CN107119572A - A kind of main rope of suspension bridge strand second traction enters the construction method of tunnel anchorage - Google Patents
A kind of main rope of suspension bridge strand second traction enters the construction method of tunnel anchorage Download PDFInfo
- Publication number
- CN107119572A CN107119572A CN201710480230.6A CN201710480230A CN107119572A CN 107119572 A CN107119572 A CN 107119572A CN 201710480230 A CN201710480230 A CN 201710480230A CN 107119572 A CN107119572 A CN 107119572A
- Authority
- CN
- China
- Prior art keywords
- strand
- tunnel anchorage
- traction
- tunnel
- anchorage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000000725 suspension Substances 0.000 title claims abstract description 16
- 238000010276 construction Methods 0.000 title claims abstract description 12
- 229910000831 Steel Inorganic materials 0.000 claims description 3
- 239000010959 steel Substances 0.000 claims description 3
- 230000001141 propulsive effect Effects 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The invention discloses the construction method that a kind of main rope of suspension bridge strand second traction enters tunnel anchorage;It is characterized in that:Comprise the following steps:(1)Releasing pulls device and is connected with strand;(2)Pull rope is fallen back;(3)Tunnel anchorage pulls device and is connected with strand;(4)Frame strand is handled;(5)Traction is in place.In Tunnel-Type Anchorage of Suspension Bridge, the narrower tunnel anchorage in space, in the case that main push-towing rope traction is using typically device is pulled, usually can not once it be drawn in place with the generation position conflict of cable saddle door frame is dissipated in tunnel anchorage.Fast and effectively it can make main cable strand is smoothly in place can increase main push-towing rope propulsive efficiency to preceding anchor face by second traction by the present invention, it is cost-effective.
Description
Technical field
The present invention relates to field of civil engineering, and in particular to one kind realizes that main rope of suspension bridge strand second traction enters tunnel
The construction method of anchor.
Background technology
At present, more Analysis of Suspension Bridges ' Anchorage system is designed to tunnel-type anchorage, and its feature of the anchorage of this form is space
It is long and narrow and with certain inclination angle.Because sectional space is narrow and small in tunnel anchorage, dissipated in tunnel at cable saddle buttress, dissipate cable saddle and door
Frame system can occupy suitable large space.It will result in main push-towing rope and draw to tunnel anchorage and dissipate at cable saddle buttress, what traction was used pulls device
Occur position with portal frame system to conflict, prevent the traction of main cable strand.
The content of the invention
It is an object of the invention to provide a kind of main rope of suspension bridge strand second traction herein to enter the side that tunnel anchorage is constructed
Method, using second traction method, replaces traction using device is pulled, and main cable strand was smoothly drawn and cable saddle door is dissipated in tunnel anchorage
Frame, effectively and safely perform.So as to ensure construction safety, improve effect, cost-effective.
The present invention is achieved in that a kind of main rope of suspension bridge strand second traction enters the method that tunnel anchorage is constructed, profit
Solve to pull the problem of device conflicts with scattered cable saddle door frame with the device of simple and convenient, it is characterised in that:Comprise the following steps:
Step one:Releasing pulls device and is connected with strand:Strand anchor head is connected with pulling device releasing, steel cable is temporarily utilized by strand
Anchor head is fixed near tunnel anchorage hole;
Step 2:Hauling rope is fallen back:Using single line reciprocating-type tractor system is by hauling rope and pulls device retroversion 100m(To lead again
It device is pulled after drawing will not advance to scattered saddle's position and be advisable);
Step 3:Tunnel anchorage pulls device and is connected with strand:The special device that pulls of tunnel anchorage is fixed with hauling rope, and main cable strand
Anchor head is connected with the special device that pulls of tunnel anchorage;
Step 4:Frame strand is handled:Strand is drawn after tunnel anchorage, it will passed through directly over from scattered cable saddle, and strand will be dragged
It is drawn into cable saddle saddle groove, is rubbed with frame strand, therefore set roller lattice to keep off in saddle groove, it is to avoid strand rubs in traction
Wipe;
Step 5:Traction is in place:Start trailer system hoist engine, strand drawn to preceding anchor face, complete main cable strand draw into
Tunnel anchorage works.
The invention has the advantages that:Enter tunnel anchorage the invention provides a kind of main rope of suspension bridge strand second traction
Construction method;Comprise the following steps:(1)Releasing pulls device and is connected with strand;(2)Pull rope is fallen back;(3)Tunnel anchorage pull device with
Strand is connected;(4)Frame strand is handled;(5)Traction is in place.In Tunnel-Type Anchorage of Suspension Bridge, the narrower tunnel anchorage in space, main push-towing rope
In the case that traction is using typically device is pulled, usually can not once it be drawn with the generation position conflict of cable saddle door frame is dissipated in tunnel anchorage
In place.Fast and effectively by second traction main cable strand can be made smoothly in place to preceding anchor face by the present invention, main push-towing rope can be increased
Propulsive efficiency, it is cost-effective.
The present invention also has the following advantages that:
1st, the tunnel anchorage complicated without design dissipates cable saddle door frame.
2nd, conventional main rope of suspension bridge trailer system can be just applicable.
3rd, temporary structure facility at cable saddle is dissipated in tunnel anchorage can not influence follow-up strand to enter saddle according to conventional arrangement completely
Construction.
4th, efficiency high, time and labour saving, and safety.
Brief description of the drawings
Fig. 1 retreats schematic diagram to pull device before tunnel anchorage hole;
Fig. 2 pulls device schematic diagram to be special in tunnel anchorage;
Fig. 3 is the processing of frame strand top schematic diagram.
Wherein:Pull rope 1, strand anchor head 2, wooden springboard 3, rope card 4(Rubber peel protection need to be twined with strand contact site), rope
Stock 5, reinforcing bar 6, roller bearing 7(Outpacking rubber skin), baffle plate 8.
Embodiment
Below in conjunction with accompanying drawing 1-3, the present invention is described in detail, and the technical scheme in the embodiment of the present invention is carried out
Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole implementation
Example.Based on the embodiment in the present invention, what those of ordinary skill in the art were obtained under the premise of creative work is not made
Every other embodiment, belongs to the scope of protection of the invention.
The present invention provides the construction method that a kind of main rope of suspension bridge strand second traction enters tunnel anchorage, makes main cable strand can
Cable saddle door frame is dissipated in tunnel anchorage smoothly to draw, effectively and is safely performed.
The specific embodiment of the invention is expanded on further below in conjunction with the accompanying drawings:
A kind of main rope of suspension bridge strand second traction enters the construction method of tunnel anchorage, main cable strand was smoothly drawn tunnel
Cable saddle door frame is dissipated in road anchor.
Step one:Releasing pulls device and is connected with strand:Strand anchor head is connected with pulling device releasing, temporarily will using steel cable
Strand anchor head is fixed near tunnel anchorage hole;
Step 2:Hauling rope is fallen back:Using single line reciprocating-type tractor system is by hauling rope and pulls device retroversion 100m(To lead again
It device is pulled after drawing will not advance to scattered saddle's position and be advisable);
Step 3:Tunnel anchorage pulls device and is connected with strand:The special device that pulls of tunnel anchorage is fixed with hauling rope, and main cable strand
Anchor head is connected with the special device that pulls of tunnel anchorage;
Step 4:Frame strand is handled:Strand is drawn after tunnel anchorage, it will passed through directly over from scattered cable saddle, and strand will be dragged
It is drawn into cable saddle saddle groove, is rubbed with frame strand, therefore set roller lattice to keep off in saddle groove, it is to avoid strand rubs in traction
Wipe;
Step 5:Traction is in place:Start trailer system hoist engine, strand drawn to preceding anchor face, complete main cable strand draw into
Tunnel anchorage works.
Draw into how tunnel anchorage is studied by dissipating cable saddle door frame, have present invention is generally directed to main rope of suspension bridge strand
The advantages of effective percentage is high, security is good, greatlys save construction cost.
The invention has the advantages that:
1st, the tunnel anchorage complicated without design dissipates cable saddle door frame.
2nd, conventional main rope of suspension bridge trailer system can be just applicable.
3rd, temporary structure facility at cable saddle is dissipated in tunnel anchorage can not influence follow-up strand to enter saddle according to conventional arrangement completely
Construction.
4th, efficiency high, time and labour saving, and safety.
The foregoing description of the disclosed embodiments, enables professional and technical personnel in the field to realize or using the present invention.
A variety of modifications to these embodiments will be apparent for those skilled in the art, as defined herein
General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, it is of the invention
The embodiments shown herein is not intended to be limited to, and is to fit to and principles disclosed herein and features of novelty phase one
The most wide scope caused.
Claims (1)
1. a kind of main rope of suspension bridge strand second traction enters the construction method of tunnel anchorage, it is characterised in that:Comprise the following steps:
Step one:Releasing pulls device and is connected with strand:Strand anchor head is released with pulling device and is connected, using steel cable by strand anchor head
It is fixed near tunnel anchorage hole;
Step 2:Hauling rope is fallen back:Using single line reciprocating-type tractor system is by hauling rope and pulls device retroversion 100m;
Step 3:Tunnel anchorage pulls device and is connected with strand anchor head:The special device that pulls of tunnel anchorage is fixed with hauling rope, and main push-towing rope
Strand anchor head is connected with the special device that pulls of tunnel anchorage;
Step 4:Frame strand is handled:Strand is drawn after tunnel anchorage, it will passed through directly over from scattered cable saddle, and strand will be dragged
It is drawn into cable saddle saddle groove, is rubbed with frame strand, therefore set roller lattice to keep off in saddle groove, it is to avoid strand rubs in traction
Wipe;
Step 5:Traction is in place:Start trailer system hoist engine, strand drawn to preceding anchor face, complete main cable strand draw into
Tunnel anchorage works.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710480230.6A CN107119572B (en) | 2017-06-22 | 2017-06-22 | A kind of main rope of suspension bridge strand second traction enters the construction method of tunnel anchorage |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710480230.6A CN107119572B (en) | 2017-06-22 | 2017-06-22 | A kind of main rope of suspension bridge strand second traction enters the construction method of tunnel anchorage |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107119572A true CN107119572A (en) | 2017-09-01 |
CN107119572B CN107119572B (en) | 2018-12-18 |
Family
ID=59719377
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710480230.6A Active CN107119572B (en) | 2017-06-22 | 2017-06-22 | A kind of main rope of suspension bridge strand second traction enters the construction method of tunnel anchorage |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107119572B (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108708756A (en) * | 2018-08-31 | 2018-10-26 | 四川路桥华东建设有限责任公司 | A kind of tunnel anchorage is interior to utilize the construction system and method that dissipate cable saddle buttress anchoring cat road head-rope |
CN108797347A (en) * | 2018-07-20 | 2018-11-13 | 中交武汉港湾工程设计研究院有限公司 | Cycle is drawn into anchor system |
CN109944166A (en) * | 2019-04-26 | 2019-06-28 | 四川路桥华东建设有限责任公司 | A kind of overlength high inclination-angle tunnel anchorage large-tonnage dissipates cable saddle and glides and installation system and operating method |
CN109973130A (en) * | 2019-04-26 | 2019-07-05 | 四川路桥华东建设有限责任公司 | Once draw construction system and method in place in a kind of main cable strand realization narrow space of Super Long Tunnel anchor |
CN110629671A (en) * | 2019-10-31 | 2019-12-31 | 中铁大桥勘测设计院集团有限公司 | A suspension bridge anchorage and its construction method |
CN110820524A (en) * | 2019-11-22 | 2020-02-21 | 柳州欧维姆机械股份有限公司 | Connecting structure, fixing structure, new main cable system and construction method for replacing main cable of suspension bridge |
CN110820523A (en) * | 2019-11-22 | 2020-02-21 | 柳州欧维姆机械股份有限公司 | Cable strand connecting structure for replacing main cable of suspension bridge, anchorage structure and construction method |
CN112176870A (en) * | 2020-09-15 | 2021-01-05 | 中交二公局第二工程有限公司 | Method for installing main cable of suspension bridge with tunnel type anchorage at two banks |
CN112176872A (en) * | 2020-09-15 | 2021-01-05 | 中交二公局第二工程有限公司 | Method for erecting main cable of anchor suspension bridge of two-bank tunnel |
CN112554056A (en) * | 2020-12-16 | 2021-03-26 | 长江水利委员会长江科学院 | Horizontal anchorage structure of suspension bridge and construction method |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH083922A (en) * | 1994-06-21 | 1996-01-09 | Hazama Gumi Ltd | Suspension bridge anchor and construction method |
CN101177931A (en) * | 2007-12-05 | 2008-05-14 | 中铁大桥局股份有限公司 | Erection of gantry type small-cycle traction system on large-span suspension bridge main cable |
CN204185775U (en) * | 2014-09-11 | 2015-03-04 | 中交第二航务工程局有限公司 | A kind of two-wire reciprocal gantry type systemic circulation trailer system |
CN104631320A (en) * | 2014-12-29 | 2015-05-20 | 大连理工大学 | Tunnel anchor of single-hole double-anchor system |
CN105648921A (en) * | 2016-02-18 | 2016-06-08 | 长江水利委员会长江科学院 | Suspension bridge rock mass and reinforced concrete plate composited type anchorage and construction method thereof |
CN106012855A (en) * | 2016-06-22 | 2016-10-12 | 四川路桥华东建设有限责任公司 | System for fast mounting steel pull rod in ultra-long and large-dip-angle tunnel anchorage and operation method |
-
2017
- 2017-06-22 CN CN201710480230.6A patent/CN107119572B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH083922A (en) * | 1994-06-21 | 1996-01-09 | Hazama Gumi Ltd | Suspension bridge anchor and construction method |
CN101177931A (en) * | 2007-12-05 | 2008-05-14 | 中铁大桥局股份有限公司 | Erection of gantry type small-cycle traction system on large-span suspension bridge main cable |
CN204185775U (en) * | 2014-09-11 | 2015-03-04 | 中交第二航务工程局有限公司 | A kind of two-wire reciprocal gantry type systemic circulation trailer system |
CN104631320A (en) * | 2014-12-29 | 2015-05-20 | 大连理工大学 | Tunnel anchor of single-hole double-anchor system |
CN105648921A (en) * | 2016-02-18 | 2016-06-08 | 长江水利委员会长江科学院 | Suspension bridge rock mass and reinforced concrete plate composited type anchorage and construction method thereof |
CN106012855A (en) * | 2016-06-22 | 2016-10-12 | 四川路桥华东建设有限责任公司 | System for fast mounting steel pull rod in ultra-long and large-dip-angle tunnel anchorage and operation method |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108797347A (en) * | 2018-07-20 | 2018-11-13 | 中交武汉港湾工程设计研究院有限公司 | Cycle is drawn into anchor system |
CN108708756A (en) * | 2018-08-31 | 2018-10-26 | 四川路桥华东建设有限责任公司 | A kind of tunnel anchorage is interior to utilize the construction system and method that dissipate cable saddle buttress anchoring cat road head-rope |
CN109973130B (en) * | 2019-04-26 | 2023-09-08 | 四川路桥华东建设有限责任公司 | Construction system and method for realizing one-time traction of extra-long tunnel anchor narrow space by main cable strand |
CN109944166A (en) * | 2019-04-26 | 2019-06-28 | 四川路桥华东建设有限责任公司 | A kind of overlength high inclination-angle tunnel anchorage large-tonnage dissipates cable saddle and glides and installation system and operating method |
CN109973130A (en) * | 2019-04-26 | 2019-07-05 | 四川路桥华东建设有限责任公司 | Once draw construction system and method in place in a kind of main cable strand realization narrow space of Super Long Tunnel anchor |
CN109944166B (en) * | 2019-04-26 | 2023-10-24 | 四川路桥华东建设有限责任公司 | Ultra-long large-dip-angle tunnel anchor large-tonnage cable saddle sliding and mounting system and operation method |
CN110629671A (en) * | 2019-10-31 | 2019-12-31 | 中铁大桥勘测设计院集团有限公司 | A suspension bridge anchorage and its construction method |
CN110820523A (en) * | 2019-11-22 | 2020-02-21 | 柳州欧维姆机械股份有限公司 | Cable strand connecting structure for replacing main cable of suspension bridge, anchorage structure and construction method |
CN110820524A (en) * | 2019-11-22 | 2020-02-21 | 柳州欧维姆机械股份有限公司 | Connecting structure, fixing structure, new main cable system and construction method for replacing main cable of suspension bridge |
CN112176872A (en) * | 2020-09-15 | 2021-01-05 | 中交二公局第二工程有限公司 | Method for erecting main cable of anchor suspension bridge of two-bank tunnel |
CN112176872B (en) * | 2020-09-15 | 2022-03-01 | 中交二公局第二工程有限公司 | A method for erecting main cables of tunnel anchor suspension bridges on both sides of the river |
CN112176870B (en) * | 2020-09-15 | 2022-04-15 | 中交二公局第二工程有限公司 | Method for installing main cable of suspension bridge with tunnel type anchorage at two banks |
CN112176870A (en) * | 2020-09-15 | 2021-01-05 | 中交二公局第二工程有限公司 | Method for installing main cable of suspension bridge with tunnel type anchorage at two banks |
CN112554056A (en) * | 2020-12-16 | 2021-03-26 | 长江水利委员会长江科学院 | Horizontal anchorage structure of suspension bridge and construction method |
Also Published As
Publication number | Publication date |
---|---|
CN107119572B (en) | 2018-12-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107119572A (en) | A kind of main rope of suspension bridge strand second traction enters the construction method of tunnel anchorage | |
CN102444086B (en) | Cable hanging system for inclined stay cable of bridge and cable hanging method for inclined stay cable of bridge | |
CN101967796B (en) | Method for arranging parallel steel wire stay cable | |
CN102900021A (en) | Split mounting type bridge wet joint construction method | |
CN106758767B (en) | A kind of suspension bridge segmented cat road and its construction method | |
CN204651779U (en) | A kind of anti-hopping releasing pulley being applicable to transmission line construction | |
CN109973130A (en) | Once draw construction system and method in place in a kind of main cable strand realization narrow space of Super Long Tunnel anchor | |
CN205222535U (en) | Dismounting device of tower machine balancing weight piece | |
CN109853393A (en) | A kind of the hanging cable construction system and its construction method of king-tower vertical transfer cable-stayed bridge | |
CN102852092B (en) | Hanging cable guiding device and method | |
CN105350782B (en) | A kind of semi-mechanization steel strand wires laying method for round silo | |
CN107268439B (en) | It is a kind of to make the quick construction method in place of main cable strand in Tunnel-Type Anchorage of Suspension Bridge using special fixture | |
CN206302092U (en) | Pulling tools for overhead transmission line cables | |
CN109403633A (en) | A kind of pilot protection and its application method of pre-buried sensor | |
CN203655140U (en) | Safe falling protector for gantry crane in process of climbing up and down straight ladder | |
CN2866439Y (en) | Harbour hoist working state windproof hook | |
CN108100888A (en) | A kind of main rope fast erecting installation method | |
CN107178044A (en) | A kind of method that I-shaped gooseneck is worn under during jacking bridge and culvert track strengthening | |
CN205605247U (en) | A hold in palm cable groove that is used for colliery to combine digging electromechanical cable | |
CN208416056U (en) | Novel steel wire rope mechanically proposes parking equipment lifting system | |
CN205367548U (en) | Mountain region pole transport means | |
CN113605230A (en) | Main cable traction system and method suitable for suspension bridge two-bank tunnel anchor | |
CN201754485U (en) | Multifunctional rope storing reel | |
CN202809490U (en) | Rope-hanging guiding device | |
CN202687869U (en) | Drag type lifting table |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |