Utility model content
The purpose of this utility model is to overcome the above-mentioned deficiency in the presence of prior art, it is provided that a kind of cost
Supporting apparatus for supporting Bridge Erector and whole opening box girder low, easy for installation.
In order to realize above-mentioned utility model purpose, this utility model provides techniques below scheme:
A kind of supporting apparatus for supporting Bridge Erector and whole opening box girder, comprising:
Support post, some described support posts are installed on pier cap vertically, and along bridge mileage side
To being distributed in bridge pier both sides;
Distribution beam, some described distribution beam are horizontally installed on described support post top, by single bridge pier,
The distribution beam being positioned at described bridge pier the same side forms for the platform supporting Bridge Erector and whole opening box girder;
Temporary support, described temporary support is installed on described distribution beam top, described temporary support top contact
Bottom described whole opening box girder;
Support means is changed into support post, distribution beam and temporary support these three steel from existing hydraulic system
The combinative structure of component, has saved cost, and has used assembled form instead, can carry out according to different operating modes
The assembly of different schemes, easy for installation.
As preferred version of the present utility model, it also includes:
Micro-tensioning system, described micro-tensioning system is made up of some jack, is arranged on described distribution beam top with whole
Between bottom the box beam of hole, and described temporary support is staggeredly arranged, bridge absolute altitude when becoming bridge continuously for bridge
Adjust.
As preferred version of the present utility model, it also includes:
Bracket, described bracket is fixedly installed in described support post top and extends outside described bridge pier, torr
It is provided with diagonal brace below frame and between support post periphery;
Described support post is arranged at the both sides of adjacent two bridge pier, and it is big that described bracket is installed on bridge
On mileage direction on support post foremost, when bracket act as Bridge Erector via, front auxiliary leg erect-position,
Use special column (original column is set up diagonal brace and formed bracket structure).
As preferred version of the present utility model, depend between the described support post periphery that same bridge pier is other
Secondary being fixed by steel pipe or shaped steel is connected, and connects each other, makes an intensity higher framework is integrally formed,
More stable.
As preferred version of the present utility model, described distribution beam is H profile steel, the opening direction court of H profile steel
To level, the H profile steel quantity of described bridge pier one side is 2, forms described platform side by side, and this structure makes
The intensity of described platform is higher.
As preferred version of the present utility model, it is provided with level between described support post and described bridge pier and props up
Support arrangement, described horizontal support device one end is fixed on the periphery of described support post, and the other end is fixed
In described bridge pier side, support post and bridge pier preferably cooperate, make single unit system support box beam time,
More stable, intensity is higher, and effect is more preferable.
As preferred version of the present utility model, described support post is symmetrically distributed in bridge pier both sides, to box beam
Support effect is more preferable, simultaneously more preferable with the effect cooperated of bridge pier.
As preferred version of the present utility model, lay respectively at described bridge pier both sides and be positioned at bridge pier mileage side
Connect by shaped steel is fixing between the support post outermost periphery of homonymy, the steel construction that at this, shaped steel is formed
Middle part and described bridge pier between be also equipped with described horizontal support device, make single unit system support box beam time,
More stable, intensity is higher, and effect is more preferable, simultaneously also more preferable with the effect cooperated of bridge pier, mutually assists
With making both of which more stable.
As preferred version of the present utility model, described support post is spliced by some steel cylinder superpositions,
Convenient installation, dismounting, and transport, storage.
As preferred version of the present utility model, described steel cylinder includes the multiple cylinder of differing heights, adapts to
The bridge pier of differing heights, and more multi-state, adaptability is higher.
Compared with prior art, the beneficial effects of the utility model:
Low cost, easy for installation.
Embodiment 1
The technical scheme that the present embodiment is concrete, is suitable for 4 across the bridge of one (4 × 40m), concrete, public
Opened the supporting apparatus for supporting Bridge Erector and whole opening box girder, as Fig. 1,2, comprising:
Support post 1, some described support posts 1 are installed on bridge pier 6 cushion cap vertically, and along bridge
Cheng Fangxiang is symmetrically distributed in bridge pier 6 both sides, between described support post 1 periphery that same bridge pier 6 is other
Pass sequentially through steel pipe or the fixing connection of shaped steel, between described support post 1 and described bridge pier 6, be provided with level
Support means, described horizontal support device one end is fixed on the periphery of described support post 1, the other end
Be fixed on described bridge pier 6 side, lay respectively at described bridge pier 6 both sides and be positioned at bridge pier 6 mileage direction with
Connect by shaped steel is fixing between the support post 1 outermost periphery of side, the steel construction that at this, shaped steel is formed
It is also equipped with described horizontal support device, support post 1 described in the present embodiment between middle part and described bridge pier 6
Being spliced by some steel cylinder superpositions, described steel cylinder includes the multiple cylinder of differing heights, described circle
Cylinder 820mm, thickness is 12mm, material use Q235, according to differing heights be divided into 4m, 2m, 1m,
The sections (bridge pier 6 height 3m-21m) of 0.5m;
Distribution beam 2, some described distribution beam 2 are horizontally installed on described support post 1 top, single bridge
Pier 6 is other, and the distribution beam 2 being positioned at described bridge pier 6 the same side forms for supporting Bridge Erector and whole opening box girder 5
Platform, described distribution beam 2 is that (a length of 3500mm, width is 300mm to H profile steel, in H profile steel
Vertical steel plate thickness 8mm, horizontally disposed steel plate thickness 6mm), the opening direction of H profile steel towards level,
The H profile steel quantity of described bridge pier 6 one side is 2, forms described platform side by side;
Temporary support 3, described temporary support 3 is installed on described distribution beam 2 top, and described temporary support 3 pushes up
Portion contacts bottom described whole opening box girder 5, and described temporary support 3 is 600mm's for external diameter in the present embodiment
Between bottom sand cylinder, the top of temporary support 3 described in the present embodiment and whole opening box girder 5, resistance to compression rubber blanket is set;
Micro-tensioning system 4, described micro-tensioning system 4 is made up of some 500T jack, is arranged on described distribution beam
Between bottom 2 tops and whole opening box girder 5, and described temporary support 3 is staggeredly arranged;
Bracket, described bracket is fixedly installed in described support post 1 top and extends outside described bridge pier 6,
It is provided with diagonal brace below bracket and between support post 1 periphery;
Described support post 1 is arranged at the both sides of adjacent two bridge pier 6, and described bracket is installed on bridge
On beam big mileage direction on support post 1 foremost.
Concrete, it being suitable for the technical program, concrete structure inspection calculation process is:
1) load confirms
Bridge Erector is setting up handing-over pier, and owing to pier shaft cannot support, all loads of girder erection by bridging machine state are by facing
Time support and undertake, so time load maximum, take maximum span 40m as calculating:
(1) (maximum span is 40m to G1=607.082T, and end bay is the heaviest span, its maximum sections coagulation
Tu Liang deadweight is 49T, adds up to beams of concrete deadweight for 607.082T)
(2) G2=20T (construction temporary load(ing))
(3) G3=P bridge machine=4X130T=520T (setting a roof beam in place under operating mode, Bridge Erector rear load-bearing support bearing power)
Temporary support adds up to and bears pressure and be herein:
2P=G1/2+G2/2+G3=607.082/2+10+520=833.5T=8335KN
Therefore it is P=8335/2=4167.5KN that single upright column bears pressure
2) column strength calculates
Intensity meets the requirements
3) strut stability calculates
Cross sectional moment of inertia is
The radius of inertia is
Fixing one end by one end freely to consider, take μ=1, according to design, light pole length at most controls at 5m
In, thus obtaining this bar flexibility is
This bar visible be in degree of rubbing bar, therefore use discount coefficient method (" mechanics of materials ", P316, Dan Zuhui
Version) can draw(Q235 proportional limit 200MPa)=180MPa
Thus can stablize trouble free service coefficient is
Therefore this bar meets stability requirement, if considering unbalance loading, in the range of unbalance loading 10%, stability can meet
Requirement.
4) bearing capacity of foundation
This programme column all stands on pile foundation support table, and cushion cap uses C30 concreting, its resistance to compression allowable
Intensity is 30MPa, and column compressive stress is far smaller than cushion cap bearing capacity, therefore does not considers.
5) inspection of temporary support intensity is calculated
Temporary support uses, and (model is 300mm × 300mm to lay double H-type steel on steel pipe post
× 8mm × 6mm) as distribution beam 2, and consolidate with column;Distribution beam 2 uses a diameter of 600mm
Temporary support 3 forms temporary support 3 with base combination, and it is designed with sand as power transmission medium, be equivalent to by
Sand is treated as fluid and is calculated as follows:
Pressure is: P=4167.5KN
Compressive stress is:
A, employing ANSYS set up plane 1/4 model, analyze it to cylinder ancient piece of jade, round, flat and with a hole in its centre active force;
B, grid division, mesh width 0.005m;
C, arrange constraint and active force, wherein A is active force 20.4MPa, and B is without frictional constraint;
D, importing interpretation of result, x direction is radial force, and y direction is tangential force;
Can show that maximum radial force is FX=2.2MPa
Maximum tangential force is FY=143.5MPa
All meet the requirements.
Verify qualified after, then carry out concrete construction:
1. overall construction method
(1) whole complete high-order assembled and stretch-draw Cheng Qiaohou across precast segmental beam, control Segmental assembling bridge-erecting machine, by whole
Fall to falsework (i.e. upright supports) across box beam, complete single span box beam erection;
(2) Bridge Erector was converted to cross-module formula, and started Bridge Erector and in face of the beam set up, proceed to next across treating
Set a roof beam in place position;
(3) after circulation frame completely joins beam sections successively, steel stranded wire penetrating adapter, assembled wet joint template, pour wet seam
Concrete, after concrete strength reaches requirement, carries out the permanent stretch-draw of integrin box beam immediately, makes sections case
Beam is converted to continuous box girder by simple supported box beam.
(4) remove interim column support, transfer to next and join beam section to be onstructed, carry out next connection beam sections circulation and execute
Work.
2. concrete column erection scheme
(1) cushion cap needs to bury φ 20 screw-thread steel and front end tapping underground for column with cushion cap even before non-casting concrete
Connect.According to pier axis in length and breadth, the instrument such as tape measure, ink fountain of employing draws column centrage and peace on cushion cap
Dress contour line, to ensure the accurate of column installation site.
(2) cushion cap is levelling
The flatness of cushion cap installation site directly affects stability when column integral assembling and bearing load, so holding
Platform levelling particularly important.Use level gauge to measure the discrepancy in elevation of its installation site, and use fine sand levelling and spread
If the plank that 5cm is thick, it is ensured that every root post plane discrepancy in elevation cannot be greater than 2mm, in four root post installation sites
The heart point discrepancy in elevation cannot be greater than 5mm.
(3) Pin is installed and supports
According to cushion cap setting-out position, lifting the oneth Pin standard knot half range also uses diagonal brace support fixing, re-uses automobile
Sling other half Pin to specify position, by tightening brace bolt, and use the lumps of wood carve son affixed with pier shaft,
All the time an entirety is become.During assembled first segment, it is vertical for strict guarantee;
(4) install section by section
After a Pin completes assembled reinforcing, assembled step section by section of being allowed for access, until it reaches assembled height, it is even
Connecting bolt and stay bolt all use electric wrench to fasten, and remain its perpendicularity, it is ensured that column is vertical
Stress.
(5) column end face is levelling and sets up H profile steel
After its column installation is carried out in strict accordance with above step, column end face is substantially not present the discrepancy in elevation, but due to
Mismachining tolerance and the impact of installation deviation, leg surface there will be uneven phenomenon.If flatness is less than 1mm,
Other measures can not be used, if flatness is more than 1mm, before H profile steel is installed, use 1mm thickness
Sheet metal is levelling, it is ensured that its homonymy discrepancy in elevation is in 1mm.And distribution beam 2 uses backing plate bolt to carry out with support
Effectively connect.
(6) dress temporary support 3 pushes up and adjusts absolute altitude
Put a little by measurement, release the position of temporary support jack and draw its contour line, jack is strictly pacified
It is placed at setting-out, is then measured by level gauge and adjust its height, in principle higher than designed elevation 3~5cm at the bottom of beam,
After treating that whole opening box girder 5 is completely placed on column by Bridge Erector, then finely tune its position to design altitude, a left side
Right employing wedge is spacing.
(7) regulation of body absolute altitude
When beam sections falls after falsework, and Bridge Erector completes via operation immediately.If after Bridge Erector via,
Produce the discrepancy in elevation between beam sections and cast-in-place 0# block, when needing to be adjusted, intend using 500T jack pair sections
Beam carries out jacking adjustment.
(8) dismounting of falsework
Beam sections complete wet seam pour, permanent prestressing tendon stretch-draw and simply supported beam continuous beam system transform and after
After watering belt construction and after reaching concrete design strength, the dismounting of support can be carried out.