.3A CN105568870B (en) 2015-12-25 2015-12-25 For the triangle hanging basket method cantilever device and its construction method of cross-line bridge construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510985782.3A CN105568870B (en) 2015-12-25 2015-12-25 For the triangle hanging basket method cantilever device and its construction method of cross-line bridge construction

Publications (2)

Publication Number Publication Date
CN105568870A CN105568870A (en) 2016-05-11
CN105568870B true CN105568870B (en) 2017-04-05

Family

ID=55879460

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510985782.3A Active CN105568870B (en) 2015-12-25 2015-12-25 For the triangle hanging basket method cantilever device and its construction method of cross-line bridge construction

Country Status (1)

Country Link
CN (1) CN105568870B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107513943A (en) * 2017-09-01 2017-12-26 北京工业大学 A kind of continuous beam closure section traveling formwork structure and construction method
CN107893377B (en) * 2017-11-27 2019-06-21 中交路桥华南工程有限公司 The on-site consolidation method of Cable-stayed Bridges loop wheel machine bottom basket system
CN108643054A (en) * 2018-06-26 2018-10-12 徐晓胜 A kind of combined steel template and installation and application for bridge construction
CN111455873A (en) * 2020-04-10 2020-07-28 中铁十一局集团第二工程有限公司 Suspension system of hanging basket
CN114351592A (en) * 2021-12-22 2022-04-15 江苏玖沐精工装备科技有限公司 Box girder forming system based on bracket transformation hanging basket structure
CN114673196B (en) * 2022-04-19 2024-02-13 中交一航局第五工程有限公司 Zero-touch construction process for isolation layer of underground water plant
CN118554358B (en) * 2024-07-30 2024-10-01 内蒙古律亭特种设备科技服务有限公司 Cable bridge for engineering

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
PL157642B1 (en) * 1989-04-27 1992-06-30 Turntable
CN101492909A (en) * 2009-02-11 2009-07-29 中铁二十一局集团有限公司 Suspended casting suspended basket steel tube concrete tripod of bridge
CN101982611A (en) * 2010-10-21 2011-03-02 中铁四局集团建筑工程有限公司 Jack symmetric precompaction construction method for hanging basket girders for bridge hanging basket suspension casting construction
CN102021469A (en) * 2010-11-02 2011-04-20 山东开泰抛丸机械有限公司 Powder for strengthening wear resistance of high-chromium iron, preparing method thereof and wear resistant castings
CN205242278U (en) * 2015-12-25 2016-05-18 广东冠粤路桥有限公司 A triangle string basket method is hanged and is watered device for deck bridge construction

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
PL157642B1 (en) * 1989-04-27 1992-06-30 Turntable
CN101492909A (en) * 2009-02-11 2009-07-29 中铁二十一局集团有限公司 Suspended casting suspended basket steel tube concrete tripod of bridge
CN101982611A (en) * 2010-10-21 2011-03-02 中铁四局集团建筑工程有限公司 Jack symmetric precompaction construction method for hanging basket girders for bridge hanging basket suspension casting construction
CN102021469A (en) * 2010-11-02 2011-04-20 山东开泰抛丸机械有限公司 Powder for strengthening wear resistance of high-chromium iron, preparing method thereof and wear resistant castings
CN205242278U (en) * 2015-12-25 2016-05-18 广东冠粤路桥有限公司 A triangle string basket method is hanged and is watered device for deck bridge construction

Also Published As

Publication number Publication date
CN105568870A (en) 2016-05-11

Similar Documents

Publication Publication Date Title
CN105568870B (en) For the triangle hanging basket method cantilever device and its construction method of cross-line bridge construction
CN106677070B (en) A kind of high-altitude long-span heavy duty construction of beam bracket and construction method
CN108004928B (en) A kind of asymmetric rigid frame-continuous girder construction technology
CN106702910B (en) A kind of main girder construction technique of the double rope face low-pylon cable-stayed bridges of double tower
CN101586330B (en) Receding construction method of cradle of continuous girder bridge made of prestressing concrete
CN104631343B (en) From traveling rhombus keying cradle in truss type structure and suspended basket and construction method
CN108660903A (en) CFST Arch Bridge and construction method
CN110528402B (en) Construction method of ultra-wide box girder multi-truss-piece combined hanging basket
CN107905124B (en) A kind of symmetrical expression rigid frame-continuous girder construction technology
CN107905114B (en) A kind of construction method of large span Successive interference cancellation
CN101781878B (en) Integral lifting template of main pylon of single-pylon cable-stayed bridge without dorsal cables and lifting construction method thereof
CN204690605U (en) The self-propelled triangular truss hanging basket of large span beam bridge
CN107905111B (en) A kind of rigid frame-continuous girder end bay construction technology
CN110453613B (en) Full-section one-step suspension casting construction method for large-span beam bridge box girder
CN108004927A (en) Double limb triangle hanging basket and large span continuous rigid frame bridge cantilever beam section construction methods
CN107974942B (en) A kind of abrupt slope side rigid frame-continuous girder end bay construction method
CN107034791A (en) A kind of assembling method of Cantilever Casting Construction Hanging Basket
CN208472543U (en) CFST Arch Bridge
CN102953337B (en) Bridge construction method
CN205242278U (en) A triangle string basket method is hanged and is watered device for deck bridge construction
CN110700119A (en) Upper traveling system of assembled Bailey beam hanging basket and design method thereof
CN108103945A (en) A kind of whole landing mould bases of cast-in-situ box girder
CN107761575A (en) Ultra-wide box beam Hanging Basket and its bottom basket system
CN106639303B (en) Elevator dedicated hydraulic creeping formwork frame body
CN106120565B (en) Large span bias Recumbent steel box tied arch bridge Buoys arrangement construction system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant