CN101177931A - Erection of gantry type small-cycle traction system on large-span suspension bridge main cable - Google Patents

Erection of gantry type small-cycle traction system on large-span suspension bridge main cable Download PDF

Info

Publication number
CN101177931A
CN101177931A CNA2007101686066A CN200710168606A CN101177931A CN 101177931 A CN101177931 A CN 101177931A CN A2007101686066 A CNA2007101686066 A CN A2007101686066A CN 200710168606 A CN200710168606 A CN 200710168606A CN 101177931 A CN101177931 A CN 101177931A
Authority
CN
China
Prior art keywords
cable
rope
anchorage
traction
main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2007101686066A
Other languages
Chinese (zh)
Other versions
CN101177931B (en
Inventor
高庚元
陈敏杰
李军堂
方乃平
袁丹诚
毛伟琦
许伟良
张光华
田继开
李希平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Engineering Group Co Ltd MBEC
Original Assignee
China Railway Major Bridge Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Engineering Co Ltd filed Critical China Railway Major Bridge Engineering Co Ltd
Priority to CN2007101686066A priority Critical patent/CN101177931B/en
Publication of CN101177931A publication Critical patent/CN101177931A/en
Application granted granted Critical
Publication of CN101177931B publication Critical patent/CN101177931B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relates to a small-circulation traction system of a door frame type for main cable erection of a suspension bridge with large span, pertaining to the construction technical field of the upper structure of a bridge. A cable storing area is arrange at the back of an anchorage A, and a 60-ton gantry crane and a cable stent are positioned in the cable storing area; a traction rope gyroscope wheel is arranged at the back of the anchorage A; a 25-ton main traction winch and a balance stent are arranged at the side of an anchorage B; a traction cable is connected with a pulling device at the place of the anchorage A and bypasses a drum of the winch at the place of the anchorage B, and the traction cable is plugged after passing the balance stent and each corner block, so as to form an annular endless cable; through traction driving and a door frame tackle, the guide-wheel group moves in horizontal and circling, so as to form a separate small circulation traction system; the small circulation has the advantages of large power, large traction force, high construction efficiency and low cost.

Description

Erection of gantry type small-cycle traction system on large-span suspension bridge main cable
Technical field
The present invention relates to main rope of suspension bridge erection construction method, belong to suspension bridge superstructure technical field of construction.
The main push-towing rope erection of gantry type small-cycle traction system is to utilize two reel friction-type hoist engine shuttling movements to realize that main push-towing rope sets up.Gantry type small-cycle traction system is suitable for setting up of various span main rope of suspension bridge, especially puts rope at main push-towing rope and has obvious superiority aspect the synchronism with drawing.
Background technology
Main push-towing rope is suspension bridge " lifeline ", and main push-towing rope sets up the construction quality that quality is directly connected to suspension bridge.
Usually large-span suspension bridge main cable sets up and adopts the reciprocating type trailer system of two-wire, but the main and auxiliary rack winch of this trailer system is arranged in the two sides of bridge main span respectively, because signal or other accidental causes, occur the phenomenon of main and auxiliary hoist engine " to drawing " easily, influence main push-towing rope and set up speed and quality.
Summary of the invention
The objective of the invention is provides a kind of reliable, continuous main push-towing rope hitch frame equipment, method at above the deficiencies in the prior art.The present invention relates to the method that a kind of main rope of suspension bridge traction is set up, be characterized in utilizing a hoist engine (11) as power, by an electrodeless circulation drag cable (10) and commentaries on classics, directive wheel, realize the drag cable shuttling movement, reach the purpose that main push-towing rope is set up in traction.This trailer system is provided with balance weight (12), can adjust the sag of drag cable (10) automatically, and the whole distraction procedure of main push-towing rope is more smooth-going, the raising strand is set up quality play good effect.
This trailer system mainly by: deposit cable system, supporting is transported facilities such as system, power circulation system, tensioning debugging mechanism and formed.
1, deposit cable system: deposit, put the rope district establish 60t straddle truck (13) and band brake torque motor put rope device (14) each one, deposit cable tray (24) quantity can reach 60 the dish.
2, system is transported in supporting: the A anchorage is put the rope district and is established the length glue cylinder, and the main push-towing rope outside in cat road is gone up every interval 8m and established supporting directive wheel (15) one.Big and main cable saddle, the cable saddle position of loosing suitably increase supporting directive wheel quantity or with the wheels that lead in the discrepancy in elevation.
3, power circulation system
3.1 drag cable (10): adopt Φ 36mm not rotate independent wire strand, the about 4800m of total length customizes in professional production producer.In the drag cable two ends, an end connects by pulling device (7), and an end directly docks, and forms electrodeless rope circuit.
3.2 drag cable turns to: A anchorage (11) is located the level of establishing and is turned to, and B anchorage (14) is established level and vertically turned to, and cat road door frame (38), AB king-tower (12) (13), cable saddle (23) buttress that looses are established guide wheel group.
3.3 pull device (7): pulling device is the facility that drag cable and main cable strand link, and sets up with the traction that realizes strand.
3.4 rack winch: open the two reels of the grooving sassafras formula rack winch that rubs, using frequency converter to set volume after a certain speed, to put constant airspeed, the rope stretching position of wire rope constant, and frequency converter can be realized the infinitely variable speeds in 5~30m/min scope; Form TT﹠C system by being installed in test suite such as pulling force sensor on the fixed pulley and amplifier and computer, by computer dynamic collection and the real-time operation total length of the tractive force of each section point and velocity variations situation, wire rope in the distraction procedure, preserve at any time and print.Can set pulling force and length velocity relation according to concrete operating mode, carry out the semi-automation under the manual intervention.
Important technological parameters:
Work effective traction: 250kN
Hauling speed: 5~30m/min infinitely variable speeds
Receive rope roll and hold rope amount: 2500m
Reel: two reels, friction-type
Drive: hoist engine is wanted can be just, backward haulage
Brakes: electronic or hydraulic pressure declutches automatically
The kind of drive: machinery or hydraulic pressure
Motor :~3 * 380V, FC=100%, 110kW, the starting of Wound-rotor type series resistance
Control mode: drum controller is a central controller, the rotor resistance starting speed governing
4, tensioning debugging mechanism: the circulation trailer system is subjected to that variations in temperature, drag cable elastic deformation are lax, the influence of the factors such as variation of hoist engine backward pull, erected state, must establish tensioning and adjust facility.Adopt the mode of trim weight.
Description of drawings
Fig. 1 a, Fig. 1 b: gantry type partial circulating general arrangement front view, vertical view
Fig. 2: the A anchorage is put rope district facade arrangement diagram
Fig. 3 a, Fig. 3 b:B anchorage towing area and tensioning debugging arrangement of mechanism vertical view, front view
Fig. 4: cat head arrangement diagram
Fig. 5: cat road door frame and door frame guide wheel arrangement diagram
Among the figure: 1-is put the rope district, the 2-towing area, and 3-door frame support cable, the 4-cat head turns to, 5-cat road door frame and guide wheel, the 6-main cable strand, 7-pulls device, 8-cat road, 9-strand idler pulley, 10-drag cable, 11-A anchorage, 12-A king-tower, the 13-B king-tower, 14-B anchorage, 15-25t hoist engine, the 16-balance weight, 17-60t single track gantry crane, 18-is put the rope device, the 19-roller, 20-drag cable rotary support and pulley, 21-8t hoist engine, 22-buttress door frame guide wheel group, the 23-cable saddle that looses, 24-rope dish, 25-cat road track cable, 26-buttress door frame, 27-balance weight support, the 28-angle pulley, 29-door frame support cable saddle, 30-cat head door frame, the 31-guide wheel group, 32-manrope saddle, 33-cat road track cable saddle, the 34-manrope, 35-pull device, 36-main cable saddle, the 37-reaction frame, 38-cat road door frame, 39-cat road door frame guide wheel.
The specific embodiment
Overall construction scheme of architecture: the employing PPWS worker method of setting up of main push-towing rope, be about to rope dish (24) and be installed in putting on the rope support behind the A anchorage, anchor head is drawn from Suo Panshang, anchor head is fixed on by the anchor head frame pulls that device (7) is gone up and be connected with drag cable (10), drive circulation drag cable (10) positive movement by the 25t rack winch (15) that is arranged in B anchorage (14) downstream, strand is dilatory towards B anchorage (14) along the cat road from A anchorage (11), draw a branch ofly, strand falls within on the supporting wheel of arranging along the cat road at every turn.In time correct the reversing of strand, crooked and loose distortion etc. in the distraction procedure.Strand is dilatory put in place after, the two ends anchor head is temporarily fixed at the anchor pole place respectively, these steel wires are just turned round to parastate, lift by crane traversing at each saddle place to strand carry out shaping, strand is made in order, puts into the saddle precalculated position.The two ends anchor head is introduced to anchor rack anchoring position by introducing device.In the locking of saddle place, anchor span is adjusted by adjusting the strand pulling force after the sag adjustment.After single strand sets up and finishes, drive the counter motion of circulation drag cable, will pull device and be back to the A anchorage, carry out setting up of next root strand by the B anchorage by rack winch.
The overall Construction Arrangement of main push-towing rope erection of gantry type small-cycle traction system: behind the A anchorage, establish and deposit the rope district, 60 tons of gantry cranes (17) are installed and are put the rope support; Behind the A anchorage, establish drag cable rotary support and pulley (20); Establish one 25 tons rack winches (15) and balance weight support (27) in B anchorage downstream.Drag cable (10) is made up of 2 Φ 36 wire rope, connect by pulling device (7) at A anchorage (11), walk around the hoist engine cylinder at the B anchor, by balance weight support (27) with respectively turn to, peg graft behind the leading block, form the ring-type endless cable, do the horizontal cyclic motion by traction drive and door frame coaster, guide wheel group, form independently small-cycle traction system, to satisfy the needs that set up main push-towing rope.

Claims (2)

1. erection of gantry type small-cycle traction system on large-span suspension bridge main cable is characterized in that:
Behind the A anchorage, establish and deposit the rope district, gantry crane is installed and is put the rope support, establish the drag cable gyroscope wheel behind the A anchorage, establish a main rack winch and balance weight support in B anchorage side, drag cable is made up of 2 Φ 36 wire rope, connect by pulling device at the A anchor, walk around the hoist engine cylinder at the B anchor,, form the ring-type endless cable by pegging graft behind balance weight support and each corner block, do the horizontal cyclic motion by traction drive and door frame coaster, guide wheel group, form independently small-cycle traction system.
2. small-cycle traction system according to claim 1, it is characterized in that: adjustablely decide the moment of torsion damping and put cable system, during the traction main push-towing rope, the main push-towing rope anchor head links to each other with pull rope by pulling device, the main rope dish is bearing in to be put on the rope support, decide the moment of torsion damping system and regulate the speeds match put Suo Sudu and main rack winch by adjustable, make and put rope speed in controlled range at any time.
CN2007101686066A 2007-12-05 2007-12-05 Erection of gantry type small-cycle traction system on large-span suspension bridge main cable Active CN101177931B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2007101686066A CN101177931B (en) 2007-12-05 2007-12-05 Erection of gantry type small-cycle traction system on large-span suspension bridge main cable

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2007101686066A CN101177931B (en) 2007-12-05 2007-12-05 Erection of gantry type small-cycle traction system on large-span suspension bridge main cable

Publications (2)

Publication Number Publication Date
CN101177931A true CN101177931A (en) 2008-05-14
CN101177931B CN101177931B (en) 2011-08-10

Family

ID=39404333

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2007101686066A Active CN101177931B (en) 2007-12-05 2007-12-05 Erection of gantry type small-cycle traction system on large-span suspension bridge main cable

Country Status (1)

Country Link
CN (1) CN101177931B (en)

Cited By (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101418542A (en) * 2008-11-21 2009-04-29 上海市政工程设计研究总院 Cable system construction method of spatial self-anchored rope-suspension bridge
CN102392418A (en) * 2011-12-01 2012-03-28 中交二公局第二工程有限公司 Span-division erection construction method of construction catwalk of multi-tower suspension bridge
CN101608426B (en) * 2008-06-20 2012-04-04 上海浦江缆索股份有限公司 Preforming traction mechanism of unit strand imitating main cable linearity of suspension bridge
CN102839605A (en) * 2012-09-25 2012-12-26 长沙理工大学 Sag control method for small-sag datum strand
CN104210977A (en) * 2014-08-07 2014-12-17 中交二公局第二工程有限公司 Modularized distribution type winch integration control system
CN104652276A (en) * 2015-01-12 2015-05-27 中交第二公路工程局有限公司 Suspension bridge main cable PPWS construction cable strand in-situ erecting method
CN105603879A (en) * 2015-12-29 2016-05-25 四川石油天然气建设工程有限责任公司 Construction technology for large-diameter pipeline crossing construction catwalk
CN107119572A (en) * 2017-06-22 2017-09-01 四川路桥华东建设有限责任公司 A kind of main rope of suspension bridge strand second traction enters the construction method of tunnel anchorage
CN107201724A (en) * 2016-03-19 2017-09-26 湖北建科结构加固有限责任公司 A kind of suspension bridge is without cat pipeline construction method
CN108374322A (en) * 2018-04-04 2018-08-07 中铁第四勘察设计院集团有限公司 A kind of asymmetric main push-towing rope railway Suspension bridge structure
CN108589539A (en) * 2018-04-27 2018-09-28 广西路桥工程集团有限公司 A kind of interim tie-rod is across installation method
CN108643057A (en) * 2018-06-20 2018-10-12 大连理工大学 A kind of interim anchor cable in girder of suspension bridge erection process balances construction method
CN108660903A (en) * 2018-06-20 2018-10-16 安徽省交通建设股份有限公司 CFST Arch Bridge and construction method
CN108729362A (en) * 2018-04-20 2018-11-02 武汉中交试验检测加固工程有限责任公司 A kind of Long span pipe bridge facade circulating picture-changing cable system and its application method
CN109898428A (en) * 2019-04-23 2019-06-18 四川公路桥梁建设集团有限公司 Overlength high inclination-angle tunnel anchorage main push-towing rope trailer system converts regulating device
CN110468712A (en) * 2019-07-30 2019-11-19 中铁大桥局集团第六工程有限公司 Main rope of suspension bridge trailer system and method
CN110510526A (en) * 2019-08-19 2019-11-29 石家庄铁道大学 A kind of cable conveyer for Traffic Emergency Safeguards
CN110939069A (en) * 2019-12-11 2020-03-31 湖北省路桥集团有限公司 Construction method of suspension bridge catwalk
CN112176871A (en) * 2020-09-15 2021-01-05 中交二公局第二工程有限公司 Method for erecting suspension bridge main cable with tunnel type anchors at two sides
CN112176870A (en) * 2020-09-15 2021-01-05 中交二公局第二工程有限公司 Method for installing main cable of suspension bridge with tunnel type anchorage at two banks
CN112195784A (en) * 2020-09-15 2021-01-08 中交第二公路工程局有限公司 Catwalk sag adjustment system and adjustment method for erecting main cable by adopting air spinning method
CN112209254A (en) * 2020-10-20 2021-01-12 广西路桥工程集团有限公司 Method for erecting main cable of cable crane
CN113152281A (en) * 2021-03-15 2021-07-23 中交二公局第二工程有限公司 Main cable structure of suspension bridge cable crane
CN113605230A (en) * 2021-07-12 2021-11-05 中交二公局第二工程有限公司 Main cable traction system and method suitable for suspension bridge two-bank tunnel anchor
CN113774806A (en) * 2021-09-29 2021-12-10 中铁大桥局集团有限公司 System and method for traction control of main cable strand of suspension bridge

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1122742C (en) * 1998-11-09 2003-10-01 柳州欧维姆建筑机械有限公司 Method and system for suspending oblique guys of cable stayed bridge
CN100478521C (en) * 2006-03-06 2009-04-15 中铁四局集团第二工程有限公司 Overline strand suspension bridge construction by drawing anchor
CN2900616Y (en) * 2006-06-01 2007-05-16 路桥集团第二公路工程局 Double line reciprocating type tracting device

Cited By (36)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101608426B (en) * 2008-06-20 2012-04-04 上海浦江缆索股份有限公司 Preforming traction mechanism of unit strand imitating main cable linearity of suspension bridge
CN101418542A (en) * 2008-11-21 2009-04-29 上海市政工程设计研究总院 Cable system construction method of spatial self-anchored rope-suspension bridge
CN101418542B (en) * 2008-11-21 2013-12-25 上海市政工程设计研究总院 Cable system construction method of spatial self-anchored rope-suspension bridge
CN102392418A (en) * 2011-12-01 2012-03-28 中交二公局第二工程有限公司 Span-division erection construction method of construction catwalk of multi-tower suspension bridge
CN102839605A (en) * 2012-09-25 2012-12-26 长沙理工大学 Sag control method for small-sag datum strand
CN104210977A (en) * 2014-08-07 2014-12-17 中交二公局第二工程有限公司 Modularized distribution type winch integration control system
CN104652276A (en) * 2015-01-12 2015-05-27 中交第二公路工程局有限公司 Suspension bridge main cable PPWS construction cable strand in-situ erecting method
CN104652276B (en) * 2015-01-12 2016-09-14 中交第二公路工程局有限公司 A kind of main rope of suspension bridge PPWS construction strand erection method in situ
CN105603879A (en) * 2015-12-29 2016-05-25 四川石油天然气建设工程有限责任公司 Construction technology for large-diameter pipeline crossing construction catwalk
CN107201724A (en) * 2016-03-19 2017-09-26 湖北建科结构加固有限责任公司 A kind of suspension bridge is without cat pipeline construction method
CN107119572B (en) * 2017-06-22 2018-12-18 四川路桥华东建设有限责任公司 A kind of main rope of suspension bridge strand second traction enters the construction method of tunnel anchorage
CN107119572A (en) * 2017-06-22 2017-09-01 四川路桥华东建设有限责任公司 A kind of main rope of suspension bridge strand second traction enters the construction method of tunnel anchorage
CN108374322A (en) * 2018-04-04 2018-08-07 中铁第四勘察设计院集团有限公司 A kind of asymmetric main push-towing rope railway Suspension bridge structure
CN108729362A (en) * 2018-04-20 2018-11-02 武汉中交试验检测加固工程有限责任公司 A kind of Long span pipe bridge facade circulating picture-changing cable system and its application method
CN108729362B (en) * 2018-04-20 2020-05-12 武汉中交试验检测加固工程有限责任公司 Large-span pipe bridge vertical face circulating cable replacement system and use method thereof
CN108589539B (en) * 2018-04-27 2019-12-31 广西路桥工程集团有限公司 Crossing installation method for temporary tie bar
CN108589539A (en) * 2018-04-27 2018-09-28 广西路桥工程集团有限公司 A kind of interim tie-rod is across installation method
CN108643057A (en) * 2018-06-20 2018-10-12 大连理工大学 A kind of interim anchor cable in girder of suspension bridge erection process balances construction method
CN108660903A (en) * 2018-06-20 2018-10-16 安徽省交通建设股份有限公司 CFST Arch Bridge and construction method
CN109898428A (en) * 2019-04-23 2019-06-18 四川公路桥梁建设集团有限公司 Overlength high inclination-angle tunnel anchorage main push-towing rope trailer system converts regulating device
CN110468712A (en) * 2019-07-30 2019-11-19 中铁大桥局集团第六工程有限公司 Main rope of suspension bridge trailer system and method
CN110510526A (en) * 2019-08-19 2019-11-29 石家庄铁道大学 A kind of cable conveyer for Traffic Emergency Safeguards
CN110510526B (en) * 2019-08-19 2024-04-02 石家庄铁道大学 Cable conveyor for traffic emergency guarantee
CN110939069A (en) * 2019-12-11 2020-03-31 湖北省路桥集团有限公司 Construction method of suspension bridge catwalk
CN112176870B (en) * 2020-09-15 2022-04-15 中交二公局第二工程有限公司 Method for installing main cable of suspension bridge with tunnel type anchorage at two banks
CN112195784A (en) * 2020-09-15 2021-01-08 中交第二公路工程局有限公司 Catwalk sag adjustment system and adjustment method for erecting main cable by adopting air spinning method
CN112176870A (en) * 2020-09-15 2021-01-05 中交二公局第二工程有限公司 Method for installing main cable of suspension bridge with tunnel type anchorage at two banks
CN112176871B (en) * 2020-09-15 2022-04-15 中交二公局第二工程有限公司 Method for erecting suspension bridge main cable with tunnel type anchors at two sides
CN112195784B (en) * 2020-09-15 2022-06-17 中交第二公路工程局有限公司 Catwalk sag adjustment system and adjustment method for erecting main cable by adopting air spinning method
CN112176871A (en) * 2020-09-15 2021-01-05 中交二公局第二工程有限公司 Method for erecting suspension bridge main cable with tunnel type anchors at two sides
CN112209254A (en) * 2020-10-20 2021-01-12 广西路桥工程集团有限公司 Method for erecting main cable of cable crane
CN112209254B (en) * 2020-10-20 2022-07-12 广西路桥工程集团有限公司 Erection method of main cable of cable crane
CN113152281A (en) * 2021-03-15 2021-07-23 中交二公局第二工程有限公司 Main cable structure of suspension bridge cable crane
CN113605230A (en) * 2021-07-12 2021-11-05 中交二公局第二工程有限公司 Main cable traction system and method suitable for suspension bridge two-bank tunnel anchor
CN113774806A (en) * 2021-09-29 2021-12-10 中铁大桥局集团有限公司 System and method for traction control of main cable strand of suspension bridge
CN113774806B (en) * 2021-09-29 2023-10-20 中铁大桥局集团有限公司 Suspension bridge main cable strand traction control system and method

Also Published As

Publication number Publication date
CN101177931B (en) 2011-08-10

Similar Documents

Publication Publication Date Title
CN101177931B (en) Erection of gantry type small-cycle traction system on large-span suspension bridge main cable
CN106315349B (en) A kind of depth vertical is restricted winding hoisting steel wire rope tension automatic equalization device and method more
CN202214152U (en) Trolley walking traction mechanism of bridge crane
CN204897040U (en) Automatic car that receive and releases of optical cable
CN110459987B (en) Automatic wire tightening device and method for overhead line system construction
CN101525108B (en) Method and device for reducing over-high deflection in amplitude changing process of caterpillar-band crane arm support
CN103924529A (en) Rolling drag device and construction method thereof
CN106144896B (en) A kind of pull-type carriage walking mechanism
CN201148312Y (en) Double cable stride lifting system carriage
CN2900616Y (en) Double line reciprocating type tracting device
CN111837752A (en) Roll up greenhouse insulation system under exhibition with snow removing function
CN107344697A (en) Cable boom hoisting
CN202848930U (en) Multifunctional tower type crane
CN105003738B (en) Construction method for mounting large-diameter pipe by applying cableway in complex mountain terrain
CN206172399U (en) Device of belt is changed to sealing -tape machine
CN2630308Y (en) Bridge rope placing apparatus
CN209227392U (en) A kind of cable active release rope device
CN207002057U (en) A kind of cable crane overhead traveling crane trailer system
CN201942465U (en) Steel cable threading and winding system
CN202848808U (en) Backpack household elevator
CN201400539Y (en) Variable-length waist rope device for crawler crane
CN203486824U (en) Automatic distance-adjustment mechanism for coupling movable pulley block
CN110143525A (en) A kind of deck unit erection gantry for having wide-angle and swinging shifting and climbing capacity
CN101787677A (en) Method for erecting girder of suspension bridge by double-hoisting hydraulic NC (numerical control) cable crane
CN210404563U (en) Automatic wire tightening device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: GROUP CO., LTD., ZHONGTIE DAQIAO BUREAU

Free format text: FORMER OWNER: CHINA ZHONGTIE MAJOR BRIDGE ENGINEERING CO., LTD.

Effective date: 20150216

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 430074 WUHAN, HUBEI PROVINCE TO: 430050 WUHAN, HUBEI PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20150216

Address after: 430050 Hanyang Road, Hanyang District, Hubei, No. 38, No.

Patentee after: Group Co., Ltd., Zhongtie Daqiao Bureau

Address before: 430074 Hubei province Wuhan Dongxin East Lake New Technology Development Zone Road Business Street No. 6 building SBI

Patentee before: China Zhongtie Major Bridge Engineering Co., Ltd.