CN203530862U - Pouring die system for straight-line section and side span closing section of continuous beam - Google Patents
Pouring die system for straight-line section and side span closing section of continuous beam Download PDFInfo
- Publication number
- CN203530862U CN203530862U CN201320632396.2U CN201320632396U CN203530862U CN 203530862 U CN203530862 U CN 203530862U CN 201320632396 U CN201320632396 U CN 201320632396U CN 203530862 U CN203530862 U CN 203530862U
- Authority
- CN
- China
- Prior art keywords
- hanging basket
- pier
- end bay
- vertical sliding
- pier shaft
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Images
Abstract
The utility model discloses a pouring die system for a straight-line section and a side span closing section of a continuous beam. The pouring die system solves the problems that too much steel is used and the construction period is long when a straight-line section and side span closing section of a high-pier continuous beam are constructed in the prior art. The pouring die system is characterized in that a pre-buried iron plate (2) and a pier top cross beam (3) are pre-buried in a pier top of a side span pier body (1), a pair of V-shaped longitudinal sliding beam supports (4) are welded to the pier top cross beam, a hanging basket (8) is arranged on the last cantilever block section (7), a platform longitudinal beam (11) is arranged between a front lower cross beam (9) of the hanging basket and the pier top cross beam, a longitudinal sliding beam suspension belt (10) of the hanging basket is connected with the middle of a hanging basket longitudinal sliding beam (14), the outer end of the hanging basket longitudinal sliding beam is connected with the top end of the V-shaped longitudinal sliding beam supports (4), and an outer die truss (15) is arranged between the top ends of the two V-shaped longitudinal sliding beam supports (4). The pouring die system reduces project cost and shortens the construction cycle of the straight-line section and side span closing section of the continuous beam.
Description
Technical field
The present invention relates to a kind of cantilevered and build the mold system of building of continuous beam, particularly a kind of high pier shaft cantilevered is built the mold system of building of the straightway of continuous beam and end bay closure segment.
Background technology
Existing high pier shaft cantilevered is built the building after straightway has been built of end bay closure segment of continuous beam and is just carried out, the building of mold system of building of building mold system and end bay closure segment of straightway is near ground abutment pier, first to carry out ground to strengthen after processing, set up again steel bracket, be ready to meet the pre-briquetting of heap carrying capacity requirement simultaneously, and pre-briquetting is lifted into steel bracket top carries out precompressed, and in precompressed process, observe the deflection of ground and steel bracket, until deflection is laid down pre-briquetting after stablizing again, the last template of straightway and end bay closure segment of setting up at the top of steel bracket.This existing building method of building mold system exist foundation treatment material and support rolled steel dosage many, lifting workload is large, length consuming time is used prepressing materials many, the problem that construction costs is high and work high above the ground has a big risk.
Summary of the invention
The invention provides the mold system of building of a kind of continuous beam straightway and end bay closure segment, solved prior art when the high pier continuous beam straightway of construction and end bay closure segment, the end bay support foundation treatment material and the support rolled steel dosage that exist are many, lifting workload is large, construction costs height and the large problem of security risk.
The present invention solves above technical problem by the following technical programs:
A kind of continuous beam straightway and end bay closure segment build mold system, comprise end bay pier shaft, apart from end bay pier shaft nearest in across pier shaft, the cantilever piece section second from the bottom of therefrom building to end bay pier shaft direction across pier shaft and the cantilever piece section last of therefrom building to end bay pier shaft direction across pier shaft, at the Dun Ding of end bay pier shaft, be embedded with pre-buried iron plate, on pre-buried iron plate, be welded with pier head piece, on pier head piece, be welded with a pair of lambdoid vertical sliding boom support, in cantilever piece section last, be provided with Hanging Basket, between the front lower transverse beam of Hanging Basket and pier head piece, be erected with platform longeron, on platform longeron, be provided with platform crossbeam, on platform crossbeam, be placed with platform panel, the middle part of the vertical sliding beam of the vertical sliding beam suspender belt of Hanging Basket and Hanging Basket links together, the vertical sliding outer end of beam of Hanging Basket and the top of lambdoid vertical sliding boom support are connected, between the top of two lambdoid vertical sliding boom supports, be provided with external mold truss, on external mold truss, be fixedly installed external mold, in the bottom of external mold truss, be provided with laterally to pull bar.
At external mold and platform panel, form build space in built and merged cast section.
A building method of building mold system for continuous beam straightway and end bay closure segment, comprises the following steps:
The first step, at the pier of end bay pier shaft, push up pre-buried 4 pre-buried iron plates, on 2 pre-buried iron plates of front side, abutment pier top, be welded and fixed pier head piece, on 2 pre-buried iron plates of abutment pier top rear, be welded and fixed another pier head piece;
Second step, the cantilever piece section second from the bottom that Hanging Basket is therefrom built to end bay pier shaft direction across pier shaft move on in cantilever piece section last, make Hanging Basket meet normal cantilever pouring condition, and the absolute altitude of adjusting the front lower lock piece of Hanging Basket are to calculating absolute altitude;
The 3rd step, platform longeron is placed successively and is fixed on before pier head piece and Hanging Basket on lower transverse beam;
The 4th step, on platform longeron placement platform crossbeam successively;
The 5th step, on platform crossbeam, lay flat upper surface plate;
The 6th step, two lambdoid vertical sliding boom supports are lifted respectively and are welded to the both sides of pier head piece, the vertical sliding beam of direction movable hanging basket with backward end bay pier shaft, links together the outer end of the vertical sliding beam of Hanging Basket and the top of vertical sliding boom support;
The 7th step, the middle part of the vertical sliding beam of the vertical sliding beam suspender belt of Hanging Basket and Hanging Basket is linked together, and the absolute altitude of adjusting the vertical sliding beam of Hanging Basket is to calculating absolute altitude;
The 8th step, on the vertical sliding beam of 2 Hanging Baskets, place external mold truss, with laterally pull bar being fastened on external mold truss the both sides of platform lock piece;
The 9th step, on external mold truss, external mold is installed.
The present invention takes full advantage of the Gravity support structure that end bay Dun Ding and Hanging Basket are built as cantilever pouring continuous beam straightway and end bay closure segment, replaced setting up on the ground end bay cast-in-place support as the Gravity support structure of its concrete work, lot of materials and preloading and prepressing materials have been saved, reduce construction costs, shorten the construction period of cantilever pouring continuous beam straightway and end bay closure segment, reduced the risk of upper air installing operation.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention;
Fig. 2 is that A-A in Fig. 1 is to sectional view.
The specific embodiment
Below in conjunction with accompanying drawing, the present invention is described in detail:
A kind of continuous beam straightway and end bay closure segment build mold system, comprise end bay pier shaft 1, apart from end bay pier shaft nearest in across pier shaft 5, the cantilever piece section 6 second from the bottom of therefrom building to end bay pier shaft 1 direction across pier shaft 5 and the cantilever piece section 7 last of therefrom building to end bay pier shaft 1 direction across pier shaft 5, at the Dun Ding of end bay pier shaft 1, be embedded with pre-buried iron plate 2, on pre-buried iron plate 2, be welded with pier head piece 3, on pier head piece 3, be welded with a pair of lambdoid vertical sliding boom support 4, in cantilever piece section 7 last, be provided with Hanging Basket 8, between the front lower transverse beam 9 of Hanging Basket 8 and pier head piece 3, be erected with platform longeron 11, on platform longeron 11, be provided with platform crossbeam 12, on platform crossbeam 12, be placed with platform panel 13, the vertical sliding beam suspender belt 10 of Hanging Basket 8 links together with the middle part of the vertical sliding beam 14 of Hanging Basket, the outer end of the vertical sliding beam 14 of Hanging Basket is connected with the top of lambdoid vertical sliding boom support 4, between the top of two lambdoid vertical sliding boom supports 4, be provided with external mold truss 15, on external mold truss 15, be fixedly installed external mold 16, in the bottom of external mold truss 15, be provided with laterally to pull bar 18.
At external mold 16 and platform panel 13, form build space in built and merged cast section 17, merge 17 merging of the concrete for the straightway of cantilever pouring continuous beam and end bay closure segment of cast section and build engineering.
A building method of building mold system for continuous beam straightway and end bay closure segment, comprises the following steps:
The first step, at the pier of end bay pier shaft 1, push up pre-buried 4 pre-buried iron plates 2, on 2 pre-buried iron plates 2 of front side, abutment pier top, be welded and fixed pier head piece 3, on 2 pre-buried iron plates 2 of abutment pier top rear, be welded and fixed another pier head piece;
Second step, the cantilever piece section 6 second from the bottom that Hanging Basket 8 is therefrom built to end bay pier shaft 1 direction across pier shaft 5 move on in cantilever piece section 7 last, make Hanging Basket 8 meet normal cantilever pouring condition, and the absolute altitude of adjusting the front lower lock piece 9 of Hanging Basket 8 are to calculating absolute altitude;
The 3rd step, platform longeron 11 is placed successively and is fixed on before pier head piece 3 and Hanging Basket on lower transverse beam 9;
The 4th step, on platform longeron 11 placement platform crossbeam 12 successively;
The 5th step, on platform crossbeam 12, lay flat upper surface plate 13;
The 6th step, two lambdoid vertical sliding boom supports 4 are lifted respectively and are welded to the both sides of pier head piece 3, the vertical sliding beam 14 of direction movable hanging basket with backward end bay pier shaft 1, links together the outer end of the vertical sliding beam 14 of Hanging Basket and the top of vertical sliding boom support 4;
The 7th step, the middle part that the vertical sliding beam suspender belt of Hanging Basket 8 10 and Hanging Basket are indulged to sliding beam 14 link together, and the absolute altitude of adjusting the vertical sliding beam 14 of Hanging Basket is to calculating absolute altitude;
The 8th step, on the vertical sliding beam 14 of 2 Hanging Baskets, place external mold truss 15, with laterally pull bar 18 being fastened on external mold truss the both sides of platform lock piece 12;
The 9th step, external mold 16 is installed on external mold truss 15.
The present invention has utilized the Gravity support structure as the concrete work of cantilever pouring continuous beam straightway and end bay closure segment apart from the Dun Ding of existing Hanging Basket on the nearest cantilever piece of end bay pier shaft and end bay pier shaft, builds support platform and the cast outer mold structure of its concrete work.With respect to traditional construction technology, the present invention has saved duration and material and piling prepressing material greatly, has reduced construction costs, has shortened the engineering time of cantilever pouring continuous beam, has reduced the risk of upper air installing operation.
Claims (2)
1. a continuous beam straightway and end bay closure segment builds mold system, comprise end bay pier shaft (1), apart from end bay pier shaft nearest in across pier shaft (5), the cantilever piece section second from the bottom (6) of therefrom building to end bay pier shaft (1) direction across pier shaft (5) and the cantilever piece section last (7) of therefrom building to end bay pier shaft (1) direction across pier shaft (5), it is characterized in that, at the Dun Ding of end bay pier shaft (1), be embedded with pre-buried iron plate (2), on pre-buried iron plate (2), be welded with pier head piece (3), on pier head piece (3), be welded with a pair of lambdoid vertical sliding boom support (4), in cantilever piece section last (7), be provided with Hanging Basket (8), between the front lower transverse beam (9) of Hanging Basket (8) and pier head piece (3), be erected with platform longeron (11), on platform longeron (11), be provided with platform crossbeam (12), on platform crossbeam (12), be placed with platform panel (13), the vertical sliding beam suspender belt (10) of Hanging Basket (8) links together with the middle part of the vertical sliding beam of Hanging Basket (14), the outer end of the vertical sliding beam of Hanging Basket (14) is connected with the top of lambdoid vertical sliding boom support (4), between the top of two lambdoid vertical sliding boom supports (4), be provided with external mold truss (15), on external mold truss (15), be fixedly installed external mold (16), in the bottom of external mold truss (15), be provided with laterally to pull bar (18).
A kind of continuous beam straightway according to claim 1 and end bay closure segment build mold system, it is characterized in that, at external mold (16) and platform panel (13), form build space in built and merged cast section (17).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320632396.2U CN203530862U (en) | 2013-10-14 | 2013-10-14 | Pouring die system for straight-line section and side span closing section of continuous beam |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320632396.2U CN203530862U (en) | 2013-10-14 | 2013-10-14 | Pouring die system for straight-line section and side span closing section of continuous beam |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203530862U true CN203530862U (en) | 2014-04-09 |
Family
ID=50417087
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320632396.2U Withdrawn - After Issue CN203530862U (en) | 2013-10-14 | 2013-10-14 | Pouring die system for straight-line section and side span closing section of continuous beam |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203530862U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103556578A (en) * | 2013-10-14 | 2014-02-05 | 中铁十九局集团有限公司 | Straight-line section and side span closure section casting mold system for continuous beam and erection method for casting mold system |
CN104264592A (en) * | 2014-10-14 | 2015-01-07 | 中国水利水电第四工程局有限公司 | Construction method of continuous beam |
-
2013
- 2013-10-14 CN CN201320632396.2U patent/CN203530862U/en not_active Withdrawn - After Issue
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103556578A (en) * | 2013-10-14 | 2014-02-05 | 中铁十九局集团有限公司 | Straight-line section and side span closure section casting mold system for continuous beam and erection method for casting mold system |
CN103556578B (en) * | 2013-10-14 | 2015-05-13 | 中铁十九局集团有限公司 | Straight-line section and side span closure section casting mold system for continuous beam and erection method for casting mold system |
CN104264592A (en) * | 2014-10-14 | 2015-01-07 | 中国水利水电第四工程局有限公司 | Construction method of continuous beam |
CN104264592B (en) * | 2014-10-14 | 2016-08-24 | 中国水利水电第四工程局有限公司 | A kind of continuous beam construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103556578B (en) | Straight-line section and side span closure section casting mold system for continuous beam and erection method for casting mold system | |
CN104695337B (en) | Self-lifting sliding and turnover construction system and construction method | |
CN203546626U (en) | Suspender replacing device for concrete-filled steel tube arch bridge | |
CN203923924U (en) | No. 0 section bracket prepressing device | |
CN107905124B (en) | A kind of symmetrical expression rigid frame-continuous girder construction technology | |
CN104131516A (en) | Bridge cast-in-cantilever method cradle counter-pressure construction method | |
CN103362074B (en) | Bridge cantilever box girder construction hanging basket pre-pressing loading device | |
CN205934747U (en) | A hang basket that is used for cantilever to pour bridge construction operation with pre -compaction structure | |
CN206801592U (en) | Hydraulic lining trolley for cut-and-cover tunnel concreting | |
CN103669228A (en) | Self-propelled movable mold frame pre-camber regulating device and regulating method thereof | |
CN202007535U (en) | Supporting reinforcing structure | |
CN204023424U (en) | A kind of Hanging Basket You Ding back-pressure mechanism | |
CN103774842A (en) | Lifting type square vertical shaft formwork | |
CN203530862U (en) | Pouring die system for straight-line section and side span closing section of continuous beam | |
CN103572703A (en) | Construction method of outer wrapped concrete obliquely pulling and buckling and ring and section dividing combination method | |
CN203475790U (en) | Hydraulic lifting-type building scaffold | |
CN103774841A (en) | Track type sliding formwork device | |
CN102926330B (en) | Installation method of hanging basket suitable for bridge construction | |
CN205669313U (en) | A kind of Universal adjustable hangs template system | |
CN203129025U (en) | Suspension fixing device for hanging basket | |
CN202830889U (en) | Rail type slip form device | |
CN204591309U (en) | The fixed tunnel lining trolley of a kind of triangle | |
CN207293909U (en) | A kind of precast beam reinforced bar skeleton hanging apparatus | |
CN203200719U (en) | Hanging type slope pouring template device | |
CN206359897U (en) | A kind of radial type steel core form unit |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20140409 Effective date of abandoning: 20150513 |
|
RGAV | Abandon patent right to avoid regrant |