JP5183606B2 - Unit structure of anchor bolt used for foundation construction of equipment and foundation construction method of equipment using it - Google Patents

Unit structure of anchor bolt used for foundation construction of equipment and foundation construction method of equipment using it Download PDF

Info

Publication number
JP5183606B2
JP5183606B2 JP2009225909A JP2009225909A JP5183606B2 JP 5183606 B2 JP5183606 B2 JP 5183606B2 JP 2009225909 A JP2009225909 A JP 2009225909A JP 2009225909 A JP2009225909 A JP 2009225909A JP 5183606 B2 JP5183606 B2 JP 5183606B2
Authority
JP
Japan
Prior art keywords
anchor bolt
template
nut
anchor
unit structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2009225909A
Other languages
Japanese (ja)
Other versions
JP2011074632A (en
Inventor
悠史 金子
良平 宮原
澄人 前澤
賢亮 森田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi GE Nuclear Energy Ltd
Original Assignee
Hitachi GE Nuclear Energy Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi GE Nuclear Energy Ltd filed Critical Hitachi GE Nuclear Energy Ltd
Priority to JP2009225909A priority Critical patent/JP5183606B2/en
Publication of JP2011074632A publication Critical patent/JP2011074632A/en
Application granted granted Critical
Publication of JP5183606B2 publication Critical patent/JP5183606B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)

Description

本発明は、各種プラントにおける電気品やポンプのような大型機器を据付ける基礎の施工方法とその施工方法に用いられるアンカーボルトのユニット構造に係る。   The present invention relates to a foundation construction method for installing large equipment such as electric appliances and pumps in various plants, and an anchor bolt unit structure used in the construction method.

特許文献1には、主柱で支持されたデッキ部にタービンおよび発電機を配置し、基礎ボルトで固定させるタービン発電機の基礎台が開示されている。そして、施工手順については、特許文献1の段落番号0020〜0035に詳細な記載があるが、段落番号0036には、基礎台の主柱をSC構造等で予めモジュールにブロック化しておき、その主柱を組み立て、デッキ部を装着させることで、工期短縮とコスト低減に加えて、作業者の労力軽減を図ること、が示されている。   Patent Document 1 discloses a turbine generator base platform in which a turbine and a generator are arranged on a deck portion supported by a main pillar and fixed with foundation bolts. As for the construction procedure, there are detailed descriptions in paragraph numbers 0020 to 0035 of Patent Document 1. In paragraph number 0036, the main pillar of the foundation is previously blocked into a module with an SC structure or the like. In addition to shortening the construction period and reducing the cost by assembling the pillar and attaching the deck part, it is shown that the labor of the worker is reduced.

しかし、特許文献1には、タービン基礎のデッキ部に基礎ボルトをデッキ部へ予め工場で組み込んだユニット(モジュール)を現地設定する方法が明示されているが、タービン基礎に特有なユニット構成を提案していて汎用性のあるユニットは明示されていない。   However, Patent Document 1 discloses a method for setting a unit (module) in which a foundation bolt is pre-installed in a factory on a deck of a turbine foundation in the factory, but a unit configuration unique to the turbine foundation is proposed. The universal unit is not specified.

特許文献2には、原子力プラントの燃料プールの基礎部構築の施工方法が開示されている。その施工順序については、その特許請求の範囲の請求項1に記載のとおり、基礎面の上方に下端筋を組み込み後、支持架台を基礎面に設置、…(途中省略)…予めユニット化したアンカーボルト・ターンバックルを取り付けて、1次コンクリートを打設、次いで2次コンクリートを打設することが示されています。   Patent Document 2 discloses a construction method for constructing a foundation of a fuel pool of a nuclear power plant. As for the construction sequence, as described in claim 1 of the claims, after installing the bottom bar above the foundation surface, the support frame is installed on the foundation surface. It is shown that bolts and turnbuckles are installed and primary concrete is cast and then secondary concrete is cast.

しかし、特許文献2にはアンカーボルトとターンバックルのユニット化が示されているに過ぎない。即ち、据付けや搬入に係る作業をアンカーボルト一本ごとに行う手間を省き、またユニット組み立て時にボルトの垂直度,ピッチ等を調整しておくことで搬入後の調整作業を簡略化するという内容を特許文献2は明示するものではありません。   However, Patent Document 2 only shows unitization of an anchor bolt and a turnbuckle. In other words, it eliminates the trouble of performing work related to installation and carry-in for each anchor bolt, and simplifies the adjustment work after carrying in by adjusting the verticality, pitch, etc. of the bolts when assembling the unit. Patent Document 2 is not specified.

特開2006−104683号公報JP 2006-104683 A 特開平7−217249号公報JP 7-217249 A

現在、各種プラントの建設工程、特に原子力プラントの建設工程は環境問題などの社会情勢から短縮化の一途をたどっている。その中で機器据付に用いられるアンカーボルトの搬入・設定作業は、そのアンカーボルトの本数も多く、多数の作業員及び工数が必要となるなど建築工程をディスターブする要因となっている。そのため、各種プラントの建設工程においては、機器据付に用いられるアンカーボルトの据付け工程の短縮化が大きな課題となっている。   At present, the construction process of various plants, especially the construction process of a nuclear power plant, is continually being shortened due to social circumstances such as environmental problems. Among them, the installation and setting work of anchor bolts used for equipment installation is a factor that disturbs the construction process, such as the large number of anchor bolts, which requires a large number of workers and man-hours. Therefore, in the construction process of various plants, shortening the installation process of the anchor bolt used for equipment installation has become a big issue.

そして、アンカーボルトを包含したユニットを用いて工程短縮を図る場合には、プラントの機器据付け床構造や据付け機器のアンカーボルトの配置位置は多種多様であるから、アンカーボルトを含むユニット化に際しては、床構造や据付け機器のアンカーボルトの配置位置に柔軟に対応できる汎用性のあるユニット構成による汎用性のある施工方法であることが要請される。   And, when trying to shorten the process using a unit that includes an anchor bolt, since there are a wide variety of plant equipment installation floor structures and installation equipment anchor bolt placement positions, when unitizing including an anchor bolt, There is a demand for a versatile construction method with a versatile unit configuration that can flexibly correspond to the floor structure and the location of anchor bolts in installation equipment.

従って、本発明の目的は、汎用性があって、工程が短縮可能な機器基礎の施工方法を提供すること、及びその施工方法に用いるのに好適なアンカーボルトのユニット構造物を提供することにある。   Accordingly, an object of the present invention is to provide an equipment foundation construction method that is versatile and that can shorten the process, and to provide an anchor bolt unit structure suitable for use in the construction method. is there.

本発明の目的を達成するための代表的なアンカーボルトのユニット構造物は、複数のアンカーボルトと、前記アンカーボルトを通したテンプレートと、前記アンカーボルト同士間を連結固定した中間締結サポートと、前記アンカーボルトに設けたシャープレートと、前記アンカーボルトに螺合させたナットと、前記ナットと前記テンプレートの間に設けたナットの廻り止め手段と、前記アンカーボルトは、複数本のアンカーボルトを長ナットで一連に連結して前記長ナット内への前記アンカーボルトのねじ込み深さを調節自在とし、前記長ナットと前記中間締結サポートとを連結して、前記アンカーボルトに前記中間締結サポートを前記長ナットを介して間接的に連結してあることを特徴としたものである。
A typical anchor bolt unit structure for achieving the object of the present invention includes a plurality of anchor bolts, a template through which the anchor bolts are passed, an intermediate fastening support in which the anchor bolts are connected and fixed, and A shear plate provided on the anchor bolt, a nut threadedly engaged with the anchor bolt, a nut detent means provided between the nut and the template, and the anchor bolt includes a plurality of anchor bolts as a long nut To connect the long nut and the intermediate fastening support, and connect the intermediate fastening support to the anchor bolt and the long nut. It is characterized by being indirectly connected through the .

また、本発明の目的を達成するための代表的な施工方法は、テンプレートに複数のアンカーボルトを通してナットでテンプレートと前記アンカーボルトとを仮固定し、前記アンカーボルト同士間を固定治具を介して中間締結サポートで連結固定し、前記ナットと前記テンプレートの間に前記ナットの廻り止めを施し、前記アンカーボルトにシャープレートを装着して全体を一ユニットにしたアンカーボルトのユニット構造物を製作し、機器の据付位置の下方に予め設けられたユニット支持架台へ前記アンカーボルトのユニット構造物を一括して搬入及び据付し、しかる後に、前記テンプレートを撤去して基礎台鉄筋を施工して前記基礎台鉄筋を埋設するようにコンクリートを打設する機器の基礎施工方法である。   In addition, a typical construction method for achieving the object of the present invention is to temporarily fix the template and the anchor bolt with a nut through a plurality of anchor bolts to the template, and a gap between the anchor bolts via a fixing jig. Connected and fixed with an intermediate fastening support, the nut is stopped between the nut and the template, a shear plate is attached to the anchor bolt to produce a unit structure of an anchor bolt that is made into a single unit, The anchor bolt unit structure is collectively loaded and installed on a unit support base provided in advance below the installation position of the equipment, and then the template is removed to construct the base support bar and the base base. It is a foundation construction method for equipment that casts concrete so as to embed rebar.

本発明の機器の基礎施工方法によれば、アンカーボルトの据付精度の調整をアンカーボルトのユニット構造物の製作時に行うことが可能となる上、その製作作業は設備の整った工場にて行う事が可能となるため、施工現場の工程をディスターブする要因とならない。また複数のアンカーボルトと、テンプレートと、中間締結サポートと、シャープレートと、ナット類とを、ナットの廻り止め手段との多数の構成メンバーを一ユニットとして据付け位置に一括して搬入し、据付作業をユニット単位で行うため、施工現場での作業員及び工数の削減がなされる。そのため、機器の基礎の施工工期の短縮が見込まれる。   According to the basic construction method for an apparatus of the present invention, it is possible to adjust the installation accuracy of the anchor bolt at the time of manufacturing the anchor bolt unit structure, and the manufacturing work should be performed in a factory equipped with equipment. Therefore, it is not a factor that disturbs the construction site process. In addition, multiple anchor bolts, templates, intermediate fastening supports, shear plates, nuts, and a number of structural members, including nut locking means, are brought together as a unit into the installation position and installed. Therefore, the number of workers and man-hours at the construction site is reduced. For this reason, the construction period of the foundation of the equipment is expected to be shortened.

さらには、アンカーボルトの配置位置を決めるテンプレートをユニットの構成メンバーにしているので、据付機器のアンカーボルトの配置位置に応じたテンプレートを用いることで各種の機器の基礎の建設に汎用性を発揮する。アンカーボルトのユニット構造は床などの周辺構造と切り離して独立して扱いながら施工するので、一層その汎用性が高く成る。   Furthermore, the template that determines the position of the anchor bolt is used as a component member of the unit. Therefore, the use of a template according to the position of the anchor bolt in the installation equipment will demonstrate versatility in the construction of various equipment foundations. . Since the anchor bolt unit structure is constructed while being handled separately from the surrounding structure such as the floor, the versatility is further enhanced.

本発明のアンカーボルトのユニット構造物によれば、記述のように機器の基礎の施工工期の短縮や汎用性の向上が達成できる施工方法に好適なユニット構造を提供できる。   According to the anchor bolt unit structure of the present invention, it is possible to provide a unit structure suitable for a construction method capable of shortening the construction period of the foundation of the equipment and improving versatility as described.

本発明の実施例1によるアンカーボルトのユニット構造物のRC型枠上据付け状態を示す立面図である。It is an elevation view which shows the installation state on the RC form of the unit structure of the anchor bolt by Example 1 of this invention. 本発明の実施例1によるプラントの建屋床構造施工からアンカーボルトのユニット構造物の床上据付け、及び機器据付けまでの手順の第1段階を示す立面図である。It is an elevation view which shows the 1st step of the procedure from the building floor structure construction of the plant by Example 1 of this invention to the floor installation of the unit structure of an anchor bolt, and apparatus installation. 同じく同上第2段階を示す立面図である。It is an elevational view showing the second stage of the same as above. 同じく同上第3段階を示す立面図である。It is an elevational view similarly showing the third stage. 同じく同上第4段階を示す立面図である。It is an elevational view similarly showing the fourth stage. 同じく同上第5段階を示す立面図である。It is an elevational view similarly showing the fifth stage. 同じく同上第6段階を示す立面図である。It is an elevational view similarly showing the sixth stage. 同じく同上第7段階を示す立面図である。It is an elevational view similarly showing the seventh stage. 同じく同上第8段階を示す立面図である。It is an elevational view similarly showing the eighth stage. 同じく同上第9段階を示す立面図である。It is an elevational view similarly showing the ninth stage. 同じく同上第10段階を示す立面図である。It is an elevational view similarly showing the tenth stage. 本発明の実施例1で採用したアンカーボルトのユニット構造物の斜視図である。It is a perspective view of the unit structure of an anchor bolt adopted in Example 1 of the present invention. 本発明の実施例1で採用したアンカーボルトのユニット構造物の組み立て手順の第1段階を示す立面図である。It is an elevation view which shows the 1st step of the assembly procedure of the unit structure of the anchor bolt employ | adopted in Example 1 of this invention. 同じく同上ユニット構造物の組み立て手順の第2段階を示す立面図である。It is an elevation view which similarly shows the 2nd step of the assembly procedure of a unit structure same as the above. 同じく同上ユニット構造物の組み立て手順の第3段階を示す立面図である。It is an elevation view which similarly shows the 3rd step of the assembly procedure of a unit structure same as the above. 同じく同上ユニット構造物の組み立て手順の第4段階を示す立面図である。It is an elevation view which similarly shows the 4th step of the assembly procedure of a unit structure same as the above. 本発明の実施例2によるアンカーボルトのユニット構造物のRC型枠上設定状態を示す立面図である。It is an elevation view which shows the RC formwork setting state of the unit structure of the anchor bolt by Example 2 of this invention. 本発明の実施例3によるアンカーボルトのユニット構造物のSCプレート上設定状態を示す立面図である。It is an elevation view which shows the setting state on the SC plate of the anchor bolt unit structure according to the third embodiment of the present invention. 本発明の実施例4によるアンカーボルトのユニット構造物の特殊な基礎形状への適用状態を示す立面図である。It is an elevation view which shows the application state to the special foundation shape of the unit structure of the anchor bolt by Example 4 of this invention. 本発明による機器の基礎の据付け現地作業手順のフロー図である。It is a flowchart of the field installation procedure of the foundation of the apparatus by this invention. 本発明のアンカーボルトのユニット構造物の工場内での製作手順のフロー図である。It is a flowchart of the manufacture procedure in the factory of the unit structure of the anchor bolt of this invention. 長さ調整可能なアンカーボルトを示す図にして、(A)図は全体外観図を、(B)図は長ナット部を断面にして表示した全体図を、(C)図はアンカーボルトの長さを最短にした状態を長ナット部を断面にして表示した全体図である。The figure shows an anchor bolt that can be adjusted in length. (A) is an overall external view, (B) is an overall view showing the long nut section in cross section, and (C) is the length of the anchor bolt. It is the whole figure which displayed the state which made the length the shortest, making the long nut part into a section.

本発明の実施形態は、機器の基礎の建設現地におけるテンプレート及びアンカーボルトの据付け・設定作業を簡略化する。すなわち設備の整った工場においてテンプレートとアンカーボルトを図12のようにユニット化する作業を行った後に建設現地に搬送することで、現地にて1本ごとのアンカーボルト据付け・設定工程を省いている。   Embodiments of the present invention simplify the installation and setting work of templates and anchor bolts at the construction site of equipment foundations. In other words, the process of unitizing the template and anchor bolts as shown in Fig. 12 is carried out in a well-equipped factory, and then transported to the construction site, eliminating the installation and setting process for each anchor bolt on site. .

アンカーボルトのユニット構造物は複数のアンカーボルト,据付ける機器のアンカーボルトの配置位置に対応して位置を決めてアンカーボルトの通し孔を設けたテンプレート,複数のアンカーボルト間を連結する中間締結サポート,アンカーボルトと中間締結サポートの結合のために用いられる固定治具,アンカーボルトに螺合させたナット及びアンカーボルトに取り付けたシャープレートからなる。   The anchor bolt unit structure consists of a plurality of anchor bolts, a template with anchor bolt through holes determined according to the position of the anchor bolts to be installed, and an intermediate fastening support that connects the anchor bolts. , A fixing jig used for coupling the anchor bolt and the intermediate fastening support, a nut screwed to the anchor bolt, and a shear plate attached to the anchor bolt.

アンカーボルトのユニット構造物の組み立ては作業環境や設備環境の整った工場にて行われる。その組み立ては、初めに据付ける機器のアンカーボルトの配置位置に対応してアンカーボルトの通し孔を加工したテンプレートを作業用の固定台に設置する。そのテンプレートには、アンカーボルトの配置位置の芯出しを行うための通し孔が加工されているのでそこにアンカーボルトを挿入し、アンカーボルト上端部が所定のレベルだけ突き出した状態でナットによりテンプレートとの仮固定を行う。   The assembly of the anchor bolt unit structure is carried out in a factory where the working environment and equipment environment are well-equipped. In the assembly, a template in which the through holes of the anchor bolts are processed corresponding to the positions of the anchor bolts of the equipment to be installed first is set on the work fixing base. The template has a through-hole for centering the position where the anchor bolt is placed. Insert the anchor bolt into the template, and the upper end of the anchor bolt protrudes to a predetermined level. Perform temporary fixing.

さらにアンカーボルト胴部に固定治具を取り付け、その固定治具を介してアンカーボルトと中間締結サポートを溶接することで各ボルトの鉛直度の調整状態を固定する。中間締結サポートはアンカーボルトへ機械的に固定された固定治具へ溶接することにより結合され、その結果、その溶接時の溶接熱影響が直接的にアンカーボルトに到達することが無く、アンカーボルトの溶接熱影響による劣化を防止でき、アンカーボルトの強度を保障できるようにしている。   Further, a fixing jig is attached to the anchor bolt body, and the vertical state of each bolt is fixed by welding the anchor bolt and the intermediate fastening support through the fixing jig. The intermediate fastening support is joined by welding to a fixing jig that is mechanically fixed to the anchor bolt. As a result, the influence of the welding heat during the welding does not directly reach the anchor bolt, and the anchor bolt Deterioration due to the influence of welding heat can be prevented, and the strength of the anchor bolt can be guaranteed.

テンプレートとナットとの間には、ナットの廻り止め溶接が施されて相互に固定される。その後に、シャープレートをアンカーボルト下端近傍の所定高さレベルに他のナットで固定する。上記各作業を工場にて行った後は、基礎の施工現地へ搬送する。   Between the template and the nut, non-rotating welding of the nut is performed and fixed to each other. Thereafter, the shear plate is fixed to a predetermined height level near the lower end of the anchor bolt with another nut. After performing each of the above operations at the factory, they are transported to the foundation construction site.

その搬送先の現地においては、機器を据付ける基礎を施工する所定位置の床のコンクリート打設底面上に基準芯より機器設定のための基準線を測定しておき、それを元に先の搬入されてきたアンカーボルトのユニット構造物を搭載するユニット支持架台の鉛直度,位置を調整して、そのユニット支持架台を鉄筋受架台に固定して立設しておく。   At the site of the transport destination, a reference line for setting the equipment is measured from the reference core on the concrete placement bottom surface of the floor at a predetermined position where the foundation for installing the equipment is constructed, and the previous carry-in is performed based on the measurement. By adjusting the verticality and position of the unit support base on which the anchor bolt unit structure that has been mounted is mounted, the unit support base is fixed and erected on the reinforcing bar base.

このように立設したユニット支持架台にアンカーボルトのユニット構造物を固定し、基礎台内の所定位置,所定レベルにアンカーボルトが配置されるようにする。   The anchor bolt unit structure is fixed to the unit support frame erected in this way, and the anchor bolt is arranged at a predetermined position and a predetermined level in the foundation.

その後に、床とその上の基礎台のコンクリートを打設してコンクリート強度がある程度出るまで養生してから廻り止めの溶接を削り取って廻り止めしていたナットを外してテンプレートを撤去する。   After that, the concrete on the floor and the foundation platform on the floor is placed and cured until the concrete strength reaches a certain level. Then, the welding of the detent is scraped off and the nut which has been deterred is removed and the template is removed.

その後に、基礎台の上面に必要な施工を加えて機器を基礎台上へアンカーボルトで締結固定し、機器の基礎台への据付を行う。   After that, necessary construction is added to the upper surface of the foundation, and the equipment is fastened and fixed to the foundation with anchor bolts, and the equipment is installed on the foundation.

このようにアンカーボルトのユニット構造物は、ユニット支持架台が完成する前に工場にて製作,施工現地に搬送しておくことで、現地においては搬送されて来たユニット構造物を一括して吊込み搬入し、位置の調整を行うのみで複数のアンカーボルトの据付けと設定作業が一括して完了となるため、現地での作業量を削減する事を可能とする。   In this way, the anchor bolt unit structure is manufactured and transported to the construction site at the factory before the unit support frame is completed, so that the unit structures that have been transported at the site are suspended together. It is possible to reduce the amount of work at the site because installation and setting of multiple anchor bolts are completed at once by simply carrying in and adjusting the position.

またアンカーボルトの鉛直度や配置ピッチの調整作業を工場にて行うため、現地での調整は据付け後の微調整で済み現地での作業効率の向上が見込まれる。   In addition, since the adjustment work of anchor bolt verticality and arrangement pitch is performed at the factory, on-site adjustments are fine adjustments after installation.

これらにより現地における作業人員,工数の削減が図れ、製作・据付けコストの削減及び工期の短縮も可能となる。   As a result, the number of workers and man-hours at the site can be reduced, and the production and installation costs can be reduced and the construction period can be shortened.

以下、本発明の一実施例を図に基づいて説明する。図1は本発明の実施例1の全体図で、原子力プラントにおける電気品やポンプなどの大型の機器を設置する建屋の階の床(階下から見た場合には天井壁に相当する)は完成後に撤去される型枠を用いての鉄筋コンクリート(RCと略称されている)構造で作られている。   Hereinafter, an embodiment of the present invention will be described with reference to the drawings. FIG. 1 is an overall view of Embodiment 1 of the present invention, and the floor of a building floor (which corresponds to a ceiling wall when viewed from the bottom) where large equipment such as electrical equipment and pumps in a nuclear power plant is installed is completed. It is made of a reinforced concrete (abbreviated as RC) structure using a formwork that is later removed.

その床は木製のRC型枠18上から図7の型枠18aの下面までの上下厚さを有している。この床内には鉄筋や鉄筋受架台13やスペーサー13aや側壁の鉄骨に接続されている水平な梁などが配置されていて、それらを埋設するようにコンクリートを打設すること(打コンと略称する)によってRC構造の床が構成されている。   The floor has a vertical thickness from the wooden RC form 18 to the lower surface of the form 18a in FIG. In this floor, there are reinforcing bars, reinforcing bar cradle 13, spacers 13a, horizontal beams connected to the side wall steel frames, etc., and concrete is placed so as to embed them (abbreviated as hammered concrete). The floor of the RC structure is configured.

大型の機器を設置する基礎は、床の上に上方へ突き出た形状にて基礎台12として建設施工されるものである。この基礎台12も基礎台鉄筋11を有するコンクリート造りとなっている。その基礎台12にアンカーボルトのユニット構造物が一部埋設されて据付けられることになる。   The foundation on which large equipment is installed is constructed and constructed as a foundation 12 in a shape protruding upward on the floor. This foundation 12 is also made of concrete having foundation reinforcement 11. A part of the anchor bolt unit structure is embedded in the foundation 12 and installed.

床の打コン底面はRC型枠18の上面に相当なるが、機器の据付け位置に直下に対応したRC型枠18の上面の位置にアンカーボルトのユニット構造物を基礎台12の高さに合わせて据付け設定した状態が図1で示されている。   The bottom surface of the floor hammer corresponds to the upper surface of the RC mold 18, but the unit structure of the anchor bolt is adjusted to the height of the foundation 12 at the position of the upper surface of the RC mold 18 corresponding to the installation position of the equipment. FIG. 1 shows the state of installation and setting.

以下に、その設定の手順やアンカーボルトのユニット構造物の組み立て手順を解説する。本実施例では、図20に示す基礎の施工現地における作業手順と、図21に示すアンカーボルトのユニット構造物の組み立て手順とに分かれ、それらの手順は並行して行われることが好ましいが、並行せずに行っても良い。   The following explains the setting procedure and the assembly procedure of the anchor bolt unit structure. In the present embodiment, the work procedure at the foundation construction site shown in FIG. 20 and the assembly procedure of the anchor bolt unit structure shown in FIG. 21 are divided, and these procedures are preferably performed in parallel. You can go without.

本実施例は、原子力プラントにおける電気品やポンプのような大型の機器を設置,固定するためのアンカーボルトを施工する際の施工方法の一つであり、そのアンカーボルトのユニット構造物は、図12のように、複数本のアンカーボルト1,機器の据付けに必要なアンカーボルトの配置位置に対応して同じ配置位置関係として開口した孔15(図13参照)を設けたテンプレート2,中間締結サポート3,固定治具4,シャープレート5及びシャープレート5を固定するナットをユニットの構成メンバーとしている。   This embodiment is one of the construction methods when constructing anchor bolts for installing and fixing large equipment such as electrical equipment and pumps in nuclear power plants. The unit structure of the anchor bolt is shown in the figure. As shown in FIG. 12, a plurality of anchor bolts 1, a template 2 provided with holes 15 (see FIG. 13) opened in the same arrangement positional relationship corresponding to the arrangement positions of anchor bolts necessary for equipment installation, and intermediate fastening support 3, fixing jig 4, shear plate 5, and nut for fixing shear plate 5 are used as constituent members of the unit.

アンカーボルトのユニット構造物の工場内での製作作業手順は以下のフロー(1)〜(7)の内容によって進められる。
フロー(1):ユニット製作作業用のテンプレート仮固定台8を設置し、テンプレート仮
固定台8上にテンプレート2を溶接にて固定する。(図13)
フロー(2):テンプレート2にはアンカーボルト1を挿入し芯出しを行うための孔15
が加工されているので、その孔15に予めナットを螺合して取り付けたア
ンカーボルト1を挿入する。(図14)
フロー(3):ナットとテンプレート2との仮固定を行いアンカーボルト1の上端部が所
定のレベルだけ突き出した状態に調整する。(図14)
フロー(4):各アンカーボルト1の姿勢が鉛直となるように鉛直度の調整を行い、中間
締結サポート3と各アンカーボルト1を締結する。ここで、アンカーボル
ト1の強度維持等の品質上、中間締結サポート3を直接アンカーボルト1
に溶接することができないので、固定治具4をアンカーボルト1の胴部へ
機械的に取り付け、中間締結サポート3をその固定治具4へ溶接で固定す
る手法を採る。(図15)
フロー(5):さらに鉛直度が保たれた状態でテンプレート2とナットとの間をナットの
廻り止め溶接14を行うことにより両者を固定する。(図16)
フロー(6):シャープレート5を、アンカーボルト1の下端近傍の所定高さレベルにて
別のナットで固定する。(図16)
フロー(7):上記各フローの作業完了後、アンカーボルトのユニット構造物が完成した
ことになるので、機器の据付け現地へ搬送する。
The manufacturing procedure of the anchor bolt unit structure in the factory proceeds according to the contents of the following flows (1) to (7).
Flow (1): A template temporary fixing base 8 for unit production work is installed, and the template temporary
The template 2 is fixed on the fixing base 8 by welding. (Fig. 13)
Flow (2): Hole 15 for inserting the anchor bolt 1 into the template 2 for centering
Is processed, so that the nut 15 is screwed into the hole 15 in advance.
Insert the anchor bolt 1. (Fig. 14)
Flow (3): The nut and the template 2 are temporarily fixed, and the upper end of the anchor bolt 1 is positioned.
Adjust so that only a certain level protrudes. (Fig. 14)
Flow (4): Adjust the verticality so that the posture of each anchor bolt 1 is vertical.
The fastening support 3 and each anchor bolt 1 are fastened. Where anchor bolt
The anchor bolt 1 is directly attached to the intermediate fastening support 3 for the quality maintenance of the
Can not be welded to the body of the anchor bolt 1
Install mechanically and fix the intermediate fastening support 3 to the fixing jig 4 by welding.
Take the technique. (Fig. 15)
Flow (5): Further, between the template 2 and the nut with the verticality maintained,
Both are fixed by carrying out detent welding 14. (Fig. 16)
Flow (6): The shear plate 5 is at a predetermined height level near the lower end of the anchor bolt 1
Secure with another nut. (Fig. 16)
Flow (7): After the completion of each flow, the anchor bolt unit structure was completed.
It will be transported to the installation site of the equipment.

上記のアンカーボルトのユニット構造物の製作及び搬送作業は、次から説明する機器の据付け現地における現地作業手順のフロー(8)までに完了できるよう時期を調整して工程管理を行うことが好ましい。   It is preferable to perform the process management by adjusting the timing so that the above-described anchor bolt unit structure production and transport work can be completed by the flow (8) of the field work procedure at the installation site of the equipment described below.

次に機器の据付け現地におけるアンカーボルトのユニット構造物を機器の据付け位置に合わせて据付ける作業について説明する。   Next, the operation of installing the anchor bolt unit structure at the installation site of the equipment in accordance with the installation position of the equipment will be described.

本実施例では、アンカーボルトのユニット構造物のほかに、ユニット支持架台柱部6aとユニット支持架台梁部6bからなるユニット支持架台6と、下端筋9,上端筋10,基礎台鉄筋11,鉄筋受架台13,スペーサー13a,支保工17,RC型枠18,型枠18a,モルタル材22,パッカープレート23等が必要となる。以下、図20に示すフロー図に基づいて据付け作業手順を説明する。
フロー(1) :打コンを行う所定エリアにおいては、機器が据付けられる階の床を建設
するために建設済の階下の床上から複数本の支保工17を立てて、支保
工17でRC型枠18を支持させる施工及び各基準芯の墨だしが完了し
ているものとする。(図2)
フロー(2) :各基準芯の測定を行い、使用に問題ないことを確認する。
フロー(3) :基礎図により機器設定基準寸法を確認し、各基準芯を元に機器設定基準
線の墨出しを行う。
フロー(4) :RC型枠18上に複数個のスペーサー13aを設定し、そのスペーサー
13a上に下端筋9を配筋して設定する。(図3)
フロー(5) :建屋の鉄骨に支持させた梁(図示せず)に鉄筋受架台13を固定し、ま
た、フロー(3)で墨出ししたRC型枠18上の機器設定基準線を元に
、RC型枠18上にユニット支持架台柱部6aを位置決めし、そのユニ
ット支持架台柱部6aを鉄筋受架台13との間での溶接で固定して立設
する。(図4)
フロー(6) :引き続いて、鉄筋受架台13上に上端筋10を配筋して設定する。
フロー(7) :ユニット支持架台柱部6a上にユニット支持架台梁部6bを固定する。
(図4)
フロー(8) :記述のアンカーボルトのユニット構造物の製作作業フローを完了して搬
送されてきたアンカーボルトのユニット構造物を設定位置の支持架台上
に搬入し、仮置きする。機器設定基準線を元に、X,Y座標の調整及び
高さレベル調整を行った後、コンクリート打設時の打設力でアンカーボ
ルトのユニット構造物が移動することを防止するために、アンカーボル
ト1の下端近傍に装着してあるシャープレート5とユニット支持架台梁
部6bとを互いに溶接で固定する。(図5)
フロー(9) :フロー(8)のように仮置きされたアンカーボルトのユニット構造物か
ら、ナットの廻り止め溶接14をグラインダー等で除去し、そのナット
を取り外した後に、テンプレート2をアンカーボルト1から取り外して
撤去しておく。(図6)
フロー(10):テンプレート2撤去後の各アンカーボルト1の鉛直度,高さレベル,配
置ピッチを検査し、各アンカーボルト1の据付け寸法が所定の公差内に
収まっていることをコンクリートの打設前に確認する。
フロー(11):ボルト上端部に保護キャップを被せる等してボルト上端部の養生作業を
行う。この養生作業はアンカーボルト1の損傷及びコンクリートの付着
,流入を防止するために行う。(図6)
フロー(12):コンクリートの打設前の各工事作業が完了したか点検を実施する。
フロー(13):基礎台12の鉄筋11の設定及び床と基礎台周囲の型枠18aの設定を
行う。(図7)
フロー(14):型枠18aの設定を完了した後に、床と基礎台の下半を一度に打コンす
る。打コン完了後、コンクリートが固化して所定の強度が発揮されるま
での所定の期間、そのコンクリートの養生を行い、その後に、基礎台型
枠18a及びRC型枠18並びに支保工17を取り外して撤去する。( 図8)
フロー(15):打コンしたコンクリート表面のレイタンス除去を行うために、その表面
のコンクリート層のチッピングを行い、基礎台12の打コン上面の高さ
調整及び基礎台の補強を行う。(図9)
フロー(16):次にパッカーの設定を行う。まずモルタル材22をパッカー設定位置に
盛り上げ、パッカーを形成する。パッカープレート23をパッカー上面
に置き、高さレベル及び水平度の調整を行い、養生して所定期間置く。
(図9)
フロー(17):アンカーボルト1及びパッカーの養生を解除し、機器24の基礎台12
に対する芯出し及び据付けを行う。据付けは、アンカーボルト1とナッ
トとにより行い、その後に、据付け検査を行い、問題なければグラウト
用の型枠18bを基礎台の周囲に設定する。(図10)
フロー(18):グラウト用の型枠18bの設定後にグラウトを行い、グラウトした表面
を平滑に整えた後に養生し、所定の養生期間をおいてグラウト用の型枠
18b及び養生を解除する。(図11)
In this embodiment, in addition to the anchor bolt unit structure, a unit support frame 6 including a unit support frame column portion 6a and a unit support frame beam portion 6b, a lower bar 9, an upper bar 10, a foundation bar 11, and a reinforcing bar The cradle 13, the spacer 13a, the supporter 17, the RC mold 18, the mold 18a, the mortar material 22, the packer plate 23, and the like are required. Hereinafter, the installation procedure will be described based on the flowchart shown in FIG.
Flow (1): In the designated area where the hammering is performed, construct the floor on the floor where the equipment will be installed
In order to do this, a plurality of supporters 17 are set up on the floors of the already constructed lower floors.
The construction to support the RC formwork 18 with the work 17 and the ink marking of each reference core are completed.
It shall be. (Figure 2)
Flow (2): Measure each reference core and confirm that there is no problem in use.
Flow (3): Check the equipment setting reference dimensions based on the basic drawing, and set the equipment setting standards based on each reference core.
Perform line marking.
Flow (4): A plurality of spacers 13a are set on the RC form 18, and the spacers
The lower end reinforcement 9 is arranged on 13a and set. (Figure 3)
Flow (5): The reinforcing bar 13 is fixed to a beam (not shown) supported by the steel frame of the building.
Also, based on the equipment setting reference line on the RC formwork 18 drawn out in the flow (3)
The unit support gantry post 6a is positioned on the RC formwork 18, and the unit
The support support column 6a is fixed by welding between the reinforcing bar support 13 and standing.
To do. (Fig. 4)
Flow (6): Subsequently, the upper end bars 10 are arranged on the reinforcing bar 13 and set.
Flow (7): The unit support frame beam portion 6b is fixed on the unit support frame column portion 6a.
(Fig. 4)
Flow (8): Complete the production work flow of the anchor bolt unit structure described and carry it
The anchor bolt unit structure that has been sent is placed on the support base at the set position.
Carry in and place temporarily. Based on the equipment setting reference line, adjustment of X and Y coordinates and
After adjusting the height level, the anchor
To prevent the unit structure from moving,
Shear plate 5 and unit support base beam mounted near the lower end of G
The part 6b is fixed to each other by welding. (Fig. 5)
Flow (9): Is the anchor bolt unit structure temporarily placed as in flow (8)?
Then, remove the nut detent weld 14 with a grinder, etc.
Remove the template 2 from the anchor bolt 1 after removing
Remove it. (Fig. 6)
Flow (10): Verticalness, height level and arrangement of each anchor bolt 1 after the template 2 is removed
The installation pitch is inspected, and the installation dimensions of each anchor bolt 1 are within the specified tolerance.
Confirm that it is in place before placing concrete.
Flow (11): Cover the top of the bolt with a protective cap, etc.
Do. This curing work is caused by damage to the anchor bolt 1 and adhesion of concrete.
, To prevent inflow. (Fig. 6)
Flow (12): Inspect whether each construction work before placing concrete is completed.
Flow (13): Setting of the reinforcing bar 11 of the base 12 and setting of the form 18a around the floor and the base
Do. (Fig. 7)
Flow (14): After completing the setting of the mold 18a, hit the floor and the lower half of the foundation base at once.
The After completion of hammering, the concrete will solidify until the specified strength is exhibited.
Curing the concrete for a predetermined period in the
The frame 18a, the RC form 18 and the support 17 are removed and removed. (Figure 8)
Flow (15): The surface of the concrete surface subjected to hitting to remove the latency.
Chipping of the concrete layer of the base, the height of the top surface of the foundation 12
Adjust and reinforce the foundation. (Fig. 9)
Flow (16): Next, the packer is set. First, put the mortar 22 in the packer setting position.
Raise and form a packer. Packer plate 23 on top of packer
, Adjust the height level and level, cure and place for a predetermined period.
(Fig. 9)
Flow (17): Release the curing of the anchor bolt 1 and the packer, and the base 12 of the device 24
Centering and installation for. For installation, anchor bolt 1 and nut
And then check the installation, and if there is no problem, grout
A mold 18b is set around the base. (Fig. 10)
Flow (18): Grout surface after grouting after setting of the grout mold 18b
After smoothening, it is cured, and after a predetermined curing period, a mold for grout
Cancel 18b and curing. (Fig. 11)

以上のようにして、機器の据付け現地作業が行われることにより、基礎台12の構築と基礎台への機器24の据付けが完了する。   As described above, the installation work of the equipment is performed, whereby the construction of the foundation 12 and the installation of the equipment 24 on the foundation are completed.

以上のように、本実施例を用いることで、複数本のアンカーボルトを据付ける際に複数本を一括して据付け作業できる上、現地でのピッチや垂直度の設定を簡略化することができる。加えて、ユニット製作作業は工場にて作業可能であるため、現地作業と並行して行う事が可能となり、現地における作業工数を削減し工期短縮を実現できる。   As described above, by using this embodiment, when a plurality of anchor bolts are installed, a plurality of the bolts can be installed collectively, and the setting of the pitch and the perpendicularity at the site can be simplified. . In addition, the unit production work can be done at the factory, so it can be performed in parallel with the field work, reducing the work time in the field and shortening the work period.

また、テンプレートを用いてアンカーボルトのユニット構造を一体に纏めているので、アンカーボルトの据付け対象構造物をユニット構造物の構成メンバーに取り入れる必要が無くて、汎用性の高いアンカーボルトのユニット構造物に仕立てることができる。本実施例では、汎用性の高いアンカーボルトのユニット構造物を用いるので、据付け対象の構造物が如何様でも据付け対応できる。   In addition, since the anchor bolt unit structure is integrated using a template, there is no need to incorporate the anchor bolt installation target structure into the structural member of the unit structure, and the anchor bolt unit structure is highly versatile. Can be tailored to. In the present embodiment, since a highly versatile anchor bolt unit structure is used, any structure to be installed can be installed.

本発明の実施例2は、実施例1の床の打コン底面を支保するRC型枠18及び支保工17の代わりに、図17のように、床底面(階下から見れば天井面となる)にデッキプレート21を用いる場合における、アンカーボルト1の施工例である。   In Example 2 of the present invention, instead of the RC form 18 and the supporting work 17 that support the bottom of the floor of the floor of Example 1, as shown in FIG. This is a construction example of the anchor bolt 1 when the deck plate 21 is used.

デッキプレート21の使用に際しては、実施例1の支保工17及びRC型枠18の代わりにデッキプレート21を建屋の鉄骨梁の上に設定して使用されるため、これらの設定を行って図20の作業手順による現地作業を行う。また、工場内での作業は図21の作業手順と同じである。   When the deck plate 21 is used, since the deck plate 21 is set on the steel beam of the building instead of the support work 17 and the RC formwork 18 of the first embodiment, these settings are performed and FIG. Work on site according to the work procedure. The work in the factory is the same as the work procedure of FIG.

本実施例のようにデッキプレート21を型枠の代わりとして用いる場合においても、上端筋,下端筋を支持するための鉄筋受架台がRC型枠を用いた場合と同様に用いられるため、RC型枠上に設定する際の作業手順と同様の手順で実施可能であり、デッキプレート21構造の床になっても本発明が実施できる。   Even when the deck plate 21 is used as a substitute for the formwork as in this embodiment, the reinforcing bar support for supporting the upper and lower reinforcements is used in the same manner as when the RC formwork is used. It can be carried out in the same procedure as the work procedure when setting on the frame, and the present invention can be carried out even when the floor has the deck plate 21 structure.

本実施例では、デッキプレート21を面材として建屋に残すことで、RC型枠18及び支保工17の撤去作業が不要でもあるので、その分、実施例1に比較して、機器の基礎台構築に関する工程短縮が可能である。短縮された工程以外のその他の工程は図20中のフローと同じ行工程となる。   In this embodiment, by leaving the deck plate 21 as a face material in the building, the removal work of the RC formwork 18 and the support work 17 is not necessary. The process related to construction can be shortened. Other processes other than the shortened process are the same row process as the flow in FIG.

本発明の実施例3は、実施例1の床の打コン底面を支保するRC型枠18及び支保工17の代わりに、図18のように、床底面(階下から見れば天井面となる)にSCプレート20を用いる場合における、アンカーボルト1の施工例である。   In Example 3 of the present invention, instead of the RC form 18 and the supporting work 17 for supporting the bottom surface of the floor of Example 1 as shown in FIG. This is a construction example of the anchor bolt 1 when the SC plate 20 is used.

本実施例では、支保工17及びRC型枠18の代わりに鋼板製のSCプレート20とそれを支持する受梁19,鋼板をつなぐ根太材が使用されるため、これらの設定を行って図20の作業手順による現地作業を行う。また、工場内での作業は図21の作業手順と同じである。   In the present embodiment, instead of the support 17 and the RC formwork 18, a steel plate SC plate 20, a support beam 19 that supports the SC plate 20, and a joist connecting the steel plates are used. Work on site according to the work procedure. The work in the factory is the same as the work procedure of FIG.

本実施例では、SCプレート20をコンクリート型枠を兼ねさせた面材として建屋に残すことで、RC型枠18及び支保工17の撤去作業が不要でもあるので、その分、実施例1に比較して、機器の基礎台構築に関する工程短縮が可能である。その上、SCプレート20にも床表層部の強度を担わせるので、実施例1に置ける図20中の下端筋設定作業が不要になるので、一層のこと工程短縮が可能となる。   In this embodiment, since the SC plate 20 is left in the building as a face material that also serves as a concrete formwork, the removal work of the RC formwork 18 and the support work 17 is unnecessary, so that compared with Example 1. Thus, it is possible to shorten the process related to the construction of the base of the equipment. In addition, since the SC plate 20 also bears the strength of the floor surface layer portion, the lower end streak setting operation in FIG. 20 in the first embodiment is not necessary, and the process can be further shortened.

その他の工程は図20中のフローに同じである。同様の手順で、本発明の床ハーフSCに対する適用も容易に可能となる。   The other steps are the same as the flow in FIG. In the same procedure, the application to the floor half SC of the present invention can be easily performed.

本発明の実施例4は、図19のように、基礎台12の形状が一点鎖線で示したように中央部にへこみのある凹形状の場合に対応した例である。   The fourth embodiment of the present invention is an example corresponding to the case where the shape of the base 12 is a concave shape with a dent in the center as shown by the alternate long and short dash line, as shown in FIG.

本実施例におけるアンカーボルト1,テンプレート2及び中間締結サポート3の組み合わせ員数及び形状は一形態に限定されること無く、多様に応用の利くものであり、基礎形状に合わせてそれを変更することが可能である。その分、汎用性が高い。   The number and shape of the combination of the anchor bolt 1, the template 2 and the intermediate fastening support 3 in the present embodiment are not limited to one form, but can be applied in various ways, and can be changed according to the basic shape. Is possible. Therefore, versatility is high.

例えば図19に示すような中央部にへこみのある凹形状の基礎台12の形状に対しては、工場内での作業において図21の作業手順でアンカーボルトのユニット構造物を作成する際に、中間締結サポート3と固定治具4の設定位置とを下方に移動させて作成することで、基礎台12の凹形状に合わせた型枠との干渉を回避できるように作成し、図20で示される実施例1と同様手順で現地作業を行う事が可能となる。   For example, with respect to the shape of the concave base 12 having a dent in the center as shown in FIG. 19, when creating the anchor bolt unit structure in the work procedure of FIG. By creating the intermediate fastening support 3 and the setting position of the fixing jig 4 by moving them downward, it is created so as to avoid interference with the formwork matched to the concave shape of the base 12 and is shown in FIG. The field work can be performed in the same procedure as in the first embodiment.

ここで、中間締結サポート3の設定位置は床レベルより上であり基礎台鉄筋11の上端より下の範囲で基礎台鉄筋11に干渉しない位置とする。   Here, the setting position of the intermediate fastening support 3 is a position that is above the floor level and that does not interfere with the foundation platform rebar 11 in a range below the upper end of the foundation platform reinforcement 11.

本発明の実施例5は、記述の各実施例におけるアンカーボルト1の採用構造が変更されており、その他の内容には変更は無い。   In the fifth embodiment of the present invention, the adoption structure of the anchor bolt 1 in each described embodiment is changed, and other contents are not changed.

本実施例にて採用されるアンカーボルトは、図22のように、アンカーボルト1aとアンカーボルト1bとを長ナット4aにねじ込んで直列的に連結してあるものである。   As shown in FIG. 22, the anchor bolt employed in this embodiment is one in which the anchor bolt 1a and the anchor bolt 1b are screwed into the long nut 4a and connected in series.

このようなアンカーボルトによれば、長ナット4a内へのアンカーボルト1aのねじ込み長さに応じて、図22(A)図のように最長の長さから図22(B)図の中間の長さを境に図22(C)の最短の長さへ全体の長さを調整できる。これとは逆に、長ナット4a内へのアンカーボルト1bのねじ込み長さを変えることにより、或いは両方のアンカーボルト1aとアンカーボルト1bの長ナット4a内へのねじ込み長さを変えることにより、全体の長さを調整できる。   According to such an anchor bolt, depending on the screwed length of the anchor bolt 1a into the long nut 4a, the middle length of FIG. 22 (B) from the longest length as shown in FIG. 22 (A). The entire length can be adjusted to the shortest length in FIG. On the contrary, by changing the screwing length of the anchor bolt 1b into the long nut 4a, or by changing the screwing lengths of both the anchor bolt 1a and the anchor bolt 1b into the long nut 4a, The length of can be adjusted.

このように、図22に示すように二本のアンカーボルト1a,1bと長ナット4aを組み合わせた構造を用いることにより、アンカーボルトをユニットに組み込んだ後も個別に長さ調整を行う事が可能となる。また、本構造をアンカーボルトのユニット構造物に適用した場合、長ナット4aは他の実施例で用いられている固定治具4の役割を兼ねさせることも可能であって、その場合には、中間締結サポート3が長ナット4aに溶接固定される。   Thus, by using a structure in which two anchor bolts 1a and 1b and a long nut 4a are combined as shown in FIG. 22, it is possible to individually adjust the length even after the anchor bolt is incorporated in the unit. It becomes. Moreover, when this structure is applied to a unit structure of an anchor bolt, the long nut 4a can also serve as the fixing jig 4 used in other embodiments. The intermediate fastening support 3 is fixed to the long nut 4a by welding.

ユニットに組み込む際の作業としては、2本のアンカーボルト1a,1bと長ナット4aを当該構造に組みあげる工程が必要となる以外は他の実施例と同様に行う事が可能である。また、現地作業についても各実施例と同じである。   The work for assembling the unit can be performed in the same manner as in the other embodiments except that a process for assembling the two anchor bolts 1a, 1b and the long nut 4a into the structure is required. The field work is also the same as each example.

本実施例では、据付け現地でアンカーボルトの長さについて変更を要請されても、その要請に、新たなアンカーボルトのユニット構造物を作成することなく、応じることができるので、その分、汎用性が高く、且つ現地作業における要請への対応能力が高くなる。その他の技術的事項は他の実施例と同じである。   In this embodiment, even if a change in the length of the anchor bolt is requested at the installation site, it is possible to meet the request without creating a new anchor bolt unit structure. And the ability to respond to requests in field work increases. Other technical matters are the same as those of the other embodiments.

このように、本発明の各実施例によれば、アンカーボルトのユニット構造物は複数のアンカーボルト,テンプレート,中間締結サポート,固定治具,ナット及びシャープレートからなり、アンカーボルトをテンプレートの芯出し孔に挿入し、上端が所定のレベルだけ突き出した状態でナットによりテンプレートと仮固定し、さらに固定治具を介して中間締結サポートにより各アンカーボルトを締結して鉛直度を調整し、その状態でテンプレートとナットの廻り止め溶接を行い固定し、その後にシャープレートをアンカーボルト下端近傍部分の所定レベルにナットで固定し、このような上記各作業を工場にて行った後、機器の据付け基礎の施工現場へ搬送し、その現場においては据付けを行う所定位置の基礎打コン底面上にユニット支持架台を設定して、アンカーボルトをユニットとして一括して据付けする施工方法が提案できる。   As described above, according to each embodiment of the present invention, the anchor bolt unit structure includes a plurality of anchor bolts, a template, an intermediate fastening support, a fixing jig, a nut, and a shear plate. Insert it into the hole and temporarily fix it to the template with a nut with the upper end protruding only to a predetermined level.Further, adjust the verticality by fastening each anchor bolt with an intermediate fastening support via a fixing jig. The template and nut are welded and fixed, and then the shear plate is fixed to the specified level near the lower end of the anchor bolt with a nut. After performing each of these operations at the factory, the foundation of the equipment is installed. Transfer the unit to the construction site and install the unit support base on the bottom of the foundation hammer at the specified position for installation. Constant to, the construction method of installation collectively anchor bolt as a unit can be proposed.

また、その施工方法に採用されるアンカーボルトのユニット構造物として、機器を基礎台上に固定するための複数のアンカーボルトと、前記アンカーボルトの芯出し用の開孔が施されているテンプレートと、前記アンカーボルトの胴部(長さ方向途中部分)を固定し鉛直度を設定するための中間締結サポートと、前記中間締結サポートとアンカーボルトとを締結するための固定治具と、前記アンカーボルトの下端近傍に取り付けられて支持架台と溶接で固定するためのシャープレートと、前記アンカーボルトとテンプレート及びアンカーボルトとシャープレートを固定するためのナットを有するものが提案できる。   In addition, as a unit structure of the anchor bolt employed in the construction method, a plurality of anchor bolts for fixing the device on the foundation base, and a template provided with an opening for centering the anchor bolt, , An intermediate fastening support for fixing the trunk portion (the middle portion in the length direction) of the anchor bolt and setting the verticality, a fixing jig for fastening the intermediate fastening support and the anchor bolt, and the anchor bolt It is possible to propose one having a shear plate attached near the lower end of the steel plate and fixed to the support frame by welding, and the anchor bolt and the template, and a nut for fixing the anchor bolt and the shear plate.

さらには、アンカーボルトのユニット構造物に採用されるアンカーボルトとして、二本のアンカーボルトを長ナットにて直列に連結した構造にすることで長ナット内へのアンカーボルトのねじ込み深さを調節することによりアンカーボルト全長の調節が可能となり、アンカーボルトのユニット構造物の据付け後も各アンカーボルトの長さを個別に調整できる構造を提案できる。   Furthermore, as anchor bolts used in anchor bolt unit structures, the anchor bolt screwing depth into the long nut is adjusted by connecting two anchor bolts in series with a long nut. This makes it possible to adjust the total length of the anchor bolt, and to propose a structure in which the length of each anchor bolt can be individually adjusted even after the anchor bolt unit structure is installed.

本発明の各実施においては、アンカーボルトの据付精度の調整をアンカーボルトのユニット構造物の製作時に行うため現地における設定作業を簡略化する事ができ、また据付作業をユニット単位で行うため、大幅な作業員及び工数の削減が図れる。   In each implementation of the present invention, the installation accuracy of the anchor bolt is adjusted at the time of manufacture of the anchor bolt unit structure, so that the setting work at the site can be simplified, and the installation work is performed in units. Can reduce the number of workers and man-hours.

加えて、アンカーボルトのユニット構造物の製作作業は工場にて行う事が可能となるため、現地の工程をディスターブする要因とならない。   In addition, the manufacturing work of the anchor bolt unit structure can be performed at the factory, so it does not disturb the local process.

さらには、アンカーボルトのユニット構造物の製作に際して、アンカーボルトが据付けられる対象の建屋の建築構造材をユニットの構成メンバーに組み込んでいないので、どのような建屋構造に対しても汎用性の高さを発揮できるうえ、建屋建築関連作業との干渉も起きにくい。   Furthermore, when manufacturing the anchor bolt unit structure, the building structural material of the building to which the anchor bolt is to be installed is not incorporated into the structural members of the unit, so it is highly versatile for any building structure. In addition, it can hardly interfere with building-related work.

本発明は、各種プラントの機器を建屋の床に据付けるために、その床に構築される基礎台の施工に利用される。   INDUSTRIAL APPLICABILITY The present invention is used for the construction of a foundation that is constructed on a floor for installing equipment of various plants on the floor of a building.

1,1a,1b アンカーボルト
2 テンプレート
3 中間締結サポート
4 固定治具
4a 長ナット
5 シャープレート
6 ユニット支持架台
6a ユニット支持架台柱部
6b ユニット支持架台梁部
8 テンプレート仮固定台
9 下端筋
10 上端筋
11 基礎台鉄筋
12 基礎台
13 鉄筋受架台
13a スペーサー
14 廻り止め溶接
15 孔
17 支保工
18 RC型枠
18a 型枠
18b グラウト用型枠
19 受梁
20 SCプレート
21 デッキプレート
22 モルタル材
23 パッカープレート
24 機器
1, 1a, 1b Anchor bolt 2 Template 3 Intermediate fastening support 4 Fixing jig 4a Long nut 5 Shear plate 6 Unit support frame 6a Unit support frame column part 6b Unit support frame beam part 8 Temporary template fixing base 9 Bottom muscle 10 Upper muscle DESCRIPTION OF SYMBOLS 11 Reinforcement base 12 Reinforcement base 13 Reinforcement support 13a Spacer 14 Non-turn welding 15 Hole 17 Support 18 RC form 18a Form 18b Grout form 19 Receiving beam 20 SC plate 21 Deck plate 22 Mortar material 23 Packer plate 24 machine

Claims (9)

複数のアンカーボルトと、前記アンカーボルトを通したテンプレートと、前記アンカーボルト同士間を連結固定した中間締結サポートと、前記アンカーボルトに設けたシャープレートと、前記アンカーボルトに螺合させたナットと、前記ナットと前記テンプレートの間に設けたナットの廻り止め手段と、前記アンカーボルトは、複数本のアンカーボルトを長ナットで一連に連結して前記長ナット内への前記アンカーボルトのねじ込み深さを調節自在とし、前記長ナットと前記中間締結サポートとを連結して、前記アンカーボルトに前記中間締結サポートを前記長ナットを介して間接的に連結してあることを特徴とした機器の基礎施工方法に用いるアンカーボルトのユニット構造物。 A plurality of anchor bolts, a template through which the anchor bolts are passed, an intermediate fastening support in which the anchor bolts are connected and fixed, a shear plate provided on the anchor bolts, and a nut screwed to the anchor bolts, A nut detent means provided between the nut and the template, and the anchor bolt, a plurality of anchor bolts are connected in series with a long nut, and the screwing depth of the anchor bolt into the long nut is increased. A foundation construction method for equipment , wherein the long nut and the intermediate fastening support are connected, and the intermediate fastening support is indirectly connected to the anchor bolt via the long nut. Anchor bolt unit structure used for テンプレートに複数のアンカーボルトを通してナットでテンプレートと前記アンカーボルトとを仮固定し、前記アンカーボルト同士間を固定治具を介して中間締結サポートで連結固定し、前記ナットと前記テンプレートの間に前記ナットの廻り止めを施し、前記アンカーボルトにシャープレートを装着して全体を一ユニットにしたアンカーボルトのユニット構造物を製作し、The template and the anchor bolt are temporarily fixed with a nut through a plurality of anchor bolts to the template, the anchor bolts are connected and fixed to each other with an intermediate fastening support via a fixing jig, and the nut is interposed between the nut and the template. The anchor bolt unit structure is manufactured by attaching the shear plate to the anchor bolt and making the whole into one unit,
機器の据付位置の下方に予め設けられたユニット支持架台へ前記アンカーボルトのユニット構造物を一括して搬入及び据付し、The anchor bolt unit structure is collectively loaded and installed on a unit support base provided in advance below the installation position of the equipment,
しかる後に、前記テンプレートを撤去して基礎台鉄筋を施工して前記基礎台鉄筋を埋設するようにコンクリートを打設する機器の基礎施工方法。After that, the foundation construction method of the equipment which removes the template, constructs the foundation platform reinforcement, and places concrete so as to embed the foundation platform reinforcement.
機器の据付け位置の下方にユニット支持架台を構築し、Build a unit support base below the equipment installation position,
その後に、請求項1に記載のアンカーボルトのユニット構造物を前記ユニット支持架台へ一括して搬入及び据付し、Thereafter, the anchor bolt unit structure according to claim 1 is collectively carried and installed on the unit support frame,
その後に、前記ユニット構造物からテンプレートを撤去して基礎台鉄筋を施工し、After that, remove the template from the unit structure and construct the foundation rebar,
その後に、前記基礎台鉄筋を埋設するようにコンクリートを打設する機器の基礎施工方法。After that, the foundation construction method of the apparatus which lays concrete so that the said foundation stand reinforcement may be embed | buried.
機器の据付け位置の下方にユニット支持架台を構築し、Build a unit support base below the equipment installation position,
その後に、複数のアンカーボルトと、前記アンカーボルトを通したテンプレートと、前記アンカーボルト同士間を連結固定した中間締結サポートと、前記アンカーボルトに設けたシャープレートと、前記アンカーボルトに螺合させたナットと、前記ナットと前記テンプレートの間に設けたナットの廻り止め手段とを備えたアンカーボルトのユニット構造物を前記ユニット支持架台へ一括して搬入及び据付し、Thereafter, a plurality of anchor bolts, a template through which the anchor bolts were passed, an intermediate fastening support in which the anchor bolts were connected and fixed, a shear plate provided on the anchor bolts, and screwed into the anchor bolts A unit structure of an anchor bolt including a nut and a nut detent means provided between the nut and the template is collectively loaded and installed on the unit support frame.
その後に、前記ユニット構造物からテンプレートを撤去して基礎台鉄筋を施工し、After that, remove the template from the unit structure and construct the foundation rebar,
その後に、前記基礎台鉄筋を埋設するようにコンクリートを打設する機器の基礎施工方法。After that, the foundation construction method of the apparatus which lays concrete so that the said foundation stand reinforcement may be embed | buried.
機器の据付け位置の下方にユニット支持架台を構築し、Build a unit support base below the equipment installation position,
その後に、複数のアンカーボルトと、前記アンカーボルトを通したテンプレートと、前記アンカーボルト同士間を連結固定した中間締結サポートと、前記アンカーボルトに設けたシャープレートと、前記アンカーボルトに螺合させたナットと、前記ナットと前記テンプレートの間に設けたナットの廻り止め手段と、前記アンカーボルトは、複数本のアンカーボルトを長ナットで一連に連結して前記長ナット内への前記アンカーボルトのねじ込み深さを調節自在としたことを特徴としたアンカーボルトのユニット構造物を前記ユニット支持架台へ一括して搬入及び据付し、Thereafter, a plurality of anchor bolts, a template through which the anchor bolts were passed, an intermediate fastening support in which the anchor bolts were connected and fixed, a shear plate provided on the anchor bolts, and screwed into the anchor bolts A nut, a nut locking means provided between the nut and the template, and the anchor bolt are formed by connecting a plurality of anchor bolts in series with a long nut and screwing the anchor bolt into the long nut. The unit structure of the anchor bolt characterized in that the depth can be adjusted is collectively carried and installed on the unit support frame,
その後に、前記ユニット構造物からテンプレートを撤去して基礎台鉄筋を施工し、After that, remove the template from the unit structure and construct the foundation rebar,
その後に、前記基礎台鉄筋を埋設するようにコンクリートを打設する機器の基礎施工方法。After that, the foundation construction method of the apparatus which lays concrete so that the said foundation stand reinforcement may be embed | buried.
請求項2において、前記アンカーボルトのユニット構造物は、前記アンカーボルトを前記テンプレートの芯出し孔に挿入し、前記アンカーボルトの上端が所定のレベルだけ前記テンプレートの上方へ突き出した状態でナットを前記アンカーボルトに螺合させて前記テンプレートと仮固定し、さらに前記テンプレートの下方の位置の前記アンカーボルトの部位に中間締結サポートを固定するための固定治具を装着し、前記アンカーボルトの鉛直度を調整して、前記固定治具を介して前記中間締結サポートにより各前記アンカーボルト間を連結固定し、その状態で前記テンプレートと前記ナットとの間で前記ナットの廻り止め溶接を行い固定し、その後に前記固定治具よりも下方に位置する前記アンカーボルトの部位にシャープレートを前記アンカーボルトに螺合させた他のナットで固定する各作業を工場にて行って製作し、このように製作された前記アンカーボルトのユニット構造物を前記ユニット支持架台へ一括して搬入及び据付することを特徴とした機器の基礎施工方法。The unit structure of the anchor bolt according to claim 2, wherein the anchor bolt is inserted into the centering hole of the template, and the nut is inserted with the upper end of the anchor bolt protruding above the template by a predetermined level. The anchor bolt is screwed and temporarily fixed to the template, and a fixing jig for fixing an intermediate fastening support is attached to a portion of the anchor bolt below the template, and the vertical degree of the anchor bolt is adjusted. Adjust and fix the anchor bolts between the anchor bolts by the intermediate fastening support via the fixing jig, and fix the nut and the non-rotating weld between the template and the nut in that state. A shear plate is placed on the anchor bolt located below the fixing jig. -Each work to be fixed with other nuts screwed to the bolts is manufactured at the factory, and the unit structure of the anchor bolts thus manufactured is brought into the unit support frame and installed in a batch. Basic construction method of equipment characterized by 請求項3乃至請求項5のいずれか一項において、前記アンカーボルトのユニット構造物は、前記アンカーボルトを前記テンプレートの芯出し孔に挿入し、前記アンカーボルトの上端が所定のレベルだけ前記テンプレートの上方へ突き出した状態でナットを前記アンカーボルトに螺合させて前記テンプレートと仮固定し、さらに前記テンプレートの下方の位置の前記アンカーボルトの部位に中間締結サポートを固定するための固定治具を装着し、前記アンカーボルトの鉛直度を調整して、前記固定治具を介して前記中間締結サポートにより各前記アンカーボルト間を連結固定し、その状態で前記テンプレートと前記ナットとの間で前記ナットの廻り止め溶接を行い固定し、その後に前記固定治具よりも下方に位置する前記アンカーボルトの部位にシャープレートを前記アンカーボルトに螺合させた他のナットで固定する各作業を工場にて行って製作し、このように製作された前記アンカーボルトのユニット構造物を前記ユニット支持架台へ一括して搬入及び据付することを特徴とした機器の基礎施工方法。The unit structure of the anchor bolt according to any one of claims 3 to 5, wherein the anchor bolt is inserted into a centering hole of the template, and an upper end of the anchor bolt is fixed to the template by a predetermined level. In the state of protruding upward, a nut is screwed onto the anchor bolt to temporarily fix it to the template, and a fixing jig for fixing the intermediate fastening support to the anchor bolt portion at a position below the template is mounted. Then, the verticality of the anchor bolt is adjusted, and the anchor bolts are connected and fixed by the intermediate fastening support via the fixing jig, and in this state, the nut is fixed between the template and the nut. A part of the anchor bolt positioned below the fixing jig after fixing with non-rotating welding The shear plate is fixed by other nuts screwed to the anchor bolts and manufactured at the factory, and the unit structure of the anchor bolts manufactured in this way is collectively put on the unit support base. A basic construction method for equipment, characterized by carrying in and installing. 請求項2乃至請求項7のいずれか一項において、前記アンカーボルトのユニット構造物を前記ユニット支持架台が構築終了する前に予め製作しておくことを特徴とした機器の基礎施工方法。8. The foundation construction method for equipment according to claim 2, wherein the unit structure of the anchor bolt is manufactured in advance before the construction of the unit support frame is completed. 請求項2乃至請求項8のいずれか一項において、前記ユニット支持架台は、その下方に施工されたコンクリートの型枠の機能をなす部材の上に構築されていることを特徴とした機器の基礎施工方法。9. The equipment base according to claim 2, wherein the unit support frame is constructed on a member that functions as a concrete formwork installed below the unit support frame. Construction method.
JP2009225909A 2009-09-30 2009-09-30 Unit structure of anchor bolt used for foundation construction of equipment and foundation construction method of equipment using it Expired - Fee Related JP5183606B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2009225909A JP5183606B2 (en) 2009-09-30 2009-09-30 Unit structure of anchor bolt used for foundation construction of equipment and foundation construction method of equipment using it

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2009225909A JP5183606B2 (en) 2009-09-30 2009-09-30 Unit structure of anchor bolt used for foundation construction of equipment and foundation construction method of equipment using it

Publications (2)

Publication Number Publication Date
JP2011074632A JP2011074632A (en) 2011-04-14
JP5183606B2 true JP5183606B2 (en) 2013-04-17

Family

ID=44018889

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2009225909A Expired - Fee Related JP5183606B2 (en) 2009-09-30 2009-09-30 Unit structure of anchor bolt used for foundation construction of equipment and foundation construction method of equipment using it

Country Status (1)

Country Link
JP (1) JP5183606B2 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106400830B (en) * 2016-08-29 2018-10-02 山东电力工程咨询院有限公司 A kind of Equipment Foundations of assembled integral
JP6897055B2 (en) * 2016-10-18 2021-06-30 中国電力株式会社 Structure installation method and installation foundation
CN110397075B (en) * 2019-07-08 2024-03-12 巨硕精密机械(常熟)有限公司 Universal horizontal adjustment ground anchor positioner assembly and installation method thereof
CN114876219B (en) * 2022-05-20 2023-09-19 中国水利水电第四工程局有限公司 Welding installation device for photovoltaic bracket foundation embedded bolts
CN115506397B (en) * 2022-09-23 2023-06-27 中国化学工程第六建设有限公司 Accurate positioning construction method for foundation anchor bolt box

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5941530A (en) * 1982-08-31 1984-03-07 Toshiba Corp Installation of foundation bolt for apparatus setting
JPH09268659A (en) * 1996-04-02 1997-10-14 Hitachi Metals Ltd Fixing structure of anchor bolt
JPH1037467A (en) * 1996-07-24 1998-02-10 Hitachi Kizai Kk Anchor bolt positioning construction
JP3162818U (en) * 2010-07-07 2010-09-16 株式会社アイ・イー・シー Anchor bolt fixing device

Also Published As

Publication number Publication date
JP2011074632A (en) 2011-04-14

Similar Documents

Publication Publication Date Title
JP5183606B2 (en) Unit structure of anchor bolt used for foundation construction of equipment and foundation construction method of equipment using it
JP2018115489A (en) Anchor frame and method of building steel frame structure using the same
CN113818562A (en) Construction method of assembled frame structure
CN210685444U (en) Quick leveling, mounting and supporting device for prefabricated external wall panel
JP5713710B2 (en) Seismic isolation structure and its construction method
JP2011012464A (en) Method of constructing base isolating structure, and temporary supporting structure for base isolating device
JP6046984B2 (en) Seismic isolation construction method and precast concrete footing
JP5033334B2 (en) Tower crane support method
KR20110049811A (en) Installation method of equipment and anchor member supporting mechanism and anchor bolt unit
KR101947418B1 (en) Continuous construction method for precast reinforced concrete structure and steel-framed structure and precast reinforced concrete column for using the method
CN111549815A (en) Steel structure foundation bolt pre-embedding construction method
JP2006299660A (en) Temporary receiving construction method and temporary receiving structure
CN105735228A (en) Construction method and installation accuracy control method of rack systems of high-lift rack climbing type ship lift
JP5749620B2 (en) Seismic isolation method for existing buildings
JP2015055079A (en) Anchor frame, and method for constructing anchor structure using the anchor frame
JP2019056284A (en) Column base reinforcement unit and method for constructing structure using column base reinforcement unit
CN112942809A (en) Combined template assembling method capable of realizing mechanical construction
JP3244102U (en) Steel house foundation structure and anchor set used therein
US20240309985A1 (en) Precast base, method of manufacturing the precast base and method of installing architectural structure having the precast base
JP2016153559A (en) Construction method of wooden building and foundation member used for construction method
JP6620370B2 (en) Repair and reinforcement structure of buildings and repair and reinforcement method
JP5465607B2 (en) Foundation construction method
KR102394812B1 (en) Method for constructing precast flat slab
CN113898195B (en) Assembled concrete structure wall column hoisting guiding and positioning device and construction method
KR102409723B1 (en) Steel post structure for automated rack and contruction method thereof

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20110629

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20110629

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20120813

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20120821

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20121022

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20121218

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20130115

R150 Certificate of patent or registration of utility model

Ref document number: 5183606

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20160125

Year of fee payment: 3

LAPS Cancellation because of no payment of annual fees