CN105003738B - Construction method for mounting large-diameter pipe by applying cableway in complex mountain terrain - Google Patents

Construction method for mounting large-diameter pipe by applying cableway in complex mountain terrain Download PDF

Info

Publication number
CN105003738B
CN105003738B CN201510380370.7A CN201510380370A CN105003738B CN 105003738 B CN105003738 B CN 105003738B CN 201510380370 A CN201510380370 A CN 201510380370A CN 105003738 B CN105003738 B CN 105003738B
Authority
CN
China
Prior art keywords
tube coupling
lifting
halyard
carrier cable
winch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510380370.7A
Other languages
Chinese (zh)
Other versions
CN105003738A (en
Inventor
王枝玘
刘书云
陈晓亮
王玉军
郭彦平
刘忠飞
董拥梅
张瑞贤
何超
杨勇
张宝瑜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Hong Sha Construction Work Co Ltd
Original Assignee
Shanxi Hong Sha Construction Work Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Hong Sha Construction Work Co Ltd filed Critical Shanxi Hong Sha Construction Work Co Ltd
Priority to CN201510380370.7A priority Critical patent/CN105003738B/en
Publication of CN105003738A publication Critical patent/CN105003738A/en
Application granted granted Critical
Publication of CN105003738B publication Critical patent/CN105003738B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C21/00Cable cranes, i.e. comprising hoisting devices running on aerial cable-ways

Abstract

The invention relates to a pipe mounting construction technology, in particular to a construction method for mounting a large-diameter pipe by applying a cableway in a complex mountain terrain, and solves the problems of long construction period, high construction strength, severe disruption of local vegetation environment and high construction difficulty in a traditional long-distance mounting construction technology of the large-diameter pipe under the condition of complex mountain terrain. The construction method for mounting the large-diameter pipe by applying the cableway in the complex mountain terrain is realized by the steps of: (a) installation of an aerial cableway: two bearing cable ground anchors, a lifting cable ground anchor, a support column, a winch, a turning fixed pulley, a bearing cable, a bearing saddle base, a traction cable, two lifting fixed pulleys, a counterweight, a lifting movable pulley, a lifting cable and a lifting hook are selected; (b) transportation of pipe joints; (c) placement in position of the pipe joints; and (d) assembly of the pipe joints. The construction method is suitable for long-distance mounting construction of the large-diameter pipe under the condition of complex mountain terrain.

Description

Mountain area complexity landform installs big-diameter pipeline construction with cableway
Technical field
The present invention relates to pipeline mounting construction technology, specifically a kind of mountain area complexity landform is with cableway installation Large Diameter Pipeline pipe Road construction.
Background technology
Long range big-diameter pipeline installation is the important infrastructure engineering in the fields such as municipal administration, water conservancy.Traditional length Mainly it is generally as follows technology to realize apart from big-diameter pipeline installation:First, packed by mule and horse, ground trailer is transported The modes such as defeated, winch rail transport, charge car handling complete the transport of tube coupling.Then, by crane stringing, dolly group peer Formula completes the in place of tube coupling and group is right.Practice have shown that, traditional long range big-diameter pipeline installation Technology is due to itself original Reason is limited, and there are the following problems:Mountain area carry out long range big-diameter pipeline construct when, frequently encounter the gradient it is big and changeable, barrier Hinder nearly and the narrow and precipitous and perilous complicated landform in complicated, place.Now, pack according to mule and horse, ground trailer transportation, winch track are transported Defeated, dolly group Peer, then need to open up a large amount of temporary roads and place under MODEL OVER COMPLEX TOPOGRAPHY, thus causes construction week It is phase length, construction high labor intensive, big to the destruction of local vegetation environmental.According to modes such as charge car handling, crane stringings, then by It is difficult to be moved along the line under MODEL OVER COMPLEX TOPOGRAPHY in lifting vehicle, causes difficulty of construction big.Based on this, it is necessary to invent one Brand-new long range big-diameter pipeline installation Technology is planted, to solve traditional long range big-diameter pipeline installation Technology The problems referred to above of presence.
The content of the invention
The present invention is in order to solve traditional long range big-diameter pipeline installation Technology under the MODEL OVER COMPLEX TOPOGRAPHY of mountain area Long construction period, construction high labor intensive, problem that difficulty of construction big big to the destruction of local vegetation environmental, there is provided Yi Zhongshan Area's complexity landform installs big-diameter pipeline construction with cableway.
The present invention adopts the following technical scheme that realization:Mountain area complexity landform installs big-diameter pipeline construction with cableway Engineering method, the method is realized using following steps:
A. the installation of aerial cableway:First, two carrier cable earth anchors, halyard earth anchor, support column, winch, changes are chosen To fixed pulley, carrier cable, load saddle, hauling rope, two lifting fixed pulleys, balancing weight, lifting movable pulley, halyard, suspension hooks; Then, first carrier cable earth anchor is embedded in into domatic location lower, second carrier cable earth anchor is embedded in into domatic location high Place, by halyard earth anchor domatic location eminence is embedded in, and support column is installed vertically on into domatic location eminence ground, by winch Domatic location lower ground is installed on, break-in fixed pulley is installed on into domatic location lower ground;Then, by one end of carrier cable With first carrier cable earth anchorage, the other end bypasses support column and second carrier cable earth anchorage, by the slip of load saddle It is installed on carrier cable;Then, hauling rope is wound on the reel of winch, behind one end of hauling rope and load saddle Surface is fixed, and the other end bypasses successively the front surface of break-in fixed pulley, support column and load saddle and fixes;Then, by first Lifting fixed pulley is installed on the lower surface rear portion of load saddle, and second lifting fixed pulley is installed on into the lower surface of load saddle Front portion, by lifting movable pulley the upper surface of balancing weight is installed on;Then, one end of halyard is wound in the reel of winch On, the other end bypasses successively first lifting fixed pulley, lifting movable pulley, second lifting fixed pulley, support column and halyard Earth anchorage;Finally, suspension hook is installed on the lower surface of balancing weight, the installation of aerial cableway is thus completed;
B. the handling of tube coupling:First, tube coupling to be installed is transported to domatic location lower ground by automobile;Then, lead to Cross winch to be wound hauling rope, thus hauling rope passes sequentially through load saddle, two lifting fixed pulleys, the dynamic cunnings of lifting Wheel, balancing weight drive suspension hook that the surface of tube coupling to be installed is moved to along carrier cable;Then, halyard is entered by winch Thus row slack rope, balancing weight drives lifting movable pulley and suspension hook to drop to close tube coupling to be installed together;Then, using suspender belt or Rope sling fixes tube coupling to be installed with suspension hook colligation, and in piece drawstring of each colligation in two ends of tube coupling to be installed;Then, by twisting Disk machine carries out tight rope to halyard, and thus halyard passes sequentially through lifting movable pulley, balancing weight, suspension hook and drive on tube coupling to be installed Rise to certain altitude;Then, hauling rope is wound by winch, hauling rope thus pass sequentially through load saddle, two Lifting fixed pulley, lifting movable pulley, balancing weight, suspension hook drive tube coupling to be installed moving to place to be installed just along carrier cable Top, thus completes the handling of tube coupling;
C. tube coupling is in place:First, two hydraulic jack supporting tables are pre-installed on the ground in place to be installed;Then, lead to Crossing winch carries out slack rope to halyard, and thus balancing weight drives lifting movable pulley, suspension hook, tube coupling to be installed to decline together;When Tube coupling to be installed drop to apart from ground 2m when, by two drawstrings treat installation tube coupling carry out pulling adjustment so that it is to be installed Tube coupling is accurately dropped in two hydraulic jack supporting tables, thus completes the in place of tube coupling;
D. the group of tube coupling is right:First, the pre- set line-up clamp on the mouth of pipe for installing tube coupling;Then, by two hydraulic pressure thousand Jin top support platform adjusts the height and the gradient of tube coupling to be installed so that the mouth of pipe alignment of tube coupling to be installed has installed the pipe of tube coupling Mouthful;Then, hauling rope is wound by winch, hauling rope thus pass sequentially through load saddle, two lifting fixed pulleys, Lifting movable pulley, balancing weight, suspension hook drive tube coupling to be installed to move along carrier cable so that the mouth of pipe insertion of tube coupling to be installed is right Mouthpart simultaneously holds out against with the mouth of pipe for installing tube coupling;Then, line-up clamp is fastened by line-up clamp hydraulic means, and by two Hydraulic jack supporting table is adjusted to firm indeformable holding state;Then, line-up clamp is removed, and by the pipe of tube coupling to be installed Mouth is welded and fixed with the mouth of pipe for installing tube coupling;Then, two hydraulic jack supporting tables are removed, and under tube coupling to be installed Side is installed by permanent buttress;Finally, tube coupling to be installed is separated with suspension hook, the group for thus completing tube coupling is right.
Compared with traditional long range big-diameter pipeline installation Technology, complexity landform in mountain area of the present invention is used Cableway installs big-diameter pipeline construction by using the aerial cableway for being provided simultaneously with handling function and elevating function, realizing The transport of tube coupling, in place and group are right, thus possess following advantage:When mountain area carries out the construction of long range big-diameter pipeline, if Run into that the gradient is big and changeable, obstacle danger and the narrow and precipitous and perilous complicated landform in complicated, place, then pack compared to mule and horse, Orly Car transport, winch rail transport, dolly group Peer, mountain area complexity landform of the present invention installs Large Diameter Pipeline with cableway Pipeline construction engineering method no longer needs to open up temporary road and place, and construction period is thus greatly shortened, construction is greatly reduced Labour intensity, completely avoid destruction to local vegetation environmental.And compared to modes such as charge car handling, crane stringings, this No longer using vehicle is lifted, thus completely mountain area complexity landform described in invention installs big-diameter pipeline construction with cableway Overcome lifting vehicle to be difficult to carry out mobile problem along the line under MODEL OVER COMPLEX TOPOGRAPHY, so as to greatly reduce difficulty of construction.
The present invention efficiently solves traditional long range big-diameter pipeline installation Technology in mountain area MODEL OVER COMPLEX TOPOGRAPHY Lower long construction period, construction high labor intensive, problem that difficulty of construction big big to the destruction of local vegetation environmental, it is adaptable to mountain area Long range big-diameter pipeline installation under MODEL OVER COMPLEX TOPOGRAPHY.
Description of the drawings
Fig. 1 is the structural representation of the aerial cableway of the present invention.
In figure:1- domatics location, 2- carrier cable earth anchors, 3- halyard earth anchors, 4- support columns, 5- winches, 6- break-ins are determined Pulley, 7- carrier cables, 8- load saddles, 9- hauling ropes, 10- lifting fixed pulleys, 11- balancing weights, 12- lifting movable pulleys, 13- liters Drop rope, 14- suspension hooks.
Specific embodiment
Mountain area complexity landform installs big-diameter pipeline construction with cableway, and the method is realized using following steps 's:
A. the installation of aerial cableway:First, two carrier cable earth anchors 2, halyard earth anchor 3, support columns 4, winch are chosen 5th, break-in fixed pulley 6, carrier cable 7, load saddle 8,9, two lifting fixed pulleys 10 of hauling rope, balancing weight 11, lifting movable pulley 12nd, halyard 13, suspension hook 14;Then, first carrier cable earth anchor 2 is embedded in into the lower of domatic location 1, by second carrier cable Earth anchor 2 is embedded in the eminence of domatic location 1, and halyard earth anchor 3 is embedded in into the eminence of domatic location 1, and support column 4 is installed vertically on The eminence ground of domatic location 1, by winch 5 the lower ground of domatic location 1 is installed on, and break-in fixed pulley 6 is installed on into domatic ground 1 lower ground of section;Then, one end of carrier cable 7 is fixed with first carrier cable earth anchor 2, the other end bypasses support column 4 and Two carrier cable earth anchors 2 are fixed, and load saddle 8 is slidably mounted on carrier cable 7;Then, hauling rope 9 is wound in into winch On 5 reel, one end of hauling rope 9 is fixed with the rear surface of load saddle 8, the other end bypasses successively break-in fixed pulley 6, props up Dagger 4 is fixed with the front surface of load saddle 8;Then, first lifting fixed pulley 10 is installed on the lower surface of load saddle 8 Rear portion, the lower surface that second lifting fixed pulley 10 is installed on into load saddle 8 is anterior, and lifting movable pulley 12 is installed on into counterweight The upper surface of block 11;Then, one end of halyard 13 is wound on the reel of winch 5, the other end bypasses successively first Lifting fixed pulley 10, lifting 12, second lifting fixed pulley 10 of movable pulley, support column 4 are fixed with halyard earth anchor 3;Finally, will Suspension hook 14 is installed on the lower surface of balancing weight 11, thus completes the installation of aerial cableway;
B. the handling of tube coupling:First, tube coupling to be installed is transported to the lower ground of domatic location 1 by automobile;Then, lead to Cross winch 5 to be wound hauling rope 9, thus hauling rope 9 passes sequentially through 8, two lifting fixed pulleys 10 of load saddle, lifting Movable pulley 12, balancing weight 11 drive suspension hook 14 that the surface of tube coupling to be installed is moved to along carrier cable 7;Then, by capstan winch Machine 5 carries out slack rope to halyard 13, and thus balancing weight 11 drives lifting movable pulley 12 and suspension hook 14 to drop to be close to together and wait to pacify Tubulature section;Then, tube coupling to be installed is fixed with the colligation of suspension hook 14 using suspender belt or rope sling, and it is each at the two ends of tube coupling to be installed Piece drawstring of colligation;Then, tight rope is carried out to halyard 13 by winch 5, thus halyard 13 passes sequentially through the dynamic cunning of lifting Wheel 12, balancing weight 11, suspension hook 14 drive tube coupling to be installed to rise to certain altitude;Then, hauling rope 9 is entered by winch 5 Thus row winding, hauling rope 9 passes sequentially through 8, two lifting fixed pulleys 10 of load saddle, lifting movable pulley 12, balancing weight 11, hangs Hook 14 drives tube coupling to be installed that the surface in place to be installed is moved to along carrier cable 7, thus completes the handling of tube coupling;
C. tube coupling is in place:First, two hydraulic jack supporting tables are pre-installed on the ground in place to be installed;Then, lead to Crossing winch 5 carries out slack rope to halyard 13, and thus balancing weight 11 drives lifting movable pulley 12, suspension hook 14, tube coupling to be installed Rise and decline;When tube coupling to be installed is dropped to apart from ground 2m, treating installation tube coupling by two drawstrings carries out pulling adjustment, makes Obtain tube coupling to be installed accurately to drop in two hydraulic jack supporting tables, thus complete the in place of tube coupling;
D. the group of tube coupling is right:First, the pre- set line-up clamp on the mouth of pipe for installing tube coupling;Then, by two hydraulic pressure thousand Jin top support platform adjusts the height and the gradient of tube coupling to be installed so that the mouth of pipe alignment of tube coupling to be installed has installed the pipe of tube coupling Mouthful;Then, hauling rope 9 is wound by winch 5, it is fixed that thus hauling rope 9 passes sequentially through 8, two liftings of load saddle Pulley 10, lifting movable pulley 12, balancing weight 11, suspension hook 14 drive tube coupling to be installed to move along carrier cable 7 so that pipe to be installed The mouth of pipe insertion line-up clamp of section simultaneously holds out against with the mouth of pipe for installing tube coupling;Then, line-up clamp is entered by line-up clamp hydraulic means Row fastening, and two hydraulic jack supporting tables are adjusted to firm indeformable holding state;Then, line-up clamp is removed, and The mouth of pipe of tube coupling to be installed is welded and fixed with the mouth of pipe for installing tube coupling;Then, two hydraulic jack supporting tables are removed, and Permanent buttress is installed in the lower section of tube coupling to be installed;Finally, tube coupling to be installed is separated with suspension hook 14, thus completes the group of tube coupling It is right.
When being embodied as, the carrier cable earth anchor 2, the halyard earth anchor 3 are using by some round logs of φ 200 bindings 7-10t earth anchors;The depth of burying of the carrier cable earth anchor 2, the depth of burying of the halyard earth anchor 3 are all higher than 2.5m;Support frame as described above 4 adopts height for the shaped steel door frame or lattice type pole of 6-9m;The carrier cable 7 adopts φ 22- φ 28 Independent wire strand;The hauling rope 9 adopts the ordinary steel ropes of φ 15.5- φ 22;The halyard 13 is general using φ 15.5- φ 22 Logical steel wire rope.

Claims (1)

1. a kind of mountain area complexity landform installs big-diameter pipeline construction with cableway, it is characterised in that:The engineering method is to adopt What following steps were realized:
A. the installation of aerial cableway:First, two carrier cable earth anchors are chosen(2), halyard earth anchor(3), support column(4), capstan winch Machine(5), break-in fixed pulley(6), carrier cable(7), load saddle(8), hauling rope(9), two lifting fixed pulleys(10), balancing weight (11), lifting movable pulley(12), halyard(13), suspension hook(14);Then, by first carrier cable earth anchor(2)It is embedded in domatic Location(1)Lower, by second carrier cable earth anchor(2)It is embedded in domatic location(1)Eminence, by halyard earth anchor(3)It is embedded in Domatic location(1)Eminence, by support column(4)It is installed vertically on domatic location(1)Eminence ground, by winch(5)It is installed on slope Shape location(1)Lower ground, by break-in fixed pulley(6)It is installed on domatic location(1)Lower ground;Then, by carrier cable(7)'s One end and first carrier cable earth anchor(2)Fixed, the other end bypasses support column(4)With second carrier cable earth anchor(2)It is fixed, will Load saddle(8)It is slidably mounted on carrier cable(7)On;Then, by hauling rope(9)It is wound in winch(5)Reel on, will lead Straw line(9)One end and load saddle(8)Rear surface fix, the other end bypasses successively break-in fixed pulley(6), support column(4) With load saddle(8)Front surface fix;Then, by first lifting fixed pulley(10)It is installed on load saddle(8)Following table Face rear portion, by second lifting fixed pulley(10)It is installed on load saddle(8)Lower surface it is anterior, movable pulley will be lifted(12)Peace Loaded on balancing weight(11)Upper surface;Then, by halyard(13)One end be wound in winch(5)Reel on, the other end First lifting fixed pulley is bypassed successively(10), lifting movable pulley(12), second lifting fixed pulley(10), support column(4)With Halyard earth anchor(3)It is fixed;Finally, by suspension hook(14)It is installed on balancing weight(11)Lower surface, thus complete aerial cableway Install;
B. the handling of tube coupling:First, tube coupling to be installed is transported to domatic location by automobile(1)Lower ground;Then, pass through Winch(5)To hauling rope(9)It is wound, hauling rope(9)Thus load saddle is passed sequentially through(8), two lifting fixed pulleys (10), lifting movable pulley(12), balancing weight(11)Drive suspension hook(14)Along carrier cable(7)Move to just going up for tube coupling to be installed Side;Then, by winch(5)To halyard(13)Carry out slack rope, balancing weight(11)Thus lifting movable pulley is driven(12)With Suspension hook(14)Close tube coupling to be installed is dropped to together;Then, using suspender belt or rope sling by tube coupling to be installed and suspension hook(14)Tie up Prick and fix, and in piece drawstring of each colligation in two ends of tube coupling to be installed;Then, by winch(5)To halyard(13)Carry out Tight rope, halyard(13)Thus lifting movable pulley is passed sequentially through(12), balancing weight(11), suspension hook(14)Drive on tube coupling to be installed Rise to certain altitude;Then, by winch(5)To hauling rope(9)It is wound, hauling rope(9)Thus load is passed sequentially through Saddle(8), two lifting fixed pulleys(10), lifting movable pulley(12), balancing weight(11), suspension hook(14)Drive tube coupling edge to be installed Carrier cable(7)The surface in place to be installed is moved to, the handling of tube coupling is thus completed;
C. tube coupling is in place:First, two hydraulic jack supporting tables are pre-installed on the ground in place to be installed;Then, by twisting Disk machine(5)To halyard(13)Carry out slack rope, balancing weight(11)Thus lifting movable pulley is driven(12), suspension hook(14), it is to be installed Tube coupling declines together;When tube coupling to be installed is dropped to apart from ground 2m, treat installation tube coupling by two drawstrings and pulled Adjustment so that tube coupling to be installed is accurately dropped in two hydraulic jack supporting tables, thus completes the in place of tube coupling;
D. the group of tube coupling is right:First, the pre- set line-up clamp on the mouth of pipe for installing tube coupling;Then, by two hydraulic jacks Supporting table adjusts the height and the gradient of tube coupling to be installed so that the mouth of pipe alignment of tube coupling to be installed has installed the mouth of pipe of tube coupling;So Afterwards, by winch(5)To hauling rope(9)It is wound, hauling rope(9)Thus load saddle is passed sequentially through(8), two liftings Fixed pulley(10), lifting movable pulley(12), balancing weight(11), suspension hook(14)Tube coupling to be installed is driven along carrier cable(7)Motion, So that the mouth of pipe of tube coupling to be installed inserts line-up clamp and holds out against with the mouth of pipe for installing tube coupling;Then, filled by line-up clamp hydraulic pressure Put and line-up clamp is fastened, and two hydraulic jack supporting tables are adjusted to firm indeformable holding state;Then, tear open Except line-up clamp, and the mouth of pipe of tube coupling to be installed is welded and fixed with the mouth of pipe for installing tube coupling;Then, two hydraulic jacks are removed Top support platform, and permanent buttress is installed in the lower section of tube coupling to be installed;Finally, by tube coupling to be installed and suspension hook(14)Separate, by The group that this completes tube coupling is right;
The carrier cable earth anchor(2), the halyard earth anchor(3)Using the 7-10t by some round logs of φ 200 bindings Earth anchor;The carrier cable earth anchor(2)The depth of burying, the halyard earth anchor(3)The depth of burying be all higher than 2.5m;Described Dagger(4)Height is adopted for the shaped steel door frame or lattice type pole of 6-9m;The carrier cable(7)Using the steel core steel of φ 22- φ 28 Cord;The hauling rope(9)Using the ordinary steel ropes of φ 15.5- φ 22;The halyard(13)It is common using φ 15.5- φ 22 Steel wire rope.
CN201510380370.7A 2015-07-02 2015-07-02 Construction method for mounting large-diameter pipe by applying cableway in complex mountain terrain Expired - Fee Related CN105003738B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510380370.7A CN105003738B (en) 2015-07-02 2015-07-02 Construction method for mounting large-diameter pipe by applying cableway in complex mountain terrain

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510380370.7A CN105003738B (en) 2015-07-02 2015-07-02 Construction method for mounting large-diameter pipe by applying cableway in complex mountain terrain

Publications (2)

Publication Number Publication Date
CN105003738A CN105003738A (en) 2015-10-28
CN105003738B true CN105003738B (en) 2017-05-17

Family

ID=54376524

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510380370.7A Expired - Fee Related CN105003738B (en) 2015-07-02 2015-07-02 Construction method for mounting large-diameter pipe by applying cableway in complex mountain terrain

Country Status (1)

Country Link
CN (1) CN105003738B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107178655B (en) * 2016-03-09 2019-06-21 中国水利水电第十一工程局有限公司 The construction method of PCCP pipe under MODEL OVER COMPLEX TOPOGRAPHY
CN106151682B (en) * 2016-07-15 2018-01-30 中国葛洲坝集团机电建设有限公司 The large-scale penstock installation downward putting device of high slope and penstock installation method
CN107792790A (en) * 2017-10-16 2018-03-13 中国化学工程第十四建设有限公司 Installation and application for the aerial cableway of mountain region construction material transport
CN109340452B (en) * 2018-12-21 2021-03-02 中国电建集团四川工程有限公司 Installation and construction method of 56-inch oil and gas transmission pipeline

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1079506A1 (en) * 1980-10-27 1984-03-15 Ивано-Франковский Институт Нефти И Газа Ropeway transportation unit
WO2000044996A1 (en) * 1999-01-28 2000-08-03 Tomio Fukui Method of installing conduit or the like on mountain using cable
WO2001044622A1 (en) * 1999-12-14 2001-06-21 Yury Sherman System for supporting substantially rigid linear structures
CN2725126Y (en) * 2004-09-20 2005-09-14 四川石油管理局 Mountainous region pipe arranging cable way
CN201494438U (en) * 2009-10-13 2010-06-02 中国石油天然气股份有限公司 Simple and fast installation cableway for maintenance and rush repair of mountain pipeline

Also Published As

Publication number Publication date
CN105003738A (en) 2015-10-28

Similar Documents

Publication Publication Date Title
CN105003738B (en) Construction method for mounting large-diameter pipe by applying cableway in complex mountain terrain
CN107792790A (en) Installation and application for the aerial cableway of mountain region construction material transport
CN105565176B (en) A kind of asymmetric cable crane of single column
CN102912730B (en) Hoisting construction method for single-rib closure rope of large-span reinforced concrete arch bridge
CN108082194A (en) A kind of 6 tonnes of heavy cableways and its installation method
CN109610922B (en) Typical topography iron tower assemblage construction equipment
CN207792533U (en) Cableway applied to mountainous region construction
CN109973130B (en) Construction system and method for realizing one-time traction of extra-long tunnel anchor narrow space by main cable strand
CN111485496A (en) System and method for slip mounting of scattered cable saddle of large-inclination-angle tunnel anchor in narrow space
CN107476195B (en) Girder transporting pulley system for transporting stiffening girder by suspension bridge
CN102587284B (en) Independent derrick mast and beam plate mounting method
CN105905815B (en) The method of work of seat ground self-balancing pole
CN107344697A (en) Cable boom hoisting
CN104494602A (en) Construction method for transmission line project material transport by prefabricated cableway
CN201033858Y (en) Tower height-adjustable double-rope freight ropeway
CN212475874U (en) Bridge cable crane system
CN102926388A (en) Earth moving device and method for deep foundation pit excavation
CN204986006U (en) Aerial cableway of big pipe diameter piping erection of complicated topography in mountain area is exclusively used in
CN216235734U (en) Vertical transportation hoisting structure for curtain wall unit plate
CN110065888A (en) A kind of cable crane main rope Demolition Construction method
CN204297970U (en) Heavy-duty machinery lifting movement system
CN203188131U (en) Beam and slab erection construction independent derrick mast device
CN208021448U (en) A kind of 6 tonnes of heavy cableways
CN207375716U (en) The aerial cableway that a kind of mountainous region pipeline is laid with
CN117410888B (en) Cross-mountain-ditch cable laying method and system towed by unmanned aerial vehicle

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170517