CN103015763A - Corridor - Google Patents

Corridor Download PDF

Info

Publication number
CN103015763A
CN103015763A CN2013100097426A CN201310009742A CN103015763A CN 103015763 A CN103015763 A CN 103015763A CN 2013100097426 A CN2013100097426 A CN 2013100097426A CN 201310009742 A CN201310009742 A CN 201310009742A CN 103015763 A CN103015763 A CN 103015763A
Authority
CN
China
Prior art keywords
vestibule
fixed
flaggy
shaped steel
rainproof
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013100097426A
Other languages
Chinese (zh)
Inventor
祝云武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SUZHOU WANYU STEEL STRUCTURE BUILDING INSTALLATION ENGINEERING Co Ltd
Original Assignee
SUZHOU WANYU STEEL STRUCTURE BUILDING INSTALLATION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SUZHOU WANYU STEEL STRUCTURE BUILDING INSTALLATION ENGINEERING Co Ltd filed Critical SUZHOU WANYU STEEL STRUCTURE BUILDING INSTALLATION ENGINEERING Co Ltd
Priority to CN2013100097426A priority Critical patent/CN103015763A/en
Publication of CN103015763A publication Critical patent/CN103015763A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention relates to a corridor. The corridor is characterized by comprising a corridor frame and flashing board layers seamlessly spliced on the corridor frame. The corridor frame comprises a plurality of sets of H-shaped steel, an arched beam and a plurality of square tubes. The sets of H-shaped steel divided into two rows are fixed on the ground through foundation bolts, the arched beam is fixed between the two rows of H-shaped steel through bolts, the square tubes longitudinally distributed are fixed on the arched beam and are distributed at intervals, and one flashing board layer is fixed on each adjacent two square tubes through a positioning device. The corridor is divided into the flashing board layers composed of a plurality of endurance boards and is fixedly mounted through the positioning devices and the foundation bolts, on-site welding accident risk is reduced, and the corridor is high in tensile and shear resistance, light in member weight, high in machining precision, economized in labor, low in noise, environment-friendly, lower in transportation and hoisting costs, free of groove in mounting and attractive in structure.

Description

A kind of vestibule
Technical field
The present invention relates to a kind of vestibule.
Background technology
In the last few years, along with the fast development of domestic market economy and domestic investment environment benign development, the engineerings such as newly-built, the enlarging of factory building, transformation are more and more, the building vestibule is installed also more and more in each factory building, for convenient actual the use needs, reducing input cost, generally all is to utilize structural steel to carry out Site Welding to form the vestibule framework, again at framework by the fixation with steel wire awning.Such vestibule is lower application life, and can not bear larger stretching resistance and shearing resistance.
Summary of the invention
The technical problem that the present invention solves provides a kind of saving cost and drops into, and improves stretching resistance and shearing resistance, and recruitment economizes, installs a kind of vestibule that pollutes the environmental protection little, that noise is low.
The present invention solves the technical scheme that its technical problem takes: a kind of vestibule comprises vestibule skeleton and seamless spliced rainproof flaggy on the vestibule skeleton; Described vestibule skeleton is comprised of many groups H shaped steel, arched girder, square tube, described many group H shaped steel divides two rows to fix on the ground by anchor bolt apparatus, between two row H shaped steel, be bolted arched girder, be fixed with many square tubes of vertically arranging at described arched girder, described square tube equidistantly distributes, at the adjacent side cross tube rainproof flaggy that is fixed by positioning device.
Further, in order to improve stretching resistance and shearing resistance, guarantee the sealing at vestibule top, prevent roof leaking, described positioner is comprised of arch press strip and the sealing bolt that passes from arch press strip middle part, the head threads of sealing bolt is fixed in the square tube, and the two ends of described arch press strip are pressed together on the rainproof flaggy.
Further, also be fixedly installed compression leg in described arch press strip inboard, described compression leg has two, and two compression legs are the symmetric position setting with the center line of arch press strip, and the bottom of described compression leg is pressed together on the rainproof flaggy.
Further, in order to improve the effect of its rainproof leakproof, described rainproof flaggy is a kind of in endurance flaggy or PE polyester flaggy or the color steel watt layer.
Further, in order to improve the drainage rates at vestibule top, central angle corresponding to the arc length of described arched girder is 30 °~80 °.
Further, in order to improve the aesthetic property of integral installation, offer a plurality of decoration hole at described H shaped steel and arched girder, described decoration hole ovalize.
Further, in order to improve H shaped steel stability is installed, described anchor bolt apparatus is L-type, this anchor bolt apparatus is by dull and stereotyped and be fixed on dull and stereotyped stone bolt and form, offer interface at described flat board, the fixed head that vertically arranges of welding also on flat board, described fixed head be distributed in interface around.
The concrete result of use of this device: the part that this vestibule forms is the rainproof flaggy that the polylith force-bearing plate forms, install fixing by positioner and anchor bolt apparatus, reduced the accident risk of Site Welding, have quite high tension, shear resistance, and construction weight has been light, machining accuracy is high, recruitment economizes, and noise is low to be Green environmental-protection building, has reduced transportation and lifting cost and has used, installation is without ditch, and structure is attractive in appearance.
Description of drawings
Fig. 1 is structural representation of the present invention;
Fig. 2 is the top view of structure of the present invention;
Fig. 3 is the schematic diagram of the rainproof flaggy of positioner pressing among the present invention;
Fig. 4 is the top view of anchor bolt apparatus;
Fig. 5 is the front view of anchor bolt apparatus;
Fig. 6 is that H shaped steel is plugged on the structural representation on the anchor bolt apparatus;
Fig. 7 is the schematic diagram of the another kind of embodiment of the present invention;
Fig. 8 is the schematic diagram of another embodiment of apparatus of the present invention.
Among the figure: 1, ground 2, anchor bolt apparatus 21, stone bolt 22, flat board 23, interface 24, fixed head 3, H shaped steel 31, decoration hole 4, arched girder 5, square tube 6, rainproof flaggy 71, sealing bolt 72, arch press strip 73, compression leg.
The specific embodiment
The below elaborates to the present invention with regard to concrete accompanying drawing.
A kind of vestibule comprises vestibule skeleton and seamless spliced rainproof flaggy 6 on the vestibule skeleton as illustrated in fig. 1 and 2; Described vestibule skeleton is comprised of many groups H shaped steel 3, arched girder 4, square tube 5, described many group H shaped steel 3 minutes two rows be fixed on the ground 1 by anchor bolt apparatus 2, be bolted arched girder 4 at two 3 of row H shaped steel, be fixed with many square tubes of vertically arranging 5 at described arched girder 4, described square tube 5 equidistantly distributes, at the adjacent side cross tube 5 rainproof flaggy 6 that is fixed by positioning device.
Further, as shown in Figure 3, in order to improve stretching resistance and shearing resistance, guarantee the sealing at vestibule top, prevent roof leaking, described positioner is comprised of arch press strip 72 and the sealing bolt 71 that passes from arch press strip middle part, and the head threads of sealing bolt 71 is fixed in the square tube 5, and the two ends of described arch press strip 72 are pressed together on the rainproof flaggy 6.
Further, also be fixedly installed compression leg 73 in described arch press strip 72 inboards, described compression leg 73 has two, and two compression legs 73 are the symmetric position setting with the center line of arch press strip 72, and the bottom of described compression leg 73 is pressed together on the rainproof flaggy 6.
Further, in order to improve the effect of its rainproof leakproof, described rainproof flaggy 6 is a kind of in endurance flaggy or PE polyester flaggy or the color steel watt layer.
Further, in order to improve the drainage rates at vestibule top, central angle corresponding to the arc length of described arched girder 4 is 30 °~80 °.
Further, in order to improve the aesthetic property of integral installation, offer a plurality of decoration hole 31 at described H shaped steel 3 and arched girder 4, described decoration hole 31 ovalizes.
Further, in order to improve H shaped steel stability is installed, shown in Fig. 4~6, described anchor bolt apparatus 2 is L-type, this anchor bolt apparatus is by dull and stereotyped 22 and be fixed on dull and stereotyped 22 stone bolt 21 and form, offer interface 23 described dull and stereotyped 22, the fixed head 24 that vertically arranges of welding also on dull and stereotyped 22, described fixed head 24 be distributed in interface 23 around.
As shown in Figure 7, the present invention adopts three row's H shaped steel and two row's arched girders to consist of double vestibule.
As shown in Figure 8, the present invention adopts three row's H shaped steel and row's arched girder to consist of double vestibule.The part that this vestibule forms is the rainproof flaggy that the polylith force-bearing plate forms, install fixing by positioner and anchor bolt apparatus 2, reduced the accident risk of Site Welding, have quite high tension, shear resistance, and construction weight has been light, machining accuracy is high, recruitment economizes, and noise is low to be Green environmental-protection building, has reduced transportation and lifting cost and has used, installation is without ditch, and structure is attractive in appearance.
It is emphasized that, it more than is better implementation column of the present invention, be not that any type of restriction is done in invention in appearance, every foundation technical spirit of the present invention all still belongs in the scope of technical solution of the present invention any simple modification, equivalent variations and modification that above embodiment does.

Claims (7)

1. a vestibule is characterized in that: comprise vestibule skeleton and seamless spliced rainproof flaggy (6) on the vestibule skeleton; Described vestibule skeleton is comprised of many groups H shaped steel (3), arched girder (4), square tube (5), described many group H shaped steel (3) minute two rows be fixed on the ground (1) by anchor bolt apparatus (2), between two row's H shaped steel (3), be bolted arched girder (4), be fixed with many square tubes of vertically arranging (5) at described arched girder (4), described square tube (5) equidistantly distributes, at adjacent side cross tube (5) the rainproof flaggy (6) that is fixed by positioning device.
2. a kind of vestibule according to claim 1, it is characterized in that: described positioner is comprised of arch press strip (72) and the sealing bolt (71) that passes from arch press strip middle part, the head threads of sealing bolt (71) is fixed in the square tube (5), and the two ends of described arch press strip (72) are pressed together on the rainproof flaggy (6).
3. a kind of vestibule according to claim 2, it is characterized in that: also be fixedly installed compression leg (73) in described arch press strip (72) inboard, described compression leg (73) has two, two compression legs (73) are the symmetric position setting with the center line of arch press strip (72), and the bottom of described compression leg (73) is pressed together on the rainproof flaggy (6).
4. a kind of vestibule according to claim 1 is characterized in that: a kind of in endurance flaggy or PE polyester flaggy or the color steel watt layer of described rainproof flaggy (6).
5. a kind of vestibule according to claim 1, it is characterized in that: central angle corresponding to the arc length of described arched girder (4) is 30 °~80 °.
6. a kind of vestibule according to claim 1 is characterized in that: offer a plurality of decoration hole (31) at described H shaped steel (3) and arched girder (4), described decoration hole (31) ovalize.
7. a kind of vestibule according to claim 1, it is characterized in that: described anchor bolt apparatus (2) is L-type, this anchor bolt apparatus is comprised of dull and stereotyped (22) and the stone bolt (21) that is fixed on flat board (22), offer interface (23) at described flat board (22), the fixed head (24) that vertically arranges of welding also on dull and stereotyped (22), described fixed head (24) be distributed in interface (23) around.
CN2013100097426A 2013-01-11 2013-01-11 Corridor Pending CN103015763A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013100097426A CN103015763A (en) 2013-01-11 2013-01-11 Corridor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013100097426A CN103015763A (en) 2013-01-11 2013-01-11 Corridor

Publications (1)

Publication Number Publication Date
CN103015763A true CN103015763A (en) 2013-04-03

Family

ID=47964820

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013100097426A Pending CN103015763A (en) 2013-01-11 2013-01-11 Corridor

Country Status (1)

Country Link
CN (1) CN103015763A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103938716A (en) * 2014-04-02 2014-07-23 深圳市北林苑景观及建筑规划设计院有限公司 Corridor
CN104060838A (en) * 2014-06-18 2014-09-24 北京首钢建设集团有限公司 Grouping and air-pairing installation method for corridor

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3017428A1 (en) * 1980-05-07 1981-11-12 Gesteins- Und Tiefbau Gmbh, 4350 Recklinghausen Mine gallery or tunnel composite support system - has stretched filled textile support tubes lying full face against steel segments
CN2332775Y (en) * 1998-02-25 1999-08-11 魏先宏 Structural installation of light weight steel frame
CN201495556U (en) * 2009-09-03 2010-06-02 中国建筑第四工程局有限公司 Structure for quickly hoisting and centering base of large steel frame
CN201635411U (en) * 2010-03-24 2010-11-17 浙江省一建建设集团有限公司 Prefabricated split-mounting type light-steel-structure processing shed
CN102852289A (en) * 2012-08-29 2013-01-02 苏州奥泰斯环保科技发展有限公司 Mounting depression bar
CN203066529U (en) * 2013-01-11 2013-07-17 苏州万宇钢结构建筑安装工程有限公司 Corridor

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3017428A1 (en) * 1980-05-07 1981-11-12 Gesteins- Und Tiefbau Gmbh, 4350 Recklinghausen Mine gallery or tunnel composite support system - has stretched filled textile support tubes lying full face against steel segments
CN2332775Y (en) * 1998-02-25 1999-08-11 魏先宏 Structural installation of light weight steel frame
CN201495556U (en) * 2009-09-03 2010-06-02 中国建筑第四工程局有限公司 Structure for quickly hoisting and centering base of large steel frame
CN201635411U (en) * 2010-03-24 2010-11-17 浙江省一建建设集团有限公司 Prefabricated split-mounting type light-steel-structure processing shed
CN102852289A (en) * 2012-08-29 2013-01-02 苏州奥泰斯环保科技发展有限公司 Mounting depression bar
CN203066529U (en) * 2013-01-11 2013-07-17 苏州万宇钢结构建筑安装工程有限公司 Corridor

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103938716A (en) * 2014-04-02 2014-07-23 深圳市北林苑景观及建筑规划设计院有限公司 Corridor
CN103938716B (en) * 2014-04-02 2016-08-17 深圳市北林苑景观及建筑规划设计院有限公司 A kind of vestibule
CN104060838A (en) * 2014-06-18 2014-09-24 北京首钢建设集团有限公司 Grouping and air-pairing installation method for corridor
CN104060838B (en) * 2014-06-18 2016-05-18 北京首钢建设集团有限公司 A kind of vestibule divides into groups aerial group to Method for Installation

Similar Documents

Publication Publication Date Title
CN104818772B (en) A kind of large span long cantilever conjoined structure and construction technology
CN206481251U (en) A kind of photovoltaic bracket device of use truss string structure beam
CN203296166U (en) Supporting structure of main module unit in module building
CN202578055U (en) Shed used for coke oven building construction and adjustable in height and width
CN205171782U (en) Frame curtain system between stone material edge list
CN106656009A (en) Solar photovoltaic panel truss
CN103015763A (en) Corridor
CN104775572A (en) Pre-stressed precast canopy plate for railway platform
CN205000463U (en) Long cantilever disjunctor structure of large -span
CN202248820U (en) Combined overhanging scaffold
CN205296927U (en) Steel bar machining shed
CN205577102U (en) Odd -shaped cross section beam column, regular cross -section post and support steel integrated configuration system
CN203066529U (en) Corridor
CN205804724U (en) A kind of embedded glass curtain wall structure system
CN205574216U (en) Many portable wind and rain canopies of point type
CN201753475U (en) Steel grid structure of strut-framed prestress orthogonal space pipe truss
CN204960076U (en) Lightweight steel construction that modularization C type roof beam middle part is connected
CN204959995U (en) Modular structure of room roof beam
CN103397638A (en) Tie bar for supporting system in high-rigidity integral prestressed fabricated foundation pit support
CN104805902B (en) It is a kind of to improve the structure of hangar stress performance
CN204326556U (en) A kind of large-span truss for both wired upper bridge constructions is safe guarding shed
CN203856256U (en) Lightning protection building
CN203113908U (en) Full assembly structure with enclosing wall and advertising board integrated
CN205172031U (en) Can space -saving building sandwich structure
CN204983335U (en) Furred ceiling is staple bolt device for conversion layer

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C05 Deemed withdrawal (patent law before 1993)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130403