CN103556578A - Casting mold system for straight line section and side span closure section of continuous beam and building method thereof - Google Patents

Casting mold system for straight line section and side span closure section of continuous beam and building method thereof Download PDF

Info

Publication number
CN103556578A
CN103556578A CN201310478131.6A CN201310478131A CN103556578A CN 103556578 A CN103556578 A CN 103556578A CN 201310478131 A CN201310478131 A CN 201310478131A CN 103556578 A CN103556578 A CN 103556578A
Authority
CN
China
Prior art keywords
hanging basket
pier
vertical sliding
end bay
platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310478131.6A
Other languages
Chinese (zh)
Other versions
CN103556578B (en
Inventor
苟黎茜
蒋庆举
钟卫华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 19th Bureau Group Co Ltd
Original Assignee
China Railway 19th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 19th Bureau Group Co Ltd filed Critical China Railway 19th Bureau Group Co Ltd
Priority to CN201310478131.6A priority Critical patent/CN103556578B/en
Publication of CN103556578A publication Critical patent/CN103556578A/en
Application granted granted Critical
Publication of CN103556578B publication Critical patent/CN103556578B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a pouring die system for a straight line section and a side span closure section of a continuous beam and a construction method thereof, and solves the problems of large steel consumption and long construction period in the construction of the straight line section and the side span closure section of the high-pier continuous beam in the prior art. The device comprises an embedded iron plate (2) and a pier top cross beam (3) which are embedded in the pier top of a side span pier body (1), wherein a pair of herringbone longitudinal sliding beam supports (4) are welded on the pier top cross beam, a hanging basket (8) is arranged on a reciprocal first cantilever block section (7), a platform longitudinal beam (11) is arranged between a front lower cross beam (9) of the hanging basket and the pier top cross beam, a longitudinal sliding beam hanging strip (10) of the hanging basket is connected with the middle part of a longitudinal sliding beam (14) of the hanging basket, the outer end of the longitudinal sliding beam of the hanging basket is connected with the top end of the herringbone longitudinal sliding beam supports (4), and an outer mold truss (15) is arranged between the top ends of the two herringbone longitudinal sliding beam supports. The construction cost is reduced, and the construction period of the straight section and the side span closure section of the continuous beam is shortened.

Description

Continuous beam straightway and end bay closure segment build mold system and building method thereof
Technical field
What the present invention relates to that a kind of cantilevered builds continuous beam builds mold system and building method thereof, particularly a kind of high pier shaft cantilevered build the straightway of continuous beam and end bay closure segment build mold system and this builds the building method of mold system.
Background technology
Existing high pier shaft cantilevered is built the building after straightway has been built of end bay closure segment of continuous beam and is just carried out, the building of mold system of building of building mold system and end bay closure segment of straightway is near ground abutment pier, first to carry out ground to strengthen after processing, set up again steel bracket, be ready to meet the pre-briquetting of heap carrying capacity requirement simultaneously, and pre-briquetting is lifted into steel bracket top carries out precompressed, and in precompressed process, observe the deflection of ground and steel bracket, until deflection is laid down pre-briquetting after stablizing again, the last template of straightway and end bay closure segment of setting up at the top of steel bracket.This existing building method of building mold system exist foundation treatment material and support rolled steel dosage many, lifting workload is large, length consuming time is used prepressing materials many, the problem that construction costs is high and work high above the ground has a big risk.
Summary of the invention
What the invention provides a kind of continuous beam straightway and end bay closure segment builds mold system and building method thereof, solved prior art when the high pier continuous beam straightway of construction and end bay closure segment, the end bay support foundation treatment material and the support rolled steel dosage that exist are many, lifting workload is large, construction costs height and the large problem of security risk.
The present invention solves above technical problem by the following technical programs:
A kind of continuous beam straightway and end bay closure segment build mold system, comprise end bay pier shaft, apart from end bay pier shaft nearest in across pier shaft, the cantilever piece section second from the bottom of therefrom building to end bay pier shaft direction across pier shaft and the cantilever piece section last of therefrom building to end bay pier shaft direction across pier shaft, at the Dun Ding of end bay pier shaft, be embedded with pre-buried iron plate, on pre-buried iron plate, be welded with pier head piece, on pier head piece, be welded with a pair of lambdoid vertical sliding boom support, in cantilever piece section last, be provided with Hanging Basket, between the front lower transverse beam of Hanging Basket and pier head piece, be erected with platform longeron, on platform longeron, be provided with platform crossbeam, on platform crossbeam, be placed with platform panel, the middle part of the vertical sliding beam of the vertical sliding beam suspender belt of Hanging Basket and Hanging Basket links together, the vertical sliding outer end of beam of Hanging Basket and the top of lambdoid vertical sliding boom support are connected, between the top of two lambdoid vertical sliding boom supports, be provided with external mold truss, on external mold truss, be fixedly installed external mold, in the bottom of external mold truss, be provided with laterally to pull bar.
At external mold and platform panel, form build space in built and merged the section of building.
A building method of building mold system for straightway and end bay closure segment, comprises the following steps:
The first step, at the pier of end bay pier shaft, push up pre-buried 4 pre-buried iron plates, on 2 pre-buried iron plates of front side, abutment pier top, be welded and fixed pier head piece, on 2 pre-buried iron plates of abutment pier top rear, be welded and fixed another pier head piece;
Second step, the cantilever piece section second from the bottom that Hanging Basket is therefrom built to end bay pier shaft direction across pier shaft move on in cantilever piece section last, make Hanging Basket meet normal cantilever pouring condition, and the absolute altitude of adjusting the front lower lock piece of Hanging Basket are to calculating absolute altitude;
The 3rd step, platform longeron is placed successively and is fixed on before pier head piece and Hanging Basket on lower transverse beam;
The 4th step, on platform longeron placement platform crossbeam successively;
The 5th step, on platform crossbeam, lay flat upper surface plate;
The 6th step, two lambdoid vertical sliding boom supports are lifted respectively and are welded to the both sides of pier head piece, the vertical sliding beam of direction movable hanging basket with backward end bay pier shaft, links together the outer end of the vertical sliding beam of Hanging Basket and the top of vertical sliding boom support;
The 7th step, the middle part of the vertical sliding beam of the vertical sliding beam suspender belt of Hanging Basket and Hanging Basket is linked together, and the absolute altitude of adjusting the vertical sliding beam of Hanging Basket is to calculating absolute altitude;
The 8th step, on the vertical sliding beam of 2 Hanging Baskets, place external mold truss, with laterally pull bar being fastened on external mold truss the both sides of platform lock piece;
The 9th step, on external mold truss, external mold is installed.
The present invention takes full advantage of the Gravity support structure that end bay Dun Ding and Hanging Basket are built as cantilever pouring continuous beam straightway and end bay closure segment, replaced setting up on the ground end bay cast-in-place support as the Gravity support structure of its concrete work, lot of materials and preloading and prepressing materials have been saved, reduce construction costs, shorten the construction period of cantilever pouring continuous beam straightway and end bay closure segment, reduced the risk of upper air installing operation.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention;
Fig. 2 is that A-A in Fig. 1 is to sectional view.
The specific embodiment
Below in conjunction with accompanying drawing, the present invention is described in detail:
A kind of continuous beam straightway and end bay closure segment build mold system, comprise end bay pier shaft 1, apart from end bay pier shaft nearest in across pier shaft 5, the cantilever piece section 6 second from the bottom of therefrom building to end bay pier shaft 1 direction across pier shaft 5 and the cantilever piece section 7 last of therefrom building to end bay pier shaft 1 direction across pier shaft 5, at the Dun Ding of end bay pier shaft 1, be embedded with pre-buried iron plate 2, on pre-buried iron plate 2, be welded with pier head piece 3, on pier head piece 3, be welded with a pair of lambdoid vertical sliding boom support 4, in cantilever piece section 7 last, be provided with Hanging Basket 8, between the front lower transverse beam 9 of Hanging Basket 8 and pier head piece 3, be erected with platform longeron 11, on platform longeron 11, be provided with platform crossbeam 12, on platform crossbeam 12, be placed with platform panel 13, the vertical sliding beam suspender belt 10 of Hanging Basket 8 links together with the middle part of the vertical sliding beam 14 of Hanging Basket, the outer end of the vertical sliding beam 14 of Hanging Basket is connected with the top of lambdoid vertical sliding boom support 4, between the top of two lambdoid vertical sliding boom supports 4, be provided with external mold truss 15, on external mold truss 15, be fixedly installed external mold 16, in the bottom of external mold truss 15, be provided with laterally to pull bar 18.
At external mold 16 and platform panel 13, form build space in built and merged the section of building 17, merge the section of building 17 merging of the concrete for the straightway of cantilever pouring continuous beam and end bay closure segment and build engineering.
A building method of building mold system for straightway and end bay closure segment, comprises the following steps:
The first step, at the pier of end bay pier shaft 1, push up pre-buried 4 pre-buried iron plates 2, on 2 pre-buried iron plates 2 of front side, abutment pier top, be welded and fixed pier head piece 3, on 2 pre-buried iron plates 2 of abutment pier top rear, be welded and fixed another pier head piece;
Second step, the cantilever piece section 6 second from the bottom that Hanging Basket 8 is therefrom built to end bay pier shaft 1 direction across pier shaft 5 move on in cantilever piece section 7 last, make Hanging Basket 8 meet normal cantilever pouring condition, and the absolute altitude of adjusting the front lower lock piece 9 of Hanging Basket 8 are to calculating absolute altitude;
The 3rd step, platform longeron 11 is placed successively and is fixed on before pier head piece 3 and Hanging Basket on lower transverse beam 9;
The 4th step, on platform longeron 11 placement platform crossbeam 12 successively;
The 5th step, on platform crossbeam 12, lay flat upper surface plate 13;
The 6th step, two lambdoid vertical sliding boom supports 4 are lifted respectively and are welded to the both sides of pier head piece 3, the vertical sliding beam 14 of direction movable hanging basket with backward end bay pier shaft 1, links together the outer end of the vertical sliding beam 14 of Hanging Basket and the top of vertical sliding boom support 4;
The 7th step, the middle part that the vertical sliding beam suspender belt of Hanging Basket 8 10 and Hanging Basket are indulged to sliding beam 14 link together, and the absolute altitude of adjusting the vertical sliding beam 14 of Hanging Basket is to calculating absolute altitude;
The 8th step, on the vertical sliding beam 14 of 2 Hanging Baskets, place external mold truss 15, with laterally pull bar 18 being fastened on external mold truss the both sides of platform lock piece 12;
The 9th step, external mold 16 is installed on external mold truss 15.
The present invention has utilized the Gravity support structure as the concrete work of cantilever pouring continuous beam straightway and end bay closure segment apart from the Dun Ding of existing Hanging Basket on the nearest cantilever piece of end bay pier shaft and end bay pier shaft, builds support platform and the cast outer mold structure of its concrete work.With respect to traditional construction technology, the present invention has saved duration and material and piling prepressing material greatly, has reduced construction costs, has shortened the engineering time of cantilever pouring continuous beam, has reduced the risk of upper air installing operation.

Claims (2)

1. a continuous beam straightway and end bay closure segment builds mold system, comprise end bay pier shaft (1), apart from end bay pier shaft nearest in across pier shaft (5), the cantilever piece section second from the bottom (6) of therefrom building to end bay pier shaft (1) direction across pier shaft (5) and the cantilever piece section last (7) of therefrom building to end bay pier shaft (1) direction across pier shaft (5), it is characterized in that, at the Dun Ding of end bay pier shaft (1), be embedded with pre-buried iron plate (2), on pre-buried iron plate (2), be welded with pier head piece (3), on pier head piece (3), be welded with a pair of lambdoid vertical sliding boom support (4), in cantilever piece section last (7), be provided with Hanging Basket (8), between the front lower transverse beam (9) of Hanging Basket (8) and pier head piece (3), be erected with platform longeron (11), on platform longeron (11), be provided with platform crossbeam (12), on platform crossbeam (12), be placed with platform panel (13), the vertical sliding beam suspender belt (10) of Hanging Basket (8) links together with the middle part of the vertical sliding beam of Hanging Basket (14), the outer end of the vertical sliding beam of Hanging Basket (14) is connected with the top of lambdoid vertical sliding boom support (4), between the top of two lambdoid vertical sliding boom supports (4), be provided with external mold truss (15), on external mold truss (15), be fixedly installed external mold (16), in the bottom of external mold truss (15), be provided with laterally to pull bar (18).
A kind of continuous beam straightway according to claim 1 and end bay closure segment build mold system, it is characterized in that, at external mold (16) and platform panel (13), form build space in built and merged the section of building (17).
3. a building method of building mold system for continuous beam straightway and end bay closure segment, comprises the following steps:
The first step, at the pier of end bay pier shaft (1), push up pre-buried 4 pre-buried iron plates (2), on 2 pre-buried iron plates (2) of front side, abutment pier top, be welded and fixed pier head piece (3), on 2 pre-buried iron plates (2) of abutment pier top rear, be welded and fixed another pier head piece;
Second step, Hanging Basket (8) is moved on to cantilever piece section last (7) from cantilever piece section second from the bottom (6), make Hanging Basket (8) meet normal cantilever pouring condition, and the absolute altitude of adjusting the front lower lock piece of Hanging Basket (8) (9) is to calculating absolute altitude;
The 3rd step, platform longeron (11) is placed successively and is fixed on before pier head piece (3) and Hanging Basket on lower transverse beam (9);
The 4th step, on platform longeron (11) placement platform crossbeam (12) successively;
The 5th step, at the upper flat upper surface plate (13) of laying of platform crossbeam (12);
The 6th step, two lambdoid vertical sliding boom supports (4) are lifted respectively and are welded to the both sides of pier head piece (3), the vertical sliding beam (14) of direction movable hanging basket with backward end bay pier shaft (1), links together the outer end of the vertical sliding beam of Hanging Basket (14) and the top of vertical sliding boom support (4);
The 7th step, the middle part that the vertical sliding beam suspender belt (10) of Hanging Basket (8) and Hanging Basket are indulged to sliding beam (14) link together, and the absolute altitude of adjusting the vertical sliding beam of Hanging Basket (14) is to calculating absolute altitude;
The 8th step, at the upper external mold truss (15) of placing of the vertical sliding beams of 2 Hanging Baskets (14), with laterally pull bar (18) being fastened on external mold truss to the both sides of platform lock piece (12);
The 9th step, at the upper external mold (16) of installing of external mold truss (15).
CN201310478131.6A 2013-10-14 2013-10-14 Casting mold system for straight line section and side span closure section of continuous beam and building method thereof Active CN103556578B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310478131.6A CN103556578B (en) 2013-10-14 2013-10-14 Casting mold system for straight line section and side span closure section of continuous beam and building method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310478131.6A CN103556578B (en) 2013-10-14 2013-10-14 Casting mold system for straight line section and side span closure section of continuous beam and building method thereof

Publications (2)

Publication Number Publication Date
CN103556578A true CN103556578A (en) 2014-02-05
CN103556578B CN103556578B (en) 2015-05-13

Family

ID=50010914

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310478131.6A Active CN103556578B (en) 2013-10-14 2013-10-14 Casting mold system for straight line section and side span closure section of continuous beam and building method thereof

Country Status (1)

Country Link
CN (1) CN103556578B (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104264592A (en) * 2014-10-14 2015-01-07 中国水利水电第四工程局有限公司 Construction method of continuous beam
CN104790302A (en) * 2015-05-08 2015-07-22 中南林业科技大学 Hanging-basket and bent-cap-support matched integral construction method for side span linear segment of high-pier continuous rigid frame bridge
CN105839540A (en) * 2016-04-29 2016-08-10 贵州桥梁建设集团有限责任公司 Arrangement method and composition structure for rigid frame bridge zero section non-welded support
CN106284080A (en) * 2016-08-11 2017-01-04 中铁十二局集团第二工程有限公司 Continuous rigid frame aqueduct closure segment construction method
CN106400702A (en) * 2016-11-28 2017-02-15 中交路桥华南工程有限公司 Auxiliary pier 0# block beam temporary anchoring structure for preventing overturning of continuous beam
CN106894345A (en) * 2017-04-17 2017-06-27 五冶集团上海有限公司 Continuous beam end bay closing device and method
CN109944170A (en) * 2019-05-06 2019-06-28 重庆建工市政交通工程有限责任公司 Continuous beam with high-pier end bay Cast-in-Situ Segment and closure section integrated construction system and construction method
CN110939075A (en) * 2019-11-12 2020-03-31 中国铁建大桥工程局集团有限公司 Combined cast-in-place construction method for straight section support and hanging basket on side of equal-span continuous beam
CN111851318A (en) * 2020-09-04 2020-10-30 安徽省交通建设股份有限公司 Cantilever bridge side span formwork system and construction method thereof
CN112323647A (en) * 2020-10-29 2021-02-05 德州市公路工程总公司 Rigid frame bridge hanging basket suspension casting system and construction method thereof
CN113123242A (en) * 2021-04-14 2021-07-16 四川瑞云建设工程有限公司 Continuous steel structure cast-in-place section and closure section simultaneous pouring construction structure and construction method
CN113737665A (en) * 2021-07-30 2021-12-03 中铁十九局集团第五工程有限公司 Pier top supporting system for continuous beam side-span cast-in-place section
CN114892523A (en) * 2022-01-07 2022-08-12 中铁十六局集团第五工程有限公司 Bridge side span closure construction method
CN115434254A (en) * 2022-10-20 2022-12-06 成都华川公路建设集团有限公司 Construction method of corrugated steel web continuous rigid frame bridge
CN117166376A (en) * 2023-11-02 2023-12-05 中铁十六局集团路桥工程有限公司 Lightweight construction method for side span cast-in-situ frame body of high mountain gorge Gu Ou continuous beam

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1121820A (en) * 1997-07-08 1999-01-26 Kumagai Gumi Co Ltd Assembly method of reinforcement for overhang-erecting construction method and its movable working car
CN1580413A (en) * 2003-08-08 2005-02-16 北京建达道桥咨询有限公司 Ground-support-free continous rigid frame bridge sidespan closure method
KR20090047436A (en) * 2009-04-22 2009-05-12 진성토건 주식회사 Method for constructing key segment of bridge
CN201526011U (en) * 2009-07-14 2010-07-14 四川路桥桥梁工程有限责任公司 Assembly type non-bracket casting side span cast-in-situ section and closure section in continuous rigid structure
CN102330414A (en) * 2011-08-09 2012-01-25 中铁十二局集团第二工程有限公司 Hanging basket cantilever method construction method of large-span continuous rigid beam sidespan cast-in-place beam section
CN202658536U (en) * 2012-04-11 2013-01-09 中铁三局集团有限公司 Device for synchronous construction of continuous girder bridge cantilever side span cast-in-situ section and folding section
CN203530862U (en) * 2013-10-14 2014-04-09 中铁十九局集团有限公司 Casting mold system for straight section and side span closure section of continuous beam

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1121820A (en) * 1997-07-08 1999-01-26 Kumagai Gumi Co Ltd Assembly method of reinforcement for overhang-erecting construction method and its movable working car
CN1580413A (en) * 2003-08-08 2005-02-16 北京建达道桥咨询有限公司 Ground-support-free continous rigid frame bridge sidespan closure method
KR20090047436A (en) * 2009-04-22 2009-05-12 진성토건 주식회사 Method for constructing key segment of bridge
CN201526011U (en) * 2009-07-14 2010-07-14 四川路桥桥梁工程有限责任公司 Assembly type non-bracket casting side span cast-in-situ section and closure section in continuous rigid structure
CN102330414A (en) * 2011-08-09 2012-01-25 中铁十二局集团第二工程有限公司 Hanging basket cantilever method construction method of large-span continuous rigid beam sidespan cast-in-place beam section
CN202658536U (en) * 2012-04-11 2013-01-09 中铁三局集团有限公司 Device for synchronous construction of continuous girder bridge cantilever side span cast-in-situ section and folding section
CN203530862U (en) * 2013-10-14 2014-04-09 中铁十九局集团有限公司 Casting mold system for straight section and side span closure section of continuous beam

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘进宝: "高墩连续梁边跨直线段的技术探索", 《山西建筑》 *
白晓红: "挂篮吊架施工连续刚构边跨现浇段及合龙段的研究", 《四川建筑科学研究》 *

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104264592B (en) * 2014-10-14 2016-08-24 中国水利水电第四工程局有限公司 A kind of continuous beam construction method
CN104264592A (en) * 2014-10-14 2015-01-07 中国水利水电第四工程局有限公司 Construction method of continuous beam
CN104790302A (en) * 2015-05-08 2015-07-22 中南林业科技大学 Hanging-basket and bent-cap-support matched integral construction method for side span linear segment of high-pier continuous rigid frame bridge
CN105839540A (en) * 2016-04-29 2016-08-10 贵州桥梁建设集团有限责任公司 Arrangement method and composition structure for rigid frame bridge zero section non-welded support
CN106284080A (en) * 2016-08-11 2017-01-04 中铁十二局集团第二工程有限公司 Continuous rigid frame aqueduct closure segment construction method
CN106284080B (en) * 2016-08-11 2019-01-11 中铁十二局集团第二工程有限公司 Continuous rigid frame aqueduct closes up section constructing method
CN106400702A (en) * 2016-11-28 2017-02-15 中交路桥华南工程有限公司 Auxiliary pier 0# block beam temporary anchoring structure for preventing overturning of continuous beam
CN106894345A (en) * 2017-04-17 2017-06-27 五冶集团上海有限公司 Continuous beam end bay closing device and method
CN109944170A (en) * 2019-05-06 2019-06-28 重庆建工市政交通工程有限责任公司 Continuous beam with high-pier end bay Cast-in-Situ Segment and closure section integrated construction system and construction method
CN110939075B (en) * 2019-11-12 2021-09-17 中国铁建大桥工程局集团有限公司 Combined cast-in-place construction method for straight section support and hanging basket on side of equal-span continuous beam
CN110939075A (en) * 2019-11-12 2020-03-31 中国铁建大桥工程局集团有限公司 Combined cast-in-place construction method for straight section support and hanging basket on side of equal-span continuous beam
CN111851318A (en) * 2020-09-04 2020-10-30 安徽省交通建设股份有限公司 Cantilever bridge side span formwork system and construction method thereof
CN111851318B (en) * 2020-09-04 2021-09-07 安徽省交通建设股份有限公司 Cantilever bridge side span formwork system and construction method thereof
CN112323647A (en) * 2020-10-29 2021-02-05 德州市公路工程总公司 Rigid frame bridge hanging basket suspension casting system and construction method thereof
CN112323647B (en) * 2020-10-29 2022-05-03 德州市公路工程总公司 Rigid frame bridge hanging basket suspension casting system and construction method thereof
CN113123242A (en) * 2021-04-14 2021-07-16 四川瑞云建设工程有限公司 Continuous steel structure cast-in-place section and closure section simultaneous pouring construction structure and construction method
CN113737665A (en) * 2021-07-30 2021-12-03 中铁十九局集团第五工程有限公司 Pier top supporting system for continuous beam side-span cast-in-place section
CN114892523A (en) * 2022-01-07 2022-08-12 中铁十六局集团第五工程有限公司 Bridge side span closure construction method
CN115434254A (en) * 2022-10-20 2022-12-06 成都华川公路建设集团有限公司 Construction method of corrugated steel web continuous rigid frame bridge
CN117166376A (en) * 2023-11-02 2023-12-05 中铁十六局集团路桥工程有限公司 Lightweight construction method for side span cast-in-situ frame body of high mountain gorge Gu Ou continuous beam
CN117166376B (en) * 2023-11-02 2024-02-20 中铁十六局集团路桥工程有限公司 Lightweight construction method for side span cast-in-situ frame body of high mountain gorge Gu Ou continuous beam

Also Published As

Publication number Publication date
CN103556578B (en) 2015-05-13

Similar Documents

Publication Publication Date Title
CN103556578B (en) Casting mold system for straight line section and side span closure section of continuous beam and building method thereof
CN104695337B (en) Self-lifting sliding and turnover construction system and construction method
CN203188121U (en) Cast-in-place bridge floor suspending mold of half-through or through arch bridge
CN103669655B (en) Deformation joint both walls body concrete pouring construction process
CN203546626U (en) Suspender replacing device for concrete-filled steel tube arch bridge
CN107905124B (en) A kind of symmetrical expression rigid frame-continuous girder construction technology
CN110528402A (en) A kind of construction method of the more purlin piece combination Hanging Baskets of ultra-wide box beam
CN103882813A (en) Corbel bracket platform for bridge pier and transverse straining beam synchronous construction and construction method of corbel bracket platform
CN110468713B (en) Dual-purpose device used as pier column template and prestressed support and construction method thereof
CN104131516A (en) Bridge cast-in-cantilever method cradle counter-pressure construction method
CN103821359A (en) Large-cross-section concrete beam layered casting construction method
CN103774842A (en) Lifting type square vertical shaft formwork
CN104695979A (en) Method for integrally and transversely moving high and large formwork through high and large trolley
CN103362074B (en) Bridge cantilever box girder construction hanging basket pre-pressing loading device
CN103669228A (en) Self-propelled movable mold frame pre-camber regulating device and regulating method thereof
CN103774841A (en) Track type sliding formwork device
CN203530862U (en) Casting mold system for straight section and side span closure section of continuous beam
JP2018154995A (en) Concrete casting method on inclined surface and movable form device
CN103866699A (en) Rail-free type walking hanging basket
CN202830889U (en) Rail type slip form device
CN106284989B (en) The sliding form bracing system of double track and complete construction method
CN203129025U (en) Suspension fixing device for hanging basket
CN102926330B (en) Installation method of hanging basket suitable for bridge construction
CN205152807U (en) Downgoing movable formwork bridge construction machine is demolishd and is hoisted construction structures with girder
CN203855879U (en) Novel high-pier turnout continuous beam support

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant