CN106894345A - Continuous beam end bay closing device and method - Google Patents

Continuous beam end bay closing device and method Download PDF

Info

Publication number
CN106894345A
CN106894345A CN201710250543.2A CN201710250543A CN106894345A CN 106894345 A CN106894345 A CN 106894345A CN 201710250543 A CN201710250543 A CN 201710250543A CN 106894345 A CN106894345 A CN 106894345A
Authority
CN
China
Prior art keywords
end bay
closing device
bed die
rear cross
support bracket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710250543.2A
Other languages
Chinese (zh)
Inventor
刘杨
张明勇
邓贤力
丛森
陈吉武
李素英
蒲伏华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC5 Group Shanghai Corp Ltd
Original Assignee
MCC5 Group Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC5 Group Shanghai Corp Ltd filed Critical MCC5 Group Shanghai Corp Ltd
Priority to CN201710250543.2A priority Critical patent/CN106894345A/en
Publication of CN106894345A publication Critical patent/CN106894345A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

In continuous beam end bay closing device of the invention and continuous beam end bay folding method, the support bracket is partially received in the reserving hole channel of transition pier capping beam, the rear cross beam is fixed on bottom edge into beam section, the bed die longeron is located at the front beam and rear cross beam top, the template is located at bed die longeron top, set this invention simplifies support, it is not take up extra place, the shaped steel for being used is also reusable, installation, convenient disassembly, construction cost is cheap, while accelerating bridge integral construction progress, improves economic benefit.

Description

Continuous beam end bay closing device and method
Technical field
The present invention relates to bridge field, particularly continuous beam end bay closing device and method.
Background technology
In recent years, continuing to develop with transport development cause, the design and construction technique of China's Large Span Bridges also with Develop rapidly.In Large Span Bridges engineering construction, cantilever method is constructed as a kind of important construction technology, is widely used in The techniques have easy construction in science of bridge building, while the features such as opening up multiple working faces, accelerating construction progress, as bridge The important developing direction of construction.
End bay closes up as one of critical process in Construction of continuous beam, directly affects full bridge structure safety and quality.Mesh Before, the construction of end bay closure segment is typically with the method for setting up full hall scaffold plus steel pipe column in transition pier, by Hanging Basket bed die One end is placed on steel pipe column, formed an operation platform, scaffold then meet steel pipe column erection construction and later stage personnel it is upper and lower Passage, but the method is higher to foundation bearing capacity, and required place is larger, if transition pier is higher, steel pipe column will increase therewith, There is larger potential safety hazard in work progress, and relatively costly, it is impossible to be used in the construction of bridge completely.
What traditional in the prior art construction method was used set up full hall scaffold in transition pier sets up and sets steel pipe column Etc. external support method needed for place it is larger, complex structure higher to ground requirement for bearing capacity, construction period is more long, construction Cost is excessive, and when setting up and using such support, there is larger potential safety hazard, it is impossible to meet wanting for bridge contact construction Ask.
The content of the invention
The present invention close up problem present in technology for continuous beam end bay, there is provided a kind of continuous beam end bay closing device and A kind of continuous beam end bay folding method has that reasonable in design, mechanical property is good, step is simple, security good and construction cost is low Advantage.
It is that, up to above-mentioned advantage, the present invention provides a kind of continuous beam end bay closing device, the device includes support bracket, preceding horizontal stroke Beam, rear cross beam, bed die longeron, template;The support bracket is partially received in the reserving hole channel of transition pier capping beam, described rear horizontal Beam is fixed on bottom edge into beam section, and the bed die longeron is located at the front beam and rear cross beam top, the mould Plate is located at bed die longeron top, and the quantity of the support bracket is multiple.
It is the front beam, the rear cross beam, described in one embodiment of continuous beam end bay closing device of the invention Support bracket and bed die longeron are I-steel.
In one embodiment of continuous beam end bay closing device of the invention, the rectangular cross-section of the reserving hole channel.
In one embodiment of continuous beam end bay closing device of the invention, the reserving hole channel is blind hole.
In one embodiment of continuous beam end bay closing device of the invention, the hole wall and bottom hole of the reserving hole channel enclose It is wound with steel plate layer.
In one embodiment of continuous beam end bay closing device of the invention, the steel plate layer outer surface is fixed with " well " Font reinforcing bar, axis of " well " the font reinforcing bar perpendicular to the reserving hole channel.
It is described into beam section by construction cradle in one embodiment of continuous beam end bay closing device of the invention Into.
In one embodiment of continuous beam end bay closing device of the invention, the reinforcing bar of the steel plate layer and the bent cap It is connected.
In one embodiment of continuous beam end bay closing device of the invention, the quantity of the bed die longeron is multiple.
The present invention also provides a kind of continuous beam end bay folding method, and methods described includes:A, poured near conjunction using Hanging Basket Hold together the beam section of section;B, bracket portion will be supported to be arranged in the reserving hole channel of transition pier capping beam;The quantity of the support bracket is many It is individual;C, hanging basket advancing ride on support bracket front beam, rear cross beam are connected with the bottom edge into beam section, preceding Bed die longeron is installed on crossbeam, rear cross beam, end bay Cast-in-Situ Segment template is installed on bed die longeron, pour end bay Cast-in-Situ Segment concrete;D、 End bay Cast-in-Situ Segment template is removed, closure segment template is installed on bed die longeron, pour closure segment concrete;F, remove closure segment template, Support bracket, front beam, rear cross beam and bed die longeron.
In continuous beam end bay closing device of the invention and continuous beam end bay folding method, the support bracket part holds It is contained in the reserving hole channel of transition pier capping beam, the rear cross beam is fixed on bottom edge into beam section, the bed die longeron position In the front beam and rear cross beam top, the template is located at bed die longeron top, is set up this invention simplifies branch Put, be not take up extra place, the shaped steel for being used is also reusable, installation, convenient disassembly, construction cost are cheap, while plus Fast bridge integral construction progress, improves economic benefit.
Brief description of the drawings
Fig. 1 show the structural representation of the vertical section of the continuous beam end bay closing device of first embodiment of the invention.
Fig. 2 show the structural representation in the cross section of continuous beam end bay closing device in Fig. 1.
Fig. 3 show the structural representation of the steel plate layer of the reserving hole channel of bent cap in Fig. 1.
Specific embodiment
Further to illustrate the present invention to reach technological means and effect that predetermined goal of the invention is taken, below in conjunction with Accompanying drawing and preferred embodiment, to proposing specific embodiment, structure, feature and its effect according to the present invention, describe in detail as after.
Fig. 1 show the structural representation of the vertical section of the continuous beam end bay closing device of first embodiment of the invention.Fig. 2 It show the structural representation in the cross section of continuous beam end bay closing device in Fig. 1.Fig. 1, Fig. 2 are referred to, is connected in the present embodiment Continuous beam end bay closing device 10 includes support bracket 12a, front beam 13a, anchor pole 12b, rear cross beam 13b, bed die longeron 15, template 17;Support bracket 12a is partially received in the reserving hole channel 110 of transition pier capping beam 100, and rear cross beam 13b is fixed by anchor pole 12b , into the bottom edge of beam section 21, bed die longeron 15 is located at front beam 13a and rear cross beam 13b tops, and template 17 is located at bed die The top of longeron 15, the quantity of support bracket 12a is multiple.The quantity of bed die longeron 15 is multiple.
Support bracket 12a is shaped steel, and 9 are set altogether, has reserving hole channel 110 at bearing pad stone 111 to set at the two ends of bent cap 100 Put spacing smaller, it is larger without the spacing of reserving hole channel 110 at bearing pad stone 111 at the middle part of bent cap 100;Support bracket 12a can select I40A I-steel, each shaped steel stretches into bent cap 1m, exposes 0.6m, and exposed parts are used to support front beam 13a.Front beam 13a, after Crossbeam 13b, bed die longeron 15 can also be I-steel.
Fig. 3 show the structural representation of the steel plate layer of the reserving hole channel of bent cap in Fig. 1.The section of reserving hole channel 110 is Rectangle, reserving hole channel 110 is blind hole.The hole wall and bottom hole of reserving hole channel 110 are surrounded with steel plate layer 111.The outer surface of steel plate layer 111 It is fixed with " well " font axis of reinforcing bar 111a, " well " font reinforcing bar 111a perpendicular to reserving hole channel 110.
Steel plate layer 111 uses the hole wall and bottom hole of 2mm steel sheet and plates, reserving hole channel 110 to be formed with by steel sheet and plate welding The steel box of bottom uncovered, " well " font reinforcing bar 111a is selected from by diameter 12mm Ribbed Bars, will before the concrete of bent cap 100 is poured " well " font reinforcing bar 111a is welded and fixed with bent cap cage bar, and vertically and horizontally position and the level of steel box should be accurately measured before fixing Absolute altitude, must be allowed on the same plane;Because the steel box length for stretching into bent cap 100 has 1m, so should set no less than 3 layers " wells " Font Ribbed Bar 111a, one of a setting before, during and after steel box respectively, if when the distribution of bent cap cage bar can not meet this condition, Can suitably be increased.
The present invention also provides a kind of continuous beam end bay folding method, and methods described includes:
A, the beam section 21 that close closure segment 22 is poured using Hanging Basket, after the beam section 21 of complete main T structures to be onstructed, are removed on Hanging Basket Portion's truss;
B, bracket 12a portions will be supported to be arranged in the reserving hole channel 110 of transition pier capping beam 100;Treat that the intensity of beam section 21 is reached After design strength, the front beam 13a reaches of Hanging Basket are positioned on support bracket 12a, after being put in place, front beam should be checked 13a whether level, if with every support bracket 12a contact closely, if not having, steel cushion block need to be increased.By rear cross beam 13b and Bottom edge into beam section 21 is connected, and before construction end bay Cast-in-Situ Segment 23, need to complete the frame of transition pier opposite side Precast T-Beam If, and complete the construction of wet seam and diaphragm plate.Rear cross beam is anchored with 15# beam sections;Remove Hanging Basket top trussing etc. only pre- Keep on file mould 172 and side form 171, and according to calculating and setting counterweight;
Bed die longeron 15 is installed on front beam 13a, rear cross beam 13b, end bay Cast-in-Situ Segment 23 is installed on bed die longeron 15 Template, the template of adjustment end bay Cast-in-Situ Segment 23, assembling reinforcement and prestressing tendon etc..Main T structures two ends beam section 21 sets counterweight, such as respectively matches somebody with somebody Weight 100.2t (this load is adjusted according to design checking counterweight, is paid attention to during deformation monitoring conceptual design), pours into a mould end bay The concrete of Cast-in-Situ Segment 23, pour concrete weight 263.5t is amounted to according to design;Simultaneously in main T structures two during the concrete of cast end bay Cast-in-Situ Segment 23 End carriage section 21 progressively unloads counterweight near the termination of end bay Cast-in-Situ Segment 23, amounts to discharging quantity 53.18t.
C, the template of dismounting end bay Cast-in-Situ Segment 23, install the template of closure segment 22 on bed die longeron 15, and end bay closure segment 22 stands Mould;The welding stiff skeleton of closure segment 22;Steel beam is closed up in tensioning temporarily;Pour the concrete of closure segment 22;The gradually main T of removal in casting process Structure two ends beam section 21 is close to the termination residue counterweight 47.02t of end bay Cast-in-Situ Segment 23 to control beam-ends vertical deformation stabilization;Tensioning end bay Base plate beam, anchoring temporarily beam residue load and mud jacking, complete the construction of end bay closure segment.
D, dismounting closure segment template, support bracket, front beam, rear cross beam and bed die longeron.
In continuous beam end bay closing device of the invention and continuous beam end bay folding method, the support bracket part holds It is contained in the reserving hole channel of transition pier capping beam, the rear cross beam is fixed on bottom edge into beam section, the bed die longeron position In the front beam and rear cross beam top, the template is located at bed die longeron top, is set up this invention simplifies branch Put, be not take up extra place, the shaped steel for being used is also reusable, installation, convenient disassembly, construction cost are cheap, while plus Fast bridge integral construction progress, improves economic benefit.
More than, only it is presently preferred embodiments of the present invention, any formal limitation is not made to the present invention, although this Invention is disclosed above with preferred embodiment, but is not limited to the present invention, any those skilled in the art, Do not depart from the range of technical solution of the present invention, be equal to when making a little change or being modified to using the technology contents of the disclosure above The Equivalent embodiments of change, as long as being without departing from technical solution of the present invention content, according to technical spirit of the invention to real above Any simple modification, equivalent variations and modification that example is made are applied, is still fallen within the range of technical solution of the present invention.

Claims (10)

1. a kind of continuous beam end bay closing device, it is characterised in that:The device includes support bracket, front beam, rear cross beam, bed die Longeron, template;The support bracket is partially received in the reserving hole channel of transition pier capping beam, and the rear cross beam is fixed on Cheng Liang The bottom edge of section, the bed die longeron is located at the front beam and rear cross beam top, and the template is located at the bed die Longeron top, the quantity of the support bracket is multiple.
2. continuous beam end bay closing device according to claim 1, it is characterised in that:The front beam, the rear cross beam, The support bracket and bed die longeron are I-steel.
3. continuous beam end bay closing device according to claim 1, it is characterised in that:The section of the reserving hole channel is square Shape.
4. continuous beam end bay closing device according to claim 3, it is characterised in that:The reserving hole channel is blind hole.
5. continuous beam end bay closing device according to claim 4, it is characterised in that:The hole wall of the reserving hole channel and hole Bottom is surrounded with steel plate layer.
6. continuous beam end bay closing device according to claim 5, it is characterised in that:The steel plate layer outer surface is fixed with " well " font reinforcing bar, axis of " well " the font reinforcing bar perpendicular to the reserving hole channel.
7. continuous beam end bay closing device according to claim 6, it is characterised in that:It is described to be applied by Hanging Basket method into beam section Work is formed.
8. continuous beam end bay closing device according to claim 7, it is characterised in that:The steel plate layer and the bent cap Bar connecting is fixed.
9. the continuous beam end bay closing device according to any one in claim 1-8, it is characterised in that:The bed die is indulged The quantity of beam is multiple.
10. a kind of continuous beam end bay folding method, it is characterised in that:Methods described includes:
A, pour the beam section near closure segment using Hanging Basket;
B, bracket portion will be supported to be arranged in the reserving hole channel of transition pier capping beam;The quantity of the support bracket is multiple;
C, hanging basket advancing ride on support bracket front beam, and rear cross beam is connected with the bottom edge into beam section, Bed die longeron is installed on front beam, rear cross beam, end bay Cast-in-Situ Segment template is installed on bed die longeron, pour end bay Cast-in-Situ Segment concrete;
D, dismounting end bay Cast-in-Situ Segment template, install closure segment template on bed die longeron, pour closure segment concrete;
F, dismounting closure segment template, support bracket, front beam, rear cross beam and bed die longeron.
CN201710250543.2A 2017-04-17 2017-04-17 Continuous beam end bay closing device and method Pending CN106894345A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710250543.2A CN106894345A (en) 2017-04-17 2017-04-17 Continuous beam end bay closing device and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710250543.2A CN106894345A (en) 2017-04-17 2017-04-17 Continuous beam end bay closing device and method

Publications (1)

Publication Number Publication Date
CN106894345A true CN106894345A (en) 2017-06-27

Family

ID=59196173

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710250543.2A Pending CN106894345A (en) 2017-04-17 2017-04-17 Continuous beam end bay closing device and method

Country Status (1)

Country Link
CN (1) CN106894345A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109944170A (en) * 2019-05-06 2019-06-28 重庆建工市政交通工程有限责任公司 Continuous beam with high-pier end bay Cast-in-Situ Segment and closure section integrated construction system and construction method
CN110409314A (en) * 2019-08-15 2019-11-05 中国五冶集团有限公司 Continuous rigid frame bridge closure section unidirectional limitation locking device and method automatically
CN112049463A (en) * 2020-08-19 2020-12-08 中建八局第二建设有限公司 Atrium beam support construction method and atrium beam support construction system
CN113494054A (en) * 2021-07-26 2021-10-12 中国建筑土木建设有限公司 Template system of cantilever pouring construction closure section and construction method thereof

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07216828A (en) * 1994-02-07 1995-08-15 Sumitomo Constr Co Ltd Erection method of bridge girder in concrete bridge
CN201128881Y (en) * 2007-11-15 2008-10-08 中交第一公路工程局有限公司 Preformed supporting structure in bent cap construction
CN101586328A (en) * 2009-06-12 2009-11-25 中国第一冶金建设有限责任公司 Anchor ear angle-table bracket building method for bridge sidespan closure segment construction
CN101761034A (en) * 2010-03-25 2010-06-30 中国建筑第六工程局有限公司 Construction method of side block straight-line segment of cantilever-concreting continuous beam
CN103485283A (en) * 2013-09-11 2014-01-01 中交第一公路工程局有限公司 Hanging bracket supporting system of side-span cast-in-place section and implementation method thereof
CN103556578A (en) * 2013-10-14 2014-02-05 中铁十九局集团有限公司 Straight-line section and side span closure section casting mold system for continuous beam and erection method for casting mold system
CN103572708A (en) * 2013-10-29 2014-02-12 西南交通大学 Large-span concrete continuous girder bridge side span folding device and method
CN203904851U (en) * 2014-04-21 2014-10-29 中铁三局集团有限公司 Continuous beam side span straight section hanger support system
CN106284080A (en) * 2016-08-11 2017-01-04 中铁十二局集团第二工程有限公司 Continuous rigid frame aqueduct closure segment construction method
CN206667071U (en) * 2017-04-17 2017-11-24 五冶集团上海有限公司 Continuous beam end bay closing device

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07216828A (en) * 1994-02-07 1995-08-15 Sumitomo Constr Co Ltd Erection method of bridge girder in concrete bridge
CN201128881Y (en) * 2007-11-15 2008-10-08 中交第一公路工程局有限公司 Preformed supporting structure in bent cap construction
CN101586328A (en) * 2009-06-12 2009-11-25 中国第一冶金建设有限责任公司 Anchor ear angle-table bracket building method for bridge sidespan closure segment construction
CN101761034A (en) * 2010-03-25 2010-06-30 中国建筑第六工程局有限公司 Construction method of side block straight-line segment of cantilever-concreting continuous beam
CN103485283A (en) * 2013-09-11 2014-01-01 中交第一公路工程局有限公司 Hanging bracket supporting system of side-span cast-in-place section and implementation method thereof
CN103556578A (en) * 2013-10-14 2014-02-05 中铁十九局集团有限公司 Straight-line section and side span closure section casting mold system for continuous beam and erection method for casting mold system
CN103572708A (en) * 2013-10-29 2014-02-12 西南交通大学 Large-span concrete continuous girder bridge side span folding device and method
CN203904851U (en) * 2014-04-21 2014-10-29 中铁三局集团有限公司 Continuous beam side span straight section hanger support system
CN106284080A (en) * 2016-08-11 2017-01-04 中铁十二局集团第二工程有限公司 Continuous rigid frame aqueduct closure segment construction method
CN206667071U (en) * 2017-04-17 2017-11-24 五冶集团上海有限公司 Continuous beam end bay closing device

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109944170A (en) * 2019-05-06 2019-06-28 重庆建工市政交通工程有限责任公司 Continuous beam with high-pier end bay Cast-in-Situ Segment and closure section integrated construction system and construction method
CN110409314A (en) * 2019-08-15 2019-11-05 中国五冶集团有限公司 Continuous rigid frame bridge closure section unidirectional limitation locking device and method automatically
CN110409314B (en) * 2019-08-15 2023-10-10 中国五冶集团有限公司 Automatic unidirectional limiting and locking device and method for closure section of continuous rigid frame bridge
CN112049463A (en) * 2020-08-19 2020-12-08 中建八局第二建设有限公司 Atrium beam support construction method and atrium beam support construction system
CN113494054A (en) * 2021-07-26 2021-10-12 中国建筑土木建设有限公司 Template system of cantilever pouring construction closure section and construction method thereof
CN113494054B (en) * 2021-07-26 2023-12-26 中国建筑土木建设有限公司 Template system of cantilever pouring construction folding section and construction method thereof

Similar Documents

Publication Publication Date Title
CN106677070B (en) A kind of high-altitude long-span heavy duty construction of beam bracket and construction method
CN105839536B (en) A kind of construction method of Cable-stayed Bridge Pylon
CN106894345A (en) Continuous beam end bay closing device and method
CN200975103Y (en) Hydraulic center top lifting framework apparatus
CN104695336B (en) The double-deck first up and then down stand construction method of Cast-in-situ Beam
CN104452597B (en) Pier prestressed cap beam with extra length Construction Supporting System in water
CN101586465B (en) Construction method of large-diameter coal bunker flat-topping lid
CN104727223B (en) A kind of hoop platform for bridge pier column construction and construction method
CN103669224A (en) Method and steel pipe support for construction of arch tower of inclined arch tower double-cable-plane prestressed concrete cable-stayed bridge
CN104594204B (en) Urban light rail viaduct mountain type U beam Construction Supporting System and construction method
CN114150766B (en) Prefabricated reinforced concrete column connecting node and construction method thereof
CN105317205B (en) The construction method and equipment therefor of a kind of elevator
CN106948276A (en) A kind of method of cast-in-place box beam bracket integral demounting
CN113550578A (en) High-altitude overhanging structure formwork support and upper protection system construction method
CN109267493B (en) Construction method for installing steel cover beam crossing river channel
CN103132460A (en) Concrete filled steel tubular temporary consolidation system of cast-in-cantilever beam
CN107882328B (en) Construction method of large-span steel truss suspension structure
CN102277836B (en) Construction method of tilting concrete tower base
CN206902913U (en) A kind of high-altitude long-span overhung structure
CN204475184U (en) Urban light rail viaduct mountain type U beam Construction Supporting System
CN206667071U (en) Continuous beam end bay closing device
CN219175013U (en) Whole support that moves down of double-deck overhead bridge
CN111519545A (en) Pier and capping beam integrated construction platform and construction method thereof
CN102493363A (en) Quick construction method for segment No.0 of continuous beam
CN214656383U (en) Line is alternately low headroom and is pieced together wide cast-in-place case roof beam support

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170627