CN101914950B CN 201010240450 CN201010240450A CN101914950B CN 101914950 B CN101914950 B CN 101914950B CN 201010240450 CN201010240450 CN 201010240450 CN 201010240450 A CN201010240450 A CN 201010240450A CN 101914950 B CN101914950 B CN 101914950B
Authority
CN
China
Prior art keywords
module
civil engineering
engineering structure
junction plate
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 201010240450
Other languages
Chinese (zh)
Other versions
CN101914950A (en
Inventor
鲁勤武
冯晓明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China General Nuclear Power Corp
China Nuclear Power Engineering Co Ltd
Original Assignee
China General Nuclear Power Corp
China Nuclear Power Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China General Nuclear Power Corp, China Nuclear Power Engineering Co Ltd filed Critical China General Nuclear Power Corp
Priority to CN 201010240450 priority Critical patent/CN101914950B/en
Publication of CN101914950A publication Critical patent/CN101914950A/en
Application granted granted Critical
Publication of CN101914950B publication Critical patent/CN101914950B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention relates to a connection structure between a module and a civil work structure and a connection method thereof. The connection structure comprises an embedded plate embedded in the civil work structure and a mounting pedestal arranged on the embedded plate. The module comprises a stand column matched with the mounting pedestal for mounting the module; and the stand column is horizontally and vertically adjustably arranged on the mounting pedestal. The connection method comprises the steps of embedding the embedded plate in the civil work structure, mounting the mounting pedestal on the embedded plate, horizontally and vertically adjusting the position of the stand column on the mounting pedestal, and fixing the stand column on the mounting pedestal. By using the connection structure and the connection method, abutted installation between the module and the civil structure can be smoothly realized, the problems that the module is difficult to locate accurately during the hoisting in-position and is time-consuming in installation are effectively reduced and the construction efficiency is improved.

Description

Syndeton between a kind of module and civil engineering structure and attaching method thereof
Technical field
The present invention relates to a kind of building field, more particularly, relate to syndeton between a kind of module and civil engineering structure and attaching method thereof.
Background technology
In nuclear power engineering, the modularization construction is an important technology of modern Construction of Nuclear Electricity, its core exactly with the nuclear power module prefabricated and on-the-spot install be divided into two independently process complete.The time of on-the-spot installation has been shortened in the modularization construction, and manufacturing process realizes mechanization, automation, is conducive to enhance productivity, and reduces labor intensity.Module improves in prefabricated process mechanism degree, saves the labour.The modularization construction technique is construction duration, the total cost that reduces engineering that shortens nuclear power engineering and improves effective means of rate of return on investment.
Yet domestic nuclear power modularization building technology also is in the starting stage and construction module is more, and Prefabricated block is arranged on the problem when having accurate positioning and installation fee in civil engineering building process.Almost do not have supplementary module accurately to locate fast and the efficient concrete measure of installing in existing nuclear power module mounting technique.After the module manufacturing is completed, although can reserve certain adjustable distance, in order to be connected with external interface, in the situation that the tolerance such as civil engineering structure construction is larger at the scene, be difficult to realize docking smoothly.
Summary of the invention
The technical problem to be solved in the present invention is, for being difficult to accurately location and efficient defective of installing fast between module in prior art and civil engineering structure, syndeton between a kind of module and civil engineering structure and attaching method thereof is provided, can accurately locates fast and efficiently be installed on civil engineering structure by fine supplementary module.
The technical solution adopted for the present invention to solve the technical problems is: the syndeton between a kind of module and civil engineering structure comprises being embedded in the embedded board in described civil engineering structure and being arranged on installed base on described embedded board; Described module comprises a plurality of columns that coordinate with described installed base for described module installation; Described column is arranged on the described installed base of a plurality of correspondences with level and up-down adjustment;
Described installed base comprises and is fixedly mounted on the boss on described embedded board and is arranged on described boss for the fixing junction plate of described column;
The described junction plate area of plane is greater than described column sectional area; The quantity of described junction plate is at least 1, during the described junction plate of polylith, and wherein 1 described junction plate and described boss welding, other described junction plate is used for changing the height of described column in the vertical direction.
The present invention also provides the method for attachment between a kind of module and civil engineering structure, comprises the following steps:
S1: embedded board is embedded in civil engineering structure;
S2: installed base is fixed on embedded board;
S3: level, adjust the position of column on described installed base up and down, change the height of column in the vertical direction by the quantity that increases junction plate, thereby realize adjusting up and down;
S4: described column is fixed on described installed base.
Method of attachment between a kind of module of the present invention and civil engineering structure, preferably, the carrying out of described step order is: first carry out described step S1, order is carried out step S2, S3 and S4 step again, perhaps, first carry out described step S2, then order is carried out step S1, S3 and S4.
Method of attachment between a kind of module of the present invention and civil engineering structure, preferably, the carrying out of described step order is: first carry out described step S1, then order is carried out step S3, S4 and S2.
The present invention can reach following beneficial effect: can realize smoothly accurately locating rapidly and efficient installation the between module and civil engineering structure by this syndeton and attaching method thereof, effectively reduce the phenomenon of doing over again in module hoisting process in place, improve efficiency of construction.
Description of drawings
The invention will be further described below in conjunction with drawings and Examples, in accompanying drawing:
Fig. 1 is the scheme of installation of the syndeton between a kind of module of the present invention and civil engineering structure;
Fig. 2 is the structural representation of the syndeton between a kind of module of the present invention and civil engineering structure;
Fig. 3 is syndeton between a kind of module of the present invention and civil engineering structure and the connection diagram between civil engineering structure;
Fig. 4 is the scheme of installation of another embodiment of syndeton between a kind of module of the present invention and civil engineering structure;
Fig. 5 is the structural representation of another embodiment of syndeton between a kind of module of the present invention and civil engineering structure;
Fig. 6 is syndeton between a kind of module of the present invention and civil engineering structure and the connection diagram of another embodiment between civil engineering structure.
The specific embodiment
Understand for technical characterictic of the present invention, purpose and effect being had more clearly, now contrast accompanying drawing and describe the specific embodiment of the present invention in detail.
Embodiment one
As shown in Fig. 1~3, be a preferential embodiment of the present invention, the syndeton 2 that a kind of module 1 and civil engineering structure are 8 comprises the embedded board 5 that is embedded in described civil engineering structure and is arranged on installed base on embedded board 5.Installed base can be square tube sleeve pipe 4, also can change the cylinder sleeve pipe into, perhaps the sleeve pipe of other shapes.
Embedded board 5 is in the civil engineering structure work progress, according to module actual installation position needs, imbeds in civil engineering structure.Civil engineering structure work progress and module installation in position process are to carry out in the different construction stages, and the civil engineering structure work progress is to belong to prefabricated process in early stage, and module installation in position process belongs to the later stage installation process.
4 welding of square tube sleeve pipe perhaps are bolted on embedded board 5, and preferred, the present embodiment is taked to be welded and fixed, can guaranteed strength.
As shown in Figure 3, in the civil engineering structure work progress, the embedded board 5 in syndeton 2 is located and is embedded in civil engineering structure 8.Civil engineering structure 8 just should according to the position of module 1 and the good embedded board 5 of column 3 position design, be located the embedded board 5 in syndeton 2 as a link of civil engineering structure construction in the civil engineering structure construction and be embedded into civil engineering structure 8 in design process.
Further, in the civil engineering structure construction, first square tube sleeve pipe 4 is welded on embedded board 5, then embedded board 5 is imbedded in civil engineering structure; Perhaps, first embedded board 5 is imbedded in civil engineering structure, then square tube sleeve pipe 4 is welded on embedded board 5.
Module 1 comprises module body and six columns 3 that are arranged on module body.The interior sectional area of square tube sleeve pipe 4 is greater than the sectional area of column 3, and column 3 can insert in square tube sleeve pipe 4 and certain remaining seam is arranged between the two.
In the module installation process, each column 3 of module is aimed at the square tube 4 of below, inserts in placely, tentatively realizes the in place of module.
Further, after module 1 is preliminary in place, utilizes the device such as jack to levelness and the verticality of module and the exact position be installed finely tune, after the accurate installation of module 1 is determined, with the joint portion of spot welding vertical columns 3 and square tube sleeve pipe 4.
Further, according to designing requirement, square tube sleeve pipe 4 joint portions of the column 3 of module 1 and syndeton are welded, weld part is carried out touch-up paint, thereby complete smooth accurate positioning and installation work between module 1 and civil engineering structure 8.
The method of attachment that a kind of module 1 and civil engineering structure are 8 is as follows: in the civil engineering structure work progress, the embedded board 5 in syndeton 2 is located and is embedded in civil engineering structure 8.Civil engineering structure 8 just should according to the position of module 1 and the good embedded board 5 of column 3 position design, be located the embedded board 5 in syndeton 2 as a link of civil engineering structure construction in the civil engineering structure construction and be embedded into civil engineering structure 8 in design process.After embedded board 5 is imbedded, then square tube sleeve pipe 4 is welded on embedded board 5; Also can first square tube sleeve pipe 4 be welded on embedded board 5, then the square tube sleeve pipe 4 that will weld and embedded board 5 integral body are imbedded in civil engineering structure 8; Square tube sleeve pipe 4 and embedded board 5 are done as a wholely to complete in the civil engineering structure work progress.
Further, in module installation in position process, each column 3 of module is aimed at the square tube 4 of below, inserts in placely, tentatively realizes the in place of module.After module 1 is preliminary in place, utilizes the device such as jack to levelness and the verticality of module and the exact position be installed finely tune, after the accurate installation of module 1 is determined, with the joint portion of spot welding vertical columns 3 and square tube sleeve pipe 4.
According to designing requirement, square tube sleeve pipe 4 joint portions of the column 3 of module 1 and syndeton are welded, weld part is carried out touch-up paint, thereby complete smooth accurate positioning and installation work between module 1 and civil engineering structure 8.
The another kind of method of attachment that a kind of module 1 and civil engineering structure are 8 is as follows: in the civil engineering structure construction, the embedded board 5 in syndeton 2 is located and is embedded in civil engineering structure 8.Civil engineering structure 8 just should according to the position of module 1 and the good embedded board 5 of column 3 position design, be located the embedded board 5 in syndeton 2 as a link of civil engineering structure construction in the civil engineering structure construction and be embedded into civil engineering structure 8 in design process.
Further, in module installation in position process, according to module actual installation position, at first square tube sleeve pipe 4 is welded on embedded board 5, then each column 3 of module is aimed at the square tube 4 of below, inserts in placely, tentatively realizes the in place of module.After module 1 is preliminary in place, utilizes the device such as jack to levelness and the verticality of module and the exact position be installed finely tune, after the accurate installation of module 1 is determined, with the joint portion of spot welding vertical columns 3 and square tube sleeve pipe 4.Perhaps, also can be first in module installation in position process the position of preliminary adjusting post 3 in square tube sleeve pipe 4, column 3 is weldingly fixed in square tube sleeve pipe 4, and then adjust integral body after welding on embedded board 5 the position and be welded and fixed.
According to designing requirement, square tube sleeve pipe 4 joint portions of the column 3 of module 1 and syndeton are welded, weld part is carried out touch-up paint, thereby complete smooth accurate positioning and installation work between module 1 and civil engineering structure 8.
Embodiment two
As shown in Fig. 4~6, be an alternative embodiment of the invention, this syndeton 7 link blocks 1 and civil engineering structures 8, syndeton 7 are by being embedded in embedded board 5 in civil engineering structure 8, being welded in the boss 6 of embedded board 5, and the junction plate 9 that is welded on boss 6 forms.
Civil engineering structure work progress and module installation in position process are to carry out in the different construction stages, and the civil engineering structure work progress is to belong to prefabricated process in early stage, and module installation in position process belongs to the later stage installation process.As shown in Figure 6, in the civil engineering structure work progress, the embedded board 5 in syndeton 7 is located and is embedded in civil engineering structure 8.Civil engineering structure 8 just should according to the position of module 1 and the good embedded board 5 of column 3 position design, be located the embedded board 5 in syndeton 7 as a link of civil engineering structure construction in the civil engineering structure construction and be embedded into civil engineering structure 8 in design process.
Module 1 comprises module body and 4 columns 3 that are arranged on module body.As shown in Figure 4 and Figure 5, the junction plate 9 of boss 6 upper ends is connected by column 3 with module 1, and the area of plane of junction plate 9 is greater than the sectional area of column 3, and column 3 can be realized the fine setting on horizontal direction on junction plate 9.
Further, each column 3 of module is aimed at the syndeton 7 of below, and drops on junction plate 9, tentatively realizes the in place of module.
Further, in order to realize the fine setting of installation site on module 1 vertical direction, in the module docking operation, can polylith be arranged for the junction plate of installing, according to actual module setting height(from bottom) needs, suitably select the quantity of junction plate.Height according to actual needs, junction plate can increase by 1, more than 2 or 2.
In the civil engineering structure work progress, 1 junction plate welds with boss 6; In the module installation process, can add junction plate quantity the later stage, thereby change the height and position of column 3 in the vertical directions.
Column 3 is the mobile position adjustment that realizes on horizontal direction on junction plate 9, realizes the adjustment of upper-lower position by increasing junction plate quantity, thereby completes smooth docking the between module 1 and civil engineering structure 8, satisfies locational required precision.
The method of attachment that a kind of module 1 and civil engineering structure are 8 is as follows: in the civil engineering structure construction, the embedded board 5 in syndeton 2 is located and is embedded in civil engineering structure 8.Civil engineering structure 8 just should according to the position of module 1 and the good embedded board 5 of column 3 position design, be located the embedded board 5 in syndeton 2 as a link of civil engineering structure construction in the civil engineering structure construction and be embedded into civil engineering structure 8 in design process.After embedded board 5 is imbedded, then boss 6 is welded on embedded board 5, then with 1 junction plate 9 welded and installed on boss 6.Perhaps, first boss 6 is welded on embedded board 5, on boss 6, then the embedded board after welding 5 is imbedded in civil engineering structure 8 with 1 junction plate 9 welded and installed.Junction plate 9, boss 6 and embedded board 5 are done as a wholely to complete in the civil engineering structure work progress.
In module installation in position process, each column 3 of module is placed on the junction plate 9 of below, and on horizontal direction, its position of fine setting, tentatively realize the in place of module.After module 1 is preliminary in place, utilize the device such as jack to levelness and the verticality of module and the exact position be installed finely tune, adjust the height of vertical direction by the quantity that increases junction plate 9, junction plate 9 can add according to actual height position needs, and the junction plate 9 of increase is by being welded and fixed.
Further, after the accurate installation of module 1 is determined, with the joint portion of spot welding vertical columns 3 with junction plate 9.Weld part is carried out touch-up paint, thereby complete smooth accurate positioning and installation work between module 1 and civil engineering structure 8.
Another method of attachment that a kind of module 1 and civil engineering structure are 8 is as follows: in the civil engineering structure construction, the embedded board 5 in syndeton 2 is located and is embedded in civil engineering structure 8.Civil engineering structure 8 just should according to the position of module 1 and the good embedded board 5 of column 3 position design, be located the embedded board 5 in syndeton 2 as a link of civil engineering structure construction in the civil engineering structure construction and be embedded into civil engineering structure 8 in design process.
In module installation in position process, at first boss 6 is welded on embedded board 5, then with 1 junction plate 9 welded and installed on boss 6.Each column 3 of module is placed on the junction plate 9 of below, and on horizontal direction, its position of fine setting, tentatively realize the in place of module.After module 1 is preliminary in place, utilize the device such as jack to levelness and the verticality of module and the exact position be installed finely tune, adjust the height of vertical direction by the quantity that increases junction plate 9, junction plate 9 can add according to actual height position needs, and the junction plate 9 of increase is by being welded and fixed.Perhaps, in module installation in position process, at first 1 junction plate 9 is on each column 3, utilize the device such as jack to levelness and the verticality of module and the exact position be installed finely tune, adjust the height of vertical direction by the quantity that increases junction plate 9, then boss 6 is welded to connect on junction plate, the position of horizontal adjustment integral body on embedded board 5 is weldingly fixed on boss 6 on embedded board 5 at last.
Further, after the accurate installation of module 1 is determined, with the joint portion of spot welding vertical columns 3 with junction plate 9.Weld part is carried out touch-up paint, thereby complete smooth accurate positioning and installation work between module 1 and civil engineering structure 8.
The above is described embodiments of the invention by reference to the accompanying drawings; but the present invention is not limited to the above-mentioned specific embodiment; the above-mentioned specific embodiment is only schematic; rather than restrictive; those of ordinary skill in the art is under enlightenment of the present invention; not breaking away from the scope situation that aim of the present invention and claim protect, also can make a lot of forms, within these all belong to protection of the present invention.

Claims (4)

1. the syndeton between a module and civil engineering structure, its characteristics be, comprises being embedded in the embedded board in described civil engineering structure and being arranged on installed base on described embedded board; Described module comprises a plurality of columns that coordinate with described installed base for described module installation; Described column is arranged on the described installed base of a plurality of correspondences with level and up-down adjustment;
Described installed base comprises and is fixedly mounted on the boss on described embedded board and is arranged on described boss for the fixing junction plate of described column;
The described junction plate area of plane is greater than described column sectional area; The quantity of described junction plate is at least 1, during the described junction plate of polylith, and wherein 1 described junction plate and described boss welding, other described junction plate is used for changing the height of described column in the vertical direction.
2. the method for attachment of the module of a claim 1 and the syndeton between civil engineering structure, is characterized in that, comprises the following steps:
S1: embedded board is embedded in civil engineering structure;
S2: installed base is fixed on embedded board;
S3: level, adjust the position of each column on corresponding installed base up and down, change the height of column in the vertical direction by the quantity that increases junction plate, thereby realize adjusting up and down;
S4: column is fixed on installed base.
3. the method for attachment of the syndeton between module according to claim 2 and civil engineering structure, its characteristics are, the carrying out order of described step is: first carry out described step S1, order is carried out step S2, S3 and S4 step again, perhaps, first carry out described step S2, then order is carried out step S1, S3 and S4.
4. the method for attachment of the syndeton between module according to claim 3 and civil engineering structure, its characteristics be, the carrying out order of described step is: first carry out described step S1, then order is carried out step S3, S4 and S2.
CN 201010240450 2010-07-26 2010-07-26 Connection structure between module and civil work structure and connection method thereof Active CN101914950B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010240450 CN101914950B (en) 2010-07-26 2010-07-26 Connection structure between module and civil work structure and connection method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010240450 CN101914950B (en) 2010-07-26 2010-07-26 Connection structure between module and civil work structure and connection method thereof

Publications (2)

Publication Number Publication Date
CN101914950A CN101914950A (en) 2010-12-15
CN101914950B true CN101914950B (en) 2013-06-19

Family

ID=43322572

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010240450 Active CN101914950B (en) 2010-07-26 2010-07-26 Connection structure between module and civil work structure and connection method thereof

Country Status (1)

Country Link
CN (1) CN101914950B (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201495556U (en) * 2009-09-03 2010-06-02 中国建筑第四工程局有限公司 Structure for quickly hoisting and centering base of large steel frame
CN101280560B (en) * 2008-05-15 2010-06-16 广州市建筑集团有限公司 Lattice pillar component and mounting method thereof
CN201794165U (en) * 2010-07-26 2011-04-13 中广核工程有限公司 Connecting structure between module and civil engineering structure

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008067598A1 (en) * 2006-12-05 2008-06-12 In2Image Pty Ltd Bracket for spigot or telescoping type joints between members

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101280560B (en) * 2008-05-15 2010-06-16 广州市建筑集团有限公司 Lattice pillar component and mounting method thereof
CN201495556U (en) * 2009-09-03 2010-06-02 中国建筑第四工程局有限公司 Structure for quickly hoisting and centering base of large steel frame
CN201794165U (en) * 2010-07-26 2011-04-13 中广核工程有限公司 Connecting structure between module and civil engineering structure

Also Published As

Publication number Publication date
CN101914950A (en) 2010-12-15

Similar Documents

Publication Publication Date Title
CN204040056U (en) A kind of location and installation support of pre-embedded anchoring bolts
CN202194244U (en) Positioning support for embedding of ultra-high steel-work pedestals
CN103669883B (en) Installation and adjustment method of combined shock insulation support
CN103526954B (en) Construction method of overweight precision embedded part
CN201723388U (en) Foundation ring fixing support for connecting foundation and tower of wind-driven generator
CN101806069B (en) Integrated fixation and installation method for bolt
KR20100087981A (en) Jig for fixing anchor bolt and construction method of support for solar power plant
CN101864840B (en) Construction method for spatial special multi-curved surface netlike shell formed by connecting gusset plates
CN101705693A (en) Method for integrally fixing and installing foundation bolts with large diameter
CN103031892B (en) Steel truss brace and manufacturing method for steel truss platform
CN202081427U (en) Embedded bolt positioning device for tower crane foundation
CN101914950B (en) Connection structure between module and civil work structure and connection method thereof
CN201794165U (en) Connecting structure between module and civil engineering structure
CN212452310U (en) First section steel anchor box positioning accuracy adjusting device of cable-stay bridge
CN202808704U (en) Auxiliary device for mounting lower spray tube of coke oven
CN113794430B (en) Photovoltaic support upright post and prestressed pipe pile connecting system and working method thereof
CN207633357U (en) Charge station assembling type base
CN217810530U (en) Oblique steel column base positioner
CN203879041U (en) Embedded plate positioning support frame
CN207210977U (en) A kind of fixation of Change of Hanger Rods of Tied Arch Bridge, levelling device
CN104328795A (en) Locator for tower frame connection stand bar and mounting foundation bolt and using method of locator for tower frame connection stand bars and mounting foundation bolts
CN212026316U (en) Foundation bolt fixing device
CN203008232U (en) Steel truss strut
CN207672599U (en) A kind of foundation bolt mounting tool
CN102444276B (en) Auxiliary adjusting method for hydraulic climbing template

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 518023 No. 69 Shennan Middle Road, Shenzhen, Guangdong, Futian District

Co-patentee after: CHINA GENERAL NUCLEAR POWER Corp.

Patentee after: CHINA NUCLEAR POWER ENGINEERING Co.,Ltd.

Address before: 518023 No. 69 Shennan Middle Road, Shenzhen, Guangdong, Futian District

Co-patentee before: CHINA GUANGDONG NUCLEAR POWER GROUP Co.,Ltd.

Patentee before: CHINA NUCLEAR POWER ENGINEERING Co.,Ltd.

CP01 Change in the name or title of a patent holder