CN204023424U - A kind of Hanging Basket You Ding back-pressure mechanism - Google Patents

A kind of Hanging Basket You Ding back-pressure mechanism Download PDF

Info

Publication number
CN204023424U
CN204023424U CN201420457385.XU CN201420457385U CN204023424U CN 204023424 U CN204023424 U CN 204023424U CN 201420457385 U CN201420457385 U CN 201420457385U CN 204023424 U CN204023424 U CN 204023424U
Authority
CN
China
Prior art keywords
built
fitting
hanging basket
pressure mechanism
girt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420457385.XU
Other languages
Chinese (zh)
Inventor
孙世全
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Provincial Transportation Engineering Group Co Ltd
Original Assignee
Jiangsu Provincial Transportation Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Provincial Transportation Engineering Group Co Ltd filed Critical Jiangsu Provincial Transportation Engineering Group Co Ltd
Priority to CN201420457385.XU priority Critical patent/CN204023424U/en
Application granted granted Critical
Publication of CN204023424U publication Critical patent/CN204023424U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides a kind of Hanging Basket You Ding back-pressure mechanism, comprise the Hanging Basket be fixed on by cantilever on the case beam body of having built, and the bottom board system be suspended on Hanging Basket hoist cable, also comprise counter-force tripod and built-in fitting, built-in fitting comprises bottom built-in fitting and top built-in fitting, counter-force tripod comprises girt and inclination depression bar, one end and the described bottom built-in fitting of girt are connected, one end of the other end and described inclination depression bar is connected, the other end and the described top built-in fitting of inclination depression bar are connected, girt is arranged on above the top press rod of described hydraulic jack.This utility model not only overcomes the shortcoming of traditional precompressed, can also simulate the actual loading situation of suspended casting suspended basket better.This back-pressure mechanism simultaneously, make Hanging Basket clearly stressed, easily control prefabricating load, safety is high, and steadiness is good, time saving and energy saving, and expense is relatively low.

Description

A kind of Hanging Basket You Ding back-pressure mechanism
Technical field
The utility model relates to the form of structure of a kind of building, bridge construction device, particularly relates to a kind of Hanging Basket You Ding back-pressure mechanism, belongs to building and technical field of transportation.
Background technology
It is important step in bridge construction that bridge beam body outstanding pours note, and the key of Hanging Basket cantilever method construction is Hanging Basket.The precompressed of Hanging Basket is absolutely necessary construction sequence, the object of Hanging Basket precompressed is mainly evaluated the intensity of Hanging Basket, rigidity and stability, the safety of checking Hanging Basket, the reliability of checking Hanging Basket and its nonelastic deformation of elimination, and measure the practical distortion value of Hanging Basket under different load, to revise mould absolute altitude simultaneously.At present, the method for Hanging Basket precompressed mainly adopts the method precompressed of the direct preloading such as sand pocket or water bag.The method length consuming time, costly, be difficult to simulation Hanging Basket actual working state, and because Hanging Basket working space is limited, preloading quantity is restricted, and is often difficult to the precompressed construction needs of the suspended casting suspended basket adapting to Long span variable cross-section continuous beam and rigid frame bridge.
Utility model content
Technical problem to be solved in the utility model is, overcomes the shortcoming of prior art, provide a kind of simulate Hanging Basket actual loading situation accurately, prefabricating load regulation and control are convenient, safety is high, structure is simple, the time saving and energy saving and Hanging Basket You Ding back-pressure mechanism that expense is low.
In order to solve above technical problem, the utility model provides a kind of Hanging Basket You Ding back-pressure mechanism, comprise the Hanging Basket be fixed on by cantilever on the case beam body of having built, and the bottom board system be suspended on Hanging Basket hoist cable, described bottom board system is by boom rest, front lower transverse beam, longitudinal distribution beam on rear lower transverse beam and crossbeam, steel form forms, described cast bed die is provided with hydraulic jack, it is characterized in that: also comprise counter-force tripod and built-in fitting, described built-in fitting comprises bottom built-in fitting and top built-in fitting, described counter-force tripod comprises girt and inclination depression bar, one end and the described bottom built-in fitting of described girt are connected, one end of the other end and described inclination depression bar is connected, the other end and the described top built-in fitting of described inclination depression bar are connected, described girt is arranged on above the top press rod of described hydraulic jack.
The technical scheme that the utility model limits further is:
Further, described inclination depression bar is fixedly connected with by a reinforcement diagonal brace with described girt.
Further, described reinforcement diagonal brace is i iron.
Further, described top built-in fitting is one group of square plate, and described bottom built-in fitting is i iron.
Further, in order to prevent the concrete at this built-in fitting place from ftractureing in load test process, described bottom built-in fitting and top built-in fitting all carry out reinforcement by anchor bar to be fixed.
Further, the herringbone bridging that described Hanging Basket is fixedly connected with horizontal beam by horizontal beam, lower end, and the column be supported between herringbone bridging summit and horizontal beam is formed, and has the track be fixed on raising-plate under horizontal beam the inner of described Hanging Basket.
Installation procedure of the present utility model and operating principle are: first pre-buried top built-in fitting and bottom built-in fitting on the web of having built, treat after this block builds part construction the girt of counter-force tripod and inclination depression bar to be separately fixed on the top pre-embedded steel slab and bottom built-in fitting of having built, after suspended casting suspended basket and bottom die of box-beam are installed and are terminated, then by hydraulic oil overhead in the headspace of counter-force tripod and bed die.Utilize hydraulic control oil pressure on top surface, press down bed die girder, pull-up suspension rod, simulation Hanging Basket actual loading, thus measure the deformation parameter at each position of Hanging Basket, to reach the object of Hanging Basket precompressed.
The beneficial effects of the utility model are: this utility model structure is simple, not only overcomes the shortcoming of traditional precompressed, meets the needs of various suspended casting suspended basket precompressed, can also simulate the actual loading situation of suspended casting suspended basket better.This back-pressure mechanism simultaneously, make Hanging Basket clearly stressed, easily control prefabricating load, safety is high, and steadiness is good, time saving and energy saving, and expense is relatively low, can meet the needs of different types of rridges cantilever casting construction.
Accompanying drawing explanation
Below in conjunction with embodiment 1 and accompanying drawing, the utility model is described further:
Fig. 1 is the structural representation of embodiment 1.
Fig. 2 is the lateral view of Fig. 1 central sill case.
Fig. 3 is the structural representation of counter-force tripod in embodiment 1.
Detailed description of the invention
embodiment 1
The present embodiment Cast-in-Situ Segment overall length 11m, the wide 16.9m of end face, the wide 8.9m of base plate, high 5.9m are single box single chamber section structure, and cantilever pouring beam section maximum weight is 4# block 170t.
A kind of Hanging Basket You Ding back-pressure mechanism that the present embodiment provides, as shown in Figures 1 to 3: the crossbeam 4 comprising the Hanging Basket 1 be fixed on by cantilever on the case beam body of having built, counter-force tripod 2, built-in fitting and be suspended on Hanging Basket hoist cable, distribution beam 4-1 covers forward and backward lower transverse beam 4 upper surface, and the steel plate supported by i iron spaced apart is formed.
Liang Dun for having manhole between top board A and base plate B is connected as a single entity, and overall in " work " character form structure, the web C of roof supporting A is extended at the two ends of base plate B respectively upward, forms the web structure end face of single box single chamber.Two web C end faces arrange the top built-in fitting 6 and bottom built-in fitting 5 of installing back-pressure mechanism respectively.
Counter-force tripod 2 comprises girt 7 and inclination depression bar 8, one end and the bottom built-in fitting 5 of girt 7 are connected, one end of the other end and inclination depression bar 8 is connected, the other end and the top built-in fitting 6 of inclination depression bar 8 are connected, and are provided with jack 3 between the rigidity distribution beam 4-1 on girt 7 outer end and crossbeam 4;
The middle part of inclination depression bar 8 and be fixed with between girt 7 and bottom built-in fitting 5 junction and strengthen diagonal brace 9.
The installation steps of Hanging Basket and bed die system are: install the crossbeam 4 that Hanging Basket 1 and outer end are suspended in midair by Hanging Basket hoist cable 10 in the bridge foundation segment length direction constructed; Wherein the herringbone bridging 1-2 that is fixedly connected with horizontal beam 1-1 by horizontal beam 1-1, lower end of the Hanging Basket 1 and column 1-3 be supported between herringbone bridging 1-2 summit and horizontal beam 1-1 is formed, and has the track 1-4 be fixed on raising-plate A under the inner of Hanging Basket 1 horizontal beam 1-1; The overhanging cantilever end of horizontal beam 1-1 fixes the upper end of hoist cable 10, and lower end and the front lower transverse beam of hoist cable 10 are fixedly connected.Rear lower transverse beam 4 is fixed on the floor beams B of bridge foundation section by suspension rod, crossbeam 4 arranges longitudinal distribution beam 4-1, and jack about 3 is arranged respectively laterally presses beam.By regulating jack 3 pressure, loading to crossbeam 4 and by the drop-down Hanging Basket 1 of hoist cable 10, eliminate the plastic strain of Hanging Basket 1 and record required elastic deformation parameter.
Top built-in fitting 6 is the square plate that a 2cm is thick, and the reinforcing bar that 5 groups of U-shaped Φ 22mm are welded at the steel plate back side is connected with web concrete.Bottom built-in fitting 5 is i iron.The 2I36 i iron that bottom built-in fitting adopts 1.1m long.
Counter-force tripod 2 and pre-embedded steel slab firm welding, form rigid connection, in order to prevent the concrete at this place from ftractureing in load test process, set up two layers of 60*60cm, φ 16 10 × 10cm anticracking steel mesh reinforcement by within the scope of the web tunneling boring of pre-buried 2I36 i iron and reaction beam top pre-embedded steel slab.
Precompressed adopts the jack of 4 150t, and strut and tie I 36 i iron maximum weighted is 118.3t, and Two bors d's oeuveres I36 i iron meets force request.
In addition to the implementation, the utility model can also have other embodiments.All employings are equal to the technical scheme of replacement or equivalent transformation formation, all drop on the protection domain of the utility model requirement.

Claims (6)

1. a Hanging Basket You Ding back-pressure mechanism, comprise the Hanging Basket be fixed on by cantilever on the case beam body of having built, and the bottom board system be suspended on Hanging Basket hoist cable, described bottom board system is by boom rest, front lower transverse beam, longitudinal distribution beam on rear lower transverse beam and crossbeam, steel form forms, described cast bed die is provided with hydraulic jack, it is characterized in that: also comprise counter-force tripod and built-in fitting, described built-in fitting comprises bottom built-in fitting and top built-in fitting, described counter-force tripod comprises girt and inclination depression bar, one end and the described bottom built-in fitting of described girt are connected, one end of the other end and described inclination depression bar is connected, the other end and the described top built-in fitting of described inclination depression bar are connected, described girt is arranged on above the top press rod of described hydraulic jack.
2. Hanging Basket You Ding back-pressure mechanism according to claim 1, is characterized in that: described inclination depression bar is strengthened diagonal brace with described girt by one and is fixedly connected with.
3. Hanging Basket You Ding back-pressure mechanism according to claim 2, is characterized in that: described reinforcement diagonal brace is i iron.
4. Hanging Basket You Ding back-pressure mechanism according to claim 1, is characterized in that: described top built-in fitting is one group of square plate, and described bottom built-in fitting is i iron.
5. Hanging Basket You Ding back-pressure mechanism according to claim 4, is characterized in that: described bottom built-in fitting and top built-in fitting all carry out reinforcement by anchor bar to be fixed.
6. Hanging Basket You Ding back-pressure mechanism according to claim 1, it is characterized in that: the herringbone bridging that described Hanging Basket is fixedly connected with horizontal beam by horizontal beam, lower end, and the column be supported between herringbone bridging summit and horizontal beam is formed, under horizontal beam the inner of described Hanging Basket, there is the track be fixed on raising-plate.
CN201420457385.XU 2014-08-14 2014-08-14 A kind of Hanging Basket You Ding back-pressure mechanism Expired - Fee Related CN204023424U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420457385.XU CN204023424U (en) 2014-08-14 2014-08-14 A kind of Hanging Basket You Ding back-pressure mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420457385.XU CN204023424U (en) 2014-08-14 2014-08-14 A kind of Hanging Basket You Ding back-pressure mechanism

Publications (1)

Publication Number Publication Date
CN204023424U true CN204023424U (en) 2014-12-17

Family

ID=52063312

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420457385.XU Expired - Fee Related CN204023424U (en) 2014-08-14 2014-08-14 A kind of Hanging Basket You Ding back-pressure mechanism

Country Status (1)

Country Link
CN (1) CN204023424U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108824803A (en) * 2018-09-03 2018-11-16 中国华西企业有限公司 A kind of huge column climbing apparatus
CN110359374A (en) * 2019-07-29 2019-10-22 中铁七局集团路桥工程有限公司 A kind of Hanging Basket precompressed counter-force bracket and its construction method
CN111074794A (en) * 2019-12-26 2020-04-28 中交二航局第四工程有限公司 Prepressing system for hanging basket of cantilever beam
CN114164771A (en) * 2021-11-22 2022-03-11 甘肃建投临夏建设管理有限公司 Prepressing device and prepressing method for viaduct cantilever casting hanging basket
CN114922067A (en) * 2022-01-07 2022-08-19 中铁十六局集团第五工程有限公司 Bridge construction process

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108824803A (en) * 2018-09-03 2018-11-16 中国华西企业有限公司 A kind of huge column climbing apparatus
CN108824803B (en) * 2018-09-03 2024-08-13 中国华西企业有限公司 Giant column climbing formwork device
CN110359374A (en) * 2019-07-29 2019-10-22 中铁七局集团路桥工程有限公司 A kind of Hanging Basket precompressed counter-force bracket and its construction method
CN111074794A (en) * 2019-12-26 2020-04-28 中交二航局第四工程有限公司 Prepressing system for hanging basket of cantilever beam
CN114164771A (en) * 2021-11-22 2022-03-11 甘肃建投临夏建设管理有限公司 Prepressing device and prepressing method for viaduct cantilever casting hanging basket
CN114164771B (en) * 2021-11-22 2023-09-12 甘肃建投临夏建设管理有限公司 Prepressing device and prepressing method for overhead bridge cantilever pouring hanging basket
CN114922067A (en) * 2022-01-07 2022-08-19 中铁十六局集团第五工程有限公司 Bridge construction process
CN114922067B (en) * 2022-01-07 2024-03-05 中铁十六局集团第五工程有限公司 Bridge construction process

Similar Documents

Publication Publication Date Title
CN204023424U (en) A kind of Hanging Basket You Ding back-pressure mechanism
CN103485283A (en) Hanging bracket supporting system of side-span cast-in-place section and implementation method thereof
CN208815424U (en) A kind of bridge descending hanging basket
CN203188121U (en) Cast-in-place bridge floor suspending mold of half-through or through arch bridge
CN104131516A (en) Bridge cast-in-cantilever method cradle counter-pressure construction method
CN202658536U (en) Device for synchronous construction of continuous girder bridge cantilever side span cast-in-situ section and folding section
CN103074854A (en) Rear supporting point triangular bracket hanging basket and bridge construction method using same
CN101781878B (en) Integral lifting template of main pylon of single-pylon cable-stayed bridge without dorsal cables and lifting construction method thereof
CN204690605U (en) The self-propelled triangular truss hanging basket of large span beam bridge
CN103195450B (en) Hydraulic pressure tunnel invert operation trolley and inverted arch construction method
CN204849607U (en) A continuous beam string basket pre -compaction device for bridge construction
CN204940312U (en) A kind of integral lifting lowering system of steel cofferdam
CN107336346B (en) Beam making pedestal
CN104695336A (en) Double-layer cast-in-situ beam support construction method adopting sequence from upper layer to lower layer
CN204589822U (en) The two cantilever bent cap anchor ear Construction Support system of a kind of solely post
CN205636496U (en) A interim strutting arrangement that is used for support frame bridge crane and whole hole case roof beam
CN202247687U (en) Universal cast-in-situ trestle for bridge
CN105714683A (en) Installation and dismantling method of high bent cast-in-situ aqueduct suspension type bailey frames
CN103669217B (en) A kind of rear-support hanging basket and its entirety change width method for traversing
CN102134832B (en) Movable support and movable support assisted method for erecting steel box beams through non-variable amplitude frame beam crane
CN102286932B (en) Construction method for off-site assembling and automatic mounting on bridge of mobile mould bridge abutment
CN103952979B (en) A kind of steel concrete superposed beam top board erection without scaffolding device and construction method
CN103437301A (en) Method for mounting construction hanging basket of suspended pouring section of single plane cable-stayed bridge
CN203049471U (en) Rear fulcrum triangular bracket hanging basket
CN107268455A (en) Concrete girder gooseneck combining structure beam cradle construction method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141217

Termination date: 20160814

CF01 Termination of patent right due to non-payment of annual fee