CN101177931B - Erection of gantry type small-cycle traction system on large-span suspension bridge main cable - Google Patents

Erection of gantry type small-cycle traction system on large-span suspension bridge main cable Download PDF

Info

Publication number
CN101177931B
CN101177931B CN2007101686066A CN200710168606A CN101177931B CN 101177931 B CN101177931 B CN 101177931B CN 2007101686066 A CN2007101686066 A CN 2007101686066A CN 200710168606 A CN200710168606 A CN 200710168606A CN 101177931 B CN101177931 B CN 101177931B
Authority
CN
China
Prior art keywords
cable
traction
main
suspension bridge
anchorage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2007101686066A
Other languages
Chinese (zh)
Other versions
CN101177931A (en
Inventor
高庚元
陈敏杰
李军堂
方乃平
袁丹诚
毛伟琦
许伟良
张光华
田继开
李希平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Engineering Group Co Ltd MBEC
Original Assignee
China Railway Major Bridge Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Engineering Co Ltd filed Critical China Railway Major Bridge Engineering Co Ltd
Priority to CN2007101686066A priority Critical patent/CN101177931B/en
Publication of CN101177931A publication Critical patent/CN101177931A/en
Application granted granted Critical
Publication of CN101177931B publication Critical patent/CN101177931B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

大跨度悬索桥主缆架设门架式小循环牵引系统,属于桥梁上部结构施工技术领域。在A锚碇后设存索区,安装60吨龙门吊机和放索支架;在此锚碇后设牵引索回转轮;在B锚碇侧设一台25吨主牵引卷扬机和平衡重支架。牵引索在A锚碇通过拽拉器连接,在B锚碇绕过卷扬机滚筒,通过平衡重支架和各转向滑车后插接,形成环状无极索,通过牵引驱动和门架滑车、导轮组作水平循环运动,形成独立的小循环牵引系统。该小循环系统优点在于其功率大、牵引力大、施工效率高,成本低。

Figure 200710168606

The utility model relates to a gantry type small circulation traction system for a main cable erection of a large-span suspension bridge, which belongs to the technical field of bridge superstructure construction. Set up a cable storage area behind the anchorage A, and install a 60-ton gantry crane and a cable-laying bracket; set up a traction cable revolving wheel behind the anchorage; set up a 25-ton main traction hoist and a balance weight bracket on the side of the anchorage B. The traction cable is connected by a puller at Anchor Anchor, bypasses the hoist drum at B Anchor Anchor, and is inserted through the balance weight bracket and each steering block to form a ring-shaped endless cable. Make a horizontal circular motion to form an independent small circular traction system. The small circulation system has the advantages of high power, large traction force, high construction efficiency and low cost.

Figure 200710168606

Description

大跨度悬索桥主缆架设门架式小循环牵引系统Gantry-type Small Circulation Traction System for Main Cable Erection of Long-span Suspension Bridge

技术领域technical field

本发明涉及悬索桥主缆架设施工方法,属于悬索桥上部结构施工技术领域。The invention relates to a construction method for a main cable erection of a suspension bridge, and belongs to the technical field of construction of the upper structure of a suspension bridge.

主缆架设门架式小循环牵引系统是利用一台双卷筒摩擦式卷扬机循环运动来实现主缆架设。门架式小循环牵引系统适用各种跨度悬索桥主缆的架设,尤其在主缆放索与牵引同步性方面具有明显的优越性。The main cable erection gantry type small circulation traction system uses a double-drum friction hoist to realize the main cable erection through the circular motion. The gantry-type small circulation traction system is suitable for the erection of main cables of suspension bridges with various spans, and has obvious advantages especially in the synchronization of main cable laying and traction.

背景技术Background technique

主缆是悬索桥的“生命线”,主缆架设质量直接关系到悬索桥的建设质量。The main cable is the "lifeline" of the suspension bridge, and the erection quality of the main cable is directly related to the construction quality of the suspension bridge.

通常大跨度悬索桥主缆架设采用双线往复式牵引系统,但该牵引系统主、辅牵引卷扬机分别布置于桥梁主跨的两岸,由于信号或其他意外原因,容易出现主、辅卷扬机“对拉”的现象,影响主缆架设速度和质量。Usually, the main cables of long-span suspension bridges are erected using a double-wire reciprocating traction system, but the main and auxiliary traction winches of the traction system are arranged on both sides of the main span of the bridge. The phenomenon affects the speed and quality of main cable erection.

发明内容Contents of the invention

本发明的目的是针对以上现有技术的不足提供一种可靠的、连续的主缆牵引架设方法。本发明涉及一种悬索桥主缆牵引架设的方法,其特点是利用一台卷扬机(11)作为动力,通过一根无极循环牵引索(10)及转、导向轮,来实现牵引索循环运动,达到牵引架设主缆的目的。该牵引系统设置有平衡重(12),能自动调整牵引索(10)的垂度,主缆的整个牵引过程比较平顺,对提高索股架设质量起到很好的作用。The object of the present invention is to provide a reliable and continuous main cable traction and erection method for the above deficiencies in the prior art. The invention relates to a method for traction and erection of the main cable of a suspension bridge, which is characterized in that a hoist (11) is used as the power to realize the circular movement of the traction cable through a non-polar circulating traction cable (10) and rotating and guiding wheels, so as to achieve The purpose of pulling and erecting the main cable. The traction system is provided with a balance weight (12), which can automatically adjust the sag of the traction cable (10). The entire traction process of the main cable is relatively smooth, which plays a good role in improving the quality of cable strand erection.

本牵引系统主要由:存放索系统、支承运送系统、动力循环系统、张紧调试机构等设施组成。The traction system is mainly composed of: storage cable system, supporting transport system, power circulation system, tensioning and debugging mechanism and other facilities.

1、存放索系统:存、放索区设60t龙门吊(13)和带制动扭矩电机的放索器(14)各一台,存放索盘(24)数量可达60盘。1. Cable storage system: a 60t gantry crane (13) and a cable release device (14) with a braking torque motor are provided in the cable storage and release area, and the number of cable reels (24) stored can reach 60 reels.

2、支承运送系统:A锚碇放索区设长短胶滚筒,猫道主缆外侧上每间隔8m设一道支承导向轮(15)。在高差较大和主索鞍、散索鞍部位适当增加支承导向轮数量或用导向轮组。2, support delivery system: A anchorage cable release area is provided with long and short rubber drums, and a support guide wheel (15) is established at intervals of 8m on the outside of the main cable of the catwalk. Appropriately increase the number of supporting guide wheels or use guide wheel sets at the parts with large height difference and main cable saddle and scatter cable saddle.

3、动力循环系统3. Power circulation system

3.1牵引索(10):采用Φ36mm不旋转钢芯钢丝绳,全长约4800m,在专业生产厂家定制。牵引索两端中,一端通过拽拉器(7)连接,一端直接对接,形成无极循环索。3.1 Traction rope (10): It adopts Φ36mm non-rotating steel core wire rope with a total length of about 4800m, which is customized by a professional manufacturer. Among the two ends of the traction rope, one end is connected by a puller (7), and the other end is directly butted to form an endless looping rope.

3.2牵引索转向:A锚碇(11)处设水平转向,B锚碇(14)设水平与竖向转向,猫道门架(38)、AB主塔(12)(13)、散索鞍(23)支墩设导轮组。3.2 Traction cable steering: Horizontal steering is set at A anchorage (11), horizontal and vertical steering is set at B anchorage (14), catwalk door frame (38), AB main tower (12) (13), loose cable saddle ( 23) The buttress is provided with a guide wheel group.

3.3拽拉器(7):拽拉器为牵引索与主缆索股连结的设施,以实现索股的牵引架设。3.3 Puller (7): The puller is a device for connecting the traction cable with the main cable strand, so as to realize the traction and erection of the strand.

3.4牵引卷扬机:开绳槽双卷筒摩檫式牵引卷扬机,使用变频器设定某一速度后卷放钢丝绳的速度恒定、出绳位置恒定,变频器能实现5~30m/min范围内的无级变速;通过安装在定滑轮上的拉力传感器及放大器等测试组件与计算机组成测控系统,通过计算机动态采集和实时牵引过程中每一段点的牵引力和速度变化情况、钢丝绳的运行总长度,随时保存打印。可根据具体工况设定拉力和速度关系,实行人工干预下的半自动化。3.4 Traction hoist: double-drum friction-type traction hoist with open rope slots. After setting a certain speed by using the frequency converter, the speed of unwinding and unwinding the steel wire rope is constant, and the position of the rope is constant. Step speed change; the measurement and control system is composed of test components such as tension sensors and amplifiers installed on the fixed pulley and the computer, and the traction force and speed changes at each point during the real-time traction process and the total running length of the wire rope are saved at any time through the computer dynamic collection and real-time traction. Print. The relationship between tension and speed can be set according to specific working conditions, and semi-automation under manual intervention can be implemented.

主要技术参数:The main technical parameters:

工作有效牵引力:250kNWorking effective traction force: 250kN

牵引速度:5~30m/min无级变速Traction speed: 5~30m/min stepless speed change

收绳筒容绳量:2500mRope capacity of the receiving drum: 2500m

卷筒:双卷筒,摩擦式Reel: double reel, friction type

驱动:卷扬机要能正、逆向牵引Drive: The hoist must be able to pull forward and reverse

制动系统:电动或液压自动松闸Braking system: electric or hydraulic automatic brake release

传动方式:机械或液压Transmission mode: mechanical or hydraulic

电动机:~3×380V,FC=100%,110kW,绕线式串联电阻起动Motor: ~3×380V, FC=100%, 110kW, start with winding series resistance

控制方式:鼓形控制器为中央控制器,转子串接电阻起动调速Control mode: the drum controller is the central controller, and the rotor is connected in series with a resistor to start the speed regulation

4、张紧调试机构:循环牵引系统受温度变化、牵引索弹性变形松弛、卷扬机后张力、架设状态的变化等因素的影响,必须设张紧调整设施。采用配平衡重的方式。4. Tension adjustment mechanism: The cyclic traction system is affected by factors such as temperature changes, elastic deformation and relaxation of traction cables, rear tension of the hoist, changes in erection status, etc., and tension adjustment facilities must be installed. The method of counterweight is adopted.

附图说明Description of drawings

图1a,图1b:门架式小循环总体布置主视图、俯视图Figure 1a, Figure 1b: Front view and top view of the overall layout of the gantry-type small circulation

图2:A锚碇放索区立面布置图Figure 2: Elevation layout of A anchorage cable laying area

图3a,图3b:B锚碇牵引区及张紧调试机构布置俯视图、主视图Fig. 3a, Fig. 3b: Top view and front view of B anchor traction area and tensioning debugging mechanism layout

图4:塔顶布置图Figure 4: Tower Top Layout

图5:猫道门架及门架导轮布置图Figure 5: Layout of catwalk door frame and door frame guide wheel

图中:1-放索区,2-牵引区,3-门架支承索,4-塔顶转向,5-猫道门架及导轮,6-主缆索股,7-拽拉器,8-猫道,9-索股托滚,10-牵引索,11-A锚碇,12-A主塔,13-B主塔,14-B锚碇,15-25t卷扬机,16-平衡重,17-60t单轨龙门吊机,18-放索器,19-滚轮,20-牵引索回转支架及滑轮,21-8t卷扬机,22-支墩门架导轮组,23-散索鞍,24-索盘,25-猫道承重索,26-支墩门架,27-平衡重支架,28-转向滑轮,29-门架支承索鞍座,30-塔顶门架,31-导轮组,32-扶手索鞍座,33-猫道承重索鞍座,34-扶手索,35-下拉装置,36-主索鞍,37-反力架,38-猫道门架,39-猫道门架导轮。In the figure: 1- cable release area, 2- traction area, 3- mast support cable, 4- tower top steering, 5- catwalk mast and guide wheel, 6- main cable strand, 7- puller, 8- Catwalk, 9-cable support roller, 10-traction cable, 11-A anchorage, 12-A main tower, 13-B main tower, 14-B anchorage, 15-25t hoist, 16-balance weight, 17 -60t monorail gantry crane, 18-cable laying device, 19-roller, 20-traction cable slewing bracket and pulley, 21-8t hoist, 22-pier gantry guide wheel group, 23-scattering saddle, 24-cable reel , 25- catwalk load-bearing cable, 26- pier gantry, 27- counterweight bracket, 28- steering pulley, 29- gantry supporting cable saddle, 30- tower top gantry, 31- guide wheel group, 32- handrail Cable saddle, 33-catwalk load-bearing cable saddle, 34-handrail cable, 35-pull-down device, 36-main cable saddle, 37-reaction frame, 38-catwalk door frame, 39-catwalk door frame guide wheel.

具体实施方式Detailed ways

总体施工架设方案:主缆的架设采用PPWS工法,即将索盘(24)安装在A锚碇后的放索支架上,把锚头从索盘上引出,将锚头通过锚头架固定在拽拉器(7)上并与牵引索(10)相连接,通过布置于B锚碇(14)下游侧的25t牵引卷扬机(15)驱动循环牵引索(10)正向运动,将索股从A锚碇(11)沿猫道面向B锚碇(14)拖拉,每次拉一束,索股落于顺猫道布置的支承导轮上。牵引过程中及时纠正索股的扭转、弯曲及松散变形等。索股拖拉到位后,将两端锚头分别临时固定在锚杆处,将这些钢丝扭正至平行状态,起吊横移在各鞍座处对索股进行整形、索股理顺,放入鞍座预定位置。两端锚头由引入装置向锚架锚固部位引进。经垂度调整后在鞍座处锁定,锚跨通过调整索股拉力进行调整。单根索股架设完成后,通过牵引卷扬机驱动循环牵引索反向运动,将拽拉器由B锚碇返回至A锚碇,进行下一根索股的架设。The overall construction and erection plan: the erection of the main cable adopts the PPWS construction method, that is, the cable reel (24) is installed on the cable-laying support behind the A anchorage, the anchor head is drawn out from the cable reel, and the anchor head is fixed on the dragging head through the anchor head frame. The puller (7) is connected with the traction cable (10), and the 25t traction hoist (15) arranged on the downstream side of the B anchorage (14) drives the circular traction cable (10) to move forward, and the strands are pulled from A Anchor anchorage (11) drags along catwalk towards B anchorage anchorage (14), pulls a bundle at a time, and cable strand falls on the supporting guide wheel arranged along catwalk. During the traction process, the torsion, bending and loose deformation of the cable strands should be corrected in time. After the cable strands are dragged in place, the anchor heads at both ends are temporarily fixed on the anchor rods respectively, these steel wires are twisted to a parallel state, and the lifting and traversing are carried out at each saddle to shape and straighten the strands, and put them into the saddle Reserved seat. The anchor heads at both ends are introduced to the anchoring position of the anchor frame by the introduction device. After the sag is adjusted, it is locked at the saddle, and the anchor span is adjusted by adjusting the tension of the strands. After the erection of a single strand is completed, the traction hoist drives the circular traction cable to move in reverse, and the puller is returned from the B anchorage to the A anchorage, and the next strand is erected.

主缆架设门架式小循环牵引系统总体施工布置:在A锚碇后设存索区,安装60吨龙门吊机(17)和放索支架;在A锚碇后设牵引索回转支架及滑轮(20);在B锚碇下游侧设一台25吨牵引卷扬机(15)和平衡重支架(27)。牵引索(10)由2根Φ36钢丝绳组成,在A锚碇(11)通过拽拉器(7)连接,在B锚绕过卷扬机滚筒,通过平衡重支架(27)和各转向、导向滑轮后插接,形成环状无极索,通过牵引驱动和门架滑车、导轮组作水平循环运动,形成独立的小循环牵引系统,以满足架设主缆的需要。The overall construction layout of the gantry-type small circulation traction system for main cable erection: set up a cable storage area behind the A anchorage, install a 60-ton gantry crane (17) and a cable release bracket; set up a traction cable rotary bracket and a pulley ( 20); A 25 tons of traction hoist (15) and counterweight support (27) are established at B anchorage downstream side. The traction cable (10) is composed of 2 Φ36 steel wire ropes, which are connected by the puller (7) at the A anchorage (11), bypass the hoist drum at the B anchor, pass through the balance weight bracket (27) and each steering and guide pulley Connected to form a ring-shaped endless cable, through the horizontal circular movement of the traction drive and the mast block and guide wheel group, an independent small circular traction system is formed to meet the needs of erecting the main cable.

Claims (3)

1. the small-cycle traction system that sets up of large-span suspension bridge main cable, comprise that main rope deposits cable system, system is transported in supporting, power circulation system, tensioning debugging mechanism, it is characterized in that drag cable walks around two reels of a friction-type hoist engine, by the balance weight support with respectively turn to, socket connection behind the leading block, form horizontal ring-type endless cable, under the traction drive effect, around two reel friction-type hoist engines, the balance weight support, angle pulley, cat road door frame guide wheel, the cat head guide wheel group, supporting door frame guide wheel group, drag cable rotary support pulley is done the horizontal cyclic motion.
2. the small-cycle traction system that sets up of main rope of suspension bridge according to claim 1, it is characterized in that: be connected with on the electrodeless drag cable of ring-type and pull device, pull device and be connected with main push-towing rope, moving of drag cable can drive the same moved further of main cable strand.
3. the small-cycle traction system that sets up of main rope of suspension bridge according to claim 1, it is characterized in that: the drive unit of the electrodeless drag cable of ring-type is a two reel friction-type hoist engine.
CN2007101686066A 2007-12-05 2007-12-05 Erection of gantry type small-cycle traction system on large-span suspension bridge main cable Active CN101177931B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2007101686066A CN101177931B (en) 2007-12-05 2007-12-05 Erection of gantry type small-cycle traction system on large-span suspension bridge main cable

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2007101686066A CN101177931B (en) 2007-12-05 2007-12-05 Erection of gantry type small-cycle traction system on large-span suspension bridge main cable

Publications (2)

Publication Number Publication Date
CN101177931A CN101177931A (en) 2008-05-14
CN101177931B true CN101177931B (en) 2011-08-10

Family

ID=39404333

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2007101686066A Active CN101177931B (en) 2007-12-05 2007-12-05 Erection of gantry type small-cycle traction system on large-span suspension bridge main cable

Country Status (1)

Country Link
CN (1) CN101177931B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108729362A (en) * 2018-04-20 2018-11-02 武汉中交试验检测加固工程有限责任公司 A kind of Long span pipe bridge facade circulating picture-changing cable system and its application method

Families Citing this family (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101608426B (en) * 2008-06-20 2012-04-04 上海浦江缆索股份有限公司 Preformed Traction Mechanism for Strands of Linear Units of Imitation Suspension Bridge Main Cable
CN101418542B (en) * 2008-11-21 2013-12-25 上海市政工程设计研究总院 Cable system construction method of spatial self-anchored rope-suspension bridge
CN102392418A (en) * 2011-12-01 2012-03-28 中交二公局第二工程有限公司 Span-division erection construction method of construction catwalk of multi-tower suspension bridge
CN102839605B (en) * 2012-09-25 2014-07-23 长沙理工大学 Sag control method for small-sag datum strand
CN104210977B (en) * 2014-08-07 2017-03-29 中交二公局第二工程有限公司 Modularized distribution type hoist engine integrated control system
CN104652276B (en) * 2015-01-12 2016-09-14 中交第二公路工程局有限公司 A kind of main rope of suspension bridge PPWS construction strand erection method in situ
CN105603879B (en) * 2015-12-29 2017-06-23 四川石油天然气建设工程有限责任公司 The construction technology in large-scale pipeline crossing construction cat road
CN107201724A (en) * 2016-03-19 2017-09-26 湖北建科结构加固有限责任公司 A kind of suspension bridge is without cat pipeline construction method
CN107119572B (en) * 2017-06-22 2018-12-18 四川路桥华东建设有限责任公司 A kind of main rope of suspension bridge strand second traction enters the construction method of tunnel anchorage
CN108374322A (en) * 2018-04-04 2018-08-07 中铁第四勘察设计院集团有限公司 A kind of asymmetric main push-towing rope railway Suspension bridge structure
CN108589539B (en) * 2018-04-27 2019-12-31 广西路桥工程集团有限公司 Crossing installation method for temporary tie bar
CN108660903B (en) * 2018-06-20 2024-12-06 安徽省交通建设股份有限公司 Steel tube concrete arch bridge and construction method
CN108643057B (en) * 2018-06-20 2019-08-20 大连理工大学 A Temporary Anchor Cable Balance Construction Method During the Erection of the Main Girder of a Suspension Bridge
CN109898428A (en) * 2019-04-23 2019-06-18 四川公路桥梁建设集团有限公司 Conversion adjusting device for anchor main cable traction system of super-large and large inclination angle tunnel
CN110468712A (en) * 2019-07-30 2019-11-19 中铁大桥局集团第六工程有限公司 Main rope of suspension bridge trailer system and method
CN110510526B (en) * 2019-08-19 2024-04-02 石家庄铁道大学 Cable conveyor for traffic emergency guarantee
CN110939069B (en) * 2019-12-11 2022-02-08 湖北省路桥集团有限公司 Construction method of suspension bridge catwalk
CN112176871B (en) * 2020-09-15 2022-04-15 中交二公局第二工程有限公司 A method for erecting main cables of a suspension bridge with tunnel anchorages on both sides
CN112195784B (en) * 2020-09-15 2022-06-17 中交第二公路工程局有限公司 Catwalk sag adjustment system and adjustment method for erecting main cable by adopting air spinning method
CN112176870B (en) * 2020-09-15 2022-04-15 中交二公局第二工程有限公司 Method for installing main cable of suspension bridge with tunnel type anchorage at two banks
CN112209254B (en) * 2020-10-20 2022-07-12 广西路桥工程集团有限公司 Erection method of main cable of cable crane
CN113152281B (en) * 2021-03-15 2023-04-07 中交二公局第二工程有限公司 Main cable structure of suspension bridge cable crane
CN113605230A (en) * 2021-07-12 2021-11-05 中交二公局第二工程有限公司 Main cable traction system and method suitable for suspension bridge two-bank tunnel anchor
CN113774806B (en) * 2021-09-29 2023-10-20 中铁大桥局集团有限公司 Suspension bridge main cable strand traction control system and method
CN117026821A (en) * 2023-08-17 2023-11-10 中铁四局集团有限公司 Reciprocating traction system and main cable strand erection method
CN117988242A (en) * 2024-04-03 2024-05-07 贵州省公路工程集团有限公司 Cable tower top line-passing tool for hoisting suspension bridge steel beam and construction method thereof
CN117988243B (en) * 2024-04-03 2024-06-14 贵州省公路工程集团有限公司 Multifunctional efficient traction system for suspension bridge upper structure and construction method thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1122742C (en) * 1998-11-09 2003-10-01 柳州欧维姆建筑机械有限公司 Method and system for suspending oblique guys of cable stayed bridge
CN1818218A (en) * 2006-03-06 2006-08-16 中铁四局集团第二工程有限公司 Overline strand suspension bridge construction by drawing anchor
CN2900616Y (en) * 2006-06-01 2007-05-16 路桥集团第二公路工程局 Double line reciprocating type tracting device

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1122742C (en) * 1998-11-09 2003-10-01 柳州欧维姆建筑机械有限公司 Method and system for suspending oblique guys of cable stayed bridge
CN1818218A (en) * 2006-03-06 2006-08-16 中铁四局集团第二工程有限公司 Overline strand suspension bridge construction by drawing anchor
CN2900616Y (en) * 2006-06-01 2007-05-16 路桥集团第二公路工程局 Double line reciprocating type tracting device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108729362A (en) * 2018-04-20 2018-11-02 武汉中交试验检测加固工程有限责任公司 A kind of Long span pipe bridge facade circulating picture-changing cable system and its application method
CN108729362B (en) * 2018-04-20 2020-05-12 武汉中交试验检测加固工程有限责任公司 Large-span pipe bridge vertical face circulating cable replacement system and use method thereof

Also Published As

Publication number Publication date
CN101177931A (en) 2008-05-14

Similar Documents

Publication Publication Date Title
CN101177931B (en) Erection of gantry type small-cycle traction system on large-span suspension bridge main cable
CN209907218U (en) A self-anchored suspension bridge main cable strand double-wire circulating traction system
CN211142840U (en) Suspension bridge main push-towing rope erects system
CN109687349B (en) Bypass cable wiring method and special equipment thereof
CN110459987B (en) Automatic wire tightening device and method for overhead line system construction
CN111576243A (en) A kind of bridge is simply supported first and then continuously negative bending moment tensioning trolley
CN109137758A (en) A kind of self-anchored suspension bridge cable construction technology
CN109488038A (en) Across the mounting structure and installation method of the beam string flexible cable of existing building
CN110143525A (en) A kind of deck unit erection gantry for having wide-angle and swinging shifting and climbing capacity
CN211368400U (en) Steel wire pay-off machine for large-span suspension bridge through air spinning method
CN214780385U (en) A bridge steel box girder hoisting device
CN2900616Y (en) Double line reciprocating type tracting device
WO2025168145A1 (en) Construction method for simultaneously replacing catenary and contact wires of entire anchor section of overhead contact system of passenger-dedicated line
CN208202586U (en) Conduit lifting device for the perfusion of power transmission tower concrete filled steel tube high-altitude
CN104310242A (en) Three-cable-group tower crane
CN214879805U (en) Steel strand power pay-off and application structure thereof
CN110002343A (en) A kind of prefabricated pipe gallery of self-driving type Urban Underground is laid with hoisting machine and construction method
CN102709849A (en) Manual multifunctional wire tightening device and wire tightening method
CN201191731Y (en) Electric tackle
CN206970077U (en) A kind of construction site hoist engine
CN117026821A (en) Reciprocating traction system and main cable strand erection method
CN210404563U (en) Automatic wire tightening device
CN201647885U (en) Trolly steel wire rope winding structure of double-beam bridge type traveling crane
CN107176548A (en) A kind of cable crane overhead traveling crane closed circulation trailer system and traction method
CN218493613U (en) Tunnel waterproof board paving and hanging trolley

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: GROUP CO., LTD., ZHONGTIE DAQIAO BUREAU

Free format text: FORMER OWNER: CHINA ZHONGTIE MAJOR BRIDGE ENGINEERING CO., LTD.

Effective date: 20150216

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 430074 WUHAN, HUBEI PROVINCE TO: 430050 WUHAN, HUBEI PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20150216

Address after: 430050 Hanyang Road, Hanyang District, Hubei, No. 38, No.

Patentee after: Group Co., Ltd., Zhongtie Daqiao Bureau

Address before: 430074 Hubei province Wuhan Dongxin East Lake New Technology Development Zone Road Business Street No. 6 building SBI

Patentee before: China Zhongtie Major Bridge Engineering Co., Ltd.