CN103103925A - Combined H-shaped steel column bracket - Google Patents

Combined H-shaped steel column bracket Download PDF

Info

Publication number
CN103103925A
CN103103925A CN2013100471876A CN201310047187A CN103103925A CN 103103925 A CN103103925 A CN 103103925A CN 2013100471876 A CN2013100471876 A CN 2013100471876A CN 201310047187 A CN201310047187 A CN 201310047187A CN 103103925 A CN103103925 A CN 103103925A
Authority
CN
China
Prior art keywords
shaped steel
combination
steel column
tower
king
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013100471876A
Other languages
Chinese (zh)
Other versions
CN103103925B (en
Inventor
朱云翔
李德坤
李芳军
伍艺
李燕青
王海南
卢以龙
朱留洋
陈飞
黄治豪
古宇鹏
罗志雄
万慧
赵祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Engineering Group Co Ltd MBEC
8th Engineering Co Ltd of MBEC
Original Assignee
China Railway Major Bridge Engineering Group Co Ltd MBEC
8th Engineering Co Ltd of MBEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Engineering Group Co Ltd MBEC, 8th Engineering Co Ltd of MBEC filed Critical China Railway Major Bridge Engineering Group Co Ltd MBEC
Priority to CN201310047187.6A priority Critical patent/CN103103925B/en
Publication of CN103103925A publication Critical patent/CN103103925A/en
Application granted granted Critical
Publication of CN103103925B publication Critical patent/CN103103925B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention relates to bridge starting section beam pier side support construction equipment, in particular to a steel truss grider cable stayed bridge starting section beam pier side combined H-shaped steel column bracket which is convenient to construct and safe. The combined H-shaped steel column bracket comprises a main pylon. Two bases are arranged on each of two sides of the bottom of the main pylon, four bases are respectively and fixedly provided with a combined H-shaped steel column outwards in an inclined mode, and every two combined H-shaped steel columns are symmetrical relative to the main pylon. The top of each combined H-shaped steel column is connected with one end of a slide beam, and the other end of the slide beam is arranged on a tower foundation support in the middle of the main pylon. The combined H-shaped steel column bracket is large in bearing capacity, easy to install, convenient to dismantle, economical and convenient, construction time is shortened, and high-altitude work danger is reduced.

Description

A kind of combination H shaped steel pillar bracket
Technical field
The present invention relates to the initial beam sections pier of bridge collateral branch frame construction equipment, the other combination of the initial beam sections pier of the steel truss girder cable-stayed bridge H shaped steel pillar bracket of a kind of easy construction specifically, safety.
Background technology
Along with the high speed development of China's economy and Transportation Infrastructure Construction, increasing public rail and combined longspan steel truss girder CONSTRUCTION OF CABLE-STAYED BRIDGE engineering have appearred.Combined bridge generally adopts steel purlin Cable-stayed Bridge Scheme, and girder adopts biplate purlin formula structure.Two main truss horizontal spacings are larger, the bridge pier side bracket reaches the whole working platform of transposition in length and breadth as the platform for lining that pier pushes up four internode steel girder erections, be also the main support structure that first pair of suspension cable hangs front girder steel weight, pier-side bracket is comprised of two, north and south carriage, load-bearing steel case beam (slipway beam), bearing beam (slide) and three direction displacement adjusting device etc.The carriage column design adopts the steel pipe post structure, suitable bridge is to adopting four comb stakes (one-sided two rows), cross-bridges is arranged two comb stakes, press laterally great slope along bridge to the outermost steel pipe, suitable bridge steel pipe is to the inside pressed minor grade laterally, adopt steel pipe as connecting system, built-in fitting welding on coxopodite column and tower seat between column.Owing to using steel pipe post as carriage, between steel pipe, connected mode has welding or flange to connect, and is welded to connect and causes the overhead welding workload large, and dangerous high, the engineering time is long; And flange connects, and due to more to connecting bolt, sections is more, causes overhead connection that difficulty is installed, and construction risk is large, and the engineering time is long.
Summary of the invention
The present invention is mainly for the existing above-mentioned technical problem of prior art, and the combination H shaped steel pillar bracket of a kind of easy construction, safety is provided.
Above-mentioned technical problem of the present invention is mainly solved by following technical proposals: a kind of combination H shaped steel pillar bracket, comprise the king-tower post, both sides, described king-tower column bottom are respectively equipped with two bases, the oblique outer combination H shaped steel column that is installed with respectively on described four bases, every two described combination H shaped steel columns are symmetrical with respect to the king-tower post; The top of described each combination H shaped steel column is connected with an end of a slipway beam respectively, and the other end of described slipway beam is positioned on the tower pier bearing that is positioned at king-tower post middle part.
As preferably, be connected by many connecting rods between described combination H shaped steel column and king-tower post.
As preferably, between the H shaped steel of described combination H shaped steel column inside by the universal rod body bolt.
As preferably, position connection by end plate by bolt between described combination H shaped steel column sections.
As preferably, described tower pier bearing two ends respectively are provided with a tower pier shearing resistance bearing, and described two slipway beam one ends are hinged with a combination H shaped steel column top respectively, and the other end is positioned on tower pier shearing resistance bearing and draws mutually connection by reinforcing bar.
As preferably, described slipway beam be placed on tower pier shearing resistance bearing an end by the inner preformed hole of described tower pier bearing to drawing finish rolling deformed bar to connect.
As preferably, described every two connect by steel pipe between the combination H shaped steel column of king-tower post the same side.
The present invention makes up H shaped steel bottom joint of vertical column and is fixed on base, other sections connects by end plate place bolt, slipway beam one end is articulated and connected with combination H shaped steel column, one end is placed on tower pier bearing, and by the slipway beam of pull-up structure with tower pier bearing both sides carried out drawing, adopt connecting rod to connect between combination H shaped steel column and king-tower post, connect by steel pipe between combination H shaped steel column, to strengthen stability.At direction across bridge, two H shaped steel braces are connected into integral body, jointly stressed.Supporting capacity of the present invention is large, installs easily, and convenient disassembly has reduced the high-altitude splicing that steel pipe brings difficulty is installed, and construction quality more easily guarantees, has reduced the engineering time, has reduced work high above the ground dangerous, and is conveniently economical.
Description of drawings
Accompanying drawing 1 is a kind of combination of the present invention H shaped steel pillar bracket structure section figure.
Accompanying drawing 2 is a kind of combination of the present invention H shaped steel pillar bracket structure elevation.
Accompanying drawing 3 is a kind of combination of the present invention H shaped steel pillar bracket steel post sections joint layout plan.
The specific embodiment
Below by embodiment, and by reference to the accompanying drawings, technical scheme of the present invention is described in further detail, obviously, described embodiment is only part embodiment of the present invention.
Embodiment 1:
Referring to accompanying drawing 1~3, a kind of combination of the present invention H shaped steel pillar bracket, comprise king-tower post 8, described king-tower post 8 two bottom sides are respectively equipped with two bases 6, the oblique outer combination H shaped steel column 1 that is installed with respectively on described four bases 6, every two described combination H shaped steel columns 1 are with respect to king-tower post 8 symmetries; The top of described each combination H shaped steel column 1 is connected with an end of a slipway beam 2 respectively, and the other end of described slipway beam 2 is positioned on the tower pier bearing 7 that is positioned at king-tower post 8 middle parts.Be connected by many connecting rods 3 between described combination H shaped steel column 1 and king-tower post 8, by universal rod body 10 bolts, position connection by end plate 11 by bolt between described combination H shaped steel column 1 sections between the H shaped steel of described combination H shaped steel column 1 inside.Described tower pier bearing 7 two ends respectively are provided with a tower pier shearing resistance bearing 4, described two slipway beam 2 one ends are hinged with combination H shaped steel column 1 top respectively, the other end is positioned on tower pier shearing resistance bearing 4 and draws mutually connection by reinforcing bar, described slipway beam 2 be placed on tower pier shearing resistance bearing 4 an end by described tower pier bearing 7 inner preformed holes to drawing finish rolling deformed bar to connect, described every two connect by steel pipe 9 between the combination H shaped steel column 1 of king-tower post 8 the same sides.
The present invention makes up H shaped steel bottom joint of vertical column and is fixed on base, other sections connects by end plate place bolt, slipway beam one end is articulated and connected with combination H shaped steel column, one end is placed on tower pier bearing, and by the slipway beam of pull-up structure with tower pier bearing both sides carried out drawing, adopt connecting rod to connect between combination H shaped steel column and king-tower post, connect by steel pipe between combination H shaped steel column, to strengthen stability.At direction across bridge, two H shaped steel braces are connected into integral body, jointly stressed.Supporting capacity of the present invention is large, installs easily, and convenient disassembly has reduced the high-altitude splicing that steel pipe brings difficulty is installed, and construction quality more easily guarantees, has reduced the engineering time, has reduced work high above the ground dangerous, and is conveniently economical.
Should be understood that above-described embodiment only to be used for explanation the present invention and be not used in and limit the scope of the invention.Should be understood that in addition those skilled in the art can make various changes or modifications the present invention after the content of having read the present invention's instruction, these equivalent form of values fall within the application's appended claims limited range equally.

Claims (7)

1. one kind is made up H shaped steel pillar bracket, it is characterized in that: comprise king-tower post (8), described king-tower post (8) two bottom sides is respectively equipped with two bases (6), the oblique outer combination H shaped steel column (1) that is installed with respectively on described four bases (6), every two described combination H shaped steel columns (1) are with respect to king-tower post (8) symmetry; The top of described each combination H shaped steel column (1) is connected with an end of a slipway beam (2) respectively, and the other end of described slipway beam (2) is positioned on the tower pier bearing (7) that is positioned at king-tower post (8) middle part.
2. combination H shaped steel pillar bracket according to claim 1 is characterized in that: be connected by many connecting rods (3) between described combination H shaped steel column (1) and king-tower post (8).
3. combination H shaped steel pillar bracket according to claim 1, is characterized in that: the described combination between the inner H shaped steel of H shaped steel column (1) by universal rod body (10) bolt.
4. combination H shaped steel pillar bracket according to claim 1, is characterized in that: position connection by end plate (11) by bolt between described combination H shaped steel column (1) sections.
5. combination H shaped steel pillar bracket according to claim 1, it is characterized in that: described tower pier bearing (7) two ends respectively are provided with a tower pier shearing resistance bearing (4), described two slipway beams (2) one ends are hinged with combination H shaped steel column (a 1) top respectively, and it is upper and draw mutually connection by reinforcing bar that the other end is positioned over tower pier shearing resistance bearing (4).
6. combination H shaped steel pillar bracket according to claim 5 is characterized in that: described slipway beam (2) be placed on tower pier shearing resistance bearing (4) an end by the inner preformed hole of described tower pier bearing (7) to drawing finish rolling deformed bar to connect.
7. combination H shaped steel pillar bracket according to claim 1 is characterized in that: described every two connect by steel pipe (9) between the combination H shaped steel column (1) of king-tower post (8) the same side.
CN201310047187.6A 2013-02-06 2013-02-06 Combined H-shaped steel column bracket Active CN103103925B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310047187.6A CN103103925B (en) 2013-02-06 2013-02-06 Combined H-shaped steel column bracket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310047187.6A CN103103925B (en) 2013-02-06 2013-02-06 Combined H-shaped steel column bracket

Publications (2)

Publication Number Publication Date
CN103103925A true CN103103925A (en) 2013-05-15
CN103103925B CN103103925B (en) 2015-04-29

Family

ID=48312099

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310047187.6A Active CN103103925B (en) 2013-02-06 2013-02-06 Combined H-shaped steel column bracket

Country Status (1)

Country Link
CN (1) CN103103925B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107604827A (en) * 2017-08-04 2018-01-19 中铁大桥局集团有限公司 A kind of porous large-span freely-supported steel truss girder bridge erection method
CN108824202A (en) * 2018-07-05 2018-11-16 中交第二航务工程局有限公司 For the installation of concrete deck cable stayed bridge Hanging Basket and the support system of tower area beam cast-in-place construction
CN109356036A (en) * 2018-11-26 2019-02-19 中铁六局集团有限公司 Middle pier pier-side bracket and its construction method
CN110241733A (en) * 2019-06-03 2019-09-17 中铁大桥局集团有限公司 A kind of large space antarafacial bracket integral installation method
CN110374006A (en) * 2019-07-22 2019-10-25 中铁大桥局集团有限公司 A kind of construction method for removing space opposite sex large-tonnage steel beam bracket
CN110424272A (en) * 2019-08-27 2019-11-08 中交路桥华南工程有限公司 Sarasota beam section bracket and its erection method
CN112609578A (en) * 2020-11-24 2021-04-06 中铁二局集团有限公司 Method for mounting steel truss girder at top section of bridge pier of cable-stayed bridge
CN115094764A (en) * 2022-06-30 2022-09-23 中铁二十局集团第三工程有限公司 Temporary support of cross-sea cable-stayed bridge and construction method

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0820910A (en) * 1994-07-05 1996-01-23 Kajima Corp Construction method of pc cable stayed bridge
CN101440606A (en) * 2008-12-29 2009-05-27 中铁大桥局股份有限公司 Pier-side bracket capable of adjusting spatial position of steel beam
CN101793010A (en) * 2010-03-16 2010-08-04 中交二航局第二工程有限公司 Arch-included integral pushing method for large-tonnage multi-span combined arch bridge
CN101858055A (en) * 2010-06-04 2010-10-13 中交第一航务工程局有限公司 Setting steel pipe bracket support system of cover beam and construction method thereof
CN201850510U (en) * 2010-09-30 2011-06-01 中铁四局集团第一工程有限公司 Inverted triangular support of cast-in-situ box girder
CN201952736U (en) * 2011-01-18 2011-08-31 中铁大桥局集团第五工程有限公司 Auxiliary pier movable bracket for assisting invariable-amplitude beam erecting crane in erecting steel box girder
CN102261042A (en) * 2011-06-09 2011-11-30 四川川交路桥有限责任公司 Cantilever diagonal bracing bracket for casting bridge pier cover beam
CN102587280A (en) * 2012-02-14 2012-07-18 中铁大桥局集团第五工程有限公司 Main tower area steel truss girder erection method of base support auxiliary frame beam crane and base support
CN202369921U (en) * 2011-11-01 2012-08-08 中铁四局集团第一工程有限公司 Inverted trapezoidal truss
CN202595631U (en) * 2012-05-24 2012-12-12 山东省路桥集团有限公司 Bridge structure support

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0820910A (en) * 1994-07-05 1996-01-23 Kajima Corp Construction method of pc cable stayed bridge
CN101440606A (en) * 2008-12-29 2009-05-27 中铁大桥局股份有限公司 Pier-side bracket capable of adjusting spatial position of steel beam
CN101793010A (en) * 2010-03-16 2010-08-04 中交二航局第二工程有限公司 Arch-included integral pushing method for large-tonnage multi-span combined arch bridge
CN101858055A (en) * 2010-06-04 2010-10-13 中交第一航务工程局有限公司 Setting steel pipe bracket support system of cover beam and construction method thereof
CN201850510U (en) * 2010-09-30 2011-06-01 中铁四局集团第一工程有限公司 Inverted triangular support of cast-in-situ box girder
CN201952736U (en) * 2011-01-18 2011-08-31 中铁大桥局集团第五工程有限公司 Auxiliary pier movable bracket for assisting invariable-amplitude beam erecting crane in erecting steel box girder
CN102261042A (en) * 2011-06-09 2011-11-30 四川川交路桥有限责任公司 Cantilever diagonal bracing bracket for casting bridge pier cover beam
CN202369921U (en) * 2011-11-01 2012-08-08 中铁四局集团第一工程有限公司 Inverted trapezoidal truss
CN102587280A (en) * 2012-02-14 2012-07-18 中铁大桥局集团第五工程有限公司 Main tower area steel truss girder erection method of base support auxiliary frame beam crane and base support
CN202595631U (en) * 2012-05-24 2012-12-12 山东省路桥集团有限公司 Bridge structure support

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
马涛: ""天兴洲长江大桥墩顶4节间钢桁梁安装方案"", 《山西建筑》, no. 1, 31 January 2010 (2010-01-31), pages 317 - 318 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107604827A (en) * 2017-08-04 2018-01-19 中铁大桥局集团有限公司 A kind of porous large-span freely-supported steel truss girder bridge erection method
CN108824202A (en) * 2018-07-05 2018-11-16 中交第二航务工程局有限公司 For the installation of concrete deck cable stayed bridge Hanging Basket and the support system of tower area beam cast-in-place construction
CN108824202B (en) * 2018-07-05 2023-06-09 中交第二航务工程局有限公司 Support system for concrete cable-stayed bridge hanging basket installation and tower area beam cast-in-situ construction
CN109356036A (en) * 2018-11-26 2019-02-19 中铁六局集团有限公司 Middle pier pier-side bracket and its construction method
CN110241733A (en) * 2019-06-03 2019-09-17 中铁大桥局集团有限公司 A kind of large space antarafacial bracket integral installation method
CN110374006A (en) * 2019-07-22 2019-10-25 中铁大桥局集团有限公司 A kind of construction method for removing space opposite sex large-tonnage steel beam bracket
CN110374006B (en) * 2019-07-22 2021-08-10 中铁大桥局集团有限公司 Construction method for dismantling space anisotropic large-tonnage steel beam bracket
CN110424272A (en) * 2019-08-27 2019-11-08 中交路桥华南工程有限公司 Sarasota beam section bracket and its erection method
CN112609578A (en) * 2020-11-24 2021-04-06 中铁二局集团有限公司 Method for mounting steel truss girder at top section of bridge pier of cable-stayed bridge
CN112609578B (en) * 2020-11-24 2022-07-22 中铁二局集团有限公司 Method for mounting steel truss girder at top section of bridge pier of cable-stayed bridge
CN115094764A (en) * 2022-06-30 2022-09-23 中铁二十局集团第三工程有限公司 Temporary support of cross-sea cable-stayed bridge and construction method

Also Published As

Publication number Publication date
CN103103925B (en) 2015-04-29

Similar Documents

Publication Publication Date Title
CN103103925B (en) Combined H-shaped steel column bracket
CN201077721Y (en) Gantry crane with falling girder
CN203188589U (en) Rigid-frame continuous beam zero block construction bracket supporting system
CN201428239Y (en) Supporting system for combined channel steel cantilever bracket template
CN105484162B (en) Suspension bridge construction stiff girder secondary on the bank swings moving device and method
CN104532749A (en) Support used for construction of upper beam of main tower of suspension bridge
CN106638314A (en) Pylon cross beam non-floor stand and pylon cross beam construction method
CN103243649A (en) System and method for quickly installing and positioning cable saddle
CN203199913U (en) Assembling and disassembling type hoisting truss
CN102261043A (en) Assembled steel pipe upright post system
CN204385629U (en) A kind of support for the construction of suspension bridge king-tower top rail
CN204662929U (en) A kind of cross-line walking fence operation device
CN203795315U (en) High pier cable-stayed bridge No.0 block non-bracket construction structure
CN103422436B (en) Construction method for utilizing corrugated steel webs to bear construction load
CN205874978U (en) A tie rod support for $descending hold formula steel pipe concrete tied arch bridge
CN210856954U (en) Support-free cable hoisting construction structure of steel arch center for deck arch bridge
CN202220400U (en) Lap-joint type formwork support beam
CN204126297U (en) A kind of temporary support of steel truss roof
CN203429556U (en) System for quickly installing and positioning cable saddle
CN210975570U (en) Operation platform for construction of large-section steel-concrete composite beam
CN210737378U (en) Support is used in bridge king-tower entablature construction
CN204080634U (en) Wavelike steel webplate continuous box girder hanging basket device
CN112664235A (en) Walking type pipe gallery formwork supporting device
CN202144681U (en) Oar-type steel well frame
CN112709162A (en) Large-span thin-wall concrete sound barrier pouring trolley

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant