CN109356036A CN201811423162.0A CN201811423162A CN109356036A CN 109356036 A CN109356036 A CN 109356036A CN 201811423162 A CN201811423162 A CN 201811423162A CN 109356036 A CN109356036 A CN 109356036A
Authority
CN
China
Prior art keywords
pier
pipe support
side bracket
pedestal
pipeline section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811423162.0A
Other languages
Chinese (zh)
Inventor
韩瑞宾
王海波
郑辉
付超
程世玉
王瑞强
张�杰
武洪全
陈小林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Railway Group Engineering Co Ltd
China Railway Sixth Group Co Ltd
Guangzhou Engineering Co Ltd of China Railway Sixth Group Co Ltd
Original Assignee
Guangzhou Railway Group Engineering Co Ltd
China Railway Sixth Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Railway Group Engineering Co Ltd, China Railway Sixth Group Co Ltd filed Critical Guangzhou Railway Group Engineering Co Ltd
Priority to CN201811423162.0A priority Critical patent/CN109356036A/en
Publication of CN109356036A publication Critical patent/CN109356036A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice

Abstract

The present invention relates to bridge construction technical fields, more particularly, to a kind of middle pier pier-side bracket and its construction method.Pier pier-side bracket includes side stand in this, and side stand includes two pack supports, and pack support includes box beam and multiple submounts, and submounts include pedestal, pipe support and attached wall;The bottom end of pipe support is connected with pedestal, and pedestal with the cushion cap of middle pier for being connected;One end of attached wall is connected with pipe support, and pier shaft side of the other end of attached wall for middle pier is connected;Box beam is connected with the top of the pipe support of pack support.Construction method of pier pier-side bracket includes: to be fixedly connected with the pedestal of submounts with the cushion cap of middle pier in this;Pipe support is fixedly connected with pedestal;Pipe support is connected with the pier shaft side of middle pier by attached wall;Box beam is fixed on to the top of pipe support.The present invention is supported by the avris of the bottom of middle pier pier-side bracket centering pier steel truss, to ensure the stability when constructing on middle pier steel truss girder.

Description

Middle pier pier-side bracket and its construction method
Technical field
The present invention relates to bridge construction technical fields, more particularly, to a kind of middle pier pier-side bracket and its construction method.
Background technique
As domestic high-grade highway and the paces of railway construction are constantly accelerated, for bridge construction mobile formwork and The application of Bridge Erector is also more and more extensive.Currently, in Jiang Zhongdun steel truss girder is installed on behind pier top portion, it is also necessary in middle pier steel truss Other constructions are carried out on beam, since middle pier steel truss girder is without other suspension devices, in the construction process, are easy in influence The stability of pier steel truss girder itself.
Summary of the invention
The purpose of the present invention is to provide a kind of middle pier pier-side bracket and its construction methods, to solve to exist in the prior art Since middle pier steel truss girder is without other suspension devices, in the construction process, be easy to influence in pier steel truss girder itself The technical issues of stability.
The present invention provides a kind of middle pier pier-side brackets comprising side stand, the side stand include two pack supports, institute Stating pack support includes box beam and multiple submounts, and the submounts include pedestal, pipe support and attached wall;The bottom end of the pipe support and institute It states pedestal to be connected, the pedestal with the cushion cap of middle pier for being connected;One end of the attached wall is connected with the pipe support, institute Pier shaft side of the other end of attached wall for middle pier is stated to be connected;The top phase of the box beam and the pipe support of the pack support Connection.
In any of the above-described technical solution, further, the pipe support include be sequentially connected from the bottom to top bottom pipeline section, in Portion's pipeline section and main leg, wherein the bottom pipeline section is connected with the pedestal, and the main leg is connected with the box beam, The central tube section is between the bottom pipeline section and the main leg.
In any of the above-described technical solution, further, the middle part pipeline section is connected with the attached wall.
In any of the above-described technical solution, further, the main leg is connected with the attached wall.
In any of the above-described technical solution, further, the middle part pipeline section, which is also connected with, draws cable rope.
In any of the above-described technical solution, further, the main leg, which is also connected with, draws cable rope.
In any of the above-described technical solution, further, the quantity of the side stand is two.
In any of the above-described technical solution, further, the quantity of the submounts in the pack support is two.
In any of the above-described technical solution, further, by multiple between multiple pipe supports in the side stand Transverse connection is connected.
In any of the above-described technical solution, further, it is connected between the adjacent transverse connection by diagonal web member It connects.
The present invention also provides the construction method of the middle pier pier-side bracket described in one kind, which includes: by sub- branch The pedestal of frame is fixedly connected with the cushion cap of middle pier;Pipe support is fixedly connected with pedestal;By attached wall by the pier shaft of pipe support and middle pier Side is connected;Box beam is fixed on to the top of pipe support.
Compared with prior art, the invention has the benefit that
Middle pier pier-side bracket provided by the invention comprising side stand, the side stand include two pack supports, described group Bracket includes box beam and multiple submounts, and the submounts include pedestal, pipe support and attached wall;The bottom end of the pipe support and the bottom Seat is connected, and the pedestal with the cushion cap of middle pier for being connected;One end of the attached wall is connected with the pipe support, described attached Pier shaft side of the other end of wall for middle pier is connected;The box beam is connected with the top of the pipe support of the pack support It connects.It is supported by the avris of the bottom of middle pier pier-side bracket centering pier steel truss, to ensure to construct on middle pier steel truss girder When stability;By submounts for support force, and the gentle support of the bottom of centering pier steel truss girder is realized by box beam; Can guarantee the stability of pipe support by attached wall, thus guarantee in pier pier-side bracket entirety stability.
The present invention also provides the middle pier pier-side bracket construction method, which includes: by submounts Pedestal is fixedly connected with the cushion cap of middle pier;Pipe support is fixedly connected with pedestal;By attached wall by the pier shaft side of pipe support and middle pier It is connected;Box beam is fixed on to the top of pipe support.Based on above-mentioned analysis it is found that in this pier pier-side bracket construction method, pass through The avris of the bottom of middle pier pier-side bracket centering pier steel truss is supported, to ensure the stabilization when constructing on middle pier steel truss girder Property.
Additional aspect and advantage of the invention will become obviously in following description section, or practice through the invention Recognize.
Detailed description of the invention
It, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical solution in the prior art Embodiment or attached drawing needed to be used in the description of the prior art be briefly described, it should be apparent that, it is described below Attached drawing is some embodiments of the present invention, for those of ordinary skill in the art, before not making the creative labor It puts, is also possible to obtain other drawings based on these drawings.
Fig. 1 is the structural schematic diagram for the middle pier pier-side bracket that the embodiment of the present invention one provides;
Fig. 2 is the partial enlargement structural representation in Fig. 1 at A;
Fig. 3 is the partial enlargement structural representation in Fig. 1 at B;
Fig. 4 is the C direction view of Fig. 1;
Fig. 5 is the partial enlargement diagram in Fig. 4 at D.
Icon:
Pier in 100-;101- side stand;102- pack support;103- submounts;104- pedestal;The bottom 105- pipeline section;106- Middle part pipeline section;107- main leg;108- attached wall;109- cushion cap;110- steel strand wires;The pre-buried anchoring piece of 112-;113- steel cofferdam; 114- box beam;115- transverse connection;116- diagonal web member;Pier steel truss girder in 200-.
Specific embodiment
Technical solution of the present invention is clearly and completely described below in conjunction with attached drawing, it is clear that described implementation Example is a part of the embodiment of the present invention, instead of all the embodiments.
The component for the embodiment of the present invention for usually describing and showing in attached drawing here can be with a variety of different configurations To arrange and design.Therefore, the detailed description of the embodiment of the present invention provided in the accompanying drawings is not intended to limit below and is wanted The scope of the present invention of protection is sought, but is merely representative of selected embodiment of the invention.
Based on the embodiments of the present invention, those of ordinary skill in the art are obtained without making creative work The every other embodiment obtained, shall fall within the protection scope of the present invention.
In the description of the present invention, it should be noted that term " center ", "upper", "lower", "left", "right", "vertical", The orientation or positional relationship of the instructions such as "horizontal", "inner", "outside" be based on the orientation or positional relationship shown in the drawings, merely to Convenient for description the present invention and simplify description, rather than the device or element of indication or suggestion meaning must have a particular orientation, It is constructed and operated in a specific orientation, therefore is not considered as limiting the invention.In addition, term " first ", " second ", " third " is used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " installation ", " phase Even ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;It can To be mechanical connection, it is also possible to be electrically connected;It can be directly connected, can also can be indirectly connected through an intermediary Connection inside two elements.For the ordinary skill in the art, above-mentioned term can be understood at this with concrete condition Concrete meaning in invention.
Embodiment one
Referring to figs. 1 to 5, the embodiment of the invention provides a kind of middle pier pier-side brackets comprising side stand 101, Side stand includes two pack supports 102, and pack support includes box beam 114 and multiple submounts 103, and submounts include pedestal 104, pipe Frame and attached wall 108;The bottom end of pipe support is connected with pedestal, and pedestal with the cushion cap 109 of middle pier 100 for being connected;The one of attached wall End is connected with pipe support, and pier shaft side of the other end of attached wall for middle pier is connected;The top of the pipe support of box beam and pack support It is connected.Submounts are made of steel substantially.
Specifically, the quantity of side stand is two.The quantity of submounts in each pack support is two.By a side Direction, that is, bridge trend of the bracket to another side stand;
Two side stands are symmetrically distributed in the two sides of middle pier using the axis of middle pier as symmetry axis;Two of each side stand Pack support is symmetrically divided with bridge center line.Pedestal is fixedly connected with the anchoring member reserved on the cushion cap of middle pier.Pipe support and cushion cap Between there is inclination angle, and the angle between the length direction of pipe support and the table top of cushion cap is less than 90 degree.Each group of each side stand In two submounts in bracket, one of submounts are located at upstream side, another submounts is located at downstream side;It is each collateral Two pack supports in frame, one of pack support are located at upstream side, another pack support is located at downstream side.
The middle pier pier-side bracket that the embodiment provides, by the avris of the bottom of middle pier pier-side bracket centering pier steel truss into Row support, to ensure the stability when constructing on middle pier steel truss girder 200;By submounts for support force, and pass through box beam To realize the gentle support of the bottom of centering pier steel truss girder;It can guarantee the stability of pipe support by attached wall, thus pier in guaranteeing The stability of pier-side bracket entirety.
In the optional scheme of the embodiment, pipe support includes being sequentially connected bottom pipeline section 105, middle part pipeline section 106 from the bottom to top And main leg 107, wherein bottom pipeline section is connected with pedestal, and main leg is connected with box beam, and central tube section is located at bottom pipeline section Between main leg.Lower tube section is located at the lower section of middle part pipeline section, and central tube section is located at the lower section of main leg.Pass through setting three Different pipeline section, in order to install.Pedestal is structure as a whole with bottom pipeline section.
In the optional scheme of the embodiment, middle part pipeline section is connected with attached wall, and one end of attached wall and middle part pipeline section weld, attached wall The other end and middle pier pier shaft side in built-in fitting weld.
In the optional scheme of the embodiment, main leg is connected with attached wall.One end of attached wall and the top of main leg are welded, attached Built-in fitting in the pier shaft side of the other end of wall and middle pier welds.
In the optional scheme of the embodiment, middle part pipeline section, which is also connected with, draws cable rope, by drawing cable rope, in order to adjust The tilt angle of middle part pipeline section.The one end for drawing cable rope is connected with middle part pipeline section, draws the other end of cable rope and the pier of middle pier It is connected at the top of body.
In the optional scheme of the embodiment, main leg, which is also connected with, draws cable rope.By drawing cable rope, in order to adjust master The tilt angle of pipeline section.The one end for drawing cable rope is connected with main leg, draws at the top of the other end of cable rope and the pier shaft of middle pier It is connected.
In the optional scheme of the embodiment, it is connected between multiple pipe supports in side stand by multiple transverse connections; Transverse connection can be pipe structure, multiple about 115 parallel interval of transverse connection distributions.
In the optional scheme of the embodiment, it is connected between adjacent a transverse connection by diagonal web member 116.Each group of branch Two submounts in frame are respectively with the box beam Welding of steel material, and box beam is located at the top of main leg, and box beam is horizontally disposed.It is horizontal It can be steel pipe to connector.
In the optional scheme of the embodiment, pass through steel between two opposite main legs in symmetrically arranged two side stands 110 tensioning of twisted wire.Pass through steel strand tension between two opposite pedestals in symmetrically arranged two side stands.The top of main leg Concrete is poured in the lumen at end, to guarantee the robustness on the top of main leg.
The inventive embodiments, additionally provide the construction method of middle pier pier-side bracket, i.e., in pier pier-side bracket installation method, The construction method the following steps are included:
Step S1: the pedestal of submounts is fixedly connected with the cushion cap of middle pier;Pipe support is fixedly connected with pedestal;By attached Pipe support is connected by wall with the pier shaft side of middle pier.
Further, include three sub-steps in step S1:
Step S101: being operated using 50t truck crane, and loop wheel machine erect-position is incited somebody to action on the direction across bridge branch trestle of steel cofferdam 113 112 Corresponding matching of pre-buried anchoring piece at the top of the cushion cap of pedestal and middle pier installs, and adjusts position and the bottom pipeline section of pedestal After tilt angle, pedestal and pre-buried anchoring piece are welded and fixed.
Step S102: middle part pipeline section prefabricated in advance is lifted to installation site, by the flange of one end of middle part pipeline section Blending bolt is fixed after disk is docked with the ring flange of bottom pipeline section;There is inclination angle due to 10 meters of central tube segment length and after installing, is Reduce the internal stress at the ring flange of docking, can be arranged on the top of middle part pipeline section and draw cable rope, draw cable rope and draw into It is fixed temporarily at the pier top of pier;Attached wall is installed again, wherein the welding pair of the built-in fitting of one end of attached wall and the pier shaft side of middle pier It connects, the other end and the welding of middle part pipeline section, before the other end of attached wall is connect with middle part pipeline section, adjusts middle part first with cable rope is drawn The inclination angle of pipeline section is welded to connect to design angle, then by the other end of attached wall and middle part pipeline section;After installing attached wall, then install Transverse connection at the middle part pipeline section of upstream and downstream side.
Step S103 lifts main leg prefabricated in advance to installation site, and the middle part pipeline section being installed Blending bolt is fixed after the ring flange docking of the other end;There is inclination angle due to 10 meters of segment length of supervisor and after installing, in order to reduce docking Traction cable rope can be arranged on main leg top in the internal stress of flange, draw cable rope and draw to temporarily solid at the pier top of middle pier It is fixed;Then attached wall is installed again, attached wall one end is connect with main leg, and the other end is connected with the built-in fitting of the pier shaft side of middle pier, Before the other end of attached wall is connect with middle part pipeline section, first with drawing the inclination angle of cable rope adjustment main leg to design angle, then will be attached Wall and the built-in fitting of pier shaft side are welded to connect;After installing attached wall, then the transverse direction installed at the main leg in downstream side connects Fitting.
Step S2: box beam 114 is fixed on to the top of pipe support.
In step S2, further, box beam is installed on the column cap top of main leg, is adjusted behind pile equipment position simultaneously It fixes, and temporary cushion block, backing plate is placed in the top of box beam, the integral thickness of cushion block is according to the design in construction design drawing Pre- lift value that absolute altitude and monitoring side provide determines;After pier-side bracket integrated member is all installed, i.e., progress pedestal and Steel strand tension at the column cap of main leg, pre- drawing steel stranded wire are made of the steel strand wires that 17 nominal diameters are 15.24mm, prestretching Power is 150t tensioning.It should be noted that the steel strand wires in main leg draw completion, coagulation need to be poured in the column cap of main leg Soil, the tension steel strand again after concrete reaches design strength.
It needs to pay attention to when pier pier-side bracket: (1), before the construction of pier-side bracket steel pipe being calculated simultaneously according to design drawing in an installation It determines pile center position, after the completion of the plan-position of penstock installation and Inclination maneuver, starts flanged joint.When connecting two flanges, The error of the straightness and flange bolt hole that guarantee the center line of two pipeline sections should within the allowable range of values, by itself weight of pipeline section Amount, compresses two segment ring flange uniformly, thereby guarantees that and be attached by same bolt stress to flange.(2), method on pipeline section Blue valve snail keyhole position should be corresponding with the pipeline section upper bolt hole position matched consistent, the spiral shell of the ring flange at same root pipeline section both ends Keyhole position should also correspond to unanimously.
Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention., rather than its limitations;To the greatest extent Pipe present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that: its according to So be possible to modify the technical solutions described in the foregoing embodiments, or to some or all of the technical features into Row equivalent replacement;And these are modified or replaceed, various embodiments of the present invention technology that it does not separate the essence of the corresponding technical solution The range of scheme.In the instructions provided here, numerous specific details are set forth.It is to be appreciated, however, that reality of the invention Applying example can practice without these specific details.In some instances, well known method, knot is not been shown in detail Structure and technology, so as not to obscure the understanding of this specification.In addition, it will be appreciated by those of skill in the art that although this institute The some embodiments stated include certain features included in other embodiments rather than other feature, but different embodiments The combination of feature means to be within the scope of the present invention and formed different embodiments.For example, being wanted in following right Ask in book, embodiment claimed it is one of any can in any combination mode come using.

Claims (10)

1. a kind of middle pier pier-side bracket, which is characterized in that including side stand, the side stand include two pack supports, described group Bracket includes box beam and multiple submounts, and the submounts include pedestal, pipe support and attached wall;The bottom end of the pipe support and the bottom Seat is connected, and the pedestal with the cushion cap of middle pier for being connected;One end of the attached wall is connected with the pipe support, described attached Pier shaft side of the other end of wall for middle pier is connected;The box beam is connected with the top of the pipe support of the pack support It connects.
2. middle pier pier-side bracket according to claim 1, which is characterized in that the pipe support includes being sequentially connected from the bottom to top Bottom pipeline section, middle part pipeline section and main leg, wherein the bottom pipeline section is connected with the pedestal, the main leg with it is described Box beam is connected, and the central tube section is between the bottom pipeline section and the main leg.
3. middle pier pier-side bracket according to claim 2, which is characterized in that the middle part pipeline section is connected with the attached wall.
4. middle pier pier-side bracket according to claim 2, which is characterized in that the main leg is connected with the attached wall.
5. middle pier pier-side bracket according to claim 3, which is characterized in that the middle part pipeline section, which is also connected with to draw, pulls wind Rope.
6. middle pier pier-side bracket according to claim 4, which is characterized in that the main leg, which is also connected with, draws cable rope.
7. middle pier pier-side bracket according to claim 1 or 2, which is characterized in that the quantity of the side stand is two.
8. middle pier pier-side bracket according to claim 1 or 2, which is characterized in that the number of the submounts in the pack support Amount is two.
9. middle pier pier-side bracket according to claim 1 or 2, which is characterized in that multiple pipes in the side stand It is connected between frame by multiple transverse connections.
10. a kind of construction method of pier pier-side bracket middle as claimed in any one of claims 1-9 wherein, which is characterized in that this is applied Work method includes: to be fixedly connected with the pedestal of submounts with the cushion cap of middle pier;Pipe support is fixedly connected with pedestal;It will by attached wall Pipe support is connected with the pier shaft side of middle pier;Box beam is fixed on to the top of pipe support.
CN201811423162.0A 2018-11-26 2018-11-26 Middle pier pier-side bracket and its construction method Pending CN109356036A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811423162.0A CN109356036A (en) 2018-11-26 2018-11-26 Middle pier pier-side bracket and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811423162.0A CN109356036A (en) 2018-11-26 2018-11-26 Middle pier pier-side bracket and its construction method

Publications (1)

Publication Number Publication Date
CN109356036A true CN109356036A (en) 2019-02-19

Family

ID=65343180

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811423162.0A Pending CN109356036A (en) 2018-11-26 2018-11-26 Middle pier pier-side bracket and its construction method

Country Status (1)

Country Link
CN (1) CN109356036A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110258293A (en) * 2019-07-22 2019-09-20 中铁大桥局集团有限公司 Cable-stayed bridge steel truss girder main pylon pier top erection construction method
CN112095491A (en) * 2020-09-09 2020-12-18 中铁六局集团有限公司 Bidirectional cantilever erection construction process for Hualun type large-span steel truss girder bridge

Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101440606A (en) * 2008-12-29 2009-05-27 中铁大桥局股份有限公司 Pier-side bracket capable of adjusting spatial position of steel beam
CN101793010A (en) * 2010-03-16 2010-08-04 中交二航局第二工程有限公司 Arch-included integral pushing method for large-tonnage multi-span combined arch bridge
CN201567533U (en) * 2009-09-28 2010-09-01 中交二公局第六工程有限公司 Assembly and disassembly-type bracket for cast-in-place of continuous beam
CN202369922U (en) * 2011-11-01 2012-08-08 中铁四局集团第一工程有限公司 Pull type bracket truss
CN103103925A (en) * 2013-02-06 2013-05-15 中铁大桥局集团第八工程有限公司 Combined H-shaped steel column bracket
CN103669226A (en) * 2013-12-25 2014-03-26 中建六局土木工程有限公司 River-crossing prestressed concrete continuous beam bridge box girder 0# block support construction method
CN203546599U (en) * 2013-09-27 2014-04-16 中铁大桥局股份有限公司 Pier-side bracket
CN104480862A (en) * 2014-12-03 2015-04-01 中铁大桥局集团有限公司 Installation method of span steel truss girder of cable-stayed bridge side
CN205636496U (en) * 2016-04-07 2016-10-12 中铁二局集团有限公司 A interim strutting arrangement that is used for support frame bridge crane and whole hole case roof beam
CN106120568A (en) * 2016-08-18 2016-11-16 德州市公路工程总公司 Cross a river Main Bridge bridge pier secondary locking temporary consolidation structure and construction method
CN107012796A (en) * 2017-05-25 2017-08-04 山东大学 A kind of wide, bracket of No. zero block construction of squat pier box beam and construction method
CN107034790A (en) * 2017-05-27 2017-08-11 中交二航局第四工程有限公司 The method of Internal force of support is reduced during girder steel symmetric double free cantilever erection
CN107100076A (en) * 2017-02-27 2017-08-29 中铁十九局集团有限公司 A kind of Cast-in-place Bent Cap construction method
CN107604827A (en) * 2017-08-04 2018-01-19 中铁大桥局集团有限公司 A kind of porous large-span freely-supported steel truss girder bridge erection method
CN108589551A (en) * 2018-06-07 2018-09-28 中交路桥华南工程有限公司 Pier stud 0# beam section cast-in-place supports
CN209292896U (en) * 2018-11-26 2019-08-23 中铁六局集团有限公司 Middle pier pier-side bracket

Patent Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101440606A (en) * 2008-12-29 2009-05-27 中铁大桥局股份有限公司 Pier-side bracket capable of adjusting spatial position of steel beam
CN201567533U (en) * 2009-09-28 2010-09-01 中交二公局第六工程有限公司 Assembly and disassembly-type bracket for cast-in-place of continuous beam
CN101793010A (en) * 2010-03-16 2010-08-04 中交二航局第二工程有限公司 Arch-included integral pushing method for large-tonnage multi-span combined arch bridge
CN202369922U (en) * 2011-11-01 2012-08-08 中铁四局集团第一工程有限公司 Pull type bracket truss
CN103103925A (en) * 2013-02-06 2013-05-15 中铁大桥局集团第八工程有限公司 Combined H-shaped steel column bracket
CN203546599U (en) * 2013-09-27 2014-04-16 中铁大桥局股份有限公司 Pier-side bracket
CN103669226A (en) * 2013-12-25 2014-03-26 中建六局土木工程有限公司 River-crossing prestressed concrete continuous beam bridge box girder 0# block support construction method
CN104480862A (en) * 2014-12-03 2015-04-01 中铁大桥局集团有限公司 Installation method of span steel truss girder of cable-stayed bridge side
CN205636496U (en) * 2016-04-07 2016-10-12 中铁二局集团有限公司 A interim strutting arrangement that is used for support frame bridge crane and whole hole case roof beam
CN106120568A (en) * 2016-08-18 2016-11-16 德州市公路工程总公司 Cross a river Main Bridge bridge pier secondary locking temporary consolidation structure and construction method
CN107100076A (en) * 2017-02-27 2017-08-29 中铁十九局集团有限公司 A kind of Cast-in-place Bent Cap construction method
CN107012796A (en) * 2017-05-25 2017-08-04 山东大学 A kind of wide, bracket of No. zero block construction of squat pier box beam and construction method
CN107034790A (en) * 2017-05-27 2017-08-11 中交二航局第四工程有限公司 The method of Internal force of support is reduced during girder steel symmetric double free cantilever erection
CN107604827A (en) * 2017-08-04 2018-01-19 中铁大桥局集团有限公司 A kind of porous large-span freely-supported steel truss girder bridge erection method
CN108589551A (en) * 2018-06-07 2018-09-28 中交路桥华南工程有限公司 Pier stud 0# beam section cast-in-place supports
CN209292896U (en) * 2018-11-26 2019-08-23 中铁六局集团有限公司 Middle pier pier-side bracket

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110258293A (en) * 2019-07-22 2019-09-20 中铁大桥局集团有限公司 Cable-stayed bridge steel truss girder main pylon pier top erection construction method
CN112095491A (en) * 2020-09-09 2020-12-18 中铁六局集团有限公司 Bidirectional cantilever erection construction process for Hualun type large-span steel truss girder bridge

Similar Documents

Publication Publication Date Title
CN105971274A (en) Overhanging support frame formwork system and construction method thereof
CN103924520B (en) Construction method and device of suspension bridge main cable anchorage prestressed pipes
CN106480823B (en) Vaulted beam device and its localization method
CN110230262A (en) Basket type steel pipe arch bridge main arch rib semi-monolithic hoisting structure and interconnection method
CN109356036A (en) Middle pier pier-side bracket and its construction method
CN103967277A (en) Construction method of super-high-rise core tube inclined shear wall
CN105780995A (en) Curved surface space pipe truss structure and mounting method thereof
CN205857032U (en) The toughened internal stress Construction Support device that a kind of floor stand combines with shelf bracket
CN209307866U (en) Middle pier trusses
CN104831818A (en) Connection node of precast reinforced concrete beam and laminated column
CN209292896U (en) Middle pier pier-side bracket
CN103243649A (en) System and method for quickly installing and positioning cable saddle
CN105401527B (en) Construction method for anchoring catwalk and catwalk anchoring device
CN106758839A (en) A kind of strutting system and its installation method of the cast-in-place segmental construction of pier top
JP2002535577A (en) Pressurized liquid circulation conduit and method for producing the same
CN109356037A (en) Middle pier trusses and its construction method
CN109736179B (en) Assembled construction method for tied arch bridge
CN208202602U (en) Beam string construction temporary support structure
CN107740585B (en) Hanging installation method for ultra-long inclined steel structure circular pipe
CN110952786A (en) Truss structure and installation method thereof
JP2812885B2 (en) Construction method of steel pipe arch
CN107938841A (en) A kind of positioning adjusting of steel column pairing and method of temporarily fixing
CN109210275A (en) A kind of I-beam pipe installation bracket
JP2645758B2 (en) Construction method of suspension bridge type pipe bridge
CN104790299A (en) Internal-span unsupported convenient construction support and method for bridge cast-in-place box beam

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination