China
Prior art keywords
arch
arch rib
steel
cast
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810636205.7A
Other languages
Chinese (zh)
Inventor
吴德胜
夏永红
周树标
丁贵生
宇汝平
汪传福
王子龙
冯晓见
吴杨
关峰
梁辉
余国凯
杨帆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Traffic Construction Ltd By Share Ltd
Original Assignee
Anhui Traffic Construction Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Traffic Construction Ltd By Share Ltd filed Critical Anhui Traffic Construction Ltd By Share Ltd
Priority to CN201810636205.7A priority Critical patent/CN108660903A/en
Publication of CN108660903A publication Critical patent/CN108660903A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D4/00Arch-type bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The present invention relates to a kind of CFST Arch Bridges, including side arch rib, main arch rib, sunpender, tie-rod and Bridge Pier structure;End bay structure include while arch stand, end bay cast-in-situ steel reinforced concrete arch rib, it is cast-in-place while arch abutment crossbeam, the cast-in-place intercostal crossbeam of end bay, existing cast-in-place side arch rib binder, pour edge column, flexible prestressing tie-rod and cast-in-place floorings;In across structure include skewback, in across steel pipe concrete arch rib, the hollow intercostal crossbeam of main arch, precast hollow longeron, flexible prestressing tie-rod, tie-rod steel plate box, truss-like permanently upper wind brace, K shapes permanently in wind brace, interim wind brace, arch springing embedded section, inside steel strand integral bundle squeezes drag-line sunpender and outside steel strand integral bundle squeezes drag-line sunpender.The beneficial effects of the invention are as follows:Steel tube arch rib fixing bracket of the present invention improves the stability in steel tube arch rib installation operation, merging precision is effectively ensured.

Description

CFST Arch Bridge and construction method
Technical field
The present invention relates to a kind of CFST Arch Bridge and construction methods, belong to science of bridge building field, are suitable for flying swallow The construction of CFST Arch Bridge.
Background technology
Longspan Bridge construction requirements using high-strength, lightweight and convenient for construction engineering material, and it is desirable that structure have compared with Good ductility and restorability.Concrete filled steel tube combined material is used in arch bridge that the dead weight of bridge can be mitigated significantly, can be with Largely improve structural dynamic performance.The arch rib of CFST Arch Bridge is the component based on compression, stability All it is science of bridge building teacher problem of interest all the time.The lateral rigidity of long-span arch bridge is typically small, in wind action It is lower to generate larger displacement, the normal operation of bridge structure may be influenced, the damage of structure is even resulted in, causes certain peace Full hidden danger.Although hollow arch rib component may be used in large-span concrete arch bridge, but its cross-sectional shape size makes wind resistance area Greatly, suffered wind load remains to lateral stability to generate large effect.Lateral wind brace can guarantee that the ribbed arch of concrete filled steel tube exists Local buckling does not occur before overall collapse, is laterally stable important guarantee.It is mixed that the arrangement of stull directly affects steel pipe The stability of solidifying soil arch bridge is one of the factor that design palpus emphasis considers.However excessive stull setting, from angle of designing and construct Degree is all unreasonable, while the overhead of arch can also be made to seem in disorder, complicated, weakens the aesthetic feeling of arch bridge.
Horizontal thrust of the flying swallow bowstring arch bridge under dead load is mainly balanced by tie-rod, and temperature load and mobile load The effects that caused arch springing at thrust then mainly offset by basis.Flying swallow bowstring arch bridge is usually held on end bay is arranged to Formula is arranged to half-through in main span.Rational structure type, generally end bay are using larger material (such as reinforcing bar of load intensity Concrete), and smaller ratio of rise to span (ratio of rise to span is smaller, and it is bigger to encircle the horizontal component that interior axial compressive force generates).This form is easy In the thrust that is generated at arch springing of balance main arch rib, also more economy.The lower supporting part of flying swallow bowstring arch bridge point is typically outstanding Hanging body system, this system flexibility is larger, can influence the comfort of garage.It can be by extending deck type bridge deck length, to carry The rigidity of high bridge deck entirety, and then reduce the deformation of operation state girder, weaken the vibration of bridge floor.Oblique sunpender can also be passed through Setting it is longitudinally rigid to improve its.The lateral stiffness for flying swallow bowstring arch bridge, can be ensured by a certain number of stulls, It can be arranged to cable-carried arch bridge, improve the lateral stiffness of bridge indirectly by the lateral inclination of sunpender.
During CFST Arch Bridge Construction, it is fixed difficult usually to encounter the installation of arch springing template.In steel tube concrete In native construction stages of arch bridge, it can usually encounter steel tube arch rib merging precision and be difficult to ensure, structural stability controls in work progress Difficulty manually puts into larger, the problems such as safety is poor during economy is poor and work progress in steel tube arch rib installation process. Construction requirement cannot be met using conventional CFST Arch Bridge tie-rod system and hanger construction method, tradition falls frame technology and applies Work complex steps, tissue are more difficult.
Invention content
The purpose of the present invention is overcoming deficiency in the prior art, a kind of CFST Arch Bridge and construction method are provided.
This CFST Arch Bridge, including side arch rib, main arch rib, sunpender, tie-rod and Bridge Pier structure;End bay structure Including while arch stand, end bay cast-in-situ steel reinforced concrete arch rib, it is cast-in-place while arch abutment crossbeam, the cast-in-place intercostal crossbeam of end bay, existing cast-in-place side Arch rib binder pours edge column, flexible prestressing tie-rod and cast-in-place floorings;In across structure include skewback, in across concrete filled steel tube The hollow intercostal crossbeam of arch rib, main arch, precast hollow longeron, flexible prestressing tie-rod, tie-rod steel plate box, the permanent windward of truss-like Permanently middle wind brace, interim wind brace, arch springing embedded section, inside steel strand integral bundle squeeze drag-line sunpender and outside steel strand integral for support, K shapes Beam squeezes drag-line sunpender;
Cast-in-place side arch rib binder is located between two panels end bay cast-in-situ steel reinforced concrete arch rib;It is existing that cast-in-place edge column is located at end bay It pours and is used to support T shape prestressed cross beams above armored concrete arch rib and skewback;Arch springing embedded section passes through arch springing external wrapping concrete It is connect with skewback, skewback is located above the cushion cap of main span;The hollow intercostal crossbeam of main arch is located in two panels across steel pipe concrete arch rib Between;Inside steel strand integral bundle squeezes drag-line sunpender and outside steel strand integral bundle squeezes drag-line sunpender top in across steel tube concrete Native arch rib connection, inside steel strand integral bundle squeezes drag-line sunpender and outside steel strand integral bundle squeezes drag-line sunpender lower part and sunpender cross Beam connects;Permanently permanently middle wind brace, interim wind brace are located in two panels between steel pipe concrete arch rib truss-like for upper wind brace, K shapes.
As preferred:The cast-in-place side arch abutment crossbeam is located above end bay cast-in-situ steel reinforced concrete arch rib end, end bay Cast-in-place intercostal crossbeam is set to above end bay cast-in-situ steel reinforced concrete arch rib.
As preferred:The flexible prestressing tie-rod is arranged through tie-rod steel plate box, and end anchorage is existing in end bay It pours at the top of armored concrete arch rib.
As preferred:The cushion cap is located above pile foundation, and column is equipped with above the cushion cap of end bay, side is equipped with above column Arch stand.
As preferred:Described end bay cast-in-situ steel reinforced concrete arch rib one end is connect with skewback, and the other end is shelved on side arch On bearing.
As preferred:Described skewback one end is connect with end bay cast-in-situ steel reinforced concrete arch rib, and it is pre- that the other end is equipped with arch springing Bury section, in pass through arch springing external wrapping concrete and arch springing embedded section across steel pipe concrete arch rib and consolidate.
As preferred:The inside steel strand integral bundle squeezes drag-line sunpender and outside steel strand integral bundle squeezes drag-line sunpender Top stretching end connect across steel pipe concrete arch rib in by Hanger Anchor head bore, lower part fixed section is pre-buried by boom end Part is connect with suspender crossbeam.
As preferred:Across steel pipe concrete arch rib installation segment includes upstream arch rib and K shapes permanently middle wind brace in described, Its front adds interim wind brace.
As preferred:Across the holder of steel pipe concrete arch rib and end bay cast-in-situ steel reinforced concrete arch rib using fixed in described Type strutting system.
The construction method of this CFST Arch Bridge, includes the following steps:
1) preparation of construction:It organizes related personnel to carry out drawing joint examination, then confides a technological secret to critical process, to goods and materials Equipment is verified, and is formulated test plan, is established Control Survey Triangulation Network for Construction, further appreciate that and implement site operation and arrange safely It applies;
2) pile foundation and pier construction:Opposite side encircles and main arch basis is constructed, and pile foundation and pier is poured, then in main arch Skewback is poured at pier, side arch pier on pour column, side arch stand is poured above column, pour main pier cushion cap, When skewback, the built-in fittings such as pre-buried arch rib arch springing steel pipe, arch springing partial pressing steel plate, arch springing Outsourcing Concrete bar built-in fitting pour master Advance installation platform upper bracket, installation main arch arch springing sky steel pipe when the cushion cap of pier, skewback;
3) main arch rib is processed:In across steel pipe concrete arch rib arch ring use concrete-filled steel tube with dumbbell sections, arch rib is in factory It is segmented prefabricated;
4) arch springing monoblock type fixing bracket is set up:Monoblock type fixing bracket is connected by pre-embedded steel slab, locating rack setting is fixed Shape steel plate and positioning bolt are positioned and are welded to WELDING STUDS welding position;
5) arch springing is constructed:Skewback is located above the cushion cap of main span, installs arch springing embedded section, binding arch springing, binder reinforcing bar, arch The construction of foot external wrapping concrete is hinged open-close type punching block pouring technique using the fixed regularization fast mounting-dismounting of external wrapping concrete attachment, pours It is affixed to build the progress of arch springing external wrapping concrete, and vibration compacting, is conserved;
6) arch rib holder is set up:Before setting up holder, the foundation stabilization stabilization processing of holder is carried out, is set around bracket basis Set corresponding pumping equipment, in across the rack construction of steel pipe concrete arch rib and end bay cast-in-situ steel reinforced concrete arch rib use regularization Strutting system;
7) the flexible support net of installation:By height adjustable arc lattice steel pallet leveling, then flexibility support net is placed on In height adjustable arc lattice steel pallet;
8) holder loads precompressed:In adopted across the pre-pressing bracket of steel pipe concrete arch rib and end bay cast-in-situ steel reinforced concrete arch rib With the anchoring bottom girder counter-force precompressed of assembled step anchor cable sash prestressing technology is combined with pouch water filling ballast precompressed;
9) deformation of timbering is monitored:The deformation of regularization strutting system vertical elastic is measured, when arch rib formwork erection is included in because construction is faced When rack sinking deformation camber;
10) arch rib holder unloads:After setting camber, regularization strutting system is unloaded;
11) trigonum girder is set up:Trigonum girder is set up on regularization strutting system, and it is horizontal to pour the hollow intercostal of main arch Beam;
12) tie-rod installation system is set up:The construction of flexible prestressing tie-rod uses the lossless traction paying off system of tie-rod drag-line, volume Finished tie bar cable disk processed sets up fixed plate rail, and finished tie bar cable disk is positioned on plate rail bottom plate, sets up drag-line bracket, installation The band vertical guide groove of idler wheel, draws haulage cable, starts hoist engine, and distraction procedure speed remains a constant speed, and traction reserves afterwards in place Enough active lengths, adjustment wheel frame absolute altitude meet design, install tie-rod anchor head:Last prestressed tie-rod anchor end;
13) arch rib construction bracket system is set up:In it is fixed across steel pipe concrete arch rib and end bay cast-in-situ steel reinforced concrete arch rib Type hingedly reinforces steel plate using separate type and combines interim Strengthening Technology with regularization monoblock type arc reinforcement channel steel, and centering is across steel pipe Concrete arch rib carrying out shaping strutting system is set up, and is shelved steel pipe by reinforcing steel pipe on regularization strutting system top and is added Strong supporting steel plate is fixed;
14) end bay structure is poured:It is horizontal that end bay arch rib template, end floor beam template, intercostal are installed on regularization strutting system Beam forms, and assembling reinforcement;Then the cast-in-place intercostal crossbeam of end bay cast-in-situ steel reinforced concrete arch rib, end bay, cast-in-place side arch rib are poured Binder pours side arch rib concrete, pours end floor beam concrete, reaches 90% or more post-stretching end floor beam prestressed strand of design strength, Cast-in-place edge column is poured on end bay cast-in-situ steel reinforced concrete arch rib;
15) across main arch fin steel tube in installing:Segmental hoisting, empty steel pipe joint is intersegmental to be connected with bolt, and empty steel pipe closes up; The hollow intercostal crossbeam of wind brace, main arch and sunpender are avoided at steel pipe segmentation;After adjusting arch, intersegmental seam is welded It connects;Welding or bolt vault gas vent;Wind brace, interim wind brace during truss-like permanently goes up wind brace, K shapes permanently are installed;
16) across main arch rib pump-injecting concrete program in:Completion is once perfused in arch rib concrete, and three cavity independent perfusions of upper, middle and lower fill Note sequence is lower boom, top boom, intermediate batten plate;Simultaneously toward vault pump-injecting concrete from the arch springing of both sides;Both sides pump-injecting concrete is to vault Shi Jixu pump notes, until being full of concrete in waiting steel pipe;Exhaust pipe is removed when concrete strength reaches requirement, same steel plate is used in combination Sealing of hole welds;
17) side arch closes up:Close up end bay cast-in-situ steel reinforced concrete arch rib, after side arch rib health 7-10 days, pours arch Foot closes up seam concrete;Symmetrically pour cast-in-place side arch rib binder;
18) the hollow intercostal crossbeam of main arch symmetrically is poured, pours the cast-in-place edge column of side arch, main arch column is installed;Lift T shapes Prestressed cross beams, the side arch abutment crossbeam of lifting end bay side, install end bay section longeron;End bay section prefabricated bridge is installed, is poured The cast-in-place floorings of end bay section;
19) hanger construction platform is set up:Operation platform includes operation platform bottom plate, is laid with sliding rail, is laid with bottom plate sliding-rail groove, Carry out setting up for platform truss;
20) tie member tensioning:Longitudinal flexible prestressed tie bar drag-line is installed, installation end bay section prestressed tie bar supporting rack is Bar steel plate box, internal side-line bar and outboard tie-bar progress tensioning respectively, tie member tensioning is using symmetrical, classification, circulation stretch-draw;
21) across main arch coil support in navigable is removed, the following portion support of main arch rib intercostal crossbeam is retained;
22) across sunpender in installing:In across steel pipe concrete arch rib arch rib hanger construction using attachment arch rib fixed rack Movable construction platform according in place across prefabricated suspender crossbeam in being symmetrically installed from span centre, arch springing to 1/4 direction of arch rib, and is pacified Fill the side crossbeam of main span side;Precast hollow longeron is installed;Tie-rod steel plate box is installed;In in the installation of prefabricated suspender crossbeam is pressed Consider that camber back rest bottom installed height mark is constructed in across arch rib sunpender structural map;After the installation of whole prefabricated crossbeams is in place, It compares above-mentioned beam bottom installed height mark and re-starts whole sunpender ropes length or the adjustment of Suo Li;
23) suspender tension anchors:Stretch-draw anchor is carried out to inside sunpender and outside sunpender respectively;Inside steel strand integral bundle squeezes Press the top stretching end that drag-line sunpender and outside steel strand integral bundle squeeze drag-line sunpender mixed across steel pipe in by Hanger Anchor head bore Solidifying soil arch rib connection, lower part fixed section are connect by boom end built-in fitting with suspender crossbeam;
24) remaining all holders are removed, main span section prefabricated bridge is installed, the cast-in-place floorings of main span section are poured;
25) deck paving and anticollision barrier are poured across balanced, symmetrical by full-bridge three, expansion joint is installed;
26) after the completion of full-bridge, all inside steel strand integral bundle extruding drag-line sunpender, outside steel strand integral bundle is carried out and squeezes and draws The Suo Li of rope sunpender and flexible prestressing tie rod anchor rope is measured, and sunpender initial tensioning Suo Li combines construction middle cross beam designed elevation control Analysis result suitably adjusted, the actual measurement Suo Li of tie member tensioning Suo Li is not more than 8% with design Suo Li errors, otherwise carries out It is corresponding to adjust rope.
The beneficial effects of the invention are as follows:
1, steel tube arch rib fixing bracket of the present invention improves the stability in steel tube arch rib installation operation, has Effect ensures merging precision.
2, assembled step anchor cable sash anchoring bottom girder counter-force precompressed of the present invention and pouch water filling ballast precompressed group The construction method of conjunction reduces unnecessary operational procedure together, has saved the duration, can be effective cost-effective.
3, the fixed regularization Quick Release of attachment of the present invention is hinged open-close type punching block, improves arch springing template installation speed Degree, is effectively ensured structure size.
4, the hanger erection platform truss in the present invention uses regularization sliding rail movable construction platform, substantially increases and hangs Bar construction efficiency, mechanization of building operation degree greatly improve.
5, the tie-rod installation in the present invention effectively prevents tie-rod by the lossless traction paying off system of tie-rod drag-line and is installing Possible damage in the process ensure that tie-rod construction integrality, effectively reduce frictional resistance.
Description of the drawings
Fig. 1 is CFST Arch Bridge facade detail drawing;
Fig. 2 is rib structure plan view;
Fig. 3 is main arch rib suspender crossbeam sectional view;
Fig. 4 is main arch rib intercostal crossbeam and side crossbeam sectional view;
Fig. 5 is side arch rib stand column and beam sectional view;
Fig. 6 is side arch abutment crossbeam sectional view;
Fig. 7 is bridge deck plan view;
Fig. 8 is regularization strutting system schematic diagram;
Fig. 9 is CFST Arch Bridge external wrapping concrete arch springing structure chart;
Figure 10 is shearing nail welding locating rack structure chart;
Figure 11 is Filled Steel Tubular Arch Bridge regularization clamp structure figure;
Figure 12 is concrete filled steel tube external prestressing tie-rod installation diagram;
Figure 13 is interchangeable locking-type tie-rod anchorage figure;
Figure 14 is Filled Steel Tubular Arch Bridge sunpender hoisting structure figure;
Figure 15 is gas vent and feed opening sectional view.
Reference sign:Across concrete filled steel tube in 1- pile foundations, 2- cushion caps, 3- skewbacks, the sides 4- arch stand, 5- columns, 6- Arch rib, 7- end bay cast-in-situ steel reinforced concretes arch rib, 8- are cast-in-place to encircle when arch abutment crossbeam, the cast-in-place intercostal crossbeam of 9- end bays, 10- are cast-in-place The cast-in-place edge column of rib binder, 11-, 12-T shapes prestressed cross beams, the hollow intercostal crossbeam of 13- main arch, 14- precast hollows longeron, 15- Bracket, 16- prefabricated bridges, the cast-in-place floorings of 17-, 18- flexible prestressings tie-rod, the insides 19- steel strand integral bundle is shelved to squeeze Steel strand integral bundle extruding drag-line sunpender, 21- Hanger Anchors head bore, the tops 22- stretching end, the lower parts 23- are solid on the outside of drag-line sunpender, 20- Determine section, 24- boom ends built-in fitting, 25- chord members steel pipe, the centres 26- batten plate, 27- self-compacting concretes, 28- feed openings, 29- Gas vent, 30- exhaust pipes, 31- arch springings embedded section, 32- arch springings external wrapping concrete, 33- arch springings partial pressing steel plate, 34- shearings Nail, the interchangeable locking-type tie-rod anchorages of 35-, 36- tie-bar supports frame, 37- tie-rods steel plate box, 38- truss-likes permanently go up wind brace, 39-K shapes Wind brace in permanent, the interim wind braces of 40-, 41- regularization strutting system, 42- arch rib regularization reinforce U-steel frame, the sides 43- crossbeam, The secondary inside arch rib of 44- suspender crossbeams, 45- outer side edges arch rib, 46- inner side edges arch rib, 47- columns bearing, 48- or so shares lower part Prestressed tie bar, the sides 51- beam support, the pavements 52-, 53- non-motor vehicles on the outside of the basic, insides 49- prestressed tie bar, 50- Road, 54- car lanes, 55- anticollision barriers, main arch rib on the outside of 56-, main arch rib, 58- prefabricated boards piecemeal, 59- grounds on the inside of 57- Handle stake, 60- shallow-layers solidification soil cement plate, 61- assembled step anchor cable sashes anchoring bottom girder, 62- anchor cables embedded section, 63- master Arch rib arch springing steel pipe, 64- reserve anchor hole, 65- frame grid type holders bottom plate, 66- pier solid plates built-in fitting, the modular L-shaped steel of 67- Grillage, 68- height adjustable arc lattices steel pallet, 69- flexibility supports net, 70- pouches, 71- side end panels, 72- easy-dismounts point Cavity plate, 73- counter-force precompressed anchor cable, 74- piers pre-buried anchor cable counter-force end, 75- pressure-bearings bar-mat reinforcement, 76- anti-shear steel plates, 77-L shapes limit Position plate, 78, connection end plate with holes, 79, comb shape entirety fixing bolt, 80- anticrackings bar-mat reinforcement, 81- arcs backplate, 82- monoblock types Fixing bracket, 83- pre-embedded steel slabs, 84- sizings steel plate, 85- shearing nail weldings locating rack, 86- positioning bolts, 87- reinforce steel pipe Shelve steel pipe, 88- reinforces supporting steel plate, chamber, 90- set girt(h)s, 91- jack, 92- ribs are shelved in the limit of 89- jack Plate, 93- arch ribs fixation steel plate, 94- steel tube arch ribs fixing bracket, 95- fastenings otic placode, 96- arc monoblock types channel steel, 97- are to drawing Adjustable long bolt, 98- arch ribs are to drawing temporary connection plate, 98- steel tube arch ribs seam, 99- continous way stress tests meter, 100- steel pipes Arch rib, 101- otic placodes fastening bolt, 102- is adjustable steel plate top plate, 103- adjustable bolts group, 104- is adjustable steel plate base, 105- can Stainless steel strut, 106- hinged shafts, 107- finished tie bar cables disk, 108- is adjusted to fix plate rail, 109- plate rails bottom plate, 110- band idler wheels vertical The symmetrical elevator of guide groove, 111-, 112- drag-line bands buckle shoulder pole girder, 113- drag-lines bracket, 114- tie-rods drag-line, 115- band transition arcs Hold in the palm tie-rod point to device, 116- haulage cables, 117- anchor plates fixing muscle, 118- sealing devices, 119- erect fixation steel plate, 120- foundation bolts, 121- compression sets, 122- protective covers, 123- support tubes, 124- fillings mortar, 125- built-in pipes, 126- Damping device, 127- sliding rails, 128- operation platforms bottom plate, 129- bottom plates sliding-rail groove, 130- are chimeric to drawing brake, 131- platforms Truss.
Specific implementation mode
The present invention is described further with reference to embodiment.The explanation of following embodiments is merely used to help understand this Invention.It should be pointed out that for those skilled in the art, without departing from the principle of the present invention, also Can be with several improvements and modifications are made to the present invention, these improvement and modification also fall into the protection domain of the claims in the present invention It is interior.
As shown in Fig. 1 to Figure 15, the CFST Arch Bridge, including:Side arch rib, main arch rib, sunpender, tie-rod and bridge Beam pier structure;End bay structure include while arch stand 4, end bay cast-in-situ steel reinforced concrete arch rib 7, it is cast-in-place while arch abutment crossbeam 8, end bay Cast-in-place intercostal crossbeam 9, pours edge column 11, flexible prestressing tie-rod 18 and cast-in-place floorings 17 at existing cast-in-place side arch rib binder 10;In Across structure include skewback 3, in across steel pipe concrete arch rib 6, the hollow intercostal crossbeam 13 of main arch, precast hollow longeron 14, flexible pre- Permanently permanently middle wind brace 39, interim wind brace 40, arch springing are pre- for upper wind brace 38, K shapes for stress tie-rod 18, tie-rod steel plate box 37, truss-like Bury section 31, inside steel strand integral bundle squeezes drag-line sunpender 19 and outside steel strand integral bundle squeezes drag-line sunpender 20;Cast-in-place side arch rib Binder 10 is located between two panels end bay cast-in-situ steel reinforced concrete arch rib 7;Cast-in-place edge column 11 is located at end bay cast-in-situ steel reinforced concrete Arch rib 7 and 3 top of skewback are used to support T shapes prestressed cross beams 12;Arch springing embedded section 31 passes through arch springing external wrapping concrete 32 and arch Seat 3 connects, and skewback 3 is located at 2 top of cushion cap of main span;The hollow intercostal crossbeam of main arch 13 is located in two panels across steel pipe concrete arch rib Between 6;Inside steel strand integral bundle squeezes drag-line sunpender 19 and outside steel strand integral bundle squeezes 20 top of drag-line sunpender in across steel Pipe concrete arch rib 6 connects, and inside steel strand integral bundle squeezes drag-line sunpender 19 and outside steel strand integral bundle squeezes drag-line sunpender 20 Lower part is connect with suspender crossbeam 44;Permanently permanently middle wind brace 39, interim wind brace 40 are located in two panels truss-like for upper wind brace 38, K shapes Between steel pipe concrete arch rib 6.
The cast-in-place side arch abutment crossbeam 8 is located above 7 end of end bay cast-in-situ steel reinforced concrete arch rib, the cast-in-place intercostal of end bay Crossbeam 9 is set to 7 top of end bay cast-in-situ steel reinforced concrete arch rib.The flexible prestressing tie-rod 18 is through tie-rod steel plate box 37 settings, end anchorage is in 7 top of end bay cast-in-situ steel reinforced concrete arch rib.The cushion cap 2 is located at 1 top of pile foundation, end bay The top of cushion cap 2 be equipped with column 5,5 top of column is equipped with side arch stand 4.Described 7 one end of end bay cast-in-situ steel reinforced concrete arch rib It is connect with skewback 3, the other end is shelved on side arch stand 4.Described 3 one end of skewback and end bay cast-in-situ steel reinforced concrete arch rib 7 Connection, the other end be equipped with arch springing embedded section 31, in it is pre-buried by arch springing external wrapping concrete 32 and arch springing across steel pipe concrete arch rib 6 Section 31 consolidates.The inside steel strand integral bundle squeezes drag-line sunpender 19 and outside steel strand integral bundle squeezes the upper of drag-line sunpender 20 Portion's stretching end 22 is connect in across steel pipe concrete arch rib 6 by Hanger Anchor head bore 21, and lower part fixed section 23 passes through boom end Built-in fitting 24 is connect with suspender crossbeam 44.In described across steel pipe concrete arch rib 6 install segment include upstream arch rib and K shapes forever Wind brace 39 in long, front adds interim wind brace 40.Across steel pipe concrete arch rib 6 and end bay cast-in-situ steel reinforced concrete in described The holder of arch rib 7 uses regularization strutting system 41.
The construction method of the CFST Arch Bridge, includes the following steps:
1) preparation of construction:It organizes related personnel to carry out drawing joint examination, then confides a technological secret to critical process, to goods and materials Equipment is verified, and is formulated test plan, is established Control Survey Triangulation Network for Construction, further appreciate that and implement site operation and arrange safely It applies;
2) pile foundation and pier construction:Opposite side encircles and main arch basis is constructed, and pile foundation 1 and pier 2 is poured, then in main arch Pier 2 at pour skewback 3, side arch pier 2 on pour column 5, side arch stand 4 is poured above column 5, pours main pier Cushion cap 2, skewback 3 when, pre-buried arch rib arch springing steel pipe, arch springing partial pressing steel plate 33, arch springing Outsourcing Concrete bar built-in fitting etc. are pre- Embedded part pours advance 2 upper bracket of installation platform when cushion cap 2, the skewback 3 of main pier, installation main arch arch springing sky steel pipe;
3) main arch rib is processed:In across steel pipe concrete arch rib 6 arch ring use concrete-filled steel tube with dumbbell sections, arch rib is in factory It is segmented prefabricated;
4) arch springing monoblock type fixing bracket is set up:Monoblock type fixing bracket 82, locating rack 85 are connected by pre-embedded steel slab 33 Setting sizing steel plate 84 and positioning bolt 86 are positioned and are welded to 34 welding position of WELDING STUDS;
5) arch springing is constructed:Skewback 3 is located at 2 top of cushion cap of main span, installation arch springing embedded section 31, binding arch springing, binder steel Muscle, the construction of arch springing external wrapping concrete 32 are hinged open-close type punching block using the fixed regularization fast mounting-dismounting of external wrapping concrete attachment and pour Technology pours arch springing external wrapping concrete 32 and carries out affixed, and vibration compacting, conserved in time;
6) arch rib holder is set up:Before setting up holder, the foundation stabilization stabilization processing of holder is carried out, is set around bracket basis Set corresponding pumping equipment, in across the rack construction of steel pipe concrete arch rib 6 and end bay cast-in-situ steel reinforced concrete arch rib 7 using shape Change strutting system 41;
7) the flexible support net of installation:By 68 leveling of height adjustable arc lattice steel pallet, then flexibility support net 69 is put It sets in height adjustable arc lattice steel pallet 68;
8) holder loads precompressed:In across steel pipe concrete arch rib 6 and end bay cast-in-situ steel reinforced concrete arch rib 7 pre-pressing bracket Prestressing technology is combined with pouch water filling ballast precompressed using the anchoring bottom girder counter-force precompressed of assembled step anchor cable sash;
9) deformation of timbering is monitored:The deformation of 41 vertical elastic of regularization strutting system is measured, when arch rib formwork erection is considered as and counts Enter the camber because of construction falsework sinking deformation;
10) arch rib holder unloads:After setting camber, regularization strutting system 41 is unloaded;
11) trigonum girder is set up:Trigonum girder is set up on regularization strutting system 41, pours the hollow intercostal of main arch Crossbeam 13;
12) tie-rod installation system is set up:The construction of flexible prestressing tie-rod 18 uses the lossless traction paying off system of tie-rod drag-line, Finished tie bar cable disk 107 is rolled, fixed plate rail 108 is set up, finished tie bar cable disk 107 is positioned on plate rail bottom plate 109, sets up Drag-line bracket 113, the installation band vertical guide groove 110 of idler wheel, draws haulage cable 116, starts hoist engine 111, distraction procedure speed Degree should not be too fast, should remain a constant speed, and traction reserves enough active lengths afterwards in place, and adjustment wheel frame absolute altitude meets design, peace Fill tie-rod anchor head:Last prestressed tie-rod anchor end;
13) arch rib construction bracket system is set up:In across steel pipe concrete arch rib 6 and end bay cast-in-situ steel reinforced concrete arch rib 7 Sizing hingedly reinforces steel plate using separate type and combines interim Strengthening Technology with regularization monoblock type arc reinforcement channel steel, and centering is across steel 6 carrying out shaping strutting system 41 of pipe concrete arch rib is set up, and is shelved on 41 top of regularization strutting system by reinforcing steel pipe Steel pipe 87 and reinforcement supporting steel plate 88 are fixed;
14) end bay structure is poured:End bay arch rib template, end floor beam template, intercostal are installed on regularization strutting system 41 Beam template, and assembling reinforcement (setting for paying attention to built-in fitting);Then it is existing that end bay cast-in-situ steel reinforced concrete arch rib 7, end bay are poured Intercostal crossbeam 9, cast-in-place side arch rib binder 10 are poured, side arch rib concrete is poured, pours end floor beam concrete, after reaching 90% or more design strength Tensioning end floor beam prestressed strand pours cast-in-place edge column 11 on end bay cast-in-situ steel reinforced concrete arch rib 7;
15) across main arch fin steel tube in installing:Segmental hoisting, empty steel pipe joint is intersegmental to be connected with bolt, and empty steel pipe closes up; The hollow intercostal crossbeam 13 of wind brace, main arch and sunpender are avoided at steel pipe segmentation;After adjusting arch, intersegmental seam is welded It connects;Welding or bolt vault gas vent 29;Wind brace 39, interim wind brace 40 during truss-like permanently goes up wind brace 38, K shapes permanently are installed;
16) across main arch rib pump-injecting concrete program in:Completion is once perfused in arch rib concrete, and three cavity independent perfusions of upper, middle and lower fill Note sequence is lower boom, top boom, intermediate batten plate 26;Simultaneously toward vault pump-injecting concrete from the arch springing of both sides;Both sides pump-injecting concrete extremely encircles Continue pump note when top, until being full of concrete in waiting steel pipe;It is vibrated two minutes with vibrating spear insertion, waits for that concrete strength reaches It is required that when remove exhaust pipe 30, the welding of same steel plate sealing of hole be used in combination;
17) side arch closes up:Close up end bay cast-in-situ steel reinforced concrete arch rib 7, after side arch rib health 7-10 days, pours arch Foot closes up seam concrete (closing up arch springing);Symmetrically pour cast-in-place side arch rib binder 11;
18) the hollow intercostal crossbeam 13 of main arch symmetrically is poured, pours the cast-in-place edge column 11 of side arch, main arch column is installed;It hangs T shapes prestressed cross beams 12 are filled, the side arch abutment crossbeam 8 of lifting end bay side installs end bay section longeron;The prefabricated bridge floor of end bay section is installed Plate 17 pours the cast-in-place floorings of end bay section 17;
19) hanger construction platform is set up:Operation platform includes operation platform bottom plate 128, is laid with sliding rail 127, is laid with bottom plate Sliding-rail groove 129 carries out setting up for platform truss 131;
20) tie member tensioning:18 drag-line of longitudinal flexible prestressed tie bar is installed, end bay section prestressed tie bar supporting rack is installed 36, tie-rod steel plate box 37, internal side-line bar and outboard tie-bar progress tensioning, tie member tensioning are opened using symmetrical, classification, cycle respectively It draws;
21) across main arch coil support in navigable is removed, the following portion support of main arch rib intercostal crossbeam is retained;
22) across sunpender in installing:In across steel pipe concrete arch rib 6 arch rib hanger construction using attachment arch rib fixed rack Movable construction platform, according in place across prefabricated suspender crossbeam 44 in being symmetrically installed from span centre, arch springing to 1/4 direction of arch rib, and The side crossbeam 43 of main span side is installed;Precast hollow longeron 14 is installed;Tie-rod steel plate box 37 is installed;In across prefabricated suspender crossbeam 44 Installation consider that camber back rest bottom installed height mark is constructed in across arch rib sunpender structural map in;Pacify in whole prefabricated crossbeams After dress is in place, compares above-mentioned beam bottom installed height mark and re-start whole sunpender ropes length or the adjustment of Suo Li;
23) suspender tension anchors:Stretch-draw anchor is carried out to inside sunpender and outside sunpender respectively;Inside steel strand integral bundle squeezes Press the top stretching end 22 of drag-line sunpender 19 and outside steel strand integral bundle extruding drag-line sunpender 20 by Hanger Anchor head bore 21 in It is connected across steel pipe concrete arch rib 6, lower part fixed section 23 is connect by boom end built-in fitting 24 with suspender crossbeam 44;
24) remaining all holders are removed, installation main span section prefabricated bridge 17 pours the cast-in-place floorings of main span section 16;
25) deck paving and anticollision barrier 55 are poured across balanced, symmetrical by full-bridge three, expansion joint is installed;
26) after the completion of full-bridge, all inside steel strand integral bundles is carried out and squeeze drag-line sunpender 19, the extruding of outside steel strand integral bundle The Suo Li of 18 anchor cable of drag-line sunpender 20 and flexible prestressing tie-rod is measured, and sunpender initial tensioning Suo Li combines construction middle cross beam design mark The analysis result of height control is suitably adjusted, and the actual measurement Suo Li and design Suo Li errors of tie member tensioning Suo Li is no no more than 8% Then carry out corresponding tune rope.

Claims (10)

1. a kind of CFST Arch Bridge, it is characterised in that including side arch rib, main arch rib, sunpender, tie-rod and Bridge Pier structure; End bay structure include while arch stand (4), end bay cast-in-situ steel reinforced concrete arch rib (7), it is cast-in-place while arch abutment crossbeam (8), end bay it is cast-in-place Intercostal crossbeam (9), pours edge column (11), flexible prestressing tie-rod (18) and cast-in-place floorings at existing cast-in-place side arch rib binder (10) (17);In across structure include skewback (3), in across steel pipe concrete arch rib (6), the hollow intercostal crossbeam (13) of main arch, precast hollow Wind brace during longeron (14), flexible prestressing tie-rod (18), tie-rod steel plate box (37), truss-like permanently go up wind brace (38), K shapes permanently (39), interim wind brace (40), arch springing embedded section (31), inside steel strand integral bundle squeeze drag-line sunpender (19) and outside steel strand integral Beam squeezes drag-line sunpender (20);
Cast-in-place side arch rib binder (10) is located between two panels end bay cast-in-situ steel reinforced concrete arch rib (7);Cast-in-place edge column (11) sets It is used to support T shapes prestressed cross beams (12) above end bay cast-in-situ steel reinforced concrete arch rib (7) and skewback (3);Arch springing embedded section (31) it is connect with skewback (3) by arch springing external wrapping concrete (32), skewback (3) is located above the cushion cap (2) of main span;Main arch is hollow Intercostal crossbeam (13) is located in two panels between steel pipe concrete arch rib (6);Inside steel strand integral bundle squeezes drag-line sunpender (19) Drag-line sunpender (20) top is squeezed with outside steel strand integral bundle to connect across steel pipe concrete arch rib (6) in, inside steel strand integral Beam squeezes drag-line sunpender (19) and outside steel strand integral bundle squeezes drag-line sunpender (20) lower part and connect with suspender crossbeam (44);Truss Permanently permanently middle wind brace (39), interim wind brace (40) are located in two panels across steel pipe concrete arch rib (6) formula for upper wind brace (38), K shapes Between.
2. CFST Arch Bridge according to claim 1, it is characterised in that:The cast-in-place side arch abutment crossbeam (8) sets Above end bay cast-in-situ steel reinforced concrete arch rib (7) end, the cast-in-place intercostal crossbeam (9) of end bay is set to end bay cast in place reinforced bar coagulation Above native arch rib (7).
3. CFST Arch Bridge according to claim 1, it is characterised in that:The flexible prestressing tie-rod (18) passes through It is through at tie-rod steel plate box (37) setting, end anchorage is at the top of end bay cast-in-situ steel reinforced concrete arch rib (7).
4. CFST Arch Bridge according to claim 1, it is characterised in that:The cushion cap (2) is located in pile foundation (1) Cushion cap (2) top of side, end bay is equipped with column (5), and side arch stand (4) is equipped with above column (5).
5. CFST Arch Bridge according to claim 1, it is characterised in that:The end bay cast-in-situ steel reinforced concrete arch Rib (7) one end is connect with skewback (3), and the other end is shelved on side arch stand (4).
6. CFST Arch Bridge according to claim 1, it is characterised in that:Described skewback (3) one end is existing with end bay Pour armored concrete arch rib (7) connection, the other end is equipped with arch springing embedded section (31), in across steel pipe concrete arch rib (6) pass through arch Foot external wrapping concrete (32) is consolidated with arch springing embedded section (31).
7. CFST Arch Bridge according to claim 1, it is characterised in that:The inside steel strand integral bundle, which squeezes, to be drawn The top stretching end (22) that rope sunpender (19) and outside steel strand integral bundle squeeze drag-line sunpender (20) passes through Hanger Anchor head bore (21) It is connect across steel pipe concrete arch rib (6) in, lower part fixed section (23) passes through boom end built-in fitting (24) and suspender crossbeam (44) it connects.
8. CFST Arch Bridge according to claim 1, it is characterised in that:Across steel pipe concrete arch rib in described (6) installation segment includes upstream arch rib and K shapes permanently middle wind brace (39), and front adds interim wind brace (40).
9. CFST Arch Bridge according to claim 1, it is characterised in that:Across steel pipe concrete arch rib in described (6) and the holder of end bay cast-in-situ steel reinforced concrete arch rib (7) uses regularization strutting system (41).
10. a kind of construction method of CFST Arch Bridge as described in claim 1, it is characterised in that include the following steps:
1) preparation of construction:It organizes related personnel to carry out drawing joint examination, then confides a technological secret to critical process, to material equipment It is verified, formulates test plan, establish Control Survey Triangulation Network for Construction, further appreciate that and implement site operation safety measure;
2) pile foundation and pier construction:Opposite side encircles and main arch basis is constructed, and pile foundation (1) and pier (2) is poured, then in main arch Pier (2) at pour skewback (3), pour column (5) on the pier (2) of side arch, pour side arch stand above the column (5) (4), when pouring cushion cap (2), skewback (3) of main pier, pre-buried arch rib arch springing steel pipe, arch springing partial pressing steel plate (33), outside arch springing The built-in fittings such as packet concrete bar built-in fitting pour advance installation platform (2) upper bracket, installation when cushion cap (2), skewback (3) of main pier Main arch arch springing sky steel pipe;
3) main arch rib is processed:In across the arch ring of steel pipe concrete arch rib (6) use concrete-filled steel tube with dumbbell sections, arch rib is in factory point Section is prefabricated;
4) arch springing monoblock type fixing bracket is set up:Monoblock type fixing bracket (82), locating rack are connected by pre-embedded steel slab (33) (85) setting sizing steel plate (84) and positioning bolt (86) are positioned and are welded to WELDING STUDS (34) welding position;
5) arch springing is constructed:Skewback (3) is located above the cushion cap (2) of main span, installation arch springing embedded section (31), binding arch springing, binder Reinforcing bar, arch springing external wrapping concrete (32) construction are hinged open-close type punching block using the fixed regularization fast mounting-dismounting of external wrapping concrete attachment Pouring technique pours arch springing external wrapping concrete (32) and carries out affixed, and vibration compacting, conserved;
6) arch rib holder is set up:Before setting up holder, the foundation stabilization stabilization processing of holder is carried out, phase is set around bracket basis Answer pumping equipment, in across the rack construction of steel pipe concrete arch rib (6) and end bay cast-in-situ steel reinforced concrete arch rib (7) using shape Change strutting system (41);
7) the flexible support net of installation:By height adjustable arc lattice steel pallet (68) leveling, then flexibility support net (69) is put It sets in height adjustable arc lattice steel pallet (68);
8) holder loads precompressed:In across steel pipe concrete arch rib (6) and end bay cast-in-situ steel reinforced concrete arch rib (7) pre-pressing bracket Prestressing technology is combined with pouch water filling ballast precompressed using the anchoring bottom girder counter-force precompressed of assembled step anchor cable sash;
9) deformation of timbering is monitored:The deformation of regularization strutting system (41) vertical elastic is measured, when arch rib formwork erection is included in because construction is faced When rack sinking deformation camber;
10) arch rib holder unloads:After setting camber, regularization strutting system (41) is unloaded;
11) trigonum girder is set up:Trigonum girder is set up on regularization strutting system (41), and it is horizontal to pour the hollow intercostal of main arch Beam (13);
12) tie-rod installation system is set up:Flexible prestressing tie-rod (18) construction uses the lossless traction paying off system of tie-rod drag-line, volume Finished tie bar cable disk (107) processed, sets up fixed plate rail (108), finished tie bar cable disk (107) be positioned over plate rail bottom plate (109) it On, drag-line bracket (113) is set up, the installation band vertical guide groove of idler wheel (110) draws haulage cable (116), starts hoist engine (111), distraction procedure speed remains a constant speed, and traction reserves enough active lengths afterwards in place, and adjustment wheel frame absolute altitude satisfaction is set Meter installs tie-rod anchor head:Last prestressed tie-rod anchor end;
13) arch rib construction bracket system is set up:In across steel pipe concrete arch rib (6) and end bay cast-in-situ steel reinforced concrete arch rib (7) Sizing hingedly reinforces steel plate using separate type and combines interim Strengthening Technology with regularization monoblock type arc reinforcement channel steel, and centering is across steel Pipe concrete arch rib (6) carrying out shaping strutting system (41) is set up, on regularization strutting system (41) top by reinforcing steel Pipe shelves steel pipe (87) and reinforces supporting steel plate (88) and fixes;
14) end bay structure is poured:It is horizontal that end bay arch rib template, end floor beam template, intercostal are installed on regularization strutting system (41) Beam forms, and assembling reinforcement;Then the cast-in-place intercostal crossbeam (9) of end bay cast-in-situ steel reinforced concrete arch rib (7), end bay, cast-in-place is poured Side arch rib binder (10) pours side arch rib concrete, pours end floor beam concrete, reaches 90% or more post-stretching end floor beam of design strength and answers in advance Power steel beam pours cast-in-place edge column (11) on end bay cast-in-situ steel reinforced concrete arch rib (7);
15) across main arch fin steel tube in installing:Segmental hoisting, empty steel pipe joint is intersegmental to be connected with bolt, and empty steel pipe closes up;Steel pipe The hollow intercostal crossbeam (13) of wind brace, main arch and sunpender are avoided at segmentation;After adjusting arch, intersegmental seam is welded It connects;Welding or bolt vault gas vent (29);Wind brace (39), interim wind during truss-like permanently goes up wind brace (38), K shapes permanently are installed It supports (40);
16) across main arch rib pump-injecting concrete program in:Completion is once perfused in arch rib concrete, and three cavity independent perfusions of upper, middle and lower are perfused suitable Sequence is lower boom, top boom, intermediate batten plate (26);Simultaneously toward vault pump-injecting concrete from the arch springing of both sides;Both sides pump-injecting concrete is to vault Shi Jixu pump notes, until being full of concrete in waiting steel pipe;Exhaust pipe (30) is removed when concrete strength reaches requirement, is used in combination same Steel plate sealing of hole welds;
17) side arch closes up:Close up end bay cast-in-situ steel reinforced concrete arch rib (7), after side arch rib health 7-10 days, pours arch springing Close up seam concrete;Symmetrically pour cast-in-place side arch rib binder (11);
18) the hollow intercostal crossbeam (13) of main arch symmetrically is poured, pours the cast-in-place edge column (11) of side arch, main arch column is installed;It hangs T shapes prestressed cross beams (12) are filled, the side arch abutment crossbeam (8) of lifting end bay side installs end bay section longeron;It is prefabricated that end bay section is installed Floorings (17) pour the cast-in-place floorings of end bay section (17);
19) hanger construction platform is set up:Operation platform includes operation platform bottom plate (128), is laid with sliding rail (127), is laid with bottom plate Sliding-rail groove (129) carries out setting up for platform truss (131);
20) tie member tensioning:Longitudinal flexible prestressed tie bar (18) drag-line is installed, end bay section prestressed tie bar supporting rack is installed (36), tie-rod steel plate box (37), distinguish internal side-line bar and outboard tie-bar carries out tensioning, and tie member tensioning use is symmetrical, is classified, follows Ring tensioning;
21) across main arch coil support in navigable is removed, the following portion support of main arch rib intercostal crossbeam is retained;
22) across sunpender in installing:In across steel pipe concrete arch rib (6) arch rib hanger construction using attachment arch rib fixed rack move Dynamic formula operation platform, according in being symmetrically installed from span centre, arch springing to 1/4 direction of arch rib across prefabricated suspender crossbeam (44) in place, and The side crossbeam (43) of main span side is installed;Precast hollow longeron (14) is installed;Tie-rod steel plate box (37) is installed;In across prefabricated sunpender The installation of crossbeam (44) considers that camber back rest bottom installed height mark is constructed in across arch rib sunpender structural map;All pre- After crossbeam installation processed is in place, compares above-mentioned beam bottom installed height mark and re-start whole sunpender ropes length or the adjustment of Suo Li;
23) suspender tension anchors:Stretch-draw anchor is carried out to inside sunpender and outside sunpender respectively;Inside steel strand integral bundle, which squeezes, to be drawn The top stretching end (22) that rope sunpender (19) and outside steel strand integral bundle squeeze drag-line sunpender (20) passes through Hanger Anchor head bore (21) It is connect across steel pipe concrete arch rib (6) in, lower part fixed section (23) passes through boom end built-in fitting (24) and suspender crossbeam (44) it connects;
24) remaining all holders are removed, installation main span section prefabricated bridge (17) pours the cast-in-place floorings of main span section (16);
25) deck paving and anticollision barrier (55) are poured across balanced, symmetrical by full-bridge three, expansion joint is installed;
26) after the completion of full-bridge, all inside steel strand integral bundle extruding drag-line sunpender (19), the extruding of outside steel strand integral bundle is carried out and is drawn The Suo Li of rope sunpender (20) and flexible prestressing tie-rod (18) anchor cable is measured, and sunpender initial tensioning Suo Li combines construction middle cross beam design The analysis result of absolute altitude control is suitably adjusted, and actual measurement Suo Li and the design Suo Li errors of tie member tensioning Suo Li are not more than 8%, Otherwise corresponding tune rope is carried out.
CN201810636205.7A 2018-06-20 2018-06-20 CFST Arch Bridge and construction method Pending CN108660903A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810636205.7A CN108660903A (en) 2018-06-20 2018-06-20 CFST Arch Bridge and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810636205.7A CN108660903A (en) 2018-06-20 2018-06-20 CFST Arch Bridge and construction method

Publications (1)

Publication Number Publication Date
CN108660903A true CN108660903A (en) 2018-10-16

Family

ID=63772175

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810636205.7A Pending CN108660903A (en) 2018-06-20 2018-06-20 CFST Arch Bridge and construction method

Country Status (1)

Country Link
CN (1) CN108660903A (en)

Cited By (44)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109137747A (en) * 2018-10-22 2019-01-04 中铁大桥局集团有限公司 A kind of flexible suspension for long-span arch bridge main girder construction
CN109295859A (en) * 2018-10-18 2019-02-01 柳州欧维姆机械股份有限公司 A kind of front fulcrum hangs the tensioning equipment and its stretch-draw construction method of blue construction
CN109469498A (en) * 2018-12-29 2019-03-15 北京京水建设集团有限公司 A kind of water-conveyance tunnel narrow space lined steel pipe mounting structure and its construction method
CN109489883A (en) * 2018-11-22 2019-03-19 长安大学 Big-size model test low-pylon cable-stayed bridge anchor-hold and cable tension test device
CN109898400A (en) * 2019-04-09 2019-06-18 江苏交通工程咨询监理有限公司 The large-span arch bridge of hyperboloid of one sheet shape variable-section steel pipe Concrete Truss arch rib
CN109914260A (en) * 2019-04-09 2019-06-21 中铁十八局集团第二工程有限公司 Four, double ribs encircle vaulted beam method without steel truss is twisted
CN110130202A (en) * 2019-04-30 2019-08-16 饶诗维 The flexible system railroad bridge vertically bent and its construction method are stabilized using arch rib
CN110184917A (en) * 2019-07-02 2019-08-30 中国十七冶集团有限公司 A kind of board plug type CFST Arch Bridge hoist cable and its anchor and construction method of installation
CN110295548A (en) * 2019-08-13 2019-10-01 中交第三航务工程局有限公司 The makeshift device of mechanical balance is maintained under the bridge construction technique of fitting the arch first then fitting the girder
CN110700071A (en) * 2019-11-16 2020-01-17 福州大学 Prefabricated assembled UHPC plate type arch bridge and construction method thereof
CN110777635A (en) * 2019-10-31 2020-02-11 中交路桥华南工程有限公司 Side arch rib construction method and side arch rib
CN110863431A (en) * 2019-11-22 2020-03-06 中国十七冶集团有限公司 Method for reinforcing steel guide cable pipe of suspension bridge suspender and improving installation precision
CN110886237A (en) * 2019-12-25 2020-03-17 中交路桥华南工程有限公司 Arch bridge construction method
CN110904811A (en) * 2019-12-23 2020-03-24 李三红 Stabilizing device for large-span concrete-filled steel tube arch bridge
CN110904854A (en) * 2019-12-25 2020-03-24 中交路桥华南工程有限公司 Arch bridge construction method adapting to removal progress
CN110965454A (en) * 2019-12-27 2020-04-07 上海绿地建设(集团)有限公司 Steel arch bridge structure and construction process thereof
CN111155412A (en) * 2020-03-13 2020-05-15 江西省交通设计研究院有限责任公司 Large swing angle steel pipe concrete arch bridge suspension cable system
CN111455870A (en) * 2020-05-19 2020-07-28 中交路桥建设有限公司 Full-width single-side combined swivel structure of steel box arch bridge and construction method
CN111485480A (en) * 2020-04-14 2020-08-04 中国铁路设计集团有限公司 Steel box stack arch for multi-line operation
CN111608087A (en) * 2020-06-04 2020-09-01 广西路桥工程集团有限公司 Method for accurately installing and positioning first-segment arch rib of steel pipe arch rib
CN111794119A (en) * 2020-07-31 2020-10-20 中铁大桥局上海工程有限公司 Temporary support system and hoisting method for basket type steel box tied arch
CN111851252A (en) * 2020-08-10 2020-10-30 中交路桥建设有限公司 Steel-concrete combined arch bridge crossing karst cave in tunnel and construction method thereof
CN111877121A (en) * 2020-07-21 2020-11-03 詹刚毅 Novel tied arch bridge structure and auxiliary tied bar arrangement method
CN111945549A (en) * 2020-08-26 2020-11-17 李�浩 Arch bridge arch foot structure
CN112144424A (en) * 2020-10-29 2020-12-29 魏家乐 Construction method for removing arch ribs of steel pipe concrete arch bridge with dumbbell-shaped cross section
CN112176868A (en) * 2020-09-04 2021-01-05 中铁大桥局第七工程有限公司 Positioning method of welded lower chord for erecting main truss
CN112227216A (en) * 2020-10-30 2021-01-15 中铁大桥勘测设计院集团有限公司 Triangular area cable buckling and sling combined construction method for steel diagonal bracing continuous rigid frame bridge
CN112779852A (en) * 2021-03-19 2021-05-11 上海市城市建设设计研究总院(集团)有限公司 Hollow continuous beam bridge V-shaped stay segment and construction method adapting to soft soil foundation area
CN113062199A (en) * 2021-04-10 2021-07-02 中铁广州工程局集团有限公司 Construction method for anti-corrosion concrete outer cladding layer of wading section of arched beam
CN113481818A (en) * 2021-08-23 2021-10-08 中铁二院工程集团有限责任公司 Through-type arch bridge suitable for ultra-high speed railway
CN113585038A (en) * 2021-06-24 2021-11-02 上海市政工程设计研究总院(集团)有限公司 Single-arch rib two-hinged arch bridge
CN113668358A (en) * 2021-08-19 2021-11-19 中铁第四勘察设计院集团有限公司 Core plate type steel-concrete combined arch rib structure and construction method and application thereof
CN113789712A (en) * 2021-09-17 2021-12-14 上海建工一建集团有限公司 Longitudinal beam and arch rib forming control method of steel arch bridge
CN114108445A (en) * 2021-09-17 2022-03-01 上海建工一建集团有限公司 Longitudinal beam and arch rib forming control device of steel arch bridge
CN114214917A (en) * 2021-12-29 2022-03-22 德州市公路工程总公司 Steel pipe concrete tied arch bridge and construction method
CN114263095A (en) * 2022-01-11 2022-04-01 山东省交通规划设计院集团有限公司 Through-type crossed tie bar multi-span continuous concrete filled steel tube basket arch bridge and construction method
CN114457668A (en) * 2022-03-30 2022-05-10 中铁上海工程局集团有限公司 Large-span spatial special-shaped arch rib flying-swallow type basket steel box arch bridge and rapid construction method
CN114575236A (en) * 2022-03-09 2022-06-03 中铁大桥勘测设计院集团有限公司 Bridge structure based on pavement is arranged around tower
CN114673102A (en) * 2022-03-31 2022-06-28 中铁二十二局集团第三工程有限公司 Steel pipe arch rib dismounting device for tied arch bridge and construction method
CN114753235A (en) * 2022-05-18 2022-07-15 同济大学 Half flexible support system of half-through type arch bridge arched girder
CN114934425A (en) * 2022-05-25 2022-08-23 中国铁建股份有限公司 Pavement paving method based on pavement slab
CN115162139A (en) * 2022-07-21 2022-10-11 上海市政工程设计研究总院(集团)有限公司 Connecting structure of steel arch bridge arch foot steel-concrete combined section and construction method thereof
CN115787505A (en) * 2022-12-20 2023-03-14 中铁上海工程局集团第一工程有限公司 Construction method of lower arch rib of flying swallow type arch bridge
CN117127480A (en) * 2023-08-18 2023-11-28 哈尔滨工业大学 Large-span arch bridge capable of reducing creep shrinkage of concrete and construction method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04250267A (en) * 1991-01-23 1992-09-07 Shimizu Corp Concrete fill steel pipe arch bearing construction of structure
CN200943181Y (en) * 2006-07-28 2007-09-05 中铁工程设计咨询集团有限公司 Three span continuous rigid structure steel arched bridge
CN101177931A (en) * 2007-12-05 2008-05-14 中铁大桥局股份有限公司 Erection of gantry type small-cycle traction system on large-span suspension bridge main cable
CN104878766A (en) * 2015-05-28 2015-09-02 南京明辉建设有限公司 Long side slope protection concrete continuous rapid pouring and form-drawing system and construction method
CN208472543U (en) * 2018-06-20 2019-02-05 安徽省交通建设股份有限公司 CFST Arch Bridge

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04250267A (en) * 1991-01-23 1992-09-07 Shimizu Corp Concrete fill steel pipe arch bearing construction of structure
CN200943181Y (en) * 2006-07-28 2007-09-05 中铁工程设计咨询集团有限公司 Three span continuous rigid structure steel arched bridge
CN101177931A (en) * 2007-12-05 2008-05-14 中铁大桥局股份有限公司 Erection of gantry type small-cycle traction system on large-span suspension bridge main cable
CN104878766A (en) * 2015-05-28 2015-09-02 南京明辉建设有限公司 Long side slope protection concrete continuous rapid pouring and form-drawing system and construction method
CN208472543U (en) * 2018-06-20 2019-02-05 安徽省交通建设股份有限公司 CFST Arch Bridge

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
苏陵云: "连续梁-拱桥0#块支架钢绞线反支点与堆载组合预压施工技术", 《铁道建筑技术》, no. 1, pages 228 - 230 *
赵福利: "金盘大桥钢管混凝土拱桥施工控制研究", 《工程科技Ⅱ辑》, no. 1, pages 034 - 200 *

Cited By (67)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109295859A (en) * 2018-10-18 2019-02-01 柳州欧维姆机械股份有限公司 A kind of front fulcrum hangs the tensioning equipment and its stretch-draw construction method of blue construction
CN109295859B (en) * 2018-10-18 2023-12-19 柳州欧维姆机械股份有限公司 Tensioning device for front supporting point hanging construction and tensioning construction method thereof
CN109137747B (en) * 2018-10-22 2023-09-26 中铁大桥局集团有限公司 Elastic hanging bracket for large-span arch bridge girder construction
CN109137747A (en) * 2018-10-22 2019-01-04 中铁大桥局集团有限公司 A kind of flexible suspension for long-span arch bridge main girder construction
CN109489883A (en) * 2018-11-22 2019-03-19 长安大学 Big-size model test low-pylon cable-stayed bridge anchor-hold and cable tension test device
CN109489883B (en) * 2018-11-22 2020-10-13 长安大学 Low tower cable-stayed bridge cable anchoring and cable force testing device for large-size model test
CN109469498B (en) * 2018-12-29 2024-04-02 北京京水建设集团有限公司 Mounting structure of lining steel pipe in narrow space of water delivery tunnel and construction method of mounting structure
CN109469498A (en) * 2018-12-29 2019-03-15 北京京水建设集团有限公司 A kind of water-conveyance tunnel narrow space lined steel pipe mounting structure and its construction method
CN109914260A (en) * 2019-04-09 2019-06-21 中铁十八局集团第二工程有限公司 Four, double ribs encircle vaulted beam method without steel truss is twisted
CN109898400A (en) * 2019-04-09 2019-06-18 江苏交通工程咨询监理有限公司 The large-span arch bridge of hyperboloid of one sheet shape variable-section steel pipe Concrete Truss arch rib
CN110130202A (en) * 2019-04-30 2019-08-16 饶诗维 The flexible system railroad bridge vertically bent and its construction method are stabilized using arch rib
CN110130202B (en) * 2019-04-30 2024-02-09 饶诗维 Flexible system railway bridge adopting arch rib to stabilize vertical deflection and construction method thereof
CN110184917A (en) * 2019-07-02 2019-08-30 中国十七冶集团有限公司 A kind of board plug type CFST Arch Bridge hoist cable and its anchor and construction method of installation
CN110295548A (en) * 2019-08-13 2019-10-01 中交第三航务工程局有限公司 The makeshift device of mechanical balance is maintained under the bridge construction technique of fitting the arch first then fitting the girder
CN110295548B (en) * 2019-08-13 2024-02-20 中交第三航务工程局有限公司 Temporary device for maintaining mechanical balance in bridge construction process of arch-before-beam
CN110777635A (en) * 2019-10-31 2020-02-11 中交路桥华南工程有限公司 Side arch rib construction method and side arch rib
CN110700071A (en) * 2019-11-16 2020-01-17 福州大学 Prefabricated assembled UHPC plate type arch bridge and construction method thereof
CN110700071B (en) * 2019-11-16 2024-06-04 福州大学 Prefabricated assembled UHPC plate type arch bridge and construction method thereof
CN110863431A (en) * 2019-11-22 2020-03-06 中国十七冶集团有限公司 Method for reinforcing steel guide cable pipe of suspension bridge suspender and improving installation precision
CN110904811A (en) * 2019-12-23 2020-03-24 李三红 Stabilizing device for large-span concrete-filled steel tube arch bridge
CN110904811B (en) * 2019-12-23 2020-11-27 徐州融创达电子科技有限公司 Stabilizing device for large-span concrete-filled steel tube arch bridge
CN110886237B (en) * 2019-12-25 2021-02-12 中交路桥华南工程有限公司 Arch bridge construction method
CN110904854A (en) * 2019-12-25 2020-03-24 中交路桥华南工程有限公司 Arch bridge construction method adapting to removal progress
CN110904854B (en) * 2019-12-25 2021-06-04 中交路桥华南工程有限公司 Arch bridge construction method adapting to removal progress
CN110886237A (en) * 2019-12-25 2020-03-17 中交路桥华南工程有限公司 Arch bridge construction method
CN110965454B (en) * 2019-12-27 2024-09-03 上海绿地建设(集团)有限公司 Steel arch bridge structure and construction process thereof
CN110965454A (en) * 2019-12-27 2020-04-07 上海绿地建设(集团)有限公司 Steel arch bridge structure and construction process thereof
CN111155412A (en) * 2020-03-13 2020-05-15 江西省交通设计研究院有限责任公司 Large swing angle steel pipe concrete arch bridge suspension cable system
CN111485480A (en) * 2020-04-14 2020-08-04 中国铁路设计集团有限公司 Steel box stack arch for multi-line operation
CN111455870A (en) * 2020-05-19 2020-07-28 中交路桥建设有限公司 Full-width single-side combined swivel structure of steel box arch bridge and construction method
CN111608087A (en) * 2020-06-04 2020-09-01 广西路桥工程集团有限公司 Method for accurately installing and positioning first-segment arch rib of steel pipe arch rib
CN111877121A (en) * 2020-07-21 2020-11-03 詹刚毅 Novel tied arch bridge structure and auxiliary tied bar arrangement method
CN111794119B (en) * 2020-07-31 2024-06-11 中铁大桥局上海工程有限公司 Temporary supporting system and hoisting method for basket type steel box tie bar arch
CN111794119A (en) * 2020-07-31 2020-10-20 中铁大桥局上海工程有限公司 Temporary support system and hoisting method for basket type steel box tied arch
CN111851252A (en) * 2020-08-10 2020-10-30 中交路桥建设有限公司 Steel-concrete combined arch bridge crossing karst cave in tunnel and construction method thereof
CN111945549A (en) * 2020-08-26 2020-11-17 李�浩 Arch bridge arch foot structure
CN112176868A (en) * 2020-09-04 2021-01-05 中铁大桥局第七工程有限公司 Positioning method of welded lower chord for erecting main truss
CN112144424A (en) * 2020-10-29 2020-12-29 魏家乐 Construction method for removing arch ribs of steel pipe concrete arch bridge with dumbbell-shaped cross section
CN112144424B (en) * 2020-10-29 2022-05-17 魏家乐 Construction method for removing arch ribs of steel pipe concrete arch bridge with dumbbell-shaped cross section
CN112227216A (en) * 2020-10-30 2021-01-15 中铁大桥勘测设计院集团有限公司 Triangular area cable buckling and sling combined construction method for steel diagonal bracing continuous rigid frame bridge
CN112779852A (en) * 2021-03-19 2021-05-11 上海市城市建设设计研究总院(集团)有限公司 Hollow continuous beam bridge V-shaped stay segment and construction method adapting to soft soil foundation area
CN112779852B (en) * 2021-03-19 2023-02-03 上海市城市建设设计研究总院(集团)有限公司 Hollow continuous beam bridge V-shaped stay segment and construction method adapting to soft soil foundation area
CN113062199A (en) * 2021-04-10 2021-07-02 中铁广州工程局集团有限公司 Construction method for anti-corrosion concrete outer cladding layer of wading section of arched beam
CN113062199B (en) * 2021-04-10 2022-08-16 中铁广州工程局集团有限公司 Construction method for anti-corrosion concrete outer cladding layer of wading section of arched beam
CN113585038A (en) * 2021-06-24 2021-11-02 上海市政工程设计研究总院(集团)有限公司 Single-arch rib two-hinged arch bridge
CN113668358A (en) * 2021-08-19 2021-11-19 中铁第四勘察设计院集团有限公司 Core plate type steel-concrete combined arch rib structure and construction method and application thereof
CN113668358B (en) * 2021-08-19 2023-02-28 中铁第四勘察设计院集团有限公司 Core plate type steel-concrete combined arch rib structure and construction method and application thereof
CN113481818A (en) * 2021-08-23 2021-10-08 中铁二院工程集团有限责任公司 Through-type arch bridge suitable for ultra-high speed railway
CN113481818B (en) * 2021-08-23 2023-01-20 中铁二院工程集团有限责任公司 Through-type arch bridge suitable for ultra-high speed railway
CN113789712B (en) * 2021-09-17 2023-10-13 上海建工一建集团有限公司 Longitudinal beam and arch rib forming control method of steel arch bridge
CN113789712A (en) * 2021-09-17 2021-12-14 上海建工一建集团有限公司 Longitudinal beam and arch rib forming control method of steel arch bridge
CN114108445A (en) * 2021-09-17 2022-03-01 上海建工一建集团有限公司 Longitudinal beam and arch rib forming control device of steel arch bridge
CN114214917A (en) * 2021-12-29 2022-03-22 德州市公路工程总公司 Steel pipe concrete tied arch bridge and construction method
CN114263095B (en) * 2022-01-11 2023-10-17 山东省交通规划设计院集团有限公司 Multi-span continuous steel tube concrete basket arch bridge with underpinning type cross tie bars and construction method
CN114263095A (en) * 2022-01-11 2022-04-01 山东省交通规划设计院集团有限公司 Through-type crossed tie bar multi-span continuous concrete filled steel tube basket arch bridge and construction method
CN114575236A (en) * 2022-03-09 2022-06-03 中铁大桥勘测设计院集团有限公司 Bridge structure based on pavement is arranged around tower
CN114575236B (en) * 2022-03-09 2023-12-29 中铁大桥勘测设计院集团有限公司 Bridge structure based on pavement is around tower arrangement
WO2023184679A1 (en) * 2022-03-30 2023-10-05 中铁上海工程局集团有限公司 Large-span space special-shaped arch rib flying-swallow type basket steel box arch bridge and rapid construction method
CN114457668A (en) * 2022-03-30 2022-05-10 中铁上海工程局集团有限公司 Large-span spatial special-shaped arch rib flying-swallow type basket steel box arch bridge and rapid construction method
CN114673102A (en) * 2022-03-31 2022-06-28 中铁二十二局集团第三工程有限公司 Steel pipe arch rib dismounting device for tied arch bridge and construction method
CN114753235A (en) * 2022-05-18 2022-07-15 同济大学 Half flexible support system of half-through type arch bridge arched girder
CN114934425B (en) * 2022-05-25 2024-04-19 中国铁建股份有限公司 Road surface paving method based on road surface plate
CN114934425A (en) * 2022-05-25 2022-08-23 中国铁建股份有限公司 Pavement paving method based on pavement slab
CN115162139A (en) * 2022-07-21 2022-10-11 上海市政工程设计研究总院(集团)有限公司 Connecting structure of steel arch bridge arch foot steel-concrete combined section and construction method thereof
CN115787505A (en) * 2022-12-20 2023-03-14 中铁上海工程局集团第一工程有限公司 Construction method of lower arch rib of flying swallow type arch bridge
CN115787505B (en) * 2022-12-20 2023-12-12 中铁上海工程局集团有限公司 Construction method of lower arch rib of delphinium arch bridge
CN117127480A (en) * 2023-08-18 2023-11-28 哈尔滨工业大学 Large-span arch bridge capable of reducing creep shrinkage of concrete and construction method thereof

Similar Documents

Publication Publication Date Title
CN108660903A (en) CFST Arch Bridge and construction method
CN104562936B (en) A kind of tie-rod steel pipe arch bridge construction method continuously
CN208472543U (en) CFST Arch Bridge
CN106758841B (en) A kind of whole construction process of the double rope face low-pylon cable-stayed bridges of double tower
CN106702910A (en) Main girder construction process for extradosed cable-stayed bridge with double towers and double cable planes
CN108265885B (en) Construction method of high-large non-orthogonal large-inclination-angle special-shaped concrete inclined column
CN107905114B (en) A kind of construction method of large span Successive interference cancellation
CN211815489U (en) Super large span flying swallow type concrete filled steel tube arch bridge with self-anchoring suspension cable system
CN104452597B (en) Pier prestressed cap beam with extra length Construction Supporting System in water
CN110453613B (en) Full-section one-step suspension casting construction method for large-span beam bridge box girder
KR102321338B1 (en) Segmental precast concrete ventilating slabs of structure and construction way in tunnel for rapid installation
CN105568870B (en) For the triangle hanging basket method cantilever device and its construction method of cross-line bridge construction
CN108999085A (en) Sea area construction of cast-in-situ box-beam bracket and sea area construction of cast-in-situ box-beam method
CN113638304B (en) Concrete beam type bridge hidden cover beam structure system and construction method thereof
CN111926715B (en) Installation method of steel box girder bridge
CN111074795A (en) Construction method for pouring continuous beam in cantilever mode spanning existing railway
CN109577206B (en) Hollow high pier formwork system and construction method
CN112554059A (en) Viaduct ground-crossing parallel bridge pier full combined support and construction method thereof
CN206815376U (en) Open cut type is without post Metro Station Structure across arch greatly
CN205242278U (en) A triangle string basket method is hanged and is watered device for deck bridge construction
CN110424246A (en) A kind of Long span bowstring arch bridge access bridge jack-up system and jack-up construction method
CN107724252B (en) A kind of continuous box girder hanging basket cantilever method construction
CN207452663U (en) A kind of base-supporting steel pipe concrete tie-rod arch structure
CN219450481U (en) Cantilever arch ring and stiffness framework combined structure based on large-span arch bridge
CN110184915A (en) The cast-in-place king-post of cable-stayed bridge and its construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination