CN201495556U - Structure for quickly hoisting and centering base of large steel frame - Google Patents

Structure for quickly hoisting and centering base of large steel frame Download PDF

Info

Publication number
CN201495556U
CN201495556U CN 200920309569 CN200920309569U CN201495556U CN 201495556 U CN201495556 U CN 201495556U CN 200920309569 CN200920309569 CN 200920309569 CN 200920309569 U CN200920309569 U CN 200920309569U CN 201495556 U CN201495556 U CN 201495556U
Authority
CN
China
Prior art keywords
sole plate
steel
steelframe
steel sole
stone bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200920309569
Other languages
Chinese (zh)
Inventor
李方波
冉志伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Engineering Division Corp Ltd
China Construction Fourth Bureau Installation Engineering Co Ltd
Original Assignee
China Construction Fourth Engineering Division Corp Ltd
China Construction Fourth Bureau Installation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Engineering Division Corp Ltd, China Construction Fourth Bureau Installation Engineering Co Ltd filed Critical China Construction Fourth Engineering Division Corp Ltd
Priority to CN 200920309569 priority Critical patent/CN201495556U/en
Application granted granted Critical
Publication of CN201495556U publication Critical patent/CN201495556U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a structure for quickly hoisting and centering a base of a large steel frame. The structure comprises a reinforced concrete foundation (1) and is characterized in that anchor bolts (2) are pre-embedded in the reinforced concrete foundation (1); the anchor bolt (2) is sheathed by a steel bottom plate (3); and a reinforced plate (4) and a reinforced plate (5) used for stabilizing steel columns (6) are arranged on the steel bottom plate (3). In the utility model, the centering process is convenient and quick during the process of hoisting in place, the engineering progress is quickened greatly, the construction expense is reduced, the time occupied by large hoister is reduced, the anchor bolts are avoided to be damaged in the construction and the reliability of the in-place process is improved.

Description

A kind of large-scale steelframe fast hoisting aligns the steelframe understructure
Technical field
The utility model relates to a kind of large-scale steelframe fast hoisting and aligns the steelframe understructure, belongs to the hoisting technology field of the medium-and-large-sized object of construction and installation.
Background technology
When petrochemical plant is installed the big heavy steelframe of 400 tons/H diesel oil hydrogenation stove, the steelframe of boiler need be aligned the location with steel sole plate accurately, since the high 25.244M of this boiler steelframe, wide 13.388M, monolithic combined hanging calculated weight 47.730T is so the lifting process that aligns bothers very much.This boiler steelframe is supported on ground 12 bases by 12 steel columns, be embedded with the stone bolt of 6 M40 * 1200mm in each basis, be welded with the steel sole plate of δ=46mm on the bottom of steel column, have on the steel sole plate and the corresponding hole of stone bolt, be connected with steel sole plate on the steel column by stone bolt pre-buried in 12 bases, steel column is fixed on the basis.
Construction hoisting method in the past is, in the bottom of steel column the stiffener between steel sole plate and steel sole plate and the steel column is all welded in advance, when lifting, stone bolt pre-buried in hole on the steel sole plate and the basis is aimed at, allow the borehole jack on the steel sole plate drop on the basis on the stone bolt, and then fix with nut.
There is following problem in this method:
1, because the boiler steelframe is not only high but also wide also very heavy, so in the process of lifting, the hole on stone bolt and the steel sole plate is difficult to align, whole aligning all needs crane gear auxiliary in the process, increased the holding time of large lifting equipment, the One-Shift Costs height;
2, in hoisting process, be easy to hit stone bolt curved or the screw thread on the stone bolt is broken.
3, aligning after the steel column in place (as: the horizontal absolute altitude of steel column, longitudinal and transverse position, gradient) is very difficult, wastes time and energy, and also needs the crane gear auxiliary construction simultaneously.
In sum, prior art is not only backward in technique, operating expenses is high, influence programming, also damage stone bolt easily, take defectives such as large-scale loop wheel machine time length, poor reliability.
The utility model content
The purpose of this utility model is that a kind of conveniently large-scale steelframe fast hoisting aligns the steelframe understructure not to be had, and to speed up the work, reduces operating expenses, prevents to destroy stone bolt in the construction, improves the reliability of engineering.
The utility model is to constitute like this: comprise reinforced concrete foundation, be embedded with stone bolt in the reinforced concrete foundation, be with steel sole plate on the stone bolt, steel sole plate is provided with stiffened panel and stiffener.
Above-mentioned large-scale steelframe fast hoisting aligns in the steelframe understructure, and described steel sole plate, stiffened panel and stiffener weld with steel column respectively.
Aforesaid large-scale steelframe fast hoisting aligns in the steelframe understructure, and described steel sole plate is provided with the U-shaped hole, and stiffened panel is provided with through hole, and stone bolt runs through U-shaped hole and through hole, and the stone bolt top is rotary with nut.
Owing to adopted technique scheme, compared with prior art, operating principle of the present utility model is earlier the steel sole plate on the basis have been carried out accurate centering and had good positioning in advance before formal lifting, and on steel sole plate and the steel column of preparing to be connected, finish center line, so to make when in place it align the course of work convenient and swift formal, and can speed up the work greatly, reduce operating expenses, reduce the holding time of large-scale loop wheel machine, prevent to break stone bolt in the construction, improved the reliability in the process in place.
Description of drawings
Fig. 1 is the schematic diagram of the steelframe understructure that adopts of the utility model;
Fig. 2 is the schematic diagram of basis and steel column;
Fig. 3 is the stiffened panel schematic diagram;
Fig. 4 is the mass-type foundation schematic diagram.
Being labeled as in the accompanying drawing: 1-reinforced concrete foundation, 2-stone bolt, 3-steel sole plate, 4-stiffened panel, 5-stiffener, 6-steel column, 7-U shape hole, 8-through hole, 9-nut, the center line of drawing on the 10-steel sole plate, the center line of drawing on the 11-steel column.
The specific embodiment
The utility model is described in further detail below in conjunction with examples of implementation, but not as to restriction of the present utility model.
Embodiment of the present utility model: present embodiment is to adopt the utility model certain petrochemical plant to be installed the example of the big heavy steelframe of 400 tons/H diesel oil hydrogenation stove, the height of 400 tons/H diesel oil hydrogenation stove is more than 25 meters, width is more than 13 meters, the design weight of monolithic combined hanging is about 48 tons, and its basis constitutes (as shown in Figure 4) by 12 reinforced concrete foundations 1 that are embedded with 6 M40 * 1200mm stone bolt.Hanging method in the past is earlier the base below the big heavy steelframe of 400 tons/H diesel oil hydrogenation stove all to be welded, when lifting, remove to align fang bolt 2 on the reinforced concrete foundation 1 with the fixing hole on the base, this method is easy to damage fang bolt 2, and align very trouble, waste time and energy, it is long to take the crane gear time.Enforcement principle of the present utility model as shown in Figure 2, be earlier the steel sole plate on the base 3 to be fixed on the reinforced concrete foundation 1, each steel sole plate 3 is adjusted horizontal absolute altitude, levelness and position in length and breadth, and on steel sole plate 3, finish longitudinal and transverse center line, also on the steel column 6 of every steelframe, finish longitudinal and transverse center line simultaneously, when lifting, with sleeve pipe fang bolt 2 is entangled, the spiral shell that breaks fang bolt 2 when preventing to lift is buckled.After steel column 6 is sling, center line on the steel sole plate 10 is alignd with center line 11 on the steel column, and be mutually the verticality that an angle of 90 degrees aligns steelframe with two transits, and then steel column 6 and steel sole plate 3 welded together, and between steel column 6 and steel sole plate 3, weld stiffener 5 and stiffened panel 4, with nut 9 that steel sole plate 3 is fixing with the fang bolt 2 on the reinforced concrete foundation at last; Method of the present utility model aligns the process simple and fast, and it is short to take the crane gear time.
Enforcement concrete operations step of the present utility model is as follows:
A), steel sole plate 3 is enclosed within on each basic anchoring bolt 2;
B), measure the levelness of each steel sole plate 3, by adjusting the taper liner iron below the steel sole plate 3, make each steel sole plate 3 plane maintenance level with spirit level;
C), measure the absolute altitude on each steel sole plate 3 plane, by adjusting plain cushion iron thickness or the quantity below the steel sole plate 3, make the absolute altitude on each steel sole plate 3 plane meet the drawing requirement with level gauge;
D), with nut 9 that steel sole plate on the stone bolt 23 is fixing, once more the absolute altitude and the levelness of each steel sole plate 3 are measured, and are finely tuned;
E), measure longitudinal and transverse spacing and diagonal distance between each basis, on steel sole plate 3, draw longitudinal and transverse center line by drawing respectively;
F), in steel column 6 bottoms of preparing to be connected with steel sole plate 3, draw longitudinal and transverse center line respectively;
G), on each stone bolt 2, put sleeve pipe, and with nut 9 sleeve pipe is pre-fixed;
H), with crane gear lifting steel column 6, the longitudinal and transverse center line on the steel column is alignd respectively with longitudinal and transverse center line on the steel sole plate;
I), be mutually the verticality that an angle of 90 degrees aligns steel column 6 with two transits;
J), with steel column 6 and steel sole plate 3 welding, and be welded on and weld stiffener 5 and stiffened panel 4 between steel column 6 and the steel sole plate 3;
K), with nut 9 that steel sole plate 3 is fixing.
The of the present utility model large-scale steelframe fast hoisting that is adopted in to correction method in above-mentioned large-scale steelframe fast hoisting aligns the steelframe understructure, as shown in Figure 1, comprise reinforced concrete foundation 1 (shown in the bottom of Fig. 2), be embedded with stone bolt 2 in the reinforced concrete foundation 1, be with steel sole plate 3 on the stone bolt 2, steel sole plate 3 is provided with stiffened panel 4 (as shown in Figure 3) and stiffener 5.Steel sole plate 3, stiffened panel 4 and stiffener 5 weld with steel column 6 respectively.Steel sole plate 3 is provided with U-shaped hole 7, and stiffened panel 4 is provided with through hole 8, and stone bolt 2 runs through U-shaped hole 7 and through hole 8, and the stone bolt top is rotary with nut 9.During concrete enforcement, can a plurality of bases (as shown in Figure 4) be set according to the place size.

Claims (3)

1. one kind large-scale steelframe fast hoisting aligns the steelframe understructure, comprise reinforced concrete foundation (1), it is characterized in that: in reinforced concrete foundation (1), be embedded with stone bolt (2), be with steel sole plate (3) on the stone bolt (2), steel sole plate (3) is provided with stiffened panel (4) and the stiffener (5) that is used for firm steel column (6).
2. large-scale steelframe fast hoisting according to claim 1 aligns the steelframe understructure, it is characterized in that: steel column (6) is welded on steel sole plate (3) and goes up and be welded between stiffened panel (4) and the stiffener (5).
3. large-scale steelframe fast hoisting according to claim 1 and 2 aligns the steelframe understructure, it is characterized in that: described steel sole plate (3) is provided with U-shaped hole (7), stiffened panel (4) is provided with through hole (8), anchoring bolt (2) runs through U-shaped hole (7) and through hole (8), and the stone bolt top is rotary with nut (9).
CN 200920309569 2009-09-03 2009-09-03 Structure for quickly hoisting and centering base of large steel frame Expired - Fee Related CN201495556U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200920309569 CN201495556U (en) 2009-09-03 2009-09-03 Structure for quickly hoisting and centering base of large steel frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200920309569 CN201495556U (en) 2009-09-03 2009-09-03 Structure for quickly hoisting and centering base of large steel frame

Publications (1)

Publication Number Publication Date
CN201495556U true CN201495556U (en) 2010-06-02

Family

ID=42438764

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200920309569 Expired - Fee Related CN201495556U (en) 2009-09-03 2009-09-03 Structure for quickly hoisting and centering base of large steel frame

Country Status (1)

Country Link
CN (1) CN201495556U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101914950A (en) * 2010-07-26 2010-12-15 中广核工程有限公司 Connection structure between module and civil work structure and connection method thereof
CN103015763A (en) * 2013-01-11 2013-04-03 苏州万宇钢结构建筑安装工程有限公司 Corridor
CN107447993A (en) * 2016-05-30 2017-12-08 五冶集团上海有限公司 A kind of girder steel moves limit method in place
CN111335349A (en) * 2020-03-23 2020-06-26 五冶集团上海有限公司 Method for modifying and installing foundation bolt of steel structure by rapid process

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101914950A (en) * 2010-07-26 2010-12-15 中广核工程有限公司 Connection structure between module and civil work structure and connection method thereof
CN101914950B (en) * 2010-07-26 2013-06-19 中广核工程有限公司 Connection structure between module and civil work structure and connection method thereof
CN103015763A (en) * 2013-01-11 2013-04-03 苏州万宇钢结构建筑安装工程有限公司 Corridor
CN107447993A (en) * 2016-05-30 2017-12-08 五冶集团上海有限公司 A kind of girder steel moves limit method in place
CN111335349A (en) * 2020-03-23 2020-06-26 五冶集团上海有限公司 Method for modifying and installing foundation bolt of steel structure by rapid process

Similar Documents

Publication Publication Date Title
CN101691815B (en) Fast hoisting-aligning method for Large-sized steel frames, and steel frame base structure
CN104328744B (en) A kind of earth anchored suspension bridge anchorage reinforcing pull rod anchor system construction method
CN103243961B (en) Titanium plate steel inner tank reversed construction device for chimney of thermal power station
CN103669883B (en) A kind of installation adjusting method of combined isolation bearing
CN105586833B (en) Stiff skeleton steel reinforcement cage global formation large-scale cast-in-place tall pier and thin wall construction method
CN201495556U (en) Structure for quickly hoisting and centering base of large steel frame
CN104695336A (en) Double-layer cast-in-situ beam support construction method adopting sequence from upper layer to lower layer
CN111851302A (en) Rapid construction method of steel trestle
CN105544587A (en) Combined tower crane foundation and construction method thereof
CN203547753U (en) Profile steel concrete shaft wall base
CN104005569A (en) Construction method for supporting beam and removing columns
CN109629449A (en) A kind of steel case arch bridge arch springing toughened internal stress installation locating support and alignment method
CN102691267A (en) High pier construction method for external whole operation platform
CN208995937U (en) Mounting bracket is slid suitable for the S type steel box girder of cable stayed bridge above subway station
CN204163104U (en) External elevator steel beam foundation constructs
CN103243910B (en) Hydraulic pressure controlled reinforced concrete structure bed die vertical supporting system and construction method thereof
CN205688420U (en) A kind of steel structure device of power station maintenance construction in operation
CN205024709U (en) Buried bolt's device is in advance suspended in midair on basis
CN107938841A (en) A kind of positioning adjusting of steel column pairing and method of temporarily fixing
CN211341789U (en) Wall form reinforcing tool
CN103754791A (en) Method for lifting water-tower 1000m<3> water tank by utilizing prestressed strands
CN102561383B (en) Tower crane base mounting method
CN203594264U (en) Clamp special for angle steel iron tower rectification and tool for angle steel iron tower rectification
CN208293437U (en) Cast-in-situ Beam assembled Large Diameter Pipeline steel pipe support structure
CN105064388A (en) Truss type rear column structure and foundation for boarding bridge and construction method for truss type rear column structure and foundation

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100602

Termination date: 20180903