CN107119572A - A kind of main rope of suspension bridge strand second traction enters the construction method of tunnel anchorage - Google Patents

A kind of main rope of suspension bridge strand second traction enters the construction method of tunnel anchorage Download PDF

Info

Publication number
CN107119572A
CN107119572A CN201710480230.6A CN201710480230A CN107119572A CN 107119572 A CN107119572 A CN 107119572A CN 201710480230 A CN201710480230 A CN 201710480230A CN 107119572 A CN107119572 A CN 107119572A
Authority
CN
China
Prior art keywords
strand
tunnel anchorage
traction
tunnel
anchorage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710480230.6A
Other languages
Chinese (zh)
Other versions
CN107119572B (en
Inventor
黄兵
唐中波
赵桐远
张晓波
张艳丽
田雪梅
陈勉
胡盼
黄茂洲
柏国胜
伏冠西
李健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SICHUAN LUQIAO HUADONG BUILDING CO Ltd
Original Assignee
SICHUAN LUQIAO HUADONG BUILDING CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SICHUAN LUQIAO HUADONG BUILDING CO Ltd filed Critical SICHUAN LUQIAO HUADONG BUILDING CO Ltd
Priority to CN201710480230.6A priority Critical patent/CN107119572B/en
Publication of CN107119572A publication Critical patent/CN107119572A/en
Application granted granted Critical
Publication of CN107119572B publication Critical patent/CN107119572B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses the construction method that a kind of main rope of suspension bridge strand second traction enters tunnel anchorage;It is characterized in that:Comprise the following steps:(1)Releasing pulls device and is connected with strand;(2)Pull rope is fallen back;(3)Tunnel anchorage pulls device and is connected with strand;(4)Frame strand is handled;(5)Traction is in place.In Tunnel-Type Anchorage of Suspension Bridge, the narrower tunnel anchorage in space, in the case that main push-towing rope traction is using typically device is pulled, usually can not once it be drawn in place with the generation position conflict of cable saddle door frame is dissipated in tunnel anchorage.Fast and effectively it can make main cable strand is smoothly in place can increase main push-towing rope propulsive efficiency to preceding anchor face by second traction by the present invention, it is cost-effective.

Description

A kind of main rope of suspension bridge strand second traction enters the construction method of tunnel anchorage
Technical field
The present invention relates to field of civil engineering, and in particular to one kind realizes that main rope of suspension bridge strand second traction enters tunnel The construction method of anchor.
Background technology
At present, more Analysis of Suspension Bridges ' Anchorage system is designed to tunnel-type anchorage, and its feature of the anchorage of this form is space It is long and narrow and with certain inclination angle.Because sectional space is narrow and small in tunnel anchorage, dissipated in tunnel at cable saddle buttress, dissipate cable saddle and door Frame system can occupy suitable large space.It will result in main push-towing rope and draw to tunnel anchorage and dissipate at cable saddle buttress, what traction was used pulls device Occur position with portal frame system to conflict, prevent the traction of main cable strand.
The content of the invention
It is an object of the invention to provide a kind of main rope of suspension bridge strand second traction herein to enter the side that tunnel anchorage is constructed Method, using second traction method, replaces traction using device is pulled, and main cable strand was smoothly drawn and cable saddle door is dissipated in tunnel anchorage Frame, effectively and safely perform.So as to ensure construction safety, improve effect, cost-effective.
The present invention is achieved in that a kind of main rope of suspension bridge strand second traction enters the method that tunnel anchorage is constructed, profit Solve to pull the problem of device conflicts with scattered cable saddle door frame with the device of simple and convenient, it is characterised in that:Comprise the following steps:
Step one:Releasing pulls device and is connected with strand:Strand anchor head is connected with pulling device releasing, steel cable is temporarily utilized by strand Anchor head is fixed near tunnel anchorage hole;
Step 2:Hauling rope is fallen back:Using single line reciprocating-type tractor system is by hauling rope and pulls device retroversion 100m(To lead again It device is pulled after drawing will not advance to scattered saddle's position and be advisable);
Step 3:Tunnel anchorage pulls device and is connected with strand:The special device that pulls of tunnel anchorage is fixed with hauling rope, and main cable strand Anchor head is connected with the special device that pulls of tunnel anchorage;
Step 4:Frame strand is handled:Strand is drawn after tunnel anchorage, it will passed through directly over from scattered cable saddle, and strand will be dragged It is drawn into cable saddle saddle groove, is rubbed with frame strand, therefore set roller lattice to keep off in saddle groove, it is to avoid strand rubs in traction Wipe;
Step 5:Traction is in place:Start trailer system hoist engine, strand drawn to preceding anchor face, complete main cable strand draw into Tunnel anchorage works.
The invention has the advantages that:Enter tunnel anchorage the invention provides a kind of main rope of suspension bridge strand second traction Construction method;Comprise the following steps:(1)Releasing pulls device and is connected with strand;(2)Pull rope is fallen back;(3)Tunnel anchorage pull device with Strand is connected;(4)Frame strand is handled;(5)Traction is in place.In Tunnel-Type Anchorage of Suspension Bridge, the narrower tunnel anchorage in space, main push-towing rope In the case that traction is using typically device is pulled, usually can not once it be drawn with the generation position conflict of cable saddle door frame is dissipated in tunnel anchorage In place.Fast and effectively by second traction main cable strand can be made smoothly in place to preceding anchor face by the present invention, main push-towing rope can be increased Propulsive efficiency, it is cost-effective.
The present invention also has the following advantages that:
1st, the tunnel anchorage complicated without design dissipates cable saddle door frame.
2nd, conventional main rope of suspension bridge trailer system can be just applicable.
3rd, temporary structure facility at cable saddle is dissipated in tunnel anchorage can not influence follow-up strand to enter saddle according to conventional arrangement completely Construction.
4th, efficiency high, time and labour saving, and safety.
Brief description of the drawings
Fig. 1 retreats schematic diagram to pull device before tunnel anchorage hole;
Fig. 2 pulls device schematic diagram to be special in tunnel anchorage;
Fig. 3 is the processing of frame strand top schematic diagram.
Wherein:Pull rope 1, strand anchor head 2, wooden springboard 3, rope card 4(Rubber peel protection need to be twined with strand contact site), rope Stock 5, reinforcing bar 6, roller bearing 7(Outpacking rubber skin), baffle plate 8.
Embodiment
Below in conjunction with accompanying drawing 1-3, the present invention is described in detail, and the technical scheme in the embodiment of the present invention is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole implementation Example.Based on the embodiment in the present invention, what those of ordinary skill in the art were obtained under the premise of creative work is not made Every other embodiment, belongs to the scope of protection of the invention.
The present invention provides the construction method that a kind of main rope of suspension bridge strand second traction enters tunnel anchorage, makes main cable strand can Cable saddle door frame is dissipated in tunnel anchorage smoothly to draw, effectively and is safely performed.
The specific embodiment of the invention is expanded on further below in conjunction with the accompanying drawings:
A kind of main rope of suspension bridge strand second traction enters the construction method of tunnel anchorage, main cable strand was smoothly drawn tunnel Cable saddle door frame is dissipated in road anchor.
Step one:Releasing pulls device and is connected with strand:Strand anchor head is connected with pulling device releasing, temporarily will using steel cable Strand anchor head is fixed near tunnel anchorage hole;
Step 2:Hauling rope is fallen back:Using single line reciprocating-type tractor system is by hauling rope and pulls device retroversion 100m(To lead again It device is pulled after drawing will not advance to scattered saddle's position and be advisable);
Step 3:Tunnel anchorage pulls device and is connected with strand:The special device that pulls of tunnel anchorage is fixed with hauling rope, and main cable strand Anchor head is connected with the special device that pulls of tunnel anchorage;
Step 4:Frame strand is handled:Strand is drawn after tunnel anchorage, it will passed through directly over from scattered cable saddle, and strand will be dragged It is drawn into cable saddle saddle groove, is rubbed with frame strand, therefore set roller lattice to keep off in saddle groove, it is to avoid strand rubs in traction Wipe;
Step 5:Traction is in place:Start trailer system hoist engine, strand drawn to preceding anchor face, complete main cable strand draw into Tunnel anchorage works.
Draw into how tunnel anchorage is studied by dissipating cable saddle door frame, have present invention is generally directed to main rope of suspension bridge strand The advantages of effective percentage is high, security is good, greatlys save construction cost.
The invention has the advantages that:
1st, the tunnel anchorage complicated without design dissipates cable saddle door frame.
2nd, conventional main rope of suspension bridge trailer system can be just applicable.
3rd, temporary structure facility at cable saddle is dissipated in tunnel anchorage can not influence follow-up strand to enter saddle according to conventional arrangement completely Construction.
4th, efficiency high, time and labour saving, and safety.
The foregoing description of the disclosed embodiments, enables professional and technical personnel in the field to realize or using the present invention. A variety of modifications to these embodiments will be apparent for those skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, it is of the invention The embodiments shown herein is not intended to be limited to, and is to fit to and principles disclosed herein and features of novelty phase one The most wide scope caused.

Claims (1)

1. a kind of main rope of suspension bridge strand second traction enters the construction method of tunnel anchorage, it is characterised in that:Comprise the following steps:
Step one:Releasing pulls device and is connected with strand:Strand anchor head is released with pulling device and is connected, using steel cable by strand anchor head It is fixed near tunnel anchorage hole;
Step 2:Hauling rope is fallen back:Using single line reciprocating-type tractor system is by hauling rope and pulls device retroversion 100m;
Step 3:Tunnel anchorage pulls device and is connected with strand anchor head:The special device that pulls of tunnel anchorage is fixed with hauling rope, and main push-towing rope Strand anchor head is connected with the special device that pulls of tunnel anchorage;
Step 4:Frame strand is handled:Strand is drawn after tunnel anchorage, it will passed through directly over from scattered cable saddle, and strand will be dragged It is drawn into cable saddle saddle groove, is rubbed with frame strand, therefore set roller lattice to keep off in saddle groove, it is to avoid strand rubs in traction Wipe;
Step 5:Traction is in place:Start trailer system hoist engine, strand drawn to preceding anchor face, complete main cable strand draw into Tunnel anchorage works.
CN201710480230.6A 2017-06-22 2017-06-22 A kind of main rope of suspension bridge strand second traction enters the construction method of tunnel anchorage Active CN107119572B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710480230.6A CN107119572B (en) 2017-06-22 2017-06-22 A kind of main rope of suspension bridge strand second traction enters the construction method of tunnel anchorage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710480230.6A CN107119572B (en) 2017-06-22 2017-06-22 A kind of main rope of suspension bridge strand second traction enters the construction method of tunnel anchorage

Publications (2)

Publication Number Publication Date
CN107119572A true CN107119572A (en) 2017-09-01
CN107119572B CN107119572B (en) 2018-12-18

Family

ID=59719377

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710480230.6A Active CN107119572B (en) 2017-06-22 2017-06-22 A kind of main rope of suspension bridge strand second traction enters the construction method of tunnel anchorage

Country Status (1)

Country Link
CN (1) CN107119572B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108708756A (en) * 2018-08-31 2018-10-26 四川路桥华东建设有限责任公司 A kind of tunnel anchorage is interior to utilize the construction system and method that dissipate cable saddle buttress anchoring cat road head-rope
CN108797347A (en) * 2018-07-20 2018-11-13 中交武汉港湾工程设计研究院有限公司 Cycle is drawn into anchor system
CN109944166A (en) * 2019-04-26 2019-06-28 四川路桥华东建设有限责任公司 A kind of overlength high inclination-angle tunnel anchorage large-tonnage dissipates cable saddle and glides and installation system and operating method
CN109973130A (en) * 2019-04-26 2019-07-05 四川路桥华东建设有限责任公司 Once draw construction system and method in place in a kind of main cable strand realization narrow space of Super Long Tunnel anchor
CN110629671A (en) * 2019-10-31 2019-12-31 中铁大桥勘测设计院集团有限公司 A suspension bridge anchorage and its construction method
CN110820524A (en) * 2019-11-22 2020-02-21 柳州欧维姆机械股份有限公司 Connecting structure, fixing structure, new main cable system and construction method for replacing main cable of suspension bridge
CN110820523A (en) * 2019-11-22 2020-02-21 柳州欧维姆机械股份有限公司 Cable strand connecting structure for replacing main cable of suspension bridge, anchorage structure and construction method
CN112176870A (en) * 2020-09-15 2021-01-05 中交二公局第二工程有限公司 Method for installing main cable of suspension bridge with tunnel type anchorage at two banks
CN112176872A (en) * 2020-09-15 2021-01-05 中交二公局第二工程有限公司 Method for erecting main cable of anchor suspension bridge of two-bank tunnel
CN112554056A (en) * 2020-12-16 2021-03-26 长江水利委员会长江科学院 Horizontal anchorage structure of suspension bridge and construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH083922A (en) * 1994-06-21 1996-01-09 Hazama Gumi Ltd Suspension bridge anchor and construction method
CN101177931A (en) * 2007-12-05 2008-05-14 中铁大桥局股份有限公司 Erection of gantry type small-cycle traction system on large-span suspension bridge main cable
CN204185775U (en) * 2014-09-11 2015-03-04 中交第二航务工程局有限公司 A kind of two-wire reciprocal gantry type systemic circulation trailer system
CN104631320A (en) * 2014-12-29 2015-05-20 大连理工大学 Tunnel anchor of single-hole double-anchor system
CN105648921A (en) * 2016-02-18 2016-06-08 长江水利委员会长江科学院 Suspension bridge rock mass and reinforced concrete plate composited type anchorage and construction method thereof
CN106012855A (en) * 2016-06-22 2016-10-12 四川路桥华东建设有限责任公司 System for fast mounting steel pull rod in ultra-long and large-dip-angle tunnel anchorage and operation method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH083922A (en) * 1994-06-21 1996-01-09 Hazama Gumi Ltd Suspension bridge anchor and construction method
CN101177931A (en) * 2007-12-05 2008-05-14 中铁大桥局股份有限公司 Erection of gantry type small-cycle traction system on large-span suspension bridge main cable
CN204185775U (en) * 2014-09-11 2015-03-04 中交第二航务工程局有限公司 A kind of two-wire reciprocal gantry type systemic circulation trailer system
CN104631320A (en) * 2014-12-29 2015-05-20 大连理工大学 Tunnel anchor of single-hole double-anchor system
CN105648921A (en) * 2016-02-18 2016-06-08 长江水利委员会长江科学院 Suspension bridge rock mass and reinforced concrete plate composited type anchorage and construction method thereof
CN106012855A (en) * 2016-06-22 2016-10-12 四川路桥华东建设有限责任公司 System for fast mounting steel pull rod in ultra-long and large-dip-angle tunnel anchorage and operation method

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108797347A (en) * 2018-07-20 2018-11-13 中交武汉港湾工程设计研究院有限公司 Cycle is drawn into anchor system
CN108708756A (en) * 2018-08-31 2018-10-26 四川路桥华东建设有限责任公司 A kind of tunnel anchorage is interior to utilize the construction system and method that dissipate cable saddle buttress anchoring cat road head-rope
CN109973130B (en) * 2019-04-26 2023-09-08 四川路桥华东建设有限责任公司 Construction system and method for realizing one-time traction of extra-long tunnel anchor narrow space by main cable strand
CN109944166A (en) * 2019-04-26 2019-06-28 四川路桥华东建设有限责任公司 A kind of overlength high inclination-angle tunnel anchorage large-tonnage dissipates cable saddle and glides and installation system and operating method
CN109973130A (en) * 2019-04-26 2019-07-05 四川路桥华东建设有限责任公司 Once draw construction system and method in place in a kind of main cable strand realization narrow space of Super Long Tunnel anchor
CN109944166B (en) * 2019-04-26 2023-10-24 四川路桥华东建设有限责任公司 Ultra-long large-dip-angle tunnel anchor large-tonnage cable saddle sliding and mounting system and operation method
CN110629671A (en) * 2019-10-31 2019-12-31 中铁大桥勘测设计院集团有限公司 A suspension bridge anchorage and its construction method
CN110820523A (en) * 2019-11-22 2020-02-21 柳州欧维姆机械股份有限公司 Cable strand connecting structure for replacing main cable of suspension bridge, anchorage structure and construction method
CN110820524A (en) * 2019-11-22 2020-02-21 柳州欧维姆机械股份有限公司 Connecting structure, fixing structure, new main cable system and construction method for replacing main cable of suspension bridge
CN112176872A (en) * 2020-09-15 2021-01-05 中交二公局第二工程有限公司 Method for erecting main cable of anchor suspension bridge of two-bank tunnel
CN112176872B (en) * 2020-09-15 2022-03-01 中交二公局第二工程有限公司 A method for erecting main cables of tunnel anchor suspension bridges on both sides of the river
CN112176870B (en) * 2020-09-15 2022-04-15 中交二公局第二工程有限公司 Method for installing main cable of suspension bridge with tunnel type anchorage at two banks
CN112176870A (en) * 2020-09-15 2021-01-05 中交二公局第二工程有限公司 Method for installing main cable of suspension bridge with tunnel type anchorage at two banks
CN112554056A (en) * 2020-12-16 2021-03-26 长江水利委员会长江科学院 Horizontal anchorage structure of suspension bridge and construction method

Also Published As

Publication number Publication date
CN107119572B (en) 2018-12-18

Similar Documents

Publication Publication Date Title
CN107119572A (en) A kind of main rope of suspension bridge strand second traction enters the construction method of tunnel anchorage
CN102444086B (en) Cable hanging system for inclined stay cable of bridge and cable hanging method for inclined stay cable of bridge
CN101967796B (en) Method for arranging parallel steel wire stay cable
CN102900021A (en) Split mounting type bridge wet joint construction method
CN106758767B (en) A kind of suspension bridge segmented cat road and its construction method
CN204651779U (en) A kind of anti-hopping releasing pulley being applicable to transmission line construction
CN109973130A (en) Once draw construction system and method in place in a kind of main cable strand realization narrow space of Super Long Tunnel anchor
CN205222535U (en) Dismounting device of tower machine balancing weight piece
CN109853393A (en) A kind of the hanging cable construction system and its construction method of king-tower vertical transfer cable-stayed bridge
CN102852092B (en) Hanging cable guiding device and method
CN105350782B (en) A kind of semi-mechanization steel strand wires laying method for round silo
CN107268439B (en) It is a kind of to make the quick construction method in place of main cable strand in Tunnel-Type Anchorage of Suspension Bridge using special fixture
CN206302092U (en) Pulling tools for overhead transmission line cables
CN109403633A (en) A kind of pilot protection and its application method of pre-buried sensor
CN203655140U (en) Safe falling protector for gantry crane in process of climbing up and down straight ladder
CN2866439Y (en) Harbour hoist working state windproof hook
CN108100888A (en) A kind of main rope fast erecting installation method
CN107178044A (en) A kind of method that I-shaped gooseneck is worn under during jacking bridge and culvert track strengthening
CN205605247U (en) A hold in palm cable groove that is used for colliery to combine digging electromechanical cable
CN208416056U (en) Novel steel wire rope mechanically proposes parking equipment lifting system
CN205367548U (en) Mountain region pole transport means
CN113605230A (en) Main cable traction system and method suitable for suspension bridge two-bank tunnel anchor
CN201754485U (en) Multifunctional rope storing reel
CN202809490U (en) Rope-hanging guiding device
CN202687869U (en) Drag type lifting table

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant