CN109944170A - Continuous beam with high-pier end bay Cast-in-Situ Segment and closure section integrated construction system and construction method - Google Patents

Continuous beam with high-pier end bay Cast-in-Situ Segment and closure section integrated construction system and construction method Download PDF

Info

Publication number
CN109944170A
CN109944170A CN201910372541.XA CN201910372541A CN109944170A CN 109944170 A CN109944170 A CN 109944170A CN 201910372541 A CN201910372541 A CN 201910372541A CN 109944170 A CN109944170 A CN 109944170A
Authority
CN
China
Prior art keywords
construction
end bay
hanging basket
cast
cantilever
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910372541.XA
Other languages
Chinese (zh)
Inventor
张志飞
杨翔
颜立
谢永辉
江真
张庆明
陶伟
向起来
李晓倩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHONGQING JIANGONG MUNICIPAL TRANSPORTATION PROJECT Co Ltd
Chongqing Construction Engineering Group Co Ltd
Original Assignee
CHONGQING JIANGONG MUNICIPAL TRANSPORTATION PROJECT Co Ltd
Chongqing Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHONGQING JIANGONG MUNICIPAL TRANSPORTATION PROJECT Co Ltd, Chongqing Construction Engineering Group Co Ltd filed Critical CHONGQING JIANGONG MUNICIPAL TRANSPORTATION PROJECT Co Ltd
Priority to CN201910372541.XA priority Critical patent/CN109944170A/en
Publication of CN109944170A publication Critical patent/CN109944170A/en
Pending legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The present invention relates to technical field of building construction, more particularly to continuous beam with high-pier end bay Cast-in-Situ Segment and closure section integrated construction system and construction method, specific steps are as follows: preparation of construction → construction monitoring calculates analysis → cantilever construction to closure section and the transformation of access bridge construction → hanging basket advancing and platform hanging basket, precompressed → end bay cast-in-place section construction → end bay closure section construction → end bay closure section tensioning → and hangs platform system and remove.It is compared with the traditional method, effectively solves the problems, such as that high pier bracket is set up, avoid a large amount of bracket erection constructions, system stress is hung using Hanging Basket, construction technology is simple, reduces materials'use amount, reduces the use of Large-scale Hoisting equipment, simultaneously for work such as bracket that may be present processing, it with save the cost, saves the duration, Technical Economy preferably waits clear superiorities, and avoiding conventional construction bracket sets up, and the work such as a large amount of based process are avoided, the duration saves apparent.

Description

Continuous beam with high-pier end bay Cast-in-Situ Segment and closure section integrated construction system and construction method
Technical field
The present invention relates to technical field of building construction, and in particular to continuous beam with high-pier end bay Cast-in-Situ Segment and closure section integration The construction method of construction system is suitable for Hanging Basket cantilever construction end bay Cast-in-Situ Segment and closure section erection without scaffolding.
Background technique
As infrastructure construction in china constantly promotes rapidly, a large amount of sciences of bridge building emerge in large numbers, and big Span Continuous beam bridge is mesh One of preceding main type of bridge.Such bridge generallys use precast beam structure in non-main span, and main span uses continuous beam, utilizes extension Basket carries out cantilever casting construction.Cradle construction continuous beam end bay closure section and Cast-in-Situ Segment high pier construction are very common, generally use Construction method is support cast-in-place.But pier stud is higher, and it is larger that bracket sets up difficulty, and lifting is difficult, and bracket elongate stabilization is deteriorated, and needs Increase more material.Bracket sets up difficulty there are foundation treatment simultaneously, and increased costs and construction period are elongated.
Summary of the invention
In view of problems of the prior art, the present invention provides continuous beam with high-pier end bay Cast-in-Situ Segment and closure section integration The construction method of construction system, it is easy for construction, it effectively solves the problems, such as that high pier bracket is set up, avoids a large amount of bracket erection constructions, System stress is hung using Hanging Basket, construction technology is simple.
To realize the above-mentioned technical purpose, The technical solution adopted by the invention is as follows:
Continuous beam with high-pier end bay Cast-in-Situ Segment and closure section integrated construction system include end bay pier shaft, away from end bay pier shaft recently in Across on pier shaft and close to the continuous of construction beam side across pier shaft, the construction beam being erected on end bay pier shaft and in being erected at Beam, it is characterised in that: further include Hanging Basket, underframe longitudinal member and floor beam, the Hanging Basket effect is mounted on continuous beam, the bottom One end of plate stringer rides upon on end bay pier shaft, the other end rides upon on Hanging Basket, and the floor beam is erected at underframe longitudinal member Bottom, the Cast-in-Situ Segment and closure section are cast on underframe longitudinal member and in the spaces between construction beam and continuous beam.
It further limits, the underframe longitudinal member and floor beam are at the lower edge of construction beam and continuous beam, The wing plate nose girder being also provided at construction beam and continuous beam upper edge right above underframe longitudinal member.
Continuous beam with high-pier end bay Cast-in-Situ Segment and closure section integrated system, specific construction method the following steps are included:
1. preparation of construction: according to conventional stand-by mode, tentatively drafting construction technical schemes, carry out temporary supporting system arrangement, system Temporary load(ing) situation is counted, the technology branch of relevant departments is obtained according to stress of the calculating analysis beam body under hoisted load It holds, is analyzed by calculating, work out special construction plan, complete the construction of end bay Cast-in-Situ Segment access bridge, end bay Cast-in-Situ Segment and closure are provided Duan Zhidian, and procedure of submitting reports for approval is completed, carry out the work of confiding a technological secret before going into operation;
2. construction monitoring calculates analysis: according to end bay is cast-in-place and joint scheme designs, 1/2 company of will act on of Hanging Basket Cast-in-Situ Segment weight Continuous girder cantilever end, in the case where cantilever end increases loading condition, analysis influences bridge internal force, determines counterweight scheme,
According to end bay is cast-in-place and joint scheme design, Hanging Basket closure pours the 1/2 of the sum of section+Cast-in-Situ Segment weight and will act on continuous beam Cantilever end, in the case where cantilever end increases loading condition, analysis influences bridge internal force, determines counterweight scheme,
Access bridge hangs the impact analysis of end bay Cast-in-Situ Segment and end bay closure section load to bridge internal force;
3. cantilever construction to closure section and access bridge is constructed: after by the construction of main pier pier top 0# block, then the symmetrical cantilever pouring in two sides, The outstanding beam section that fills uses Hanging Basket cantilever construction, after the completion of one of them main pier cantilever construction, retreat in time in across Hanging Basket, be the other side Back boom construction hanging basket provides working space, in the last one cantilever segmental construction, needs each sunpender of Hanging Basket passing through box beam Hole suitably amplify, it is ensured that box beam deform when sunpender can in the hole of box beam front and back move freely, access bridge construct when in access bridge Sunpender hole is reserved on wing plate and top plate to support as stringer under stringer, wing plate inside Hanging Basket;
4. hanging basket advancing and platform hanging basket transformation, precompressed: boom segments end is moved forward to after the completion of Hanging Basket cantilever construction, by Hanging Basket Stringer be adjusted to it is consistent with abutment pier top surface absolute altitude locate, whether detection stringer length meets end bay Cast-in-Situ Segment and closure section pours length Degree, the spreading stringer in the ungratified situation of height;Lower beam before Hanging Basket is extended into bridge pier, then Hanging Basket stringer is ridden upon into bridge Front crossbeam is removed after on pier, and overlap joint is met by the mobile adjustment stringer position of Hanging Basket and is required, wherein end bay Cast-in-Situ Segment and closure Section wing plate outside-supporting beam and inside top plate supporting beam by finish rolling deformed bar are hung on access bridge wing plate and inner top panel;Remove cantilever When Hanging Basket, end bay closure section bracket and installation template are set up, construction material, equipment in removing case top, case are applied for closure section The material and facility of work is put in an orderly manner to pier top;
Hanging Basket is transformed after the completion of stage+module, carries out precompressed to whole system, end bay construction section uses steel and 1t/ bags of sandbag Common preloading carries out preloading according to the sequence of bottom plate, web, top plate and wing plate, wherein by 40% → 60% → 80% → 100% → The other end of 120% multistage loadings, T structure is balanced ballast by water tank;
5. end bay cast-in-place section construction: end bay cast-in-place section construction platform floor is supported on abutment pier by Hanging Basket stringer and Hanging Basket cantilever is applied Workshop section, wing plate are supported on longitudinal hanging beam, and when end bay cast-in-place section construction, installation bed die and side form first adjust template Position and absolute altitude carry out the installation at bottom, abdomen, top and diaphragm plate reinforcing bar, bellows after installation inner support, internal model and sealing end mould, most After-pouring concrete, according to embedded anchorage is designed, realizes one-end tension when constructing end bay Cast-in-Situ Segment;
In end bay cast-in-place section construction, need to end bay cantilever end carry out ballast, and according to design and monitoring requirement in across side into Row counterweight, when Cast-in-Situ Segment pours concrete, cantilever end, which synchronizes, to discharge water, to keep cantilever end elevation not change, end bay cantilever end with Midspan closing end counterweight is all made of water tank and the mode that end bay cantilever end carries out ballast is arranged in, and wherein the weight of water tank is existing for end bay Pour end and pour the 1/2 of weight, wherein water tank welds water tank using brick or irony, when end bay Cast-in-Situ Segment pours, in across water tank not Waterproof unloading, only end bay cantilever end discharges water unloading;
6. end bay closure section construction: being locked according to midspan closing hanger installation → reinforcing bar binding → prestress pipe installation → closure It is fixed, remove lateral opening bracket, remove central bearing point horizontal direction temporary constraint → selection on the day of minimum temperature time casting concrete → Removal water tank ballast → closure section prestressed stretch-draw, anchoring, grouting finish step by step while casting concrete sequence carries out Construction, closure pour cantilever end and should temporarily connect with end bay Cast-in-Situ Segment, and the section concrete that avoids joining the two sections of a bridge, etc is pouring and premature cure mistake Apparent volume change occurs in journey, locking time is executed by closure section locking design, and Construction Support stiff skeleton is using " pre-buried The bold property I-shaped steel skeleton+pre-embedded anchoring bolts of foundation bolt+connection ";
7. end bay closure section tensioning: according to Design of Construction Organization arrangement, adjusting prestressing force in advance is one-end tension technique, cast-in-place Embedded anchor plate tensioning position, installs both ends tension ground tackle for anchored end after lashing when section construction, passes through anchorage using steel strand wires, And pre-tightened in the other end using single tendon stretch jack, entire beam tension is finally carried out using the jack for adapting to specification;
8. hanging platform system dismounting: after end bay closure is constructed, according to the stress specific requirement of midspan closing, prestressed grouting Platform is hung in dismounting after reaching design requirement, is hung platform and is unclamped hangar system first when removing, is supported on the Hanging Basket stringer of abutment pier Lower reduction lowering device is disengaged end template, is gradually transferred Hanging Basket floor beam, stringer to ground, Hanging Basket master using hoist engine Truss is moved to the 0# sections of enough positions of Lifting Capacity by walking line mode, and is removed using loop wheel machine, wherein when removing, it then follows The principle of " first prop up and tear open afterwards, rear branch is first torn open ".
According to the Comprehensive Correlation of the prior art, this construction method had the advantage that above
1. it is easy for construction, it effectively solves the problems, such as that high pier bracket is set up, avoids a large amount of bracket erection constructions, body is hung using Hanging Basket It is stress, construction technology is simple.
2. Technical Economy is good: present approach reduces materials'use amounts, reduce the use of Large-scale Hoisting equipment, same to hour hands To work such as bracket that may be present processing, there is save the cost, save the duration, Technical Economy preferably waits clear superiorities.
3. the duration saves, efficiency is improved: continuous beam with high-pier end bay Cast-in-Situ Segment and closure section integration non-stand construction method It avoids conventional construction bracket to set up, and avoids the work such as a large amount of based process, the duration saves apparent.
Detailed description of the invention
Fig. 1 is the schematic view of the front view of continuous beam with high-pier end bay Cast-in-Situ Segment and closure section integrated construction system;
Fig. 2 is the flow diagram of the construction method of continuous beam with high-pier end bay Cast-in-Situ Segment and closure section integrated construction system;
Corresponding mark is respectively as follows: 1- end bay pier shaft in figure, across pier shaft in 2-, 3- construction beam, and 4- continuous beam, 5- Hanging Basket, the bottom 6- Plate stringer, 7- floor beam, 8- wing plate nose girder.
Specific embodiment
In order to which those skilled in the art may be better understood, with reference to the accompanying drawings and examples to the technology of the present invention Scheme further illustrates.
Continuous beam with high-pier end bay Cast-in-Situ Segment and closure section integrated construction system as shown in Figure 1, including end bay pier shaft 1, Away from end bay pier shaft 1 recently in across pier shaft 2, the construction beam 3 being erected on end bay pier shaft 1 and in being erected at across on pier shaft 2 and Continuous beam 4 close to 3 side of construction beam, it is characterised in that: further include Hanging Basket 5, underframe longitudinal member 6 and floor beam 7, the extension The effect of basket 5 is mounted on continuous beam 4, and one end of the underframe longitudinal member 6 rides upon on end bay pier shaft 2, the other end rides upon Hanging Basket 5 On, the floor beam 7 is erected at the bottom of underframe longitudinal member 6, and the Cast-in-Situ Segment and closure section are cast on underframe longitudinal member 6 and locate In the space between construction beam 3 and continuous beam 4.The underframe longitudinal member 6 and floor beam 7 are in construction beam 3 and continuously At the lower edge of beam 4, it is also provided with the wing plate right above underframe longitudinal member 6 at 4 upper edge of construction beam 3 and continuous beam and leads Beam 8.
Its specific construction method the following steps are included:
1. preparation of construction: according to conventional stand-by mode, tentatively drafting construction technical schemes, carry out temporary supporting system arrangement, system Temporary load(ing) situation is counted, the technology branch of relevant departments is obtained according to stress of the calculating analysis beam body under hoisted load It holds, is analyzed by calculating, work out special construction plan, complete the construction of end bay Cast-in-Situ Segment access bridge, end bay Cast-in-Situ Segment and closure are provided Duan Zhidian, and procedure of submitting reports for approval is completed, carry out the work of confiding a technological secret before going into operation;
2. construction monitoring calculates analysis: according to end bay is cast-in-place and joint scheme designs, 1/2 company of will act on of Hanging Basket Cast-in-Situ Segment weight Continuous girder cantilever end, in the case where cantilever end increases loading condition, analysis influences bridge internal force, determines counterweight scheme,
According to end bay is cast-in-place and joint scheme design, Hanging Basket closure pours the 1/2 of the sum of section+Cast-in-Situ Segment weight and will act on continuous beam Cantilever end, in the case where cantilever end increases loading condition, analysis influences bridge internal force, determines counterweight scheme,
Access bridge hangs the impact analysis of end bay Cast-in-Situ Segment and end bay closure section load to bridge internal force;
3. cantilever construction to closure section and access bridge is constructed: after by the construction of main pier pier top 0# block, then the symmetrical cantilever pouring in two sides, The outstanding beam section that fills uses Hanging Basket cantilever construction, after the completion of one of them main pier cantilever construction, retreat in time in across Hanging Basket, be the other side Back boom construction hanging basket provides working space, in the last one cantilever segmental construction, needs each sunpender of Hanging Basket passing through box beam Hole suitably amplify, it is ensured that box beam deform when sunpender can in the hole of box beam front and back move freely, access bridge construct when in access bridge Sunpender hole is reserved on wing plate and top plate to support as stringer under stringer, wing plate inside Hanging Basket;
4. hanging basket advancing and platform hanging basket transformation, precompressed: boom segments end is moved forward to after the completion of Hanging Basket cantilever construction, by Hanging Basket Stringer be adjusted to it is consistent with abutment pier top surface absolute altitude locate, whether detection stringer length meets end bay Cast-in-Situ Segment and closure section pours length Degree, the spreading stringer in the ungratified situation of height;Lower beam before Hanging Basket is extended into bridge pier, then Hanging Basket stringer is ridden upon into bridge Front crossbeam is removed after on pier, and overlap joint is met by the mobile adjustment stringer position of Hanging Basket and is required, wherein end bay Cast-in-Situ Segment and closure Section wing plate outside-supporting beam and inside top plate supporting beam by finish rolling deformed bar are hung on access bridge wing plate and inner top panel;Remove cantilever When Hanging Basket, end bay closure section bracket and installation template are set up, construction material, equipment in removing case top, case are applied for closure section The material and facility of work is put in an orderly manner to pier top;
Hanging Basket is transformed after the completion of stage+module, carries out precompressed to whole system, end bay construction section uses steel and 1t/ bags of sandbag Common preloading carries out preloading according to the sequence of bottom plate, web, top plate and wing plate, wherein by 40% → 60% → 80% → 100% → The other end of 120% multistage loadings, T structure is balanced ballast by water tank;
5. end bay cast-in-place section construction: end bay cast-in-place section construction platform floor is supported on abutment pier by Hanging Basket stringer and Hanging Basket cantilever is applied Workshop section, wing plate are supported on longitudinal hanging beam, and when end bay cast-in-place section construction, installation bed die and side form first adjust template Position and absolute altitude carry out the installation at bottom, abdomen, top and diaphragm plate reinforcing bar, bellows after installation inner support, internal model and sealing end mould, most After-pouring concrete, according to embedded anchorage is designed, realizes one-end tension when constructing end bay Cast-in-Situ Segment;
In end bay cast-in-place section construction, need to end bay cantilever end carry out ballast, and according to design and monitoring requirement in across side into Row counterweight, when Cast-in-Situ Segment pours concrete, cantilever end, which synchronizes, to discharge water, to keep cantilever end elevation not change, end bay cantilever end with Midspan closing end counterweight is all made of water tank and the mode that end bay cantilever end carries out ballast is arranged in, and wherein the weight of water tank is existing for end bay Pour end and pour the 1/2 of weight, wherein water tank welds water tank using brick or irony, when end bay Cast-in-Situ Segment pours, in across water tank not Waterproof unloading, only end bay cantilever end discharges water unloading;
6. end bay closure section construction: being locked according to midspan closing hanger installation → reinforcing bar binding → prestress pipe installation → closure It is fixed, remove lateral opening bracket, remove central bearing point horizontal direction temporary constraint → selection on the day of minimum temperature time casting concrete → Removal water tank ballast → closure section prestressed stretch-draw, anchoring, grouting finish step by step while casting concrete sequence carries out Construction, closure pour cantilever end and should temporarily connect with end bay Cast-in-Situ Segment, and the section concrete that avoids joining the two sections of a bridge, etc is pouring and premature cure mistake Apparent volume change occurs in journey, locking time is executed by closure section locking design, and Construction Support stiff skeleton is using " pre-buried The bold property I-shaped steel skeleton+pre-embedded anchoring bolts of foundation bolt+connection ";
7. end bay closure section tensioning: according to Design of Construction Organization arrangement, adjusting prestressing force in advance is one-end tension technique, cast-in-place Embedded anchor plate tensioning position, installs both ends tension ground tackle for anchored end after lashing when section construction, passes through anchorage using steel strand wires, And pre-tightened in the other end using single tendon stretch jack, entire beam tension is finally carried out using the jack for adapting to specification;
8. hanging platform system dismounting: after end bay closure is constructed, according to the stress specific requirement of midspan closing, prestressed grouting Platform is hung in dismounting after reaching design requirement, is hung platform and is unclamped hangar system first when removing, is supported on the Hanging Basket stringer of abutment pier Lower reduction lowering device is disengaged end template, is gradually transferred Hanging Basket floor beam, stringer to ground, Hanging Basket master using hoist engine Truss is moved to the 0# sections of enough positions of Lifting Capacity by walking line mode, and is removed using loop wheel machine, wherein when removing, it then follows The principle of " first prop up and tear open afterwards, rear branch is first torn open ".
Above to it is provided by the invention be suitable for continuous beam with high-pier end bay Cast-in-Situ Segment and closure section integrated construction system into It has gone and has been discussed in detail, the explanation of specific embodiment is merely used to help understand method and its core concept of the invention.It should refer to It out, for those skilled in the art, without departing from the principle of the present invention, can also be to the present invention Some improvement and modification can also be carried out, and these improvements and modifications also fall within the scope of protection of the claims of the present invention.

Claims (3)

1. continuous beam with high-pier end bay Cast-in-Situ Segment and closure section integrated construction system, including it is end bay pier shaft, nearest away from end bay pier shaft In across pier shaft, the construction beam being erected on end bay pier shaft and in being erected at across the company on pier shaft and close to construction beam side Continuous beam, it is characterised in that: further include Hanging Basket, underframe longitudinal member and floor beam, the Hanging Basket effect is mounted on continuous beam, described One end of underframe longitudinal member rides upon on end bay pier shaft, the other end rides upon on Hanging Basket, and the floor beam is erected at underframe longitudinal member Bottom, the Cast-in-Situ Segment and closure section are cast on underframe longitudinal member and in the spaces between construction beam and continuous beam.
2. continuous beam with high-pier end bay Cast-in-Situ Segment according to claim 1 and closure section integrated construction system, feature exist In: the underframe longitudinal member and floor beam are at the lower edge of construction beam and continuous beam, on construction beam and continuous beam Edge is also provided with the wing plate nose girder right above underframe longitudinal member.
3. the construction party of continuous beam with high-pier end bay Cast-in-Situ Segment according to claim 1 and closure section integrated construction system Method includes the following steps:
1. preparation of construction: according to conventional stand-by mode, tentatively drafting construction technical schemes, carry out temporary supporting system arrangement, system Temporary load(ing) situation is counted, the technology branch of relevant departments is obtained according to stress of the calculating analysis beam body under hoisted load It holds, is analyzed by calculating, work out special construction plan, complete the construction of end bay Cast-in-Situ Segment access bridge, end bay Cast-in-Situ Segment and closure are provided Duan Zhidian, and procedure of submitting reports for approval is completed, carry out the work of confiding a technological secret before going into operation;
2. construction monitoring calculates analysis: according to end bay is cast-in-place and joint scheme designs, 1/2 company of will act on of Hanging Basket Cast-in-Situ Segment weight Continuous girder cantilever end, in the case where cantilever end increases loading condition, analysis influences bridge internal force, determines counterweight scheme,
According to end bay is cast-in-place and joint scheme design, Hanging Basket closure pours the 1/2 of the sum of section+Cast-in-Situ Segment weight and will act on continuous beam Cantilever end, in the case where cantilever end increases loading condition, analysis influences bridge internal force, determines counterweight scheme,
Access bridge hangs the impact analysis of end bay Cast-in-Situ Segment and end bay closure section load to bridge internal force;
3. cantilever construction to closure section and access bridge is constructed: after by the construction of main pier pier top 0# block, then the symmetrical cantilever pouring in two sides, The outstanding beam section that fills uses Hanging Basket cantilever construction, after the completion of one of them main pier cantilever construction, retreat in time in across Hanging Basket, be the other side Back boom construction hanging basket provides working space, in the last one cantilever segmental construction, needs each sunpender of Hanging Basket passing through box beam Hole suitably amplify, it is ensured that box beam deform when sunpender can in the hole of box beam front and back move freely, access bridge construct when in access bridge Sunpender hole is reserved on wing plate and top plate to support as stringer under stringer, wing plate inside Hanging Basket;
4. hanging basket advancing and platform hanging basket transformation, precompressed: boom segments end is moved forward to after the completion of Hanging Basket cantilever construction, by Hanging Basket Stringer be adjusted to it is consistent with abutment pier top surface absolute altitude locate, whether detection stringer length meets end bay Cast-in-Situ Segment and closure section pours length Degree, the spreading stringer in the ungratified situation of height;Lower beam before Hanging Basket is extended into bridge pier, then Hanging Basket stringer is ridden upon into bridge Front crossbeam is removed after on pier, and overlap joint is met by the mobile adjustment stringer position of Hanging Basket and is required, wherein end bay Cast-in-Situ Segment and closure Section wing plate outside-supporting beam and inside top plate supporting beam by finish rolling deformed bar are hung on access bridge wing plate and inner top panel;Remove cantilever When Hanging Basket, end bay closure section bracket and installation template are set up, construction material, equipment in removing case top, case are applied for closure section The material and facility of work is put in an orderly manner to pier top;
Hanging Basket is transformed after the completion of stage+module, carries out precompressed to whole system, end bay construction section uses steel and 1t/ bags of sandbag Common preloading carries out preloading according to the sequence of bottom plate, web, top plate and wing plate, wherein by 40% → 60% → 80% → 100% → The other end of 120% multistage loadings, T structure is balanced ballast by water tank;
5. end bay cast-in-place section construction: end bay cast-in-place section construction platform floor is supported on abutment pier by Hanging Basket stringer and Hanging Basket cantilever is applied Workshop section, wing plate are supported on longitudinal hanging beam, and when end bay cast-in-place section construction, installation bed die and side form first adjust template Position and absolute altitude carry out the installation at bottom, abdomen, top and diaphragm plate reinforcing bar, bellows after installation inner support, internal model and sealing end mould, most After-pouring concrete, according to embedded anchorage is designed, realizes one-end tension when constructing end bay Cast-in-Situ Segment;
In end bay cast-in-place section construction, need to end bay cantilever end carry out ballast, and according to design and monitoring requirement in across side into Row counterweight, when Cast-in-Situ Segment pours concrete, cantilever end, which synchronizes, to discharge water, to keep cantilever end elevation not change, end bay cantilever end with Midspan closing end counterweight is all made of water tank and the mode that end bay cantilever end carries out ballast is arranged in, and wherein the weight of water tank is existing for end bay Pour end and pour the 1/2 of weight, wherein water tank welds water tank using brick or irony, when end bay Cast-in-Situ Segment pours, in across water tank not Waterproof unloading, only end bay cantilever end discharges water unloading;
6. end bay closure section construction: being locked according to midspan closing hanger installation → reinforcing bar binding → prestress pipe installation → closure It is fixed, remove lateral opening bracket, remove central bearing point horizontal direction temporary constraint → selection on the day of minimum temperature time casting concrete → Removal water tank ballast → closure section prestressed stretch-draw, anchoring, grouting finish step by step while casting concrete sequence carries out Construction, closure pour cantilever end and should temporarily connect with end bay Cast-in-Situ Segment, and the section concrete that avoids joining the two sections of a bridge, etc is pouring and premature cure mistake Apparent volume change occurs in journey, locking time is executed by closure section locking design, and Construction Support stiff skeleton is using " pre-buried The bold property I-shaped steel skeleton+pre-embedded anchoring bolts of foundation bolt+connection ";
7. end bay closure section tensioning: according to Design of Construction Organization arrangement, adjusting prestressing force in advance is one-end tension technique, cast-in-place Embedded anchor plate tensioning position, installs both ends tension ground tackle for anchored end after lashing when section construction, passes through anchorage using steel strand wires, And pre-tightened in the other end using single tendon stretch jack, entire beam tension is finally carried out using the jack for adapting to specification;
8. hanging platform system dismounting: after end bay closure is constructed, according to the stress specific requirement of midspan closing, prestressed grouting Platform is hung in dismounting after reaching design requirement, is hung platform and is unclamped hangar system first when removing, is supported on the Hanging Basket stringer of abutment pier Lower reduction lowering device is disengaged end template, is gradually transferred Hanging Basket floor beam, stringer to ground, Hanging Basket master using hoist engine Truss is moved to the 0# sections of enough positions of Lifting Capacity by walking line mode, and is removed using loop wheel machine, wherein when removing, it then follows The principle of " first prop up and tear open afterwards, rear branch is first torn open ".
CN201910372541.XA 2019-05-06 2019-05-06 Continuous beam with high-pier end bay Cast-in-Situ Segment and closure section integrated construction system and construction method Pending CN109944170A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910372541.XA CN109944170A (en) 2019-05-06 2019-05-06 Continuous beam with high-pier end bay Cast-in-Situ Segment and closure section integrated construction system and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910372541.XA CN109944170A (en) 2019-05-06 2019-05-06 Continuous beam with high-pier end bay Cast-in-Situ Segment and closure section integrated construction system and construction method

Publications (1)

Publication Number Publication Date
CN109944170A true CN109944170A (en) 2019-06-28

Family

ID=67016966

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910372541.XA Pending CN109944170A (en) 2019-05-06 2019-05-06 Continuous beam with high-pier end bay Cast-in-Situ Segment and closure section integrated construction system and construction method

Country Status (1)

Country Link
CN (1) CN109944170A (en)

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110345915A (en) * 2019-07-11 2019-10-18 中交公路养护工程技术有限公司 A kind of highway Surveillance of Continuous Beam end bay Cast-in-Situ Segment precompressed detection device and method
CN110409306A (en) * 2019-07-23 2019-11-05 中国十七冶集团有限公司 A kind of construction method that continuous rigid frame bridge end bay closes up
CN110409316A (en) * 2019-08-15 2019-11-05 中交路桥华南工程有限公司 End bay closure construction method
CN110468714A (en) * 2019-08-09 2019-11-19 中铁七局集团有限公司 Overlength joins lateral closure construction method after unequal span asymmetric continuous bridge is first indulged
CN110629677A (en) * 2019-09-29 2019-12-31 中铁大桥局集团有限公司 Method for erecting section steel beam on pier top short slideway beam
CN111088759A (en) * 2019-12-24 2020-05-01 中交二航局第四工程有限公司 Construction method for steel strand of side span closure section of cast-in-place beam cast by cantilever
CN111254832A (en) * 2020-01-21 2020-06-09 中铁大桥科学研究院有限公司 Integral hoisting closure method and system for long section of cable-stayed bridge steel girder
CN111455874A (en) * 2020-04-26 2020-07-28 中国建筑第七工程局有限公司 Construction method for overlong side span straight line segment of high pier of corrugated steel web PC bridge
CN111926720A (en) * 2020-08-12 2020-11-13 中建七局交通建设有限公司 Construction method suitable for continuous steel-structure cantilever beam closure in loess area
CN112942125A (en) * 2021-03-11 2021-06-11 中铁二院工程集团有限责任公司 Bridge forming method for concrete tie beam with continuous structure of half-through arch bridge
CN113123242A (en) * 2021-04-14 2021-07-16 四川瑞云建设工程有限公司 Continuous steel structure cast-in-place section and closure section simultaneous pouring construction structure and construction method
CN113216010A (en) * 2021-05-10 2021-08-06 中交路桥建设有限公司 Construction method for closure section of corrugated steel web bridge
CN113265959A (en) * 2021-05-13 2021-08-17 中铁建云南投资有限公司 Construction method for side-span cast-in-place section of hanging basket combined bracket of high-pier steel web bridge
CN113722801A (en) * 2021-09-07 2021-11-30 中国铁路设计集团有限公司 Method for intelligently generating construction stage of concrete beam bridge by suspension casting method
CN113832870A (en) * 2021-08-31 2021-12-24 中交基础设施养护集团有限公司 Construction method of rhombic hanging basket
CN113846574A (en) * 2021-11-01 2021-12-28 重庆交通建设(集团)有限责任公司 Construction method of adjustable movable template for T-beam flange cross slope
CN113897868A (en) * 2021-10-12 2022-01-07 张成瑞 Construction method for realizing short-tower cable-stayed bridge closure front box girder segment by long platform front fulcrum hanging basket
CN117166376A (en) * 2023-11-02 2023-12-05 中铁十六局集团路桥工程有限公司 Lightweight construction method for side span cast-in-situ frame body of high mountain gorge Gu Ou continuous beam

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009057685A (en) * 2007-08-29 2009-03-19 Sumitomo Mitsui Construction Co Ltd Movable suspension support
CN102493362A (en) * 2011-11-24 2012-06-13 中铁二十三局集团有限公司 Construction method for midspan closure segment of longspan continuous rigid frame bridge
CN103485283A (en) * 2013-09-11 2014-01-01 中交第一公路工程局有限公司 Hanging bracket supporting system of side-span cast-in-place section and implementation method thereof
CN103556578A (en) * 2013-10-14 2014-02-05 中铁十九局集团有限公司 Straight-line section and side span closure section casting mold system for continuous beam and erection method for casting mold system
KR20150144384A (en) * 2014-06-16 2015-12-28 삼성물산 주식회사 Form traveler and construction method for fcm bridge using the same
CN105484158A (en) * 2015-12-02 2016-04-13 中交路桥建设有限公司 Asymmetrical casting construction method of side span of rigid frame bridge with extra high piers and long span length
CN105926443A (en) * 2016-04-21 2016-09-07 中铁十七局集团第二工程有限公司 Construction method for continuous rigid frame side span by first girder installation and then closure
CN106894345A (en) * 2017-04-17 2017-06-27 五冶集团上海有限公司 Continuous beam end bay closing device and method
CN207998792U (en) * 2017-12-14 2018-10-23 中交一公局海威工程建设有限公司 A kind of Hanging Basket rack mounting structure
CN210151596U (en) * 2019-05-06 2020-03-17 重庆建工市政交通工程有限责任公司 Integrated construction system for side-span cast-in-place section and closure section of high-pier continuous beam

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009057685A (en) * 2007-08-29 2009-03-19 Sumitomo Mitsui Construction Co Ltd Movable suspension support
CN102493362A (en) * 2011-11-24 2012-06-13 中铁二十三局集团有限公司 Construction method for midspan closure segment of longspan continuous rigid frame bridge
CN103485283A (en) * 2013-09-11 2014-01-01 中交第一公路工程局有限公司 Hanging bracket supporting system of side-span cast-in-place section and implementation method thereof
CN103556578A (en) * 2013-10-14 2014-02-05 中铁十九局集团有限公司 Straight-line section and side span closure section casting mold system for continuous beam and erection method for casting mold system
KR20150144384A (en) * 2014-06-16 2015-12-28 삼성물산 주식회사 Form traveler and construction method for fcm bridge using the same
CN105484158A (en) * 2015-12-02 2016-04-13 中交路桥建设有限公司 Asymmetrical casting construction method of side span of rigid frame bridge with extra high piers and long span length
CN105926443A (en) * 2016-04-21 2016-09-07 中铁十七局集团第二工程有限公司 Construction method for continuous rigid frame side span by first girder installation and then closure
CN106894345A (en) * 2017-04-17 2017-06-27 五冶集团上海有限公司 Continuous beam end bay closing device and method
CN207998792U (en) * 2017-12-14 2018-10-23 中交一公局海威工程建设有限公司 A kind of Hanging Basket rack mounting structure
CN210151596U (en) * 2019-05-06 2020-03-17 重庆建工市政交通工程有限责任公司 Integrated construction system for side-span cast-in-place section and closure section of high-pier continuous beam

Cited By (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110345915B (en) * 2019-07-11 2021-04-20 中交公路养护工程技术有限公司 Device and method for detecting prepressing of side-span cast-in-place section of continuous beam of highway bridge
CN110345915A (en) * 2019-07-11 2019-10-18 中交公路养护工程技术有限公司 A kind of highway Surveillance of Continuous Beam end bay Cast-in-Situ Segment precompressed detection device and method
CN110409306A (en) * 2019-07-23 2019-11-05 中国十七冶集团有限公司 A kind of construction method that continuous rigid frame bridge end bay closes up
CN110468714A (en) * 2019-08-09 2019-11-19 中铁七局集团有限公司 Overlength joins lateral closure construction method after unequal span asymmetric continuous bridge is first indulged
CN110468714B (en) * 2019-08-09 2021-04-30 中铁七局集团有限公司 Longitudinal and transverse closure construction method of ultra-long-connection unequal-span asymmetric continuous bridge
CN110409316A (en) * 2019-08-15 2019-11-05 中交路桥华南工程有限公司 End bay closure construction method
CN110629677A (en) * 2019-09-29 2019-12-31 中铁大桥局集团有限公司 Method for erecting section steel beam on pier top short slideway beam
CN111088759A (en) * 2019-12-24 2020-05-01 中交二航局第四工程有限公司 Construction method for steel strand of side span closure section of cast-in-place beam cast by cantilever
CN111254832A (en) * 2020-01-21 2020-06-09 中铁大桥科学研究院有限公司 Integral hoisting closure method and system for long section of cable-stayed bridge steel girder
CN111455874A (en) * 2020-04-26 2020-07-28 中国建筑第七工程局有限公司 Construction method for overlong side span straight line segment of high pier of corrugated steel web PC bridge
CN111926720A (en) * 2020-08-12 2020-11-13 中建七局交通建设有限公司 Construction method suitable for continuous steel-structure cantilever beam closure in loess area
CN111926720B (en) * 2020-08-12 2022-01-25 中建七局交通建设有限公司 Construction method suitable for continuous steel-structure cantilever beam closure in loess area
CN112942125A (en) * 2021-03-11 2021-06-11 中铁二院工程集团有限责任公司 Bridge forming method for concrete tie beam with continuous structure of half-through arch bridge
CN112942125B (en) * 2021-03-11 2022-09-27 中铁二院工程集团有限责任公司 Bridge forming method for concrete tie beam with continuous structure of half-through arch bridge
CN113123242A (en) * 2021-04-14 2021-07-16 四川瑞云建设工程有限公司 Continuous steel structure cast-in-place section and closure section simultaneous pouring construction structure and construction method
CN113216010A (en) * 2021-05-10 2021-08-06 中交路桥建设有限公司 Construction method for closure section of corrugated steel web bridge
CN113265959A (en) * 2021-05-13 2021-08-17 中铁建云南投资有限公司 Construction method for side-span cast-in-place section of hanging basket combined bracket of high-pier steel web bridge
CN113832870A (en) * 2021-08-31 2021-12-24 中交基础设施养护集团有限公司 Construction method of rhombic hanging basket
CN113722801A (en) * 2021-09-07 2021-11-30 中国铁路设计集团有限公司 Method for intelligently generating construction stage of concrete beam bridge by suspension casting method
CN113897868A (en) * 2021-10-12 2022-01-07 张成瑞 Construction method for realizing short-tower cable-stayed bridge closure front box girder segment by long platform front fulcrum hanging basket
CN113897868B (en) * 2021-10-12 2023-06-20 张成瑞 Construction method for box girder sections before closure of short-tower cable-stayed bridge
CN113846574A (en) * 2021-11-01 2021-12-28 重庆交通建设(集团)有限责任公司 Construction method of adjustable movable template for T-beam flange cross slope
CN117166376A (en) * 2023-11-02 2023-12-05 中铁十六局集团路桥工程有限公司 Lightweight construction method for side span cast-in-situ frame body of high mountain gorge Gu Ou continuous beam
CN117166376B (en) * 2023-11-02 2024-02-20 中铁十六局集团路桥工程有限公司 Lightweight construction method for side span cast-in-situ frame body of high mountain gorge Gu Ou continuous beam

