CN107938841A - A kind of positioning adjusting of steel column pairing and method of temporarily fixing - Google Patents

A kind of positioning adjusting of steel column pairing and method of temporarily fixing Download PDF

Info

Publication number
CN107938841A
CN107938841A CN201711205810.0A CN201711205810A CN107938841A CN 107938841 A CN107938841 A CN 107938841A CN 201711205810 A CN201711205810 A CN 201711205810A CN 107938841 A CN107938841 A CN 107938841A
Authority
CN
China
Prior art keywords
column
segmented column
adjusting
steel column
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711205810.0A
Other languages
Chinese (zh)
Inventor
陈学进
严擒龙
张建新
厉栋
徐文秀
宋元亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Huning Steel Mechanism Co Ltd
Original Assignee
Jiangsu Huning Steel Mechanism Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Huning Steel Mechanism Co Ltd filed Critical Jiangsu Huning Steel Mechanism Co Ltd
Priority to CN201711205810.0A priority Critical patent/CN107938841A/en
Publication of CN107938841A publication Critical patent/CN107938841A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • E04B2001/2406Connection nodes
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • E04B2001/246Post to post connections

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

Positioning adjusting and method of temporarily fixing the invention discloses a kind of steel column pairing, comprise the following steps:First, Level tune:The first support plate is welded on the lower segmented column top that installation is complete;Jack is arranged between the first support plate and upper segmented column;The horizontal level of upper segmented column is adjusted by jack, carries out the misalignment amendment of segmented column and lower segmented column;2nd, verticality is adjusted:The second support plate is welded on lower segmented column top, is welded in upper segmented column bottom and adjusts accessory plate;Jack is arranged between the second support plate and adjusting accessory plate;The verticality of upper segmented column is adjusted by jack, carries out the verticality amendment of segmented column;3rd, it is interim fixed:Lower segmented column and upper segmented column are removably fastenedly connected by one group of temporary connection plate;Its adjusting process is easy to operate, ensure that the precision especially verticality of steel column entirety, suitable for site operation and reduces construction cost.

Description

A kind of positioning adjusting of steel column pairing and method of temporarily fixing
Technical field
The present invention relates to the technical field of engineering construction, the positioning of more particularly to a kind of steel column pairing is adjusted and consolidated temporarily Determine method.
Background technology
Structural steelwork be with steel make based on structure, mainly girder steel, steel column, steel made of shaped steel and steel plate etc. The components such as truss form, and generally use weld seam, bolt or rivet interlacement between each component or component, are main building structure classes One of type.Because its dead weight is lighter, and easy construction, it is widely used in the fields such as large-sized workshop, bridge, venue, Super High.
Steel column is the major bearing structures of structure, its installation quality is significant to the stability of steel building, steel column Integrally-built load is born jointly with its concrete foundation, in order to ensure the stable delivery of stress, it is necessary to assure the verticality of steel column And with its basis combine closely.For high-rise building, steel column is installed using segmentation, the docking between segmented column With the especially needed stringent control of installation accuracy.
The content of the invention
The purpose of invention:Positioning adjusting and method of temporarily fixing the invention discloses a kind of steel column pairing, use letter Single reliable regulating device is adjusted to carry out Level tune between upper and lower two sections steel column and verticality, ensure that the essence of steel column entirety Degree especially verticality, its adjusting process is easy to operate, suitable for site operation and reduces construction cost.
Technical solution:In order to realize the above object the positioning the invention discloses a kind of steel column pairing is adjusted and interim Fixing means, comprises the following steps:First, Level tune:A, the first support plate is welded on the lower segmented column top that installation is complete;B, will Jack is arranged between the first support plate and upper segmented column;C, the horizontal level of upper segmented column is adjusted by jack, carries out section The misalignment amendment of column and lower segmented column;2nd, verticality is adjusted:D, the second support plate is welded on lower segmented column top, in upper segmented column bottom Welding adjusts accessory plate;E, jack is arranged between the second support plate and adjusting accessory plate;F, adjusted by jack The verticality of segmented column, carries out the verticality amendment of segmented column;3rd, it is interim fixed:G, by one group of temporary connection plate by lower segmented column Removably it is fastenedly connected with upper segmented column.
Further, a kind of positioning adjusting of above-mentioned steel column pairing and method of temporarily fixing, it is further comprising the steps of: One group of first column connecting plate is installed in lower segmented column upper end, and one group of second connecting plate is installed in upper segmented column lower end.
Further, a kind of positioning adjusting of above-mentioned steel column pairing and method of temporarily fixing, face for one group in the step g When connecting plate carry out the interim fixed of lower segmented column and upper segmented column by connecting the first connecting plate and the second connecting plate.
Further, a kind of positioning adjusting of above-mentioned steel column pairing and method of temporarily fixing, the pair of interim connection Plate is separately positioned on the both sides of the first connecting plate and the second connecting plate, and it is dismountable interim fixed that progress is bolted.
Further, a kind of positioning adjusting of above-mentioned steel column pairing and method of temporarily fixing, it is fixed to further include steel column measurement Position, specifically includes following steps:Horizontal level positioning measurement, carries out the anchor point of tube head according to the elements of a fix using total powerstation Get positioning ready;Verticality positioning measurement, is controlled orthogonal two vertical center lines using total powerstation and theodolite.
Further, a kind of positioning adjusting of above-mentioned steel column pairing and method of temporarily fixing, it is further comprising the steps of:Face When fix after, carry out the reinforcement of weld of lower segmented column and upper segmented column.
Further, a kind of positioning adjusting of above-mentioned steel column pairing and method of temporarily fixing, described one group first connects The quantity of plate and one group of second connecting plate is 4, and is set with crossing distribution on steel column periphery, first connecting plate There is hole for hoist.
Further, a kind of positioning adjusting of above-mentioned steel column pairing and method of temporarily fixing, first support plate and Second support plate is L-shaped, and the adjusting accessory plate is T-shaped.
Above-mentioned technical proposal can be seen that the present invention and have the advantages that:
(1)A kind of positioning adjusting of steel column pairing of the present invention and method of temporarily fixing, use simple and reliable adjusting Device come carry out it is upper and lower two section steel column between Level tune and verticality adjust, ensure that the precision of steel column entirety is especially vertical Degree, its adjusting process is easy to operate, suitable for site operation and reduces construction cost.
(2)A kind of positioning adjusting of steel column pairing of the present invention and method of temporarily fixing, temporarily fixed installation It is simple and convenient with dismantling.
(3)A kind of positioning adjusting of steel column pairing of the present invention and method of temporarily fixing, the lifting lug of segmented column and company Fishplate bar is integrated, and simplifies structure.
Brief description of the drawings
Fig. 1 is that a kind of positioning adjusting of steel column pairing of the present invention and method of temporarily fixing are used for circular cross-section steel The Level tune schematic diagram of column;
Fig. 2 is that a kind of positioning of steel column pairing of the present invention is adjusted and method of temporarily fixing is used for circular cross-section steel column Verticality adjusts schematic diagram;
Fig. 3 is that a kind of positioning adjusting of steel column pairing of the present invention and method of temporarily fixing are used for star section steel column Level tune schematic diagram;
Fig. 4 is that a kind of positioning adjusting of steel column pairing of the present invention and method of temporarily fixing are used for star section steel column Verticality adjust schematic diagram;
Fig. 5 is that a kind of positioning of steel column pairing of the present invention is adjusted and the interim of method of temporarily fixing fixes schematic diagram;
In figure:Segmented column under 1-, the first support plates of 2-, 3- jack, the upper segmented columns of 4-, the second support plates of 5-, 6- adjust accessory plate, 7- Temporary connection plate, 8- the first column connecting plates, the second connecting plates of 9-, 10- holes for hoist.
Embodiment
Below in conjunction with the accompanying drawings, the specific embodiment of the invention is described in detail.
Embodiment
Positioning adjusting and method of temporarily fixing the invention discloses a kind of steel column pairing, as shown in Figures 1 to 5, bag Include following steps:
Lifting lug is arranged and steel column lifting:
One group of first column connecting plate 8 is installed in lower 1 upper end of segmented column, one group of second connecting plate 9 is installed in upper 4 lower end of segmented column.It is described First connecting plate 8 is equipped with hole for hoist 10, this is that accessory is welded on component in order to reduce to the greatest extent, therefore connects using first Fishplate bar 8 serves as shackle plate, and the hole of Φ 40 is opened up on the first connecting plate 8 as hole for hoist 10;
Lifting is hung using 4 points, and the quantity of one group of first connecting plate 8 and one group of second connecting plate 9 is 4, and with ten Font is distributed in steel column periphery.
Steel column measurement and positioning:
Horizontal level positioning measurement, carries out getting positioning ready according to the elements of a fix using total powerstation to the anchor point of tube head;Verticality Positioning measurement, is controlled orthogonal two vertical center lines using total powerstation and theodolite.
Level tune:
A, the first support plate 2 is welded on 1 top of lower segmented column that installation is complete, first support plate 2 is L-shaped;
B, jack 3 is arranged between the first support plate 2 and upper segmented column 4;
C, the horizontal level of upper segmented column 4 is adjusted by jack 3, carries out the misalignment amendment of segmented column 4 and lower segmented column 1;
Verticality is adjusted:
D, the second support plate 5 is welded on lower 1 top of segmented column, is welded in upper 4 bottom of segmented column and adjust accessory plate 6;Second support Plate 5 is L-shaped, and the adjusting accessory plate 6 is T-shaped;
E, jack 3 is arranged between the second support plate 5 and adjusting accessory plate 6;
F, the verticality of upper segmented column 4 is adjusted by jack 3, carries out the verticality amendment of segmented column 4;
It is interim fixed:
G, lower segmented column 1 and upper segmented column 4 are removably fastenedly connected by one group of temporary connection plate 7;Described one group interim Connecting plate 7 is separately positioned on the both sides of the first connecting plate 8 and the second connecting plate 9, passes through 8 and second connection of the first connecting plate of connection Plate 9 carries out lower segmented column 1 and is fixed with the interim of upper segmented column 4, and it is dismountable interim fixed that progress is bolted.
The above is only the preferred embodiment of the present invention, it should be noted that for those skilled in the art For, without departing from the principle of the present invention, some improvement can also be made, these improvement also should be regarded as the guarantor of the present invention Protect scope.

Claims (8)

1. positioning adjusting and the method for temporarily fixing of a kind of steel column pairing, it is characterised in that:Comprise the following steps:
First, Level tune:
A, in the lower segmented column that installation is complete(1)Weld the first support plate in top(2);
B, by jack(3)It is arranged in the first support plate(2)With upper segmented column(4)Between;
C, jack is passed through(3)Segmented column in adjusting(4)Horizontal level, carry out segmented column(4)With lower segmented column(1)Misalignment repair Just;
2nd, verticality is adjusted:
D, in lower segmented column(1)Weld the second support plate in top(5), in upper segmented column(4)Bottom welding adjusts accessory plate(6);
E, by jack(3)It is arranged in the second support plate(5)With adjusting accessory plate(6)Between;
F, jack is passed through(3)Segmented column in adjusting(4)Verticality, carry out segmented column(4)Verticality amendment;
3rd, it is interim fixed:
G, one group of temporary connection plate is passed through(7)By lower segmented column(1)With upper segmented column(4)Removably it is fastenedly connected.
2. positioning adjusting and the method for temporarily fixing of a kind of steel column pairing according to claim 1, it is characterised in that:Also Comprise the following steps:In lower segmented column(1)Upper end is installed by one group of first column connecting plate(8), in upper segmented column(4)Lower end installation one group the Two connecting plates(9).
3. positioning adjusting and the method for temporarily fixing of a kind of steel column pairing according to claim 2, it is characterised in that:Institute State one group of temporary connection plate in step g(7)By connecting the first connecting plate(8)With the second connecting plate(9)Carry out lower segmented column(1)With Upper segmented column(4)It is interim fixed.
4. positioning adjusting and the method for temporarily fixing of a kind of steel column pairing according to claim 3, it is characterised in that:Institute State a pair of of temporary connection plate(7)It is separately positioned on the first connecting plate(8)And second connecting plate(9)Both sides, and connected by bolt It is dismountable interim fixed to tap into row.
5. positioning adjusting and the method for temporarily fixing of a kind of steel column pairing according to claim 1, it is characterised in that:Also Including steel column measurement and positioning, following steps are specifically included:Horizontal level positioning measurement, using total powerstation according to the elements of a fix to pipe The anchor point of head carries out getting positioning ready;Verticality positioning measurement, it is vertical to orthogonal two using total powerstation and theodolite Center line is controlled.
6. positioning adjusting and the method for temporarily fixing of a kind of steel column pairing according to claim 1, it is characterised in that:Also Comprise the following steps:After temporarily fixed, lower segmented column is carried out(1)With upper segmented column(4)Reinforcement of weld.
7. positioning adjusting and the method for temporarily fixing of a kind of steel column pairing according to claim 2, it is characterised in that:Institute State one group of first connecting plate(8)With one group of second connecting plate(9)Quantity be 4, and with crossing distribution outside steel column Week, first connecting plate(8)It is equipped with hole for hoist(10).
8. positioning adjusting and the method for temporarily fixing of a kind of steel column pairing according to claim 1, it is characterised in that:Institute State the first support plate(2)With the second support plate(5)It is L-shaped, the adjusting accessory plate(6)It is T-shaped.
CN201711205810.0A 2017-11-27 2017-11-27 A kind of positioning adjusting of steel column pairing and method of temporarily fixing Pending CN107938841A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711205810.0A CN107938841A (en) 2017-11-27 2017-11-27 A kind of positioning adjusting of steel column pairing and method of temporarily fixing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711205810.0A CN107938841A (en) 2017-11-27 2017-11-27 A kind of positioning adjusting of steel column pairing and method of temporarily fixing

Publications (1)

Publication Number Publication Date
CN107938841A true CN107938841A (en) 2018-04-20

Family

ID=61950034

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711205810.0A Pending CN107938841A (en) 2017-11-27 2017-11-27 A kind of positioning adjusting of steel column pairing and method of temporarily fixing

Country Status (1)

Country Link
CN (1) CN107938841A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112302253A (en) * 2020-10-29 2021-02-02 中国人民解放军63926部队 H-shaped steel column adjusting method
CN114086771A (en) * 2021-11-25 2022-02-25 中铁建设集团华东工程有限公司 Steel column installation process

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204781598U (en) * 2015-05-29 2015-11-18 中建钢构江苏有限公司 Interim connection structure of detachable steel column
JP2016102298A (en) * 2014-11-27 2016-06-02 株式会社竹中工務店 Building raising structure
CN106760197A (en) * 2016-12-02 2017-05-31 江苏沪宁钢机股份有限公司 A kind of method that allowable error is installed in steel column structure and its control
CN107013046A (en) * 2017-06-19 2017-08-04 中冶建工集团有限公司 A kind of antidote of heavy in section concrete filled steel tube coupled column

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016102298A (en) * 2014-11-27 2016-06-02 株式会社竹中工務店 Building raising structure
CN204781598U (en) * 2015-05-29 2015-11-18 中建钢构江苏有限公司 Interim connection structure of detachable steel column
CN106760197A (en) * 2016-12-02 2017-05-31 江苏沪宁钢机股份有限公司 A kind of method that allowable error is installed in steel column structure and its control
CN107013046A (en) * 2017-06-19 2017-08-04 中冶建工集团有限公司 A kind of antidote of heavy in section concrete filled steel tube coupled column

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘建国: "大型构件钢柱安装垂直度校正方法", 《天津建设科技》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112302253A (en) * 2020-10-29 2021-02-02 中国人民解放军63926部队 H-shaped steel column adjusting method
CN114086771A (en) * 2021-11-25 2022-02-25 中铁建设集团华东工程有限公司 Steel column installation process

Similar Documents

Publication Publication Date Title
CN101691815B (en) Fast hoisting-aligning method for Large-sized steel frames, and steel frame base structure
CN106120559B (en) A kind of bridge limited bracket construction method and bridge
CN105586833B (en) Stiff skeleton steel reinforcement cage global formation large-scale cast-in-place tall pier and thin wall construction method
CN109853404A (en) Steel truss girder bridge cantilever assembly erection method
CN106087744B (en) Cable-stayed bridge beams of concrete cable guide pipe supporting and positioning device and method
CN106192776A (en) A kind of big Span Continuous Flexible arch bridge with steel truss beam free cantilever erection construction technology
CN105780995A (en) Curved surface space pipe truss structure and mounting method thereof
CN107336346A (en) A kind of beam making bench
CN107842131A (en) A kind of combining structure and its installation method of steel plate shear force wall and steel column
CN107227686A (en) A kind of tunnel-type anchorage pre-stress system locating support construction method
CN103243649A (en) System and method for quickly installing and positioning cable saddle
CN112627055A (en) Bridge bent cap formwork support adjusting device and bridge bent cap construction method
CN107938841A (en) A kind of positioning adjusting of steel column pairing and method of temporarily fixing
CN111456422A (en) Belt supporting device and method for conical steel truss on top of sliding-form silo of squat silo wall
CN107795005A (en) A kind of steel core concrete column and reinforced concrete column concrete core cylinder mixed structure and installation method
CN106368322B (en) A kind of installation method for the bi-directional symmetrical inclination steel column between super high-rise building conversion layer
CN117071448A (en) Sectional construction method for installing steel structure arch centering
CN201495556U (en) Structure for quickly hoisting and centering base of large steel frame
CN108374350B (en) Assembly jig frame of steel anchor beam and steel corbel unit and installation method
CN203429556U (en) System for quickly installing and positioning cable saddle
CN106049286A (en) Integral lifting and installation construction method for prefabricated temporary steel pipe brackets
CN109252526A (en) Assembled support construction technique based on prestressing force fish belly sill support technology
CN109235483A (en) A kind of large equipment base foundation bolt positioning device and its application method
CN114876209A (en) Steel reinforced beam sectional construction method for limited hoisting
CN212224677U (en) Temporary fixing adjusting system for drop position of section steel beam

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180420

RJ01 Rejection of invention patent application after publication