CN203546599U - Pier-side bracket - Google Patents
Pier-side bracket Download PDFInfo
- Publication number
- CN203546599U CN203546599U CN201320602605.9U CN201320602605U CN203546599U CN 203546599 U CN203546599 U CN 203546599U CN 201320602605 U CN201320602605 U CN 201320602605U CN 203546599 U CN203546599 U CN 203546599U
- Authority
- CN
- China
- Prior art keywords
- pier
- bracket
- side bracket
- steel truss
- truss girder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320602605.9U CN203546599U (en) | 2013-09-27 | 2013-09-27 | Pier-side bracket |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320602605.9U CN203546599U (en) | 2013-09-27 | 2013-09-27 | Pier-side bracket |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203546599U true CN203546599U (en) | 2014-04-16 |
Family
ID=50464736
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320602605.9U Expired - Lifetime CN203546599U (en) | 2013-09-27 | 2013-09-27 | Pier-side bracket |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203546599U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108265634A (en) * | 2018-03-12 | 2018-07-10 | 中铁建大桥工程局集团第四工程有限公司 | A kind of high pier girder steel pushing tow support device and construction method |
CN108677741A (en) * | 2018-07-27 | 2018-10-19 | 中国铁建大桥工程局集团有限公司 | A kind of construction method promoting high pier large-tonnage steel bearing |
CN109356036A (en) * | 2018-11-26 | 2019-02-19 | 中铁六局集团有限公司 | Middle pier pier-side bracket and its construction method |
CN110258293A (en) * | 2019-07-22 | 2019-09-20 | 中铁大桥局集团有限公司 | Cable-stayed bridge steel truss girder main pylon pier top erection construction method |
-
2013
- 2013-09-27 CN CN201320602605.9U patent/CN203546599U/en not_active Expired - Lifetime
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108265634A (en) * | 2018-03-12 | 2018-07-10 | 中铁建大桥工程局集团第四工程有限公司 | A kind of high pier girder steel pushing tow support device and construction method |
CN108265634B (en) * | 2018-03-12 | 2023-09-29 | 中铁建大桥工程局集团第四工程有限公司 | High pier steel beam pushing supporting device and construction method |
CN108677741A (en) * | 2018-07-27 | 2018-10-19 | 中国铁建大桥工程局集团有限公司 | A kind of construction method promoting high pier large-tonnage steel bearing |
CN109356036A (en) * | 2018-11-26 | 2019-02-19 | 中铁六局集团有限公司 | Middle pier pier-side bracket and its construction method |
CN110258293A (en) * | 2019-07-22 | 2019-09-20 | 中铁大桥局集团有限公司 | Cable-stayed bridge steel truss girder main pylon pier top erection construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103510475B (en) | Three main truss steel truss girder simply connected twin spans are without nose girder long distance push construction method | |
CN109868755B (en) | Hanging basket construction method for diamond truss hanging basket and cantilever beam | |
CN203546599U (en) | Pier-side bracket | |
CN103938552B (en) | Steel truss arched bridge self-balancing cantilever construction method and the spacing bearing of main pier | |
CN103074854A (en) | Rear supporting point triangular bracket hanging basket and bridge construction method using same | |
CN105839549A (en) | Truss type cantilever construction hanging basket | |
CN102535348B (en) | Method for tensioning stayed cables of hinged tower cable stayed bridge | |
CN109736206A (en) | Wavelike steel webplate continuous bridge end bay closes up cast-in-place support structure and construction method | |
CN103898834A (en) | Concrete-filled steel tube composite beam and trussed cable tower cable-stayed bridge and construction method thereof | |
CN202380390U (en) | Flexible arch support frame with vault pushing steel truss girder | |
CN203049471U (en) | Rear fulcrum triangular bracket hanging basket | |
CN207244469U (en) | Beam body aids in thrustor | |
CN205421022U (en) | Suspension bridge stiffening beam handing equipment that slides | |
CN102926330B (en) | Installation method of hanging basket suitable for bridge construction | |
CN205636521U (en) | Basket is hung in construction of truss -like cantilever | |
CN205242238U (en) | Be applied to self anchored suspension bridge's main girder structure | |
CN211815595U (en) | Lower tower column tension and compression structure for cable tower | |
CN101831872B (en) | Front and rear fulcrum combined cradle | |
CN204644869U (en) | Drag-line bridge tower anchoring structure | |
CN207700074U (en) | The double limb triangle hanging baskets of continuous rigid frame bridge cantilever beam section construction | |
CN110219234A (en) | Temperature self-adaptation tower Liang Shunqiao is to constant temperature reinforcing pull rod constrained procedure and system | |
CN203741729U (en) | Pre-stress supporting system used for bridge incremental launching construction method | |
CN203361021U (en) | Double-spliced type truss hanging basket | |
CN202416192U (en) | Rhombus truss hanging basket used in bridge construction | |
CN103132461B (en) | For the flexible carrier device of steel truss beam bridge cantilever construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Owner name: GROUP CO., LTD., ZHONGTIE DAQIAO BUREAU Free format text: FORMER OWNER: CHINA ZHONGTIE MAJOR BRIDGE ENGINEERING CO., LTD. Effective date: 20150225 Owner name: NO.1 ENGINEERING CO., LTD., ZHONGTIE BRIDGE BUREAU Free format text: FORMER OWNER: NO.1 ENGINEERING CO., LTD., ZHONGTIE BRIDGE BUREAU GROUP GROUP CO., LTD., ZHONGTIE DAQIAO BUREAU Effective date: 20150225 |
|
C41 | Transfer of patent application or patent right or utility model | ||
COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 430074 WUHAN, HUBEI PROVINCE TO: 430050 WUHAN, HUBEI PROVINCE |
|
TR01 | Transfer of patent right |
Effective date of registration: 20150225 Address after: 430050 Hanyang Road, Hanyang District, Hubei, No. 38, No. Patentee after: CHINA RAILWAY MAJOR BRIDGE ENGINEERING GROUP Co.,Ltd. Patentee after: 1ST ENGINEERING CO., LTD. OF CHINA RAILWAY MAJOR BRIDGE ENGINEERING GROUP Co.,Ltd. Address before: 430074 Hubei province Wuhan Dongxin East Lake New Technology Development Zone Road SBI Venture Street No. 6 Building 12 layer Patentee before: CHINA RAILWAY MAJOR BRIDGE ENGINEERING Co.,Ltd. Patentee before: 1ST ENGINEERING CO., LTD. OF CHINA RAILWAY MAJOR BRIDGE ENGINEERING GROUP Co.,Ltd. Patentee before: CHINA RAILWAY MAJOR BRIDGE ENGINEERING GROUP Co.,Ltd. |
|
CX01 | Expiry of patent term |
Granted publication date: 20140416 |
|
CX01 | Expiry of patent term |