CN104480862A - Installation method of span steel truss girder of cable-stayed bridge side - Google Patents

Installation method of span steel truss girder of cable-stayed bridge side Download PDF

Info

Publication number
CN104480862A
CN104480862A CN201410723740.8A CN201410723740A CN104480862A CN 104480862 A CN104480862 A CN 104480862A CN 201410723740 A CN201410723740 A CN 201410723740A CN 104480862 A CN104480862 A CN 104480862A
Authority
CN
China
Prior art keywords
internode
bridge deck
steel truss
bridge
truss girder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410723740.8A
Other languages
Chinese (zh)
Other versions
CN104480862B (en
Inventor
潘东发
涂满明
毛伟琦
吴方明
马涛
赵鹍鹏
张爱花
覃勇刚
贾卫中
胡军
姚森
徐烨
张栋
赵全成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Engineering Group Co Ltd MBEC
Original Assignee
China Railway Major Bridge Engineering Group Co Ltd MBEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Engineering Group Co Ltd MBEC filed Critical China Railway Major Bridge Engineering Group Co Ltd MBEC
Priority to CN201410723740.8A priority Critical patent/CN104480862B/en
Publication of CN104480862A publication Critical patent/CN104480862A/en
Application granted granted Critical
Publication of CN104480862B publication Critical patent/CN104480862B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Abstract

The invention discloses an installation method of span steel truss girder of cable-stayed bridge side which relates to the technical field of bridge construction. The installation method includes forming a bridge deck panel by parts assembling steel truss beam bottom chord and bridge deck in pier top panel, vertically hanging and installing a assembled bridge deck panel by an erection crane, pushing a panel space towards abutment pier by a pushing device, part assembling a web member, a principle rafter and a bracing thereof at the largest bearing force of the whole bridge deck panel, continuously installing bridge deck panel and pushing until the bridge deck panel reaches the abutment pier, finally finishing the installation of the rest space web member, principle rafter and bracing thereof and erecting a stay cable. The installation method of span steel truss girder of cable-stayed bridge side improves the construction environment of span steel truss girder, the construction efficiency is increased and the installation method of span steel truss girder of cable-stayed bridge side has great applicability and economy.

Description

A kind of erection method of cable stayed bridge end bay steel truss girder
Technical field
The present invention relates to Bridge Construction technical field, be specifically related to a kind of erection method of cable stayed bridge end bay steel truss girder.
Background technology
The erection of cable stayed bridge end bay steel truss girder is one of important step in CONSTRUCTION OF CABLE-STAYED BRIDGE.Its traditional mounting method mainly contains following three kinds:
1, steel truss girder from king-tower to both sides two cantilever erection.After the construction of king-tower lower transverse beam, set up pier-side bracket, steel truss girder between pier epimerite is installed, girder erection crane is installed at steel truss girder top, king-tower bilateral symmetry is loose spells or whole segmental erection steel truss girder, has often set up an internode and has synchronously hung suspension cable, until end bay has been constructed and midspan closing.
2, steel truss girder utilizes that support is auxiliary to be set up from abutment pier to king-tower direction.Between end bay bridge pier, be abound with falsework, on falsework, loose spelling erecting steel truss girder, after end bay steel truss girder has set up, has hung suspension cable.
3, steel truss girder is from king-tower to abutment pier direction jack-in erection.After the construction of king-tower lower transverse beam, set up pier-side bracket, Dun Ding arranges incremental launching device, installs steel truss girder between pier epimerite, nose girder is installed in steel truss girder front end, girder erection crane is installed at steel truss girder top, and the steel truss girder of an afterbody assembling internode, to the steel truss girder of an end bay direction pushing tow internode, girder erection crane in move forward an internode across direction, so repeatedly, after completing the erection of end bay steel truss girder, suspension cable is hung.
The first and the second erection method all need to transport steel girder member bar, and steel girder member bar is heavier, usually can run into the problem of disembarkation difficulty, and therefore, need arrange special harbour, trestle and lifting station etc., transhipment has high input, and wastes time and energy, and efficiency is low.
In the third erection method, need to arrange nose girder in steel truss girder front end, to reduce steel truss girder stress and front end degree of disturbing, temporary structure is more, and construction environment is complicated.
Summary of the invention
For the defect existed in prior art, the object of the present invention is to provide a kind of erection method of cable stayed bridge end bay steel truss girder, can not only solve the problem, and improve the construction environment of end bay steel truss girder erection, improve efficiency of construction, there is very strong applicability and economy.
For reaching above object, the technical scheme that the present invention takes is: the erection method providing a kind of cable stayed bridge end bay steel truss girder, comprises the following steps:
S1. after king-tower lower transverse beam has been constructed, pier-side bracket is set up, the pier-side bracket top layout incremental launching device set up, and steel truss girder lower edge between the assembly pier epimerite of incremental launching device top and bridge deck, form bridge deck internode; After the bridge deck internode of preset number to be done is assembled, bridge deck internode installs girder erection crane;
S2. build abutment pier and Temporary Piers, and the steel truss girder lower edge of single internode and bridge deck are assembled into entirety in factory simultaneously, form bridge deck internode; Utilize girder erection crane vertical lifting that a bridge deck internode is installed; After completing the erection of a bridge deck internode, utilize incremental launching device by overall for the bridge deck internode distance to an abutment pier direction pushing tow internode, then move forward girder erection crane;
S3. step S2 is repeated, until the stressed maximum of the bridge deck internode of entirety from the slippage of pier top out;
The maximum assembly web member of the bridge deck internode water-cooled system S4. in whole pushing tow process, to wind up and bracing, until the web member of the multiple internodes that need install of the maximum of water-cooled system, to wind up and the whole installation of bracing;
S5. step S2 is repeated, until bridge deck internode arrives abutment pier place;
S6. complete the web member of residue internode, wind up and the installation of bracing, and hang suspension cable.
On the basis of technique scheme, in described step S1, described in complete that the bridge deck internode of preset number is assembled is set to four bridge deck internodes.
On the basis of technique scheme, in described step S1, utilize the steel truss girder lower edge between crane barge assembly pier epimerite and bridge deck, form bridge deck internode.
On the basis of technique scheme, in described step S2, when building abutment pier, according to the bridge deck internode of pushing tow, stressed and deformation, adds and builds Temporary Piers between abutment pier and king-tower.
On the basis of technique scheme, in described step S2, transport ship on water is utilized to treat being transported to girder erection crane at the assembled bridge deck internode completed of factory below chord position.
On the basis of technique scheme, in described step S4, utilize the maximum assembly web member of the bridge deck internode water-cooled system of crane barge in whole pushing tow process, wind up and bracing.
On the basis of technique scheme, in described step S4, the web member of multiple internode is installed, wind up and bracing time, the bridge deck internode of every pushing tow internode, install an internode web member, wind up and bracing.
On the basis of technique scheme, in described step in S4, described need install web member, to wind up and the internode number of bracing is four internodes.
On the basis of technique scheme, in described step in S6, utilize the web member of mobile crane installation residue internode, wind up and bracing.
Beneficial effect of the present invention is:
1, in the present invention, utilize the bridge deck internode of the assembled Dun Ding of crane barge, all the other bridge deck internodes are after factory is assembled into entirety, the whole internode lifting of girder erection crane is utilized to install, without the need to arranging special harbour, trestle and lifting station to transport steel girder member bar in whole process, save the input of transhipment, time saving and energy saving, efficiency is high.
2, in the present invention, steel truss girder front end is without the need to arranging nose girder.In order to reduce stress and the front end amount of deflection of steel truss girder lower edge and bridge deck, the maximum of the bridge deck internode water-cooled system in whole pushing tow process install in advance multiple internode web member, wind up and bracing, all the other web members, to wind up and bracing is installed after pushing tow puts in place.This construction method, the weight of bridge deck internode when not only alleviating pushing tow, also saves temporary structure and drops into, improve the construction environment of steel truss girder erection, improve efficiency of construction, have very strong applicability and economy.
Accompanying drawing explanation
Fig. 1 is steel truss girder lower edge and bridge deck erection schematic diagram between pier epimerite;
Fig. 2 is that steel truss girder lower edge and bridge deck set up and pushing tow schematic diagram;
Fig. 3 is stressed maximum web member, winds up and bracing scheme of installation;
Fig. 4 is residue internode web member, wind up and bracing and suspension cable scheme of installation.
Reference numeral:
1-pier-side bracket; 2-incremental launching device; 3-bridge deck internode; 4-girder erection crane; 5-abutment pier; 6-web member, to wind up and bracing; 7-suspension cable; 8-crane barge; 9-transport ship on water; 10-Temporary Piers; 11-mobile crane.
Detailed description of the invention
Below in conjunction with drawings and Examples, the present invention is described in further detail.
The invention provides a kind of erection method of cable stayed bridge end bay steel truss girder, comprise the following steps:
S1. as shown in Figure 1, after king-tower lower transverse beam has been constructed, set up pier-side bracket 1, the pier-side bracket 1 top layout incremental launching device 2 set up, and utilize the steel truss girder lower edge of crane barge 8 between the assembly pier epimerite of incremental launching device 2 top and bridge deck, form bridge deck internode 3; Complete the bridge deck internode 3 of four internodes assembled after, bridge deck internode 3 is installed girder erection crane 4.
S2. as shown in Figure 2, build abutment pier 5, and according to the bridge deck internode of pushing tow stressed and deformation, add between abutment pier 5 and king-tower and build Temporary Piers 10, to provide support a little, the steel truss girder lower edge of single internode and bridge deck are assembled into entirety in factory simultaneously, form bridge deck internode 3; Utilizing transport ship on water 9 to treat below chord position by being transported to girder erection crane 4 at the assembled bridge deck internode 3 completed of factory, utilizing girder erection crane 4 whole internode vertical lifting that a bridge deck internode 3 is installed; After completing the erection of a bridge deck internode 3, utilize incremental launching device 2 by the distance of bridge deck internode 3 entirety to an abutment pier 5 direction pushing tow internode, and the girder erection crane 4 that moves forward, continue the installation of next bridge deck internode 3.
S3. step S2 is repeated, until the installed surface of the stressed maximum of the bridge deck internode 3 of entirety from the slippage of pier top out.
S4. as shown in Figure 3, utilize the maximum assembly web member of bridge deck internode 3 water-cooled system of crane barge 8 in whole pushing tow process, wind up and bracing 6, until the web member of four internodes need installing of the maximum of water-cooled system, to wind up and bracing 6 all installations.
The web member of concrete installation four internodes, wind up and bracing 6 time, every pushing tow bridge deck internode 3, installs the web member of an internode, winds up and bracing 6.
S5. repeat step S2, until bridge deck internode 3 is through Temporary Piers 10, arrive abutment pier 5 place.
S6. as shown in Figure 4, bridge on mobile crane 11, utilize mobile crane 11 complete residue internode web member, wind up and the installation of bracing 6, and hang suspension cable 7.
When utilizing this method to set up cable stayed bridge end bay steel truss girder, without the need to arranging special harbour, trestle and lifting station to transport steel girder member bar in whole process, save the input of transhipment, time saving and energy saving, efficiency is high.And, steel truss girder front end is without the need to arranging nose girder, in order to reduce stress and the front end amount of deflection of steel truss girder lower edge and bridge deck, only the maximum of bridge deck internode 3 water-cooled system in whole pushing tow process the web member of multiple internode need be installed in advance, wind up and bracing 6, the web member of all the other internodes, to wind up and bracing 6 is installed after bridge deck internode 3 integral pushing puts in place again, the weight of bridge deck internode 3 when not only alleviating pushing tow, be beneficial to operation, also save the input of temporary structure, improve the construction environment of steel truss girder erection, improve efficiency of construction, there is very strong applicability and economy.
The present invention is not limited to above-mentioned embodiment, and for those skilled in the art, under the premise without departing from the principles of the invention, can also make some improvements and modifications, these improvements and modifications are also considered as within protection scope of the present invention.The content be not described in detail in this manual belongs to the known prior art of professional and technical personnel in the field.

Claims (9)

1. an erection method for cable stayed bridge end bay steel truss girder, is characterized in that, comprises the following steps:
S1. after king-tower lower transverse beam has been constructed, set up pier-side bracket (1), at the pier-side bracket set up (1) top layout incremental launching device (2), and steel truss girder lower edge between the assembly pier epimerite of incremental launching device (2) top and bridge deck, form bridge deck internode (3); After the bridge deck internode (3) of preset number to be done is assembled, bridge deck internode (3) is installed girder erection crane (4);
S2. build abutment pier (5) and Temporary Piers (10), and the steel truss girder lower edge of single internode and bridge deck are assembled into entirety in factory simultaneously, form bridge deck internode (3); Utilize girder erection crane (4) vertical lifting that a bridge deck internode (3) is installed; After completing the erection of a bridge deck internode (3), utilize incremental launching device (2) by overall for bridge deck internode (3) distance to abutment pier (5) direction pushing tow internode, then move forward girder erection crane (4);
S3. step S2 is repeated, until the stressed maximum of the bridge deck internode (3) of entirety from the slippage of pier top out;
The maximum assembly web member of bridge deck internode (3) water-cooled system S4. in whole pushing tow process, to wind up and bracing (6), until the web member of the multiple internodes that need install of the maximum of water-cooled system, to wind up and bracing (6) all installations;
S5. step S2 is repeated, until bridge deck internode (3) arrives abutment pier (5) place;
S6. complete the web member of residue internode, wind up and the installation of bracing (6), and hang suspension cable (7).
2. the erection method of cable stayed bridge end bay steel truss girder as claimed in claim 1, is characterized in that: in described step S1, described in complete that the bridge deck internode (3) of preset number is assembled is set to four bridge deck internodes (3).
3. the erection method of cable stayed bridge end bay steel truss girder as claimed in claim 1, is characterized in that: in described step S1, utilizes the steel truss girder lower edge between crane barge (8) assembly pier epimerite and bridge deck, forms bridge deck internode (3).
4. the erection method of cable stayed bridge end bay steel truss girder as claimed in claim 1, it is characterized in that: in described step S2, when building abutment pier (5), stressed and the deformation according to the bridge deck internode (3) of pushing tow, adds and builds Temporary Piers (10) between abutment pier (5) and king-tower.
5. the erection method of cable stayed bridge end bay steel truss girder as claimed in claim 1, it is characterized in that: in described step S2, utilizing transport ship on water (9) to treat being transported to girder erection crane (4) at the assembled bridge deck internode (3) completed of factory below chord position.
6. the erection method of cable stayed bridge end bay steel truss girder as claimed in claim 1, it is characterized in that: in described step S4, utilize the maximum assembly web member of bridge deck internode (3) water-cooled system of crane barge (8) in whole pushing tow process, wind up and bracing (6).
7. the erection method of cable stayed bridge end bay steel truss girder as claimed in claim 1, it is characterized in that: in described step S4, the web member of multiple internode is installed, wind up and bracing (6) time, the bridge deck internode (3) of every pushing tow internode, installs the web member of an internode, winds up and bracing (6).
8. the erection method of cable stayed bridge end bay steel truss girder as claimed in claim 1, is characterized in that: in described step in S4, described need install web member, to wind up and the internode number of bracing (6) is four internodes.
9. the erection method of cable stayed bridge end bay steel truss girder as claimed in claim 1, is characterized in that: in described step in S6, utilizes the web member of mobile crane (11) installation residue internode, winds up and bracing (6).
CN201410723740.8A 2014-12-03 2014-12-03 A kind of erection method of cable stayed bridge end bay steel truss girder Active CN104480862B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410723740.8A CN104480862B (en) 2014-12-03 2014-12-03 A kind of erection method of cable stayed bridge end bay steel truss girder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410723740.8A CN104480862B (en) 2014-12-03 2014-12-03 A kind of erection method of cable stayed bridge end bay steel truss girder

Publications (2)

Publication Number Publication Date
CN104480862A true CN104480862A (en) 2015-04-01
CN104480862B CN104480862B (en) 2016-04-20

Family

ID=52755460

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410723740.8A Active CN104480862B (en) 2014-12-03 2014-12-03 A kind of erection method of cable stayed bridge end bay steel truss girder

Country Status (1)

Country Link
CN (1) CN104480862B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105178186A (en) * 2015-06-05 2015-12-23 山东聚智机械科技有限公司 Installation method for basalt fiber vault type road flyover
CN105317008A (en) * 2015-09-08 2016-02-10 贵州省公路工程集团有限公司 An overall lifting transport method of steel truss girder sections of a steel truss girder cable-stayed bridge
CN106917358A (en) * 2017-04-28 2017-07-04 北京城建道桥建设集团有限公司 A kind of cable-stayed bridge main-beam combination constructing method thereof and its counter weight construction system
CN108265628A (en) * 2018-02-01 2018-07-10 中交路桥建设有限公司 One kind rides cable-styled erection crane lifting cable-stayed bridge girder steel and bridge floor board construction method
CN108411783A (en) * 2018-03-12 2018-08-17 中铁建大桥工程局集团第四工程有限公司 A kind of steel truss girder joint assembling and construction method
CN110468721A (en) * 2019-08-29 2019-11-19 中铁大桥局集团有限公司 A kind of large span trestle Cantilever Construction Method
CN110629677A (en) * 2019-09-29 2019-12-31 中铁大桥局集团有限公司 Method for erecting section steel beam on pier top short slideway beam
CN111254831A (en) * 2020-01-20 2020-06-09 中铁大桥局第七工程有限公司 Hoisting method of steel structure frame beam of through arch bridge

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08311817A (en) * 1995-05-18 1996-11-26 Mitsubishi Heavy Ind Ltd Bridge erection device
CN1900423A (en) * 2006-07-10 2007-01-24 中铁大桥局股份有限公司 Integrate section frame building method for steel truss
CN102373671A (en) * 2011-11-18 2012-03-14 中铁四局集团有限公司 Steel trussed beam and flexible arch bridge construction method with vault pushing
CN102535343A (en) * 2012-02-02 2012-07-04 中铁大桥局股份有限公司 Method for erecting girder on top of main tower mound of steel truss girder cable-stayed bridge
CN103911956A (en) * 2014-03-21 2014-07-09 中铁大桥局股份有限公司 Long-span cable stayed bridge steel truss girder mounting method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08311817A (en) * 1995-05-18 1996-11-26 Mitsubishi Heavy Ind Ltd Bridge erection device
CN1900423A (en) * 2006-07-10 2007-01-24 中铁大桥局股份有限公司 Integrate section frame building method for steel truss
CN102373671A (en) * 2011-11-18 2012-03-14 中铁四局集团有限公司 Steel trussed beam and flexible arch bridge construction method with vault pushing
CN102535343A (en) * 2012-02-02 2012-07-04 中铁大桥局股份有限公司 Method for erecting girder on top of main tower mound of steel truss girder cable-stayed bridge
CN103911956A (en) * 2014-03-21 2014-07-09 中铁大桥局股份有限公司 Long-span cable stayed bridge steel truss girder mounting method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王吉连等: "天兴洲公铁两用长江大桥墩顶节间钢梁架设施工技术", 《2012年9月建筑科技与管理学术交流会议文集》, 30 September 2012 (2012-09-30) *

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105178186A (en) * 2015-06-05 2015-12-23 山东聚智机械科技有限公司 Installation method for basalt fiber vault type road flyover
CN105178186B (en) * 2015-06-05 2016-12-07 山东聚源玄武岩纤维股份有限公司 A kind of installation method of basalt fibre arcuately road overpass
CN105317008A (en) * 2015-09-08 2016-02-10 贵州省公路工程集团有限公司 An overall lifting transport method of steel truss girder sections of a steel truss girder cable-stayed bridge
CN105317008B (en) * 2015-09-08 2018-06-29 贵州省公路工程集团有限公司 A kind of Integral lifting method of steel truss girder cable-stayed bridge steel truss girder segment
CN106917358A (en) * 2017-04-28 2017-07-04 北京城建道桥建设集团有限公司 A kind of cable-stayed bridge main-beam combination constructing method thereof and its counter weight construction system
CN106917358B (en) * 2017-04-28 2018-11-20 北京城建道桥建设集团有限公司 A kind of cable-stayed bridge main-beam combination constructing method thereof and its counter weight construction system
CN108265628A (en) * 2018-02-01 2018-07-10 中交路桥建设有限公司 One kind rides cable-styled erection crane lifting cable-stayed bridge girder steel and bridge floor board construction method
CN108411783A (en) * 2018-03-12 2018-08-17 中铁建大桥工程局集团第四工程有限公司 A kind of steel truss girder joint assembling and construction method
CN110468721A (en) * 2019-08-29 2019-11-19 中铁大桥局集团有限公司 A kind of large span trestle Cantilever Construction Method
CN110629677A (en) * 2019-09-29 2019-12-31 中铁大桥局集团有限公司 Method for erecting section steel beam on pier top short slideway beam
CN110629677B (en) * 2019-09-29 2021-01-26 中铁大桥局集团有限公司 Method for erecting section steel beam on pier top short slideway beam
CN111254831A (en) * 2020-01-20 2020-06-09 中铁大桥局第七工程有限公司 Hoisting method of steel structure frame beam of through arch bridge
CN111254831B (en) * 2020-01-20 2021-05-14 中铁大桥局第七工程有限公司 Hoisting method of steel structure frame beam of through arch bridge

Also Published As

Publication number Publication date
CN104480862B (en) 2016-04-20

Similar Documents

Publication Publication Date Title
CN104480862B (en) A kind of erection method of cable stayed bridge end bay steel truss girder
CN103911956B (en) A kind of large span stayed-cable bridge steel truss girder mounting method
CN103075017B (en) Super-long-span cylindrical shell lattice structure construction method
CN102352604B (en) Truss sheet unit of steel truss girder, steel truss girder structure and mounting method thereof
CN102121234B (en) Quick construction method of two-tower five-span steel truss girder cable-stayed bridge
CN105604334A (en) Rapid-construction method used for overall installation of large-span steel truss
WO2018133045A1 (en) Method for mounting self-anchored suspension bridge
CN105970836A (en) Method for erecting large-span lower chord variable truss high continuous steel trussed beam cantilever
CN104746437A (en) Self-anchoring type mounting method of suspension bridge
CN103556627B (en) A kind of hanging cage structure for large diameter bored pile reinforcing bar cage hoisting
CN103437300A (en) Construction method for erecting double cantilevers for pier top steel beam without pier-side bracket
CN104594201B (en) A kind of method utilizing one-sided pier-side bracket to set up pier top girder steel
CN102409607B (en) Separately precast and assembled bent cap and construction technology
CN201554034U (en) Horizontal embedding support structure for post-pouring belt of top-down construction
CN102587280B (en) Main tower area steel truss girder erection method of base support auxiliary frame beam crane and base support
CN104314009B (en) Big sections hoisting mechanism and using method
CN202899639U (en) Concrete column structure
CN205296869U (en) Spatial grid structure thrustor that slides
CN105625732A (en) Supporting-free construction method of ultrahigh overhung steel-structure truss
CN204039898U (en) Can be used for the suspension trestle waterborne of pumping of concrete
CN103147405B (en) Method for erecting steel girder of cable-stayed bridge with diagonal main trusses
CN204266127U (en) Large sections hoisting mechanism
CN201560397U (en) Whole support for steel box girder precise location installation
CN205775812U (en) A kind of structure of bridge pier building body
CN201952736U (en) Auxiliary pier movable bracket for assisting invariable-amplitude beam erecting crane in erecting steel box girder

Legal Events

Date Code Title Description
PB01 Publication
C06 Publication
SE01 Entry into force of request for substantive examination
C10 Entry into substantive examination
CB03 Change of inventor or designer information

Inventor after: Pan Dongfa

Inventor after: Jia Weizhong

Inventor after: Hu Jun

Inventor after: Yao Sen

Inventor after: Xu Ye

Inventor after: Zhang Dong

Inventor after: Zhao Quancheng

Inventor after: Zhu Mingquan

Inventor after: Tu Manming

Inventor after: Mao Weiqi

Inventor after: Wu Fangming

Inventor after: Ma Tao

Inventor after: Zhao Kunpeng

Inventor after: Zhang Aihua

Inventor after: Qin Yonggang

Inventor before: Pan Dongfa

Inventor before: Hu Jun

Inventor before: Yao Sen

Inventor before: Xu Ye

Inventor before: Zhang Dong

Inventor before: Zhao Quancheng

Inventor before: Tu Manming

Inventor before: Mao Weiqi

Inventor before: Wu Fangming

Inventor before: Ma Tao

Inventor before: Zhao Kunpeng

Inventor before: Zhang Aihua

Inventor before: Qin Yonggang

Inventor before: Jia Weizhong

COR Change of bibliographic data
GR01 Patent grant
C14 Grant of patent or utility model