Similar Documents

Publication Publication Date Title
CN109944170A (en) Continuous beam with high-pier end bay Cast-in-Situ Segment and closure section integrated construction system and construction method
CN106702910B (en) A kind of main girder construction technique of the double rope face low-pylon cable-stayed bridges of double tower
CN108004928B (en) A kind of asymmetric rigid frame-continuous girder construction technology
CN208815424U (en) A kind of bridge descending hanging basket
CN109505267A (en) A kind of Hanging Basket cantilever pouring construction method
CN107905124B (en) A kind of symmetrical expression rigid frame-continuous girder construction technology
CN101691742B (en) Construction method for back cable-balancing single-side cantilever concreted beam bodies of slant-legged rigid frame bridges
CN107905111B (en) A kind of rigid frame-continuous girder end bay construction technology
CN108004925B (en) Prestress reinforced concrete circular arch tower construction method
CN108086170B (en) The hole construction method excessively of mobile formwork and mobile formwork
CN102094392A (en) Lower supported hanging basket in bridge construction and application thereof
CN101781878A (en) Integral lifting template of main pylon of single-pylon cable-stayed bridge without dorsal cables and lifting construction method thereof
CN110453613A (en) A kind of cantilever method construction of Large span girder bridge box beam tunneling boring
CN105040594A (en) Variable cross-section box girder bridge closure segment construction method
CN110409319A (en) A kind of cast-in-place floorings bracket of large span steel reinforced concrete combination beam and construction method
CN111074795A (en) Construction method for pouring continuous beam in cantilever mode spanning existing railway
JP2023543524A (en) Construction method of steel concrete main girder of cable-stayed bridge
CN210151596U (en) Integrated construction system for side-span cast-in-place section and closure section of high-pier continuous beam
CN209144661U (en) Mould bases for bridge construction
CN110409318A (en) A kind of large span freely-supported steel reinforced concrete bondbeam assembling method
CN206887771U (en) A kind of small across footpath plate-beam construction platform structure
CN212714544U (en) Rhombus is hung basket and is retreated and demolishd horizontal extension reinforcement construction structure
CN111893889A (en) Main bridge closure section construction method
CN111485500A (en) Transverse lengthening reinforcing construction method and structure for retreating and dismantling of rhombic hanging basket
CN208430437U (en) A kind of mobile formwork bridge fabrication machine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Zhang Zhifei

Inventor after: Li Bingyue

Inventor after: Jiang Bo

Inventor after: Wang Hai

Inventor after: Chen Zhenyu

Inventor after: Liu Zhongfu

Inventor after: Yang Zhonghu

Inventor after: Yi Sicong

Inventor after: Yu Fei

Inventor after: Li Hongling

Inventor after: Hu Jianbo

Inventor after: Yang Xiang

Inventor after: Ma Yingfu

Inventor after: Duan Jili

Inventor after: Xu Li

Inventor after: Yan Li

Inventor after: Xie Yonghui

Inventor after: Jiang Zhen

Inventor after: Zhang Qingming

Inventor after: Tao Wei

Inventor after: Xiang Qilai

Inventor after: Li Xiaoqian

Inventor before: Zhang Zhifei

Inventor before: Yang Xiang

Inventor before: Yan Li

Inventor before: Xie Yonghui

Inventor before: Jiang Zhen

Inventor before: Zhang Qingming

Inventor before: Tao Wei

Inventor before: Xiang Qilai

Inventor before: Li Xiaoqian

CB03 Change of inventor or designer information