CN202369922U - Pull type bracket truss - Google Patents

Pull type bracket truss Download PDF

Info

Publication number
CN202369922U
CN202369922U CN 201120426398 CN201120426398U CN202369922U CN 202369922 U CN202369922 U CN 202369922U CN 201120426398 CN201120426398 CN 201120426398 CN 201120426398 U CN201120426398 U CN 201120426398U CN 202369922 U CN202369922 U CN 202369922U
Authority
CN
China
Prior art keywords
bar
pull
longeron
pressing rod
longitudinal beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201120426398
Other languages
Chinese (zh)
Inventor
帅勇
吴永贵
陈翼
李波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Engineering Co Ltd of CTCE Group
Original Assignee
First Engineering Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Engineering Co Ltd of CTCE Group filed Critical First Engineering Co Ltd of CTCE Group
Priority to CN 201120426398 priority Critical patent/CN202369922U/en
Application granted granted Critical
Publication of CN202369922U publication Critical patent/CN202369922U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a pull type bracket truss, which comprises a left diagonal pressing rod, a right diagonal pressing rod, a left longitudinal beam and a right longitudinal beam, wherein the left diagonal pressing rod and the right diagonal pressing rod are diagonally arranged on the left side and the right side of a pier body respectively; the bottoms of the left diagonal pressing rod and the right diagonal pressing rod are fixedly connected with a supporting seat, which is embedded in the pier body, through a supporting steel plate; the top ends of the left diagonal pressing rod and the right diagonal pressing rod are supported against the bottoms of the left longitudinal beam and the right longitudinal beam respectively; a pull pressing rod is arranged between the diagonal pressing rods and the longitudinal beams; the two ends of the pull pressing rod are connected with the diagonal pressing rods and the longitudinal beams respectively; supporting cushion stone is arranged at the top end of the pier body; a pull rod is embedded in the supporting cushion stone; the two ends of the pull rod are fixedly connected between the left longitudinal beam and the right longitudinal beam respectively; and the left longitudinal beam and the right longitudinal beam are pulled to the left side wall and the right side wall of the pier body. The pull type bracket truss has low bracket erection height; the workload is greatly reduced; the technical difficulty in bracket structure erection is reduced; and thus, the safety and the application flexibility for a bracket structure are improved.

Description

To pull-type carriage purlin
Technical field
The utility model relates to a kind of to pull-type carriage trussed construction, is the braced structures that is used for the higher cantilever pouring reinforced concrete beam of the bridge engineering pier shaft height in crossing highway, railway or river No. zero piece and a piece construction.
Background technology
Along with the application of technological progress and new material, the reinforced concrete continuous beam of large span is extensively applied in the bridge engineering in crossing highway, railway, river.In the work progress that continuous beam cantilever is built, No. zero piece, a piece are the job platforms of Hanging Basket assembly unit as the girder construction above the pier top.There is more problem in traditional structure construction: 1. high pier construction sets up that its place sclerosis scope of full framing is big, architecture basics has high input, operating expenses high; 2. the steel pipe column bracket construction height is high, needs multiple welding to become whole, and its weldquality is difficult to be guaranteed, and steel pipe column lifting length is big simultaneously, and the lifting time is long, and the technical difficulty coefficient is big; 3. its verticality of full framing of setting up and steel pipe column bracket is difficult to control, the reinforcement measure difficulty; 4. the timbering material usage quantity is big, and the preparation of construction time is longer, drops into bigger; 5. full framing and steel pipe column bracket are installed, the dismounting time is long, and the work high above the ground time is long, has increased construction risk.Can overcome the defective that traditional job practices is brought to pull-type carriage trussed construction construction.
The utility model content
The utility model is for avoiding above-mentioned existing in prior technology weak point; A kind of high pier shaft reinforced concrete continuous beam No. zero piece, a piece construction braced structures are provided; In the hope of simplifying construction technology, economical with materials and cost, shorten No. zero piece, a piece construction period.
The utility model technical solution problem provides following scheme:
A kind of to pull-type carriage purlin; Comprise the left and right bar that baroclines, left and right longeron; Two bars that barocline tilt to be installed in the left and right sides of pier shaft respectively about said, said about two barocline bar the bottom be fixedly connected with supporting seat on being embedded in pier shaft through supporting steel plate, said about two barocline bar the top be supported on the bottom of left-right longeron respectively; Said baroclining is provided with strut and tie between bar and the longeron; The two ends of said strut and tie are connected with longeron with the bar that baroclines respectively, and the top of said pier shaft is provided with the support pinner, are embedded with pull bar in the said support pinner; Connect between the longeron about said two ends to pull bar are fixedly connected on respectively, left-right longeron is drawn on the left and right sides sidewall that leans against pier shaft.
Said longeron, the bar that baroclines, strut and tie are Two bors d's oeuveres shaped steel, between Two bors d's oeuveres shaped steel junction plate are set and form integral body, and longeron all adopts and is welded to connect with the bar that baroclines, strut and tie contact position, and longeron web place adds stiffening rib in the contact position simultaneously.
Said fining twisted steel to pull bar employing PSB830 material φ 32mm is embedded in and supports in the pinner, and the steel plate that the pull bar two ends is provided with double nut and longeron welding is tightened.
The back-pressure bar vertically is installed respectively on the abutting end of two longerons about said, and said back-pressure rod member comprises vertical pull bar, and said vertical pull bar bottom is embedded in the pier shaft, and vertical pull bar adopts the fining twisted steel of PSB830 material φ 32mm.
Compare with full framing, steel pipe column bracket, the utility model beneficial effect is embodied in:
1. adopt pull-type carriage trussed construction construction, in construction, need not, without long period preparation material to the place sclerosis.
2. adopt pull-type carriage trussed construction construction, at the bottom of the support scaffolding height, workload significantly reduces; Reduce the technical difficulty that supporting structure is set up, thereby improved the safety and use flexibility of supporting structure.
3. adopt pull-type carriage trussed construction construction, material usage is few, greatly reduces operating expenses.
4. adopt pull-type carriage trussed construction construction, support is installed, dismantling operation is simple, has reduced the engineering time of work high above the ground, has reduced construction risk.
5. adopt pull-type carriage trussed construction construction, need not pre-buried pallet stringer in pier cap, it is dismountable that carriage brace bottom is provided with the bolt connection, and the carriage truss can reuse.
6. adopt pull-type carriage trussed construction construction, increased pallet stringer and the concrete contact area of pier cap, reduced concrete concentrated stress effectively at pier cap end face pre-buried steel backing plate.
7. adopt pull-type carriage trussed construction construction, reduced on the longeron end at use back-pressure bar on the longeron and scratched distortion.
Description of drawings
Fig. 1 is the structural representation of the utility model.
The specific embodiment
Referring to accompanying drawing, a kind of to pull-type carriage purlin, comprise the left and right bar 1,2 that baroclines; Left and right longeron 3,4; Two bars 1,2 that barocline tilt to be installed in the left and right sides of pier shaft 5 respectively about said, said about two barocline bar 1,2 the bottom be fixedly connected with supporting seat 7 on being embedded in pier shaft 5 through supporting steel plate 6, said about two barocline bar 1,2 the top be supported on the bottom of left-right longeron 3,4 respectively; Said barocline bar 1,2 and longeron 3, be provided with strut and tie 8 between 4; The two ends of said strut and tie 8 are connected with longeron 3,4 with the bar 1,2 that baroclines respectively, and the top of said pier shaft 5 is provided with supports pinner 9, is embedded with pull bar 10 in the said support pinner 9; Said two ends to pull bar 10 are fixedly connected on left-right longeron 3 respectively, between 4, left-right longeron 3,4 are drawn on the left and right sides sidewall that leans against pier shaft 5.
Said longeron 3,4, the bar 1,2 that baroclines, strut and tie 8 are Two bors d's oeuveres shaped steel; Between Two bors d's oeuveres shaped steel junction plate is set and forms integral body; Longeron 3,4 and the bar 1,2 that baroclines, strut and tie 8 contact positions are all adopted and are welded to connect, and longeron 3,4 web places add stiffening rib 11 in the contact position simultaneously.
Said fining twisted steel to pull bar 10 employing PSB830 material φ 32mm is embedded in and supports in the pinner 9, and the steel plate that pull bar 10 two ends is provided with double nut and longeron 3,4 welding is tightened.
Back-pressure bar 12 vertically is installed respectively on the abutting end of two longerons 3,4 about said, and said back-pressure rod member 12 comprises vertical pull bar, and said vertical pull bar 12 bottoms are embedded in the pier shaft 5, and vertical pull bar adopts the fining twisted steel of PSB830 material φ 32mm.

Claims (4)

1. one kind to pull-type carriage purlin; Comprise the left and right bar that baroclines, left and right longeron; It is characterized in that: two bars that barocline tilt to be installed in the left and right sides of pier shaft respectively about said, said about two barocline bar the bottom be fixedly connected with supporting seat on being embedded in pier shaft through supporting steel plate, said about two barocline bar the top be supported on the bottom of left-right longeron respectively; Said baroclining is provided with strut and tie between bar and the longeron; The two ends of said strut and tie are connected with longeron with the bar that baroclines respectively, and the top of said pier shaft is provided with the support pinner, are embedded with pull bar in the said support pinner; Said two ends to pull bar are fixedly connected on respectively between the left-right longeron, and left-right longeron is drawn on the left and right sides sidewall that leans against pier shaft.
2. said to pull-type carriage purlin according to claim 1; It is characterized in that: said longeron, the bar that baroclines, strut and tie are Two bors d's oeuveres shaped steel; Between Two bors d's oeuveres shaped steel junction plate is set and forms integral body; Longeron all adopts and is welded to connect with the bar that baroclines, strut and tie contact position, and longeron web place adds stiffening rib in the contact position simultaneously.
3. said to pull-type carriage purlin according to claim 1, it is characterized in that: said fining twisted steel to pull bar employing PSB830 material φ 32mm, be embedded in and support in the pinner, the steel plate that the pull bar two ends is provided with double nut and longeron welding is tightened.
4. said to pull-type carriage purlin according to claim 1; It is characterized in that: the back-pressure bar vertically is installed respectively on the abutting end of two longerons about said; Said back-pressure rod member comprises vertical pull bar; Said vertical pull bar bottom is embedded in the pier shaft, and vertical pull bar adopts the fining twisted steel of PSB830 material φ 32mm.
CN 201120426398 2011-11-01 2011-11-01 Pull type bracket truss Expired - Fee Related CN202369922U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201120426398 CN202369922U (en) 2011-11-01 2011-11-01 Pull type bracket truss

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201120426398 CN202369922U (en) 2011-11-01 2011-11-01 Pull type bracket truss

Publications (1)

Publication Number Publication Date
CN202369922U true CN202369922U (en) 2012-08-08

Family

ID=46593631

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201120426398 Expired - Fee Related CN202369922U (en) 2011-11-01 2011-11-01 Pull type bracket truss

Country Status (1)

Country Link
CN (1) CN202369922U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103628416A (en) * 2013-12-18 2014-03-12 中铁大桥局股份有限公司 Stiffening girder counter-straining near-pier bracket of suspension bridge
CN109356036A (en) * 2018-11-26 2019-02-19 中铁六局集团有限公司 Middle pier pier-side bracket and its construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103628416A (en) * 2013-12-18 2014-03-12 中铁大桥局股份有限公司 Stiffening girder counter-straining near-pier bracket of suspension bridge
CN103628416B (en) * 2013-12-18 2016-06-29 中铁大桥局集团有限公司 Stiffening girder of suspension bridge is to pulling type pier side bracket
CN109356036A (en) * 2018-11-26 2019-02-19 中铁六局集团有限公司 Middle pier pier-side bracket and its construction method

Similar Documents

Publication Publication Date Title
CN101538896A (en) Construction method for jettied structure at high attitude of high-rise building
CN104631343A (en) Self-travelling diamond-shaped pin-connected truss-type form traveler structure and form traveler travelling and constructing method
CN102021889A (en) Bridge erection method
CN202347446U (en) Supporting structure for construction of zero block of reinforced concrete continuous beam
CN202830785U (en) High pier bridge cantilever casting concrete 0 # block pier top bracket
CN103321155B (en) Viaduct pier operation platform system and build this system and pour into a mould the method for bridge pier
CN201406844Y (en) Support of middle flange plate construction formwork of concrete-steel beam
CN102454292A (en) Supporting steel frame of high altitude large-span cantilever structure mold frame
CN202369922U (en) Pull type bracket truss
CN202369921U (en) Inverted trapezoidal truss
CN212956151U (en) Cast-in-place beam flange plate template system
CN103866692A (en) Novel assembling method for bent cap bearing frame
CN106638265A (en) Steel reinforced concrete beam rigid framework bridge
CN202766974U (en) Bent cap bearing frame without full framing
CN203175092U (en) Processing shed capable of being assembled with hanging structure
CN210368658U (en) No. 0 piece construction bracket of high mound continuous beam
CN208717939U (en) A kind of efficiently molding building hoist foundation structure
CN108755438B (en) Y-shaped pier continuous beam construction pi-shaped support and installation construction method thereof
CN203113226U (en) Formwork support system with towering asymmetric concrete cantilever structure
CN202247706U (en) Hanging bracket
CN207032671U (en) Steel and concrete post and the attachment structure of steel and concrete post and Vierendeel girder
CN104532758A (en) Construction support for pre-stress concrete suspension-poured continuous beam number zero segment
CN201343822Y (en) Large span cantilevered concrete truss
CN204343174U (en) A kind of prestress concrete cantilever continuous beam No. zero block construction support
CN110714613B (en) Reinforcing device for ultra-high large-span steel reinforced concrete cast-in-place beam template and construction method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120808

Termination date: 20181101

CF01 Termination of patent right due to non-payment of annual fee