CN101806069B - Integrated fixation and installation method for bolt - Google Patents

Integrated fixation and installation method for bolt Download PDF

Info

Publication number
CN101806069B
CN101806069B CN201010148825XA CN201010148825A CN101806069B CN 101806069 B CN101806069 B CN 101806069B CN 201010148825X A CN201010148825X A CN 201010148825XA CN 201010148825 A CN201010148825 A CN 201010148825A CN 101806069 B CN101806069 B CN 101806069B
Authority
CN
China
Prior art keywords
bolt
channel
section steel
fixing frame
steel fixing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201010148825XA
Other languages
Chinese (zh)
Other versions
CN101806069A (en
Inventor
肖策
高有伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Tianjin Corp Ltd
Original Assignee
Tianjin MCC20 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin MCC20 Construction Co Ltd filed Critical Tianjin MCC20 Construction Co Ltd
Priority to CN201010148825XA priority Critical patent/CN101806069B/en
Publication of CN101806069A publication Critical patent/CN101806069A/en
Application granted granted Critical
Publication of CN101806069B publication Critical patent/CN101806069B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention discloses an integrated fixation and installation method for a bolt, which comprises the following steps of: assembling U-steel with a bolt hole in pairs into a frame-shaped U-steel fixing mount; determining the central line of each edge and obviously marking the central line; mounting upright poles and cross bars of a rigid bracket on spot; welding the rigid bracket solidly; performing spot welding on a bonding strip preliminarily; horizontally placing the U-steel fixing mount on the cross bars, welding the U-steel fixing mount and the cross bars and fixing the two after the central line of the U-steel fixing mount is consistent with a pre-determined central line; allowing an embedded bolt to penetrate a bolt hole at the bottom; adjusting the height of the top end by using a nut for leveling the top end; bonding and fixing the whole body by using the bonding strip after the alignment is performed completely and the measurement and re-checking show no error. The integrated fixation and installation method for the bolt is simple, feasible, high in efficiency and reliable in construction equality, can be performed under a plurality of conditions and increase the working efficiency by at least four times, greatly saves cost and improves production efficiency.

Description

Integrated fixation and installation method for bolt
Technical field
The present invention relates to the method for construction in a kind of Equipment Foundations work progress, specifically, relate to a kind of method of construction that the bolt overall fixed is installed.
Background technique
In the metallurgical industry engineering construction, along with the control of country to metallurgical industry size, low-producing construction project was restricted or controlled present stage.Because the metallurgical engineering scale that gets the Green Light is increasing, the equipment and the auxiliary facility that need just become increasingly complex, and corresponding construction technical requirement is more and more accurate, and the manipulator instrument is also more and more accurate, and therefore the installation precision to equipment requires also more and more higher.One of them performance is, the bolt of engineering equipment base increases thereupon, the corresponding increase of bolt quantity, the pre-buried required precision of bolt is higher, national regulation requires the deviation precision to be controlled in the 2mm to the civil engineering pre-embedded bolt, and the production of import equipment and installation producer often require the precision of bolt higher, so the civil engineering difficulty strengthens.
Conventional bolt method is: single bolt is installed respectively one by one, the welding fixing frame, and use theodolite etc. to carry out location work; On fixing frame, determine the bolt center, and use the punching pin punctum, thick bolt is hung in the relevant position with crane, preliminary centering bolt tip position, the centering perpendicularity makes deviation in allowed band again, in the bottom drawknot bar is welded on the fixing frame then, makes it firm.Use theodolite and messenger wire to weigh down relative position, absolute altitude and the perpendicularity of secondary calibration bolt afterwards, after calibrated affirmation size is errorless, use rigid material at two different direction that the lower end welding is fixing, secondary is proofreaied and correct again, and fixed top, finally be bolted on the fixing frame.
Conventional bolt installation steps are: fixing frame blanking, preliminary welding, measurement and positioning, each bolt all need be finished installation through preliminary installation, bolt level, vertical position adjustment, installation check, calibration, fixing frame welding.When utilizing the said method construction, it is poor that bolt is installed validity, and quality does not guarantee.Need to measure the engineer and do a large amount of check coordinate and elevation work, long construction period, labor intensity is big, and the cost of labour expenditure is many.The steel material that fixing bolt needs is many, and the not assurance of its strength and stiffness, and concreting very easily exerts an influence to the vibration of bolt, causes the bolt relative position to change easily, installs to equipment and brings difficulty.
Summary of the invention
The technical problem to be solved in the present invention provide a kind of simple and easy to do, efficient is high, reliable construction quality, and the integrated fixation and installation method for bolt that can under multiple condition, construct, work efficiency can improve four times at least after adopting the method, has saved cost greatly, has improved manufacturing efficiency.
In order to solve the problems of the technologies described above, the present invention is achieved by following technological scheme:
A kind of integrated fixation and installation method for bolt, form by following steps successively:
A. on channel-section steel, open bolt hole according to the diameter of need pre-embedded bolt;
B. according to the setting-out size, with channel-section steel material group to being assembled into the channel-section steel fixing frame of shaped as frame;
C. carry out the division of center line on each limit and make the visible marking for the good channel-section steel fixing frame of assembly unit;
D. on-the-spot rigid support vertical rod and the cross bar installed, with vertical rod and cross bar firm welding, preliminary spot welding drawknot bar;
E. on cross bar, keep flat the channel-section steel fixing frame, the center line that makes the channel-section steel fixing frame and design reserve center line consistent after, the channel-section steel fixing frame is weldingly fixed on the cross bar;
F. every pre-embedded bolt passes from the bottom bolt hole of channel-section steel fixing frame, and the top utilizes nut to carry out absolute altitude and regulates levelling;
G. treat whole centerings and measure check errorless after, use the drawknot bar to carry out whole drawknot to the channel-section steel fixing frame and fix, guarantee channel-section steel fixing frame monolithic stability.
Wherein, the aperture of the bolt hole among the step a is than the big 1mm of diameter of pre-embedded bolt.
The invention has the beneficial effects as follows:
(1) the present invention adopts bolt overall fixed construction method of installation, utilize hole-drilled channel-section steel fixing frame, bolt is pierced in the hole, and disposable centering and adjustment add the fixing bolt bottom and just can finish the installation of bolt overall fixed, convenient and swift, reduced labor intensity to a great extent, improved working efficiency, artificial less investment, expense reduces, and has saved human and material resources and financial resources.
(2) the present invention can make bolt installation precision integral body be improved, not only utilizing nut to carry out absolute altitude in vertical direction regulates, and substantially horizontal top is fixed by channel-section steel, the bottom is carried out overall fixed with angle steel to bolt, raise labour efficiency than single, when concreting, can resist concrete impact force; The vibration that concrete vibrator produces and the interference in other external world have fully guaranteed the rigidity and the intensity of bolt frame, thereby have guaranteed construction quality.
When (3) quantity of installing when bolt is big, the steel material that method of the present invention needs still less, this is because need be to the fixing drawknot of four direction during single bolt; When bolt is installed in groups, this group bolt is carried out four direction overall fixed drawknot get final product, need not all fix one by one by every bolt, reduce steel material.
(4) bolt installation method of the present invention can be constructed under multiple condition, not only in industrial building engineering, use when plant bottom case is installed, can also in steel-structure factory building column foundation, petrochemical industry project, fix middle the use by base, even hot blast stove anchor bolt radius ratio is bigger, circular bolt can be cut into arc section with steel plate, and locating holes in the above, can obtain good result equally, raise labour efficiency.
Description of drawings
Fig. 1 is the elevation that the present invention passes through channel-section steel fixing frame overall fixed bolt;
Fig. 2 is the planimetric map of channel-section steel fixing frame used in the present invention;
Fig. 3 is the single bolt of the present invention installment state schematic representation on the channel-section steel fixing frame.
---1 channel-section steel fixing frame---2 vertical rod---3 among the figure: pre-embedded bolt
Cross bar---4 drawknot bars---5 bolts hole---6 hexagon nut---7
Embodiment
The present invention is described in further detail below in conjunction with drawings and Examples:
The invention discloses a kind of integrated fixation and installation method for bolt, utilize the channel-section steel material disposable that many bolt in groups are firm, guarantee the once pre-buried precision of bolt.
As shown in Figure 1, for present embodiment, at first, through lathe auger shell keyhole 6 on the 10# channel-section steel, the quantity of bolt hole 6 amounts to 10, opens bolt hole 6 according to pre-embedded bolt 1 quantity on the general channel-section steel, and the diameter decision is the amount doesn't matter.Bolt hole 6 apertures require the aperture to be not more than 1mm than the diameter of pre-embedded bolt 1 than the big 1mm of pre-embedded bolt 1 diameter usually.
The channel-section steel that has bored bolt hole 6 is carried out pre-assembly unit according to designing requirement, and four channel-section steels weld an integral body, are assembled into the channel-section steel fixing frame 2 of shaped as frame, as shown in Figure 2.
The good channel-section steel fixing frame 2 of assembly unit is carried out the division of center line and makes the visible marking on each limit, that is to say, the line of centres of 2 liang of groups of described channel-section steel fixing frame opposite side is made the visible marking.
The concrete making step of above-mentioned channel-section steel fixing frame 2 is as follows:
1. consider the loss of channel-section steel, rationally carry out channel-section steel blanking assembly unit work; 2. need the diameter of pre-embedded bolt 1 to carry out the preliminary setting-out of steel plate according to this group; 3. check errorless after, on channel-section steel, open bolt hole 6, require the aperture to be not more than 1mm than pre-embedded bolt 1 diameter; 4. according to the setting-out size, with each channel-section steel material be grouping, assembly unit; 5. after the assembly unit each bolt position is accurately located; 6. after opening bolt hole 6, carry out exhaustive test once more, errorless after, carry out on-the-spot pre-embedded bolt 1 installment work.
After the good channel-section steel fixing frame 2 of assembly unit, rigid support vertical rod 3 and cross bar 4 are installed at the scene, with vertical rod 3 and cross bar 4 firm welding, and preliminary spot welding drawknot bar 5;
On cross bar 4, keep flat channel-section steel fixing frame 2 then, the center line that makes channel-section steel fixing frame 2 and design reserve center line consistent after, channel-section steel fixing frame 2 is weldingly fixed on the cross bar 4;
As shown in Figure 3, the bottom bolt hole 6 of every pre-embedded bolt 1 from channel-section steel fixing frame 2 passed, the top utilizes hexagon nut 7 to carry out absolute altitude and regulates levelling again;
At last, all centerings and measuring check errorless after, use drawknot bars 5 to carry out whole drawknot to channel-section steel fixing frame 2 and fix, guarantee channel-section steel fixing frame 2 monolithic stabilities.
It should be noted that in construction the size of channel-section steel fixing frame 2 is indefinite, therefore, the size of used channel-section steel model depends on diameter, weight and the size of institute's pre-embedded bolt 1.
Although in conjunction with the accompanying drawings the preferred embodiments of the present invention are described above; but the present invention is not limited to above-mentioned embodiment; above-mentioned embodiment only is schematic; be not restrictive; those of ordinary skill in the art is under enlightenment of the present invention; not breaking away under the scope situation that aim of the present invention and claim protect, can also make the concrete conversion of a lot of forms, these all belong within protection scope of the present invention.

Claims (2)

1. an integrated fixation and installation method for bolt is characterized in that, is made up of following steps successively:
A. on channel-section steel, open bolt hole according to the diameter of need pre-embedded bolt;
B. according to the setting-out size, with channel-section steel material group to being assembled into the channel-section steel fixing frame of shaped as frame;
C. carry out the division of center line on each limit and make the visible marking for the good channel-section steel fixing frame of assembly unit;
D. on-the-spot rigid support vertical rod and the cross bar installed, with vertical rod and cross bar firm welding, preliminary spot welding drawknot bar;
E. on cross bar, keep flat the channel-section steel fixing frame, the center line that makes the channel-section steel fixing frame and design reserve center line consistent after, the channel-section steel fixing frame is weldingly fixed on the cross bar;
F. every pre-embedded bolt passes from the bottom bolt hole of channel-section steel fixing frame, and the top utilizes nut to carry out absolute altitude and regulates levelling;
G. treat whole centerings and measure check errorless after, use the drawknot bar to carry out whole drawknot to the channel-section steel fixing frame and fix, guarantee channel-section steel fixing frame monolithic stability.
2. a kind of integrated fixation and installation method for bolt according to claim 1 is characterized in that, the aperture of the bolt hole among the step a is than the big 1mm of diameter of pre-embedded bolt.
CN201010148825XA 2010-04-16 2010-04-16 Integrated fixation and installation method for bolt Active CN101806069B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010148825XA CN101806069B (en) 2010-04-16 2010-04-16 Integrated fixation and installation method for bolt

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010148825XA CN101806069B (en) 2010-04-16 2010-04-16 Integrated fixation and installation method for bolt

Publications (2)

Publication Number Publication Date
CN101806069A CN101806069A (en) 2010-08-18
CN101806069B true CN101806069B (en) 2011-07-06

Family

ID=42608011

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010148825XA Active CN101806069B (en) 2010-04-16 2010-04-16 Integrated fixation and installation method for bolt

Country Status (1)

Country Link
CN (1) CN101806069B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102425186B (en) * 2011-08-26 2014-02-05 中建钢构有限公司 Foundation bolt stock and manufacture method thereof
CN103669389A (en) * 2012-09-26 2014-03-26 上海宝冶集团有限公司 Corrugated pipe fixing method for positioning foundation bolt
CN102900098B (en) * 2012-11-14 2015-08-19 国家电网公司 Basis built-in fitting leveling construction technology
CN106006361A (en) * 2016-06-30 2016-10-12 中国五冶集团有限公司 Pre-buried bolt assembly
CN106498975B (en) * 2016-10-31 2018-09-14 五冶集团上海有限公司 Wet type paper machine room anchor bolt installation method
CN109162399B (en) * 2018-10-24 2024-06-18 湖南远大建工股份有限公司 Leveling device for prefabricated inverted ridge and leveling construction method of leveling device
CN112323846B (en) * 2020-11-27 2022-03-01 中国第十八冶金建设有限公司 Installation construction method of blast furnace hot blast stove foundation annular distribution embedded bolts
CN115126266A (en) * 2022-07-04 2022-09-30 中铁二十局集团第二工程有限公司 Construction method of embedded part

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2596170Y (en) * 2002-10-30 2003-12-31 莱芜钢铁集团有限公司 Positioning rack of pre-buried ground bolt
CN101307603A (en) * 2008-06-06 2008-11-19 中冶天工上海十三冶建设有限公司 Column base anchor bolt moving-out type fixing rack construction method

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6055125A (en) * 1983-08-31 1985-03-30 Toshiba Eng Constr Co Ltd Setter for foundation bolt for installing apparatus

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2596170Y (en) * 2002-10-30 2003-12-31 莱芜钢铁集团有限公司 Positioning rack of pre-buried ground bolt
CN101307603A (en) * 2008-06-06 2008-11-19 中冶天工上海十三冶建设有限公司 Column base anchor bolt moving-out type fixing rack construction method

Also Published As

Publication number Publication date
CN101806069A (en) 2010-08-18

Similar Documents

Publication Publication Date Title
CN101806069B (en) Integrated fixation and installation method for bolt
CN102561712B (en) Precise positioning frame for large steel columns and equipment foundation fixing bolts and construction method of precise positioning frame
CN101705693A (en) Method for integrally fixing and installing foundation bolts with large diameter
CN101266011A (en) Mounting device for preburying high precision major diameter anchor bolt and mounting method therefor
CN202577380U (en) Steel member perpendicularity correcting device for construction of upright column piles
CN207392771U (en) A kind of guide type steel column locator
CN106759943A (en) A kind of pre-assembled Anchor Bolts in Steel Column Bases structure
CN215594016U (en) Mounting structure of shock insulation support
JP5183606B2 (en) Unit structure of anchor bolt used for foundation construction of equipment and foundation construction method of equipment using it
CN111549815A (en) Steel structure foundation bolt pre-embedding construction method
KR20110049811A (en) Installation method of equipment and anchor member supporting mechanism and anchor bolt unit
CN106320186B (en) A kind of skewback embedded anchor bar positioning system and construction method
CN104863259A (en) Upside-down construction method for large-span ultra-high signal-layer cylindrical architectural steel structure
CN115821753A (en) Precision positioning method for main tower cable guide pipe of cable-stayed bridge
CN202381269U (en) Adjusting device of mounting levelness of basic ring of wind driven generator
CN109252526A (en) Assembled support construction technique based on prestressing force fish belly sill support technology
CN115341475A (en) Steel anchor box positioning and mounting method
CN110144927B (en) Device for embedding foundation bolt group
CN113323404A (en) Installation method of integrated steel truss
CN106988293B (en) A kind of ship lift main equipment room steel lattice column construction method and installation accuracy control method
CN201187666Y (en) Apparatus for mounting built-in high precision large diameter anchor bolt
CN201778495U (en) Jig frame for overhead assembly of large-span truss
JP6454591B2 (en) Construction method of seismic isolation foundation
CN216041780U (en) Independent foundation column base anchor bolt positioning sleeve frame
CN215618974U (en) Embedded rib positioning system for square pier stud bearing platform of assembly type

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP03 Change of name, title or address

Address after: 300301 Dongli District, flawless Street Jintang Highway Bridge No. ten

Patentee after: MCC TIANGONG GROUP TIANJIN CO., LTD.

Address before: 300301, Tanggu District, Tianjin twenty Street flawless

Patentee before: Tianjin MCC20 Construction Co., Ltd.