CN109252526A - Assembled support construction technique based on prestressing force fish belly sill support technology - Google Patents

Assembled support construction technique based on prestressing force fish belly sill support technology Download PDF

Info

Publication number
CN109252526A
CN109252526A CN201811183192.9A CN201811183192A CN109252526A CN 109252526 A CN109252526 A CN 109252526A CN 201811183192 A CN201811183192 A CN 201811183192A CN 109252526 A CN109252526 A CN 109252526A
Authority
CN
China
Prior art keywords
component
installation
shelf bracket
construction
fish belly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201811183192.9A
Other languages
Chinese (zh)
Inventor
孙军
杨泓斌
盖守超
隋新春
齐鹏飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Bozhilin Robot Co Ltd
Original Assignee
Dingchen Construction Management Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dingchen Construction Management Co Ltd filed Critical Dingchen Construction Management Co Ltd
Priority to CN201811183192.9A priority Critical patent/CN109252526A/en
Publication of CN109252526A publication Critical patent/CN109252526A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Foundations (AREA)

Abstract

The present invention proposes the assembled support construction technique based on prestressing force fish belly sill support technology, comprising the following steps: selected supporting construction component, enclosure wall construction, column component construction, the construction of shelf bracket component, the installation of purlin component, the installation of bracket and support beam, corner brace member installation, the installation of fish belly beam and applies prestressing force;The rigidity and stability of entire assembled supporting construction can be improved to being made for assembled supporting construction by carrying out using prestressing force fish belly sill support technology in the present invention, it can be with open construction site space, convenient for remaining production work in foundation pit, also has the characteristics that short time limit, energy consumption can be greatly reduced, the stability after shelf bracket installation can be improved by the pretreatment to shelf bracket component, more preferably positioning datum environment is provided for the positioning of the purlin installation in subsequent handling, so as to improve the installation precision and structural stability of entire assembled supporting construction.

Description

Assembled support construction technique based on prestressing force fish belly sill support technology
Technical field
The present invention relates to building engineering fields, more particularly to the assembled supporting knot based on prestressing force fish belly sill support technology Structure construction technology.
Background technique
Pattern foundation pit supporting structure is the safety to guarantee Underground Construction and foundation pit surrounding environment, to foundation pit side-wall and surrounding enviroment Using the engineering-built method of supporting and retaining system, reinforcing and safeguard measure.Assembled supporting construction be based on molding prefabricated components, It is assembled into supporting construction at the scene by various technological means, currently, more mature assembled supporting construction has in the market: Prefabricated pile, coercion underground continuous wall structure, prestressing force fish belly sill support construction, tool-type combination inner support etc., wherein prestressing force Fish belly sill support technology (IPS engineering method) is that (high strength low relaxed steel strand wires are as upper chord member, H profile steel conduct by fish belly sill Bearing beam, with the composition such as H profile steel support beam different in size), to support, angle brace, column, crossbeam, pull rod, triangular nodes, precompressed The standarized components group such as holding device, which merges, applies prestressing force, forms plane pre-stressed support systems and stereochemical structure system.
Most of traditional supporting construction is traditional support girder construction, and traditional support girder construction occupies in the construction process Construction ground area is larger, and the structure construction convenience in foundation pit is poor, at the same traditional support girder construction component installation, disassembly and The period of the constructions such as pit earthwork excavation is long, and construction cost is higher.Therefore, the present invention proposes to support skill based on prestressing force fish belly sill The assembled support construction technique of art, to solve shortcoming in the prior art.
Summary of the invention
In view of the above-mentioned problems, present invention proposition is carried out using prestressing force fish belly sill support technology to assembled supporting construction The rigidity and stability that entire assembled supporting construction can be improved is made, it can be with open construction site, convenient for its in foundation pit Remaining production work can effectively improve space utilization rate in foundation pit, have the characteristics that short time limit, quality are easily controllable, can be with Greatly reduce energy consumption.
The present invention proposes the assembled support construction technique based on prestressing force fish belly sill support technology, including following step It is rapid:
Step 1: selected supporting construction component
The quantity of supporting construction component is determined according to the assembled support structure design drawing of foundation pit, and according to the dress of foundation pit Multi-party responsible person is carried out with formula support structure design drawing and checks supporting construction the number of components, determines that supporting construction component is accurate It is errorless;
Step 2: enclosure wall construction
It is enclosed on construction ground according to the assembled support construction drawing requirement of foundation pit and builds enclosure wall;
Step 3: column component construction
Column component is mounted in reserved post holes according to the assembled support construction drawing of foundation pit, and uses longitude and latitude The verticality of instrument column component carries out verification correction, guarantees column component verticality without offset, after column component installs Column component is completely fixed in reserved post holes in such a way that vibration is beaten;
Step 4: shelf bracket component construction
Shelf bracket component is installed at the closed line of foundation pit enclosure wall surrounding, shelf bracket component is carried out in a pre-installation Pretreatment, then will be installed at pretreated shelf bracket lifting component to column component, column component and shelf bracket It is attached between component using high-strength bolt, the assembled supporting construction of the upper elevation line and foundation pit that control shelf bracket component is applied The center line of purlin component on work drawing guarantees the connection with column component of shelf bracket component in same level position Portion is solid and reliable, and welding is twisted and rosin joint phenomenon, and the whippletree needs of shelf bracket component are in a horizontal state, shelf bracket The whippletree elevation angle of component is controlled in 90-95 degree;
Step 5: purlin component installation
Using hanging device by purlin lifting component to shelf bracket, to shelf bracket structure after purlin lifting component is in place Part checked, check shelf bracket component in purlin hoisting process whether because there is loosening problem in the reasons such as collision, if three Loosening problem, which occurs, in angle bracket component then to need to carry out inspection fixation to shelf bracket component again;
Step 6: the installation of bracket and support beam
Collet member and support beam are installed using welding procedure, and welding method is by the way of being fully welded, weld seam Height is greater than 8 millimeters, needs to monitor collet member during installation collet member and support beam and supports beam The verticality of horizontal absolute altitude and bracket;
Step 7: corner brace member installation
Corner brace member is subjected to pre-splicing combination in ground region, then passes through hanging device for the angle brace after pre-splicing combination Installation is fixed in lifting component to predetermined installation position;
Step 8: fish belly beam installation
By fish belly beam on the ground according to the design of fish belly sill on the assembled support construction drawing of foundation pit across Degree carries out preassembling, will be on the pre-splicing fish belly sill lifting component to shelf bracket component installed using hanging device after preassembling Side, then the pre-splicing fish belly beam both ends installed are fixedly mounted with shelf bracket component respectively;
Step 9: apply prestressing force
Fish belly beam carries out application pretightning force to each component of assembled supporting construction after installing.
Further improvement lies in that: supporting construction the number of components also needs after determining to supporting construction component in the step 1 Carry out an acceptance inspection inspection, and the scope of examination includes: to check member profile size, bolt hole size, bolt pitch of holes and weld assembled matter Amount, and need to repair the supporting construction component for causing deformation in transportational process, the excessive supporting construction structure of deflection Part needs remake or choose.
Further improvement lies in that: construction site position is first determined according to foundation pit size design drawing requirement in the step 2 It sets, and distribution and fluctuations to the earthen formations of construction site, groundwater level and quality of groundwater situation detect, Detection is enclosed to build again and be gone along with sb. to guard him without flattening again to the ground of construction site after influencing construction factor after the leveling of construction site ground Wall.
Further improvement lies in that: the absolute altitude it needs to be determined that column component is gone back in the step 3 central post work progress, and Structural elements on other column components is assembled, what structural elements was beaten with piling machine using vibration again after being completed Column component is completely fixed in reserved post holes by mode.
Further improvement lies in that: it needs using horizontal measuring instrument after the step 4 intermediate cam carrier member installation to triangle Bracket buys carry out horizontal degree measurement, therefore, to assure that shelf bracket component and column component are in being horizontally disposed with, if shelf bracket Component and column component are not then to need to unclamp high-strength bolt again in horizontally disposed, again levelling rear installation shelf bracket structure Part, until shelf bracket component is in horizontally disposed with column component completely.
Further improvement lies in that: the pretreatment that the step 4 intermediate cam carrier member carries out in a pre-installation are as follows: triangle support It must assure that the connecting portion of shelf bracket component and column component does not have impurity in the installation process of frame member, for triangle support The impurity needs that the connecting portion of frame member and column component occurs timely are cleared up.
Further improvement lies in that: it needs first to carry out purlin component base point of installation before the installation of purlin component in the step 5 Determination, using dedicated fiducial point measuring instrument to carrying out positioning on the inside of the two neighboring corner of foundation pit really before the installation of purlin component Determine datum mark, then plane positioning is carried out using the method for hanging wire by the basic point.
Further improvement lies in that: collet member is installed using high strong ties bolt with column component in the step 6 It connects, the installation direction of high strong ties bolt and the direction of column component are consistent in collet member.
Further improvement lies in that: corner brace member needs diagonal brace structure after the pre-splicing combination of ground region in the step 7 The pre-splicing straight degree of combined support of part is checked, passes through hanging device after passed examination again for the angle after pre-splicing combination Installation is fixed in support lifting component to predetermined installation position.
Further improvement lies in that: prestressed application rule in the step 9 are as follows: check the high-strength of lattice piece interconnecting piece Whether the connection of bolt and high strong ties bolt consolidates, then diagonal brace component applies prestressing force, finally on fish belly beam Steel strand wires apply prestressing force.
The invention has the benefit that assembled supporting construction uses prestressing force fish belly sill that technology progress is made in the present invention Support has the characteristics that low cost, short time limit, quality are easily controllable with conventional supporting means, can greatly reduce energy consumption, subtract Lack building waste, has higher social and economic benefits and environmental-protection function, while carrying out using prestressing force fish belly sill support technology The rigidity and stability of entire assembled supporting construction can be improved to being made for assembled supporting construction, it can open construction field Ground can effectively improve space utilization rate in foundation pit convenient for remaining production work in foundation pit, and be connected by high-strength screw thread Connecing each component facilitates the later period to dismantle, it is possible to reduce labour pays, and can be improved three by the pretreatment to shelf bracket component Stability after angle bracket installation provides more preferably positioning datum environment for the positioning of the purlin installation in subsequent handling, So as to improve the installation precision and structural stability of entire assembled supporting construction.
Detailed description of the invention
Fig. 1 is construction flow chart of the present invention.
Specific embodiment
In order to deepen the understanding of the present invention, the present invention is further described below in conjunction with embodiment, the present embodiment For explaining only the invention, it is not intended to limit the scope of the present invention..
According to Fig. 1, the present invention proposes a kind of technical solution:
Assembled support construction technique based on prestressing force fish belly sill support technology, comprising the following steps:
Step 1: selected supporting construction component
The quantity of supporting construction component is determined according to the assembled support structure design drawing of foundation pit, and according to the dress of foundation pit Multi-party responsible person is carried out with formula support structure design drawing and checks supporting construction the number of components, determines that supporting construction component is accurate Errorless, supporting construction the number of components also needs the inspection that carries out an acceptance inspection to supporting construction component after determining, the scope of examination includes: to check Member profile size, bolt hole size, bolt pitch of holes and assembled quality is welded, and needed to causing to deform in transportational process Supporting construction component repaired, deflection it is excessive supporting construction component needs remake or choose;
Step 2: enclosure wall construction
Construction site position is first determined according to foundation pit size design drawing requirement, and to point of the earthen formations of construction site Cloth and fluctuations, groundwater level and quality of groundwater situation are detected, detection without influence construction factor after again to construction The ground in place is flattened, and is enclosed again after the leveling of construction site ground and is built enclosure wall;
Step 3: column component construction
Column component is mounted in reserved post holes according to the assembled support construction drawing of foundation pit, and uses longitude and latitude The verticality of instrument column component carries out verification correction, guarantee column component verticality without offset, in column work progress also It needs to be determined that the absolute altitude of column component, and the structural elements on other column components is assembled, structural elements group on column Column component is completely fixed in reserved post holes in such a way that vibration is beaten with piling machine again after the completion of dress;
Step 4: shelf bracket component construction
Shelf bracket component is installed at the closed line of foundation pit enclosure wall surrounding, shelf bracket component is carried out in a pre-installation Pretreatment, in order to guarantee shelf bracket component installation process intermediate cam carrier member and column component connecting portion it is not miscellaneous Matter, the impurity needs occurred for the connecting portion of shelf bracket component and column component are timely cleared up, then will be located in advance It is installed at shelf bracket lifting component to column component after reason, high-strength spiral shell is used between column component and shelf bracket component Bolt is attached, and controls the purlin structure in the upper elevation line of shelf bracket component and the assembled support construction drawing of foundation pit The center line of part guarantees, the solderless solid and reliable with the interconnecting piece of column component of shelf bracket component in same level position Twisted and rosin joint phenomenon is connect, and the whippletree needs of shelf bracket component are in a horizontal state, the whippletree elevation angle of shelf bracket component Control needs to buy carry out horizontal degree measurement to shelf bracket using horizontal measuring instrument after 90 degree, the installation of shelf bracket component, Shelf bracket component and column component are necessary to ensure that in being horizontally disposed with, if shelf bracket component and column component are not in level Setting then needs to unclamp high-strength bolt again, again levelling rear installation shelf bracket component, until shelf bracket component and column Component is in horizontally disposed completely;
Step 5: purlin component installation
Need first to carry out the determination of purlin component base point of installation before the installation of purlin component, using special before the installation of purlin component With datum mark measuring instrument to carrying out positioning determining datum mark on the inside of the two neighboring corner of foundation pit, then by the basic point using hanging The method of line carries out plane positioning, then using hanging device by purlin lifting component to shelf bracket, purlin lifting component Shelf bracket component is checked after in place, checks shelf bracket component in purlin hoisting process whether because of reasons such as collisions There is loosening problem, needs to carry out inspection fixation to shelf bracket component again if loosening problem occurs in shelf bracket component;
Step 6: the installation of bracket and support beam
Collet member and support beam are installed using welding procedure, and welding method is by the way of being fully welded, weld seam Height is greater than 8 millimeters, needs to monitor collet member during installation collet member and support beam and supports beam The verticality of horizontal absolute altitude and bracket, collet member carry out installation connection, bracket using high strong ties bolt and column component The installation direction of high strong ties bolt and the direction of column component are consistent on component;
Step 7: corner brace member installation
Corner brace member needs the pre-splicing straight degree of combined support of diagonal brace component after the pre-splicing combination of ground region It is checked, the corner brace member after pre-splicing combination is lifted to predetermined installation position by hanging device again after passed examination and is carried out It is fixedly mounted;
Step 8: fish belly beam installation
By fish belly beam on the ground according to the design of fish belly sill on the assembled support construction drawing of foundation pit across Degree carries out preassembling, will be on the pre-splicing fish belly sill lifting component to shelf bracket component installed using hanging device after preassembling Side, then the pre-splicing fish belly beam both ends installed are fixedly mounted with shelf bracket component respectively;
Step 9: apply prestressing force
Fish belly beam carries out application pretightning force to each component of assembled supporting construction after installing, and first checks lattice piece Whether the connection of the high-strength bolt of interconnecting piece and high strong ties bolt consolidates, then diagonal brace component applies prestressing force, finally to fish Steel strand wires on web grider component apply prestressing force.
Assembled supporting construction is made technology using prestressing force fish belly sill and is supported and conventional supporting means in the present invention Have the characteristics that low cost, short time limit, quality are easily controllable, energy consumption can be greatly reduced, reduce building waste, had higher Social and economic benefits and environmental-protection function, while being carried out using prestressing force fish belly sill support technology to assembled supporting construction The rigidity and stability that entire assembled supporting construction can be improved is made, it can be with open construction site, convenient for its in foundation pit Remaining production work can effectively improve space utilization rate in foundation pit, and facilitate the later period by high-strength each component of threaded connection Disassembly, it is possible to reduce labour pays, steady after shelf bracket installation can be improved by the pretreatment to shelf bracket component It is qualitative, more preferably positioning datum environment is provided for the positioning of the purlin installation in subsequent handling, it is entire so as to improve The installation precision and structural stability of assembled supporting construction.
The basic principles, main features and advantages of the invention have been shown and described above.The technical staff of the industry should Understand, the present invention is not limited to the above embodiments, and the above embodiments and description only describe originals of the invention Reason, without departing from the spirit and scope of the present invention, various changes and improvements may be made to the invention, these changes and improvements It all fall within the protetion scope of the claimed invention.The claimed scope of the invention is by appended claims and its equivalent circle It is fixed.

Claims (10)

1. the assembled support construction technique based on prestressing force fish belly sill support technology, it is characterised in that: including following step It is rapid:
Step 1: selected supporting construction component
The quantity of supporting construction component is determined according to the assembled support structure design drawing of foundation pit, and according to the assembled of foundation pit Support structure design drawing carries out multi-party responsible person and checks supporting construction the number of components, determines the accurate nothing of supporting construction component Accidentally;
Step 2: enclosure wall construction
It is enclosed on construction ground according to the assembled support construction drawing requirement of foundation pit and builds enclosure wall;
Step 3: column component construction
Column component is mounted in reserved post holes according to the assembled support construction drawing of foundation pit, and uses theodolite pair The verticality of column component carries out verification correction, guarantees column component verticality without offset, column component uses after installing Column component is completely fixed in reserved post holes by the mode that vibration is beaten;
Step 4: shelf bracket component construction
Shelf bracket component is installed at the closed line of foundation pit enclosure wall surrounding, shelf bracket component is located in advance in a pre-installation Reason, then will be installed at pretreated shelf bracket lifting component to column component, column component and shelf bracket component Between be attached using high-strength bolt, control shelf bracket component upper elevation line and foundation pit assembled support construction figure The center line of purlin component on paper guarantees the firm with the interconnecting piece of column component of shelf bracket component in same level position Gu reliable, welding is twisted and rosin joint phenomenon, and the whippletree needs of shelf bracket component are in a horizontal state, shelf bracket component The whippletree elevation angle control in 90-95 degree;
Step 5: purlin component installation
Using hanging device by purlin lifting component to shelf bracket, after purlin lifting component is in place to shelf bracket component into Row check, check shelf bracket component in purlin hoisting process whether because collision etc. reasons there is loosening problem, if triangle support Loosening problem, which occurs, in frame member then to need to carry out inspection fixation to shelf bracket component again;
Step 6: the installation of bracket and support beam
Collet member and support beam are installed using welding procedure, and welding method is by the way of being fully welded, weld bead height Greater than 8 millimeters, needs to monitor collet member during installation collet member and support beam and support the level of beam The verticality of absolute altitude and bracket;
Step 7: corner brace member installation
Corner brace member is subjected to pre-splicing combination in ground region, then passes through hanging device for the corner brace member after pre-splicing combination Installation is fixed in lifting to predetermined installation position;
Step 8: fish belly beam installation
By fish belly beam on the ground according to the design span of fish belly sill on the assembled support construction drawing of foundation pit into Row preassembling, using hanging device by above the pre-splicing fish belly sill lifting component installed to shelf bracket component after preassembling, then The pre-splicing fish belly beam both ends installed are fixedly mounted with shelf bracket component respectively;
Step 9: apply prestressing force
Fish belly beam carries out application pretightning force to each component of assembled supporting construction after installing.
2. the assembled support construction technique according to claim 1 based on prestressing force fish belly sill support technology, Be characterized in that: supporting construction the number of components also needs the inspection that carries out an acceptance inspection to supporting construction component after determining in the step 1, The scope of examination includes: inspection member profile size, bolt hole size, bolt pitch of holes and welds assembled quality, and needs pair The supporting construction component of deformation is caused to be repaired in transportational process, the excessive supporting construction component needs of deflection remake Or it chooses.
3. the assembled support construction technique according to claim 1 based on prestressing force fish belly sill support technology, It is characterized in that: construction site position first being determined according to foundation pit size design drawing requirement in the step 2, and to construction site Earthen formations distribution and fluctuations, groundwater level and quality of groundwater situation detected, detection without influence construct The ground of construction site is flattened again after factor, is enclosed again after the leveling of construction site ground and builds enclosure wall.
4. the assembled support construction technique according to claim 1 based on prestressing force fish belly sill support technology, It is characterized in that: also it needs to be determined that the absolute altitude of column component in the step 3 central post work progress, and by other column components On structural elements assembled, structural elements be completed after again with piling machine in such a way that vibration is beaten by column component It is completely fixed in reserved post holes.
5. the assembled support construction technique according to claim 1 based on prestressing force fish belly sill support technology, It is characterized in that: needing to buy carry out water to shelf bracket using horizontal measuring instrument after the step 4 intermediate cam carrier member installation Pingdu measurement, therefore, to assure that shelf bracket component and column component are in being horizontally disposed with, if shelf bracket component and column component Not being is in be horizontally disposed with then to need to unclamp high-strength bolt again, again levelling rear installation shelf bracket component, until shelf bracket Component is in horizontally disposed with column component completely.
6. the assembled support construction technique according to claim 1 based on prestressing force fish belly sill support technology, It is characterized in that: the pretreatment that the step 4 intermediate cam carrier member carries out in a pre-installation are as follows: the installation of shelf bracket component It must assure that the connecting portion of shelf bracket component and column component does not have impurity in journey, for shelf bracket component and column structure The impurity needs that the connecting portion of part occurs timely are cleared up.
7. the assembled support construction technique according to claim 1 based on prestressing force fish belly sill support technology, It is characterized in that: needing first to carry out the determination of purlin component base point of installation, purlin structure in the step 5 before the installation of purlin component Using dedicated fiducial point measuring instrument to carrying out positioning determining datum mark on the inside of the two neighboring corner of foundation pit before part installation, then lead to It crosses the basic point and plane positioning is carried out using the method for hanging wire.
8. the assembled support construction technique according to claim 1 based on prestressing force fish belly sill support technology, Be characterized in that: collet member carries out installation connection, collet member using high strong ties bolt and column component in the step 6 The installation direction of upper high strong ties bolt and the direction of column component are consistent.
9. the assembled support construction technique according to claim 1 based on prestressing force fish belly sill support technology, Be characterized in that: corner brace member needs the pre-splicing combination of diagonal brace component after the pre-splicing combination of ground region in the step 7 The straight degree of support checked, the corner brace member after pre-splicing combination is lifted to pre- by hanging device again after passed examination Determine installation position and installation is fixed.
10. the assembled support construction technique according to claim 1 based on prestressing force fish belly sill support technology, It is characterized in that: prestressed application rule in the step 9 are as follows: check the high-strength bolt and high strong ties of lattice piece interconnecting piece Whether the connection of bolt consolidates, then diagonal brace component applies prestressing force, is finally answered in advance the steel strand wires application on fish belly beam Power.
CN201811183192.9A 2018-10-11 2018-10-11 Assembled support construction technique based on prestressing force fish belly sill support technology Withdrawn CN109252526A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811183192.9A CN109252526A (en) 2018-10-11 2018-10-11 Assembled support construction technique based on prestressing force fish belly sill support technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811183192.9A CN109252526A (en) 2018-10-11 2018-10-11 Assembled support construction technique based on prestressing force fish belly sill support technology

Publications (1)

Publication Number Publication Date
CN109252526A true CN109252526A (en) 2019-01-22

Family

ID=65045085

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811183192.9A Withdrawn CN109252526A (en) 2018-10-11 2018-10-11 Assembled support construction technique based on prestressing force fish belly sill support technology

Country Status (1)

Country Link
CN (1) CN109252526A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111236253A (en) * 2020-02-11 2020-06-05 中铁隧道集团二处有限公司 Construction process for installing steel purlin and steel support on water
CN111305233A (en) * 2020-04-17 2020-06-19 中交一公局集团有限公司 Axial force compensation type prestress fish-bellied foundation pit steel supporting structure and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111236253A (en) * 2020-02-11 2020-06-05 中铁隧道集团二处有限公司 Construction process for installing steel purlin and steel support on water
CN111305233A (en) * 2020-04-17 2020-06-19 中交一公局集团有限公司 Axial force compensation type prestress fish-bellied foundation pit steel supporting structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN109763569B (en) Construction method of cantilever awning
CN102888998B (en) Method and structure for lifting supporting steel column
CN115419277B (en) Construction method of heavy steel box type diagonal column
CN110106881A (en) A kind of steel-pipe pile construction guidance locating rack and construction method
CN105317052B (en) Tower crane foundation bolt fixing method
CN109457965A (en) The Efficient installation method and its device of precast concrete wall panel
CN109252526A (en) Assembled support construction technique based on prestressing force fish belly sill support technology
CN116255016A (en) Beam column construction process of large-span steel structure building
CN106759943A (en) A kind of pre-assembled Anchor Bolts in Steel Column Bases structure
CN206562667U (en) A kind of quick pedestal anchor bolt structure in place
CN116770980A (en) Ultra-long variable-height V-shaped large-span steel structure corridor and construction method thereof
CN102777044B (en) Hoisting method of steel-structured spraying layer of urea prilling tower
CN114086770A (en) Hoisting and mounting method for steel frame structure
WO2020259469A1 (en) Welded overhead line system hard cross beam and construction method therefor
CN202544423U (en) Hoisting structure of supporting steel column
CN105040992B (en) Reverse inverted-insertion type construction method for structural steel columns
CN107881914B (en) Wire-dividing tube type cable saddle back field assembly type positioning device and assembly method
CN105735228A (en) Construction method and installation accuracy control method of rack systems of high-lift rack climbing type ship lift
CN110790113B (en) Construction method suitable for mounting wall-attached frame of ultra-long-distance construction elevator
CN113738125B (en) Construction method for lifting limited-space large-span steel structure of station house under line
CN115012575A (en) Construction process for lifting hyperbolic square pipe truss roof of railway station house in blocks
CN206554273U (en) A kind of pre-assembled Anchor Bolts in Steel Column Bases structure
CN211368420U (en) Main tower lower beam bracing support system
CN210529741U (en) Independent foundation embedded bolt mounting structure
CN106801470A (en) A kind of quick pedestal anchor bolt structure in place

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20190927

Address after: 528300 East Office Building 201-11, No. 11 Junye East Road, Beijiao Town, Shunde District, Foshan City, Guangdong Province

Applicant after: Guangdong Bozhilin Robot Co., Ltd.

Address before: Room 105-46536, No. 6 Baohua Road, Hengqin New District, Zhuhai City, Guangdong Province

Applicant before: Dingchen Construction Management Co., Ltd.

TA01 Transfer of patent application right
WW01 Invention patent application withdrawn after publication

Application publication date: 20190122

WW01 Invention patent application withdrawn after publication