CN103103925B - Combined H-shaped steel column bracket - Google Patents
Combined H-shaped steel column bracket Download PDFInfo
- Publication number
- CN103103925B CN103103925B CN201310047187.6A CN201310047187A CN103103925B CN 103103925 B CN103103925 B CN 103103925B CN 201310047187 A CN201310047187 A CN 201310047187A CN 103103925 B CN103103925 B CN 103103925B
- Authority
- CN
- China
- Prior art keywords
- steel column
- profile steel
- combination
- tower
- king
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The invention relates to bridge starting section beam pier side support construction equipment, in particular to a steel truss grider cable stayed bridge starting section beam pier side combined H-shaped steel column bracket which is convenient to construct and safe. The combined H-shaped steel column bracket comprises a main pylon. Two bases are arranged on each of two sides of the bottom of the main pylon, four bases are respectively and fixedly provided with a combined H-shaped steel column outwards in an inclined mode, and every two combined H-shaped steel columns are symmetrical relative to the main pylon. The top of each combined H-shaped steel column is connected with one end of a slide beam, and the other end of the slide beam is arranged on a tower foundation support in the middle of the main pylon. The combined H-shaped steel column bracket is large in bearing capacity, easy to install, convenient to dismantle, economical and convenient, construction time is shortened, and high-altitude work danger is reduced.
Description
Technical field
The present invention relates to bridge initial beam sections pier collateral branch frame construction equipment, the initial beam sections pier of the steel truss girder cable-stayed bridge other combination H profile steel pillar bracket of a kind of easy construction specifically, safety.
Background technology
Along with the high speed development of China's economy and Transportation Infrastructure Construction, increasing public rail and combined longspan steel truss girder CONSTRUCTION OF CABLE-STAYED BRIDGE engineering are there is.The main bridge of non-major P.E.subject generally adopts steel purlin Cable-stayed Bridge Scheme, and girder adopts biplate purlin formula structure.Two panels main truss horizontal spacing is larger, bridge pier side bracket is as the platform for lining of pier top four internode steel girder erection and transposition is whole in length and breadth workbench, also be the main support structure that first pair of suspension cable hangs front girder steel weight, pier-side bracket is made up of two, north and south bracket, load-bearing steel box-girder (slipway beam), bearing beam (slide) and three direction displacement adjusting device etc.Bracket column design adopts steel pipe post structure, along bridge to the stake of employing four comb (one-sided two rows), cross-bridges arranges two comb stakes, great slope is pressed laterally to outermost steel pipe along bridge, minor grade pressed laterally by suitable bridge to the inside steel pipe, adopt steel pipe as connection system between column, coxopodite column welds with built-in fitting on tower seat.Due to steel pipe post as bracket, between steel pipe, connected mode has welding or ring flange to connect, and is welded to connect and causes overhead welding workload large, and dangerous high, the engineering time is long; And ring flange connects, due to more to connecting bolt, sections is more, and cause overhead connection to install difficulty, construction risk is large, and the engineering time is long.
Summary of the invention
The present invention, mainly for the above-mentioned technical problem existing for prior art, provides the combination H profile steel pillar bracket of a kind of easy construction, safety.
Above-mentioned technical problem of the present invention is mainly solved by following technical proposals: a kind of combination H profile steel pillar bracket, comprise king-tower post, both sides, described king-tower column bottom are respectively equipped with two bases, obliquely respectively on described four bases outer be installed with a combination H profile steel column, the combination H profile steel column described in every two is relative to king-tower column symmetry; The top of described each combination H profile steel column is connected with one end of a slipway beam respectively, and the other end of described slipway beam is positioned on the tower pier bearing that is positioned in the middle part of king-tower post.
As preferably, described combination H profile steel column is connected by many connecting rods with between king-tower post.
As preferably, by universal rod body bolt between the H profile steel of described combination H profile steel column inside.
As preferably, between described combination H profile steel column sections, position connection by end plate by bolt.
As preferably, described tower pier bearing two ends are respectively provided with a tower pier shearing resistance bearing, and described two slipway beam one end combine H profile steel column top respectively with one hinged, and the other end to be positioned on tower pier shearing resistance bearing and to draw connection mutually by reinforcing bar.
As preferably, described slipway beam be placed in one end on tower pier shearing resistance bearing by described tower pier bearing internal reservation hole to drawing finish rolling deformed bar to connect.
As preferably, described every two are passed through fastener for connection between the combination H profile steel column of king-tower post the same side.
The present invention combines H profile steel bottom joint of vertical column and is fixed on base, other sections is connected by end plate place bolt, slipway beam one end is articulated and connected with combination H profile steel column, one end is placed on tower pier bearing, and by the slipway beam of tower pier bearing both sides being carried out drawing to pull-up structure, between combination H profile steel column and king-tower post, connecting rod is adopted to connect, by fastener for connection between combination H profile steel column, to strengthen stability.At direction across bridge, two H profile steel braces are connected into entirety, jointly stressed.Bearing capacity of the present invention is large, installs easily, convenient disassembly, decrease the high-altitude splicing installation difficulty that steel pipe brings, and construction quality more easily ensures, decreases the engineering time, reduces work high above the ground danger, economical convenient.
Accompanying drawing explanation
Accompanying drawing 1 is the present invention's one combination H profile steel pillar bracket structure section figure.
Accompanying drawing 2 is the present invention's one combination H profile steel pillar bracket structural facades figure.
Accompanying drawing 3 is the present invention's one combination H profile steel pillar bracket steel column sections joint plane layout drawing.
Detailed description of the invention
Below by embodiment, and by reference to the accompanying drawings, be described in further detail technical scheme of the present invention, obviously, described embodiment is only section Example of the present invention.
Embodiment 1:
See accompanying drawing 1 ~ 3, the present invention's one combination H profile steel pillar bracket, comprise king-tower post 8, described king-tower post 8 two bottom sides is respectively equipped with two bases 6, obliquely respectively on described four bases 6 outer be installed with a combination H profile steel column 1, the combination H profile steel column 1 described in every two is symmetrical relative to king-tower post 8; The top of described each combination H profile steel column 1 is connected with one end of a slipway beam 2 respectively, and the other end of described slipway beam 2 is positioned on the tower pier bearing 7 that is positioned in the middle part of king-tower post 8.Described combination H profile steel column 1 is connected by many connecting rods 3 with between king-tower post 8, by universal rod body 10 bolt between the H profile steel of described combination H profile steel column 1 inside, between described combination H profile steel column 1 sections, position connection by end plate 11 by bolt.Described tower pier bearing 7 two ends are respectively provided with a tower pier shearing resistance bearing 4, described two slipway beam 2 one end combine H profile steel column 1 top respectively with one hinged, the other end to be positioned on tower pier shearing resistance bearing 4 and to draw connection mutually by reinforcing bar, described slipway beam 2 be placed in one end on tower pier shearing resistance bearing 4 by described tower pier bearing 7 internal reservation hole to drawing finish rolling deformed bar to connect, described every two are connected by steel pipe 9 between the combination H profile steel column 1 of king-tower post 8 the same side.
The present invention combines H profile steel bottom joint of vertical column and is fixed on base, other sections is connected by end plate place bolt, slipway beam one end is articulated and connected with combination H profile steel column, one end is placed on tower pier bearing, and by the slipway beam of tower pier bearing both sides being carried out drawing to pull-up structure, between combination H profile steel column and king-tower post, connecting rod is adopted to connect, by fastener for connection between combination H profile steel column, to strengthen stability.At direction across bridge, two H profile steel braces are connected into entirety, jointly stressed.Bearing capacity of the present invention is large, installs easily, convenient disassembly, decrease the high-altitude splicing installation difficulty that steel pipe brings, and construction quality more easily ensures, decreases the engineering time, reduces work high above the ground danger, economical convenient.
Should be understood that above-described embodiment is only not used in for illustration of the present invention to limit the scope of the invention.In addition should be understood that those skilled in the art can make various changes or modifications the present invention, and these equivalent form of values fall within the application's appended claims limited range equally after the content of having read the present invention's instruction.
Claims (1)
1. a combination H profile steel pillar bracket, it is characterized in that: comprise king-tower post (8), described king-tower post (8) two bottom sides is respectively equipped with two bases (6), obliquely respectively on described four bases (6) outer be installed with combination H profile steel column (1), the combination H profile steel column (1) described in every two is symmetrical relative to king-tower post (8); The top of described each combination H profile steel column (1) is connected with one end of a slipway beam (2) respectively, the other end of described slipway beam (2) be positioned over be positioned at king-tower post (8) middle part tower pier bearing (7) on;
Described combination H profile steel column (1) is connected by many connecting rods (3) with between king-tower post (8);
By universal rod body (10) bolt between the H profile steel that described combination H profile steel column (1) is inner;
Connection is positioned by end plate (11) by bolt between described combination H profile steel column (1) sections;
Described tower pier bearing (7) two ends are respectively provided with tower pier shearing resistance bearing (4), described two slipway beam (2) one end combine H profile steel column (1) top respectively with one hinged, and the other end is positioned over tower pier shearing resistance bearing (4) and goes up and draw connection mutually by reinforcing bar;
Described slipway beam (2) be placed in one end in tower pier shearing resistance bearing (4) by described tower pier bearing (7) internal reservation hole to drawing finish rolling deformed bar to connect;
Described every two are connected by steel pipe (9) between the combination H profile steel column (1) of king-tower post (8) the same side.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310047187.6A CN103103925B (en) | 2013-02-06 | 2013-02-06 | Combined H-shaped steel column bracket |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310047187.6A CN103103925B (en) | 2013-02-06 | 2013-02-06 | Combined H-shaped steel column bracket |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103103925A CN103103925A (en) | 2013-05-15 |
CN103103925B true CN103103925B (en) | 2015-04-29 |
Family
ID=48312099
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310047187.6A Active CN103103925B (en) | 2013-02-06 | 2013-02-06 | Combined H-shaped steel column bracket |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103103925B (en) |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107604827A (en) * | 2017-08-04 | 2018-01-19 | 中铁大桥局集团有限公司 | A kind of porous large-span freely-supported steel truss girder bridge erection method |
CN108824202B (en) * | 2018-07-05 | 2023-06-09 | 中交第二航务工程局有限公司 | Support system for concrete cable-stayed bridge hanging basket installation and tower area beam cast-in-situ construction |
CN109356036A (en) * | 2018-11-26 | 2019-02-19 | 中铁六局集团有限公司 | Middle pier pier-side bracket and its construction method |
CN110241733A (en) * | 2019-06-03 | 2019-09-17 | 中铁大桥局集团有限公司 | A kind of large space antarafacial bracket integral installation method |
CN110374006B (en) * | 2019-07-22 | 2021-08-10 | 中铁大桥局集团有限公司 | Construction method for dismantling space anisotropic large-tonnage steel beam bracket |
CN110424272A (en) * | 2019-08-27 | 2019-11-08 | 中交路桥华南工程有限公司 | Sarasota beam section bracket and its erection method |
CN112609578B (en) * | 2020-11-24 | 2022-07-22 | 中铁二局集团有限公司 | Method for mounting steel truss girder at top section of bridge pier of cable-stayed bridge |
CN115094764A (en) * | 2022-06-30 | 2022-09-23 | 中铁二十局集团第三工程有限公司 | Temporary support of cross-sea cable-stayed bridge and construction method |
Family Cites Families (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0820910A (en) * | 1994-07-05 | 1996-01-23 | Kajima Corp | Construction method of pc cable stayed bridge |
CN101440606A (en) * | 2008-12-29 | 2009-05-27 | 中铁大桥局股份有限公司 | Pier-side bracket capable of adjusting spatial position of steel beam |
CN101793010B (en) * | 2010-03-16 | 2012-08-29 | 中交二航局第二工程有限公司 | Arch-included integral pushing method for large-tonnage multi-span combined arch bridge |
CN101858055A (en) * | 2010-06-04 | 2010-10-13 | 中交第一航务工程局有限公司 | Setting steel pipe bracket support system of cover beam and construction method thereof |
CN201850510U (en) * | 2010-09-30 | 2011-06-01 | 中铁四局集团第一工程有限公司 | Inverted triangular support of cast-in-situ box girder |
CN201952736U (en) * | 2011-01-18 | 2011-08-31 | 中铁大桥局集团第五工程有限公司 | Auxiliary pier movable bracket for assisting invariable-amplitude beam erecting crane in erecting steel box girder |
CN102261042B (en) * | 2011-06-09 | 2013-03-06 | 四川川交路桥有限责任公司 | Cantilever diagonal bracing bracket for casting bridge pier cover beam |
CN202369921U (en) * | 2011-11-01 | 2012-08-08 | 中铁四局集团第一工程有限公司 | Inverted trapezoidal truss |
CN102587280B (en) * | 2012-02-14 | 2013-12-25 | 中铁大桥局集团第五工程有限公司 | Main tower area steel truss girder erection method of base support auxiliary frame beam crane and base support |
CN202595631U (en) * | 2012-05-24 | 2012-12-12 | 山东省路桥集团有限公司 | Bridge structure support |
-
2013
- 2013-02-06 CN CN201310047187.6A patent/CN103103925B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN103103925A (en) | 2013-05-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103103925B (en) | Combined H-shaped steel column bracket | |
CN104213508B (en) | A kind of method utilizing stull and external tendon to control king-post displacement | |
CN203334730U (en) | Split mounting type steel-structure movable workshop in construction site | |
CN201428239Y (en) | Supporting system for combined channel steel cantilever bracket template | |
CN105568853A (en) | Large-span steel concrete combined truss girder side position transverse movement and girder dropping construction method | |
CN108240069A (en) | A kind of large span multi-section combined truss roof structure system and its construction method | |
CN104532749A (en) | Support used for construction of upper beam of main tower of suspension bridge | |
CN202626846U (en) | Ultrahigh combined support for bridge side span cast-in-situ section | |
CN105003090A (en) | Temporary support frame for mounting assembly type steel structure | |
CN103243649A (en) | System and method for quickly installing and positioning cable saddle | |
CN102444270B (en) | Sleeve joint oblique key type support bracket | |
CN111608078A (en) | Construction method of combined Bailey cable crane tower | |
CN204385629U (en) | A kind of support for the construction of suspension bridge king-tower top rail | |
CN202176343U (en) | Self-propelled multifunctional template trolley combining device | |
CN204662929U (en) | A kind of cross-line walking fence operation device | |
CN203795315U (en) | High pier cable-stayed bridge No.0 block non-bracket construction structure | |
CN204876631U (en) | Assembled steel structure installation uses interim support frame | |
CN204126297U (en) | A kind of temporary support of steel truss roof | |
CN103835238A (en) | High-pier cable-stayed bridge zero-number block non-bracket construction method and structure in construction process | |
CN203429556U (en) | System for quickly installing and positioning cable saddle | |
CN110080117A (en) | Portable simplified concrete barrier formwork vehicle and preparation method thereof | |
CN210975570U (en) | Operation platform for construction of large-section steel-concrete composite beam | |
CN204418027U (en) | A kind of bracket of the cable saddle floor installation that falls apart for self-anchored suspension bridge | |
CN202790959U (en) | Steel pipe truss structure based on aloft lateral support | |
CN204057576U (en) | Be attached to the jacking system of section |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |