CN108677741A - A kind of construction method promoting high pier large-tonnage steel bearing - Google Patents

A kind of construction method promoting high pier large-tonnage steel bearing Download PDF

Info

Publication number
CN108677741A
CN108677741A CN201810838757.6A CN201810838757A CN108677741A CN 108677741 A CN108677741 A CN 108677741A CN 201810838757 A CN201810838757 A CN 201810838757A CN 108677741 A CN108677741 A CN 108677741A
Authority
CN
China
Prior art keywords
pier
slideway
construction method
steel bearing
tonnage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810838757.6A
Other languages
Chinese (zh)
Inventor
宋伟俊
王晨光
王宏毅
林再志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Bridge Engineering Bureau Group Co Ltd
Original Assignee
China Railway Construction Bridge Engineering Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Bridge Engineering Bureau Group Co Ltd filed Critical China Railway Construction Bridge Engineering Bureau Group Co Ltd
Priority to CN201810838757.6A priority Critical patent/CN108677741A/en
Publication of CN108677741A publication Critical patent/CN108677741A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/04Bearings; Hinges

Abstract

The invention provides a kind of construction method promoting high pier large-tonnage steel bearing, and the device applied includes the pier top slideway being connected and fixed with built-in fitting on bridge pier, and the pier top hanger for being adjusted to pier coping portion can be slid through slideway by being equipped on slideway;The pier top hanger is equipped with the hoisting mechanism for driving steel strand wires folding and unfolding, and the steel strand wires lower end is connected with promotion hanging basket.The method for improving that the invention provides, can safely and effectively carry out the promotion work of high pier large-tonnage steel bearing, be particularly suitable for the case where field condition is not suitable for using heavy mechanical equipment.Meanwhile the structure member involved in method for improving can be repeatedly utilized so that, construction cost is greatly saved, the Improve Efficiency that high pier large-tonnage steel bearing is joined for overlength is particularly evident.

Description

A kind of construction method promoting high pier large-tonnage steel bearing
Technical field
The invention belongs to technical field of bridge engineering, and applying for high pier large-tonnage steel bearing is promoted more particularly, to a kind of Work method.
Background technology
With the rapid development of Bridges in Our Country technology, comprehensive speed-raising of railway, the demand to across river, cross a river bridge constantly increases Add.Have become the mainstream of existing Loads of Long-span Bridges across river, cross a river non-major P.E.subject.Not with bridge span and design load Disconnected to increase, the bearing specification for connecting bridge upper beam and lower part pier shaft is also increasing, the increase of supporting stand size and weight So that the lifting of bearing becomes problem.Traditional bearing installation method is lifted using heavy mechanical equipment, large-tonnage branch The lifting of seat is to the more demanding of mechanical equipment, and there is use costs, and high, foundation requires high limitation.
Invention content
In view of this, the invention proposes a kind of construction method promoting high pier large-tonnage steel bearing, effective solution Scene can not use heavy mechanical equipment lifting bearing or the problem of heavy mechanical equipment higher operating costs, using this method, It can be efficiently completed bearing lifting work, while saving construction cost.
In order to achieve the above objectives, the technical solution of the invention is realized in:
A kind of construction method promoting high pier large-tonnage steel bearing, the constructing device of the application include with it is pre-buried on bridge pier The pier top slideway that part is connected and fixed, the pier top hanger for being adjusted to pier coping portion can be slid through slideway by being equipped on slideway;The pier Top handling attachment is equipped with the hoisting mechanism for driving steel strand wires folding and unfolding, and the steel strand wires lower end is connected with promotion hanging basket.
Construction method includes the following steps:
1. before the final section concrete of bridge pier pier shaft of constructing, built-in fitting is set at design position;
2. after pier shaft concrete construction, pier top slideway is installed on built-in fitting, and pier top is set up on pier top slideway Hanger;
3. in pier top hanger over-assemble hoisting mechanism, steel strand wires are worn on hoisting mechanism, and by steel strand wires lower end and pier Promotion hanging basket connection at the position of bottom;
It is promoted on hanging basket 4. bridle iron to be hoisted is placed in, manipulates hoisting mechanism and pull steel strand wires, bridle iron is carried Rise to pier top position.
Further, spatial position is limited at pier bottom, it is difficult to which when storing the promotion hanging basket, in pier bottom position, setting is used for Storage promotes the pier bottom hanging basket holder of hanging basket.
Further, the hoisting mechanism includes vertical jack.
Further, the built-in fitting includes the steel plate for fixing pier top slideway.
Further, it is equipped with concrete edge joist at the top of the pier shaft, the pier top slideway is by the concrete edge joist branch Support is fixed.
Further, the concrete edge joist setting is several, is uniformly arranged centered on bridge pier center line.
Further, step 1. in design position at include concrete edge joist edge.
Compared with the existing technology, the invention has the advantage that:
The method for improving that the invention provides, can safely and effectively carry out the promotion work of high pier large-tonnage steel bearing Make, is particularly suitable for the case where field condition is not suitable for using heavy mechanical equipment.Meanwhile the structural portion involved in method for improving Part can be repeatedly utilized so that, construction cost is greatly saved, and the Improve Efficiency that high pier large-tonnage steel bearing is joined for overlength is particularly bright It is aobvious.
Description of the drawings
The attached drawing for constituting the part of the invention is used for providing further understanding the invention, present invention wound The illustrative embodiments and their description made do not constitute the improper restriction to the invention for explaining the invention. In attached drawing:
Fig. 1 is the structural schematic diagram of the invention;
Fig. 2 is the structural schematic diagram in the directions A-A in Fig. 1;
Fig. 3 is the structural schematic diagram in the directions B-B in Fig. 1;
Fig. 4 is the structural schematic diagram in the directions C-C in Fig. 1;
Fig. 5 is schematic diagram of the invention when pier bottom hanging basket holder is arranged close to bridge pier bottom position.
Reference sign:
1- built-in fittings;2- pier top slideways;3- pier top hangers;4- steel strand wires;5- hoisting mechanisms;6- promotes hanging basket;7- pier bottoms Hanging basket holder;8- concrete edge joists.
Specific implementation mode
It should be noted that in the absence of conflict, the feature in embodiment and embodiment in the invention can To be combined with each other.
In the description of the invention, it is to be understood that term "center", " longitudinal direction ", " transverse direction ", "upper", "lower", The orientation or positional relationship of the instructions such as "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outside" is It is based on the orientation or positional relationship shown in the drawings, is merely for convenience of description the invention and simplifies to describe, rather than indicate Or imply that signified device or element must have a particular orientation, with specific azimuth configuration and operation, therefore cannot understand For the limitation to the invention.In addition, term " first ", " second " etc. are used for description purposes only, and should not be understood as indicating Or it implies relative importance or implicitly indicates the quantity of indicated technical characteristic." first ", " second " etc. are defined as a result, Feature can explicitly or implicitly include one or more this feature.In the description of the invention, unless separately It is described, the meaning of " plurality " is two or more.
In the description of the invention, it should be noted that unless otherwise clearly defined and limited, term " peace Dress ", " connected ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integrally Connection;It can be mechanical connection, can also be electrical connection;Can be directly connected, can also indirectly connected through an intermediary, It can be the connection inside two elements.For the ordinary skill in the art, on being understood by concrete condition State concrete meaning of the term in the invention.
With reference to embodiment come the present invention will be described in detail create.
A kind of device applied in the construction method for promoting high pier large-tonnage steel bearing, as shown in Fig. 1 to 5, including with bridge The pier top slideway 2 that built-in fitting 1 is connected and fixed on pier, the pier top for being adjusted to pier coping portion can be slid through slideway by, which being equipped on slideway, hangs Frame 3;The pier top hanger is equipped with the hoisting mechanism 5 for driving 4 folding and unfolding of steel strand wires, and the steel driven in hoisting mechanism twists Line lower end, which is connected with, promotes hanging basket 6.
A kind of construction method promoting high pier large-tonnage steel bearing using above-mentioned apparatus is provided below, includes the following steps:
1. (in fact, final section slow setting soil here refers to pier shaft before the final section concrete of bridge pier pier shaft of constructing Topmost can also be the concrete edge joist at the top of pier shaft signified in the following contents), (press force analysis in design position With selected position after design) at be arranged built-in fitting;
2. after pier shaft concrete construction, pier top slideway is installed on built-in fitting, and pier top is set up on pier top slideway Hanger;In general, pier top sliding provides space for the adjustment of pier top hanger installation site, and the slideway as adjustment uses.Pier top Slideway can be perpendicular to pier shaft setting, facilitate pier top hanger towards being adjusted on bridge pier (closer or far from bridge pier) direction It is whole, to reach best using effect, also for the bridle iron of matching different size.
3. in pier top hanger over-assemble hoisting mechanism, steel strand wires are worn on hoisting mechanism, and by steel strand wires lower end and pier Promotion hanging basket connection at the position of bottom;Above-mentioned hoisting mechanism generally may include vertical jack, using vertically arranged very heavy The stretching motion on top realizes the lifting of steel strand wires.Specifically, can be by extension bar one end of jack upward, and stretching out Fixed seat is arranged in bar top, and steel strand wires upper end is fixed in the fixed seat, by the flexible of jack, drives fixed seat or more Movement, and then realize the lifting of steel strand wires, to realize the lifting of the promotion hanging basket to steel strand wires lower end.
It is promoted on hanging basket 4. bridle iron to be hoisted is placed in, manipulates hoisting mechanism and pull steel strand wires, bridle iron is carried Rise to pier top position.Using above-mentioned lifting method for improving, large-tonnage steel bearing can be easily promoted, lifting process stabilization can It leans on, also, the position by adjusting pier top hanger on pier top slideway, effectively avoids bridle iron from being collided with bridge pier, lifting process It is reliable and stable.
It in addition, being promoted bridle iron to after pier top, can be adjusted, be realized by sliding of the pier top hanger on pier top slideway Installation in place can be efficiently completed bearing lifting work, while saving construction cost using this method.
Spatial position is limited at pier bottom, it is difficult to which when storing the promotion hanging basket, in pier bottom position, setting is carried for storing The pier bottom hanging basket holder 7 of hanging basket.Such structure setting, it is ensured that in the case of space is limited, carried carrying out bridle iron When rising operation, hanging basket will be promoted and be stored on pier bottom hanging basket holder, without transferring to pier bottom portion again.
It should be noted that when being provided with concrete edge joist 8, above-mentioned steps 1. in design position at include actually The edge of concrete edge joist.I.e., it is possible to be that slideway is fixed on the slow setting soil side joist of bridge pier, by concrete edge joist Reliable support is provided, keeps stablizing.
Above-mentioned built-in fitting includes the steel plate for fixing pier top slideway, pier top slideway is reliably fixed by steel plate, together When, above-mentioned pier shaft top is equipped with concrete edge joist, and the pier top slideway is fixed by the concrete edge joist support, can be true Guarantor's pier top slideway is fixed, and the stretching top of pier top slideway is practical to provide reliable support force by concrete side bar, and structure is steady It is qualitative good, will not unstability, promoted large-tonnage steel bearing when, entire operation process stationarity is good.
Above-mentioned concrete edge joist setting is several, is uniformly arranged centered on bridge pier center line, pier top slideway can be divided into Left and right two parts are separately fixed on corresponding concrete edge joist, to keep the stability for the pier top hanger installed on slideway.
The method for improving that the invention provides, can safely and effectively carry out the promotion work of high pier large-tonnage steel bearing Make, is particularly suitable for the case where field condition is not suitable for using heavy mechanical equipment.Meanwhile the structural portion involved in method for improving Part can be repeatedly utilized so that, construction cost is greatly saved, and the Improve Efficiency that high pier large-tonnage steel bearing is joined for overlength is particularly bright It is aobvious.
The foregoing is merely the preferred embodiments of the invention, are not intended to limit the invention creation, all at this Within the spirit and principle of innovation and creation, any modification, equivalent replacement, improvement and so on should be included in the invention Protection domain within.

Claims (7)

1. a kind of construction method promoting high pier large-tonnage steel bearing, which is characterized in that the device applied in method includes and bridge The pier top slideway that built-in fitting is connected and fixed on pier, the pier top for being adjusted to pier coping portion can be slid through slideway by, which being equipped on slideway, hangs Frame;The pier top hanger is equipped with the hoisting mechanism for driving steel strand wires folding and unfolding, and the steel strand wires lower end is connected with promotion and hangs Basket;
Construction method includes the following steps:
1. before the final section concrete of bridge pier pier shaft of constructing, built-in fitting is set at design position;
2. after pier shaft concrete construction, pier top slideway is installed on built-in fitting, and set up pier top hanger on pier top slideway;
3. in pier top hanger over-assemble hoisting mechanism, steel strand wires are worn on hoisting mechanism, and by steel strand wires lower end and pier bottom position Set the promotion hanging basket connection at place;
It is promoted on hanging basket 4. bridle iron to be hoisted is placed in, manipulates hoisting mechanism and pull steel strand wires, bridle iron is promoted to Pier top position.
2. a kind of construction method promoting high pier large-tonnage steel bearing according to claim 1, it is characterised in that:Work as pier bottom It is limited to locate spatial position, it is difficult to which when storing the promotion hanging basket, setting is hung for storing the pier bottom of promotion hanging basket in pier bottom position Basket holder.
3. a kind of construction method promoting high pier large-tonnage steel bearing according to claim 1, it is characterised in that:It is described to carry It includes vertical jack to rise mechanism.
4. a kind of construction method promoting high pier large-tonnage steel bearing according to claim 1, it is characterised in that:It is described pre- Embedded part includes the steel plate for fixing pier top slideway.
5. a kind of construction method promoting high pier large-tonnage steel bearing according to claim 1, it is characterised in that:The pier Concrete edge joist is equipped at the top of body, the pier top slideway is fixed by the concrete edge joist support.
6. a kind of construction method promoting high pier large-tonnage steel bearing according to claim 5, it is characterised in that:It is described mixed Solidifying soil side joist setting is several, is uniformly arranged centered on bridge pier center line.
7. a kind of construction method promoting high pier large-tonnage steel bearing according to claim 5, it is characterised in that:Step is 1. In design position at include concrete edge joist edge.
CN201810838757.6A 2018-07-27 2018-07-27 A kind of construction method promoting high pier large-tonnage steel bearing Pending CN108677741A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810838757.6A CN108677741A (en) 2018-07-27 2018-07-27 A kind of construction method promoting high pier large-tonnage steel bearing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810838757.6A CN108677741A (en) 2018-07-27 2018-07-27 A kind of construction method promoting high pier large-tonnage steel bearing

Publications (1)

Publication Number Publication Date
CN108677741A true CN108677741A (en) 2018-10-19

Family

ID=63815808

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810838757.6A Pending CN108677741A (en) 2018-07-27 2018-07-27 A kind of construction method promoting high pier large-tonnage steel bearing

Country Status (1)

Country Link
CN (1) CN108677741A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102493353A (en) * 2011-12-23 2012-06-13 中铁大桥局股份有限公司 Method for hoisting large equipment in bridge construction and pier top lifting frame
CN203546599U (en) * 2013-09-27 2014-04-16 中铁大桥局股份有限公司 Pier-side bracket
CN203716062U (en) * 2013-11-22 2014-07-16 中交二航局第四工程有限公司 Integral type pier body decorating hanging basket
KR101491952B1 (en) * 2014-03-18 2015-02-09 주식회사 인터컨스텍 Twin-leaf Arch System and Fabrication Method for thereof
KR101703798B1 (en) * 2016-01-08 2017-02-09 (주)천마기술단 Prestressed Concrete Beam with curve implementation possible connection structure and Constructing Method thereof
CN108086169A (en) * 2017-12-13 2018-05-29 中国铁建大桥工程局集团有限公司 The installation method for improving of bridge construction mobile formwork

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102493353A (en) * 2011-12-23 2012-06-13 中铁大桥局股份有限公司 Method for hoisting large equipment in bridge construction and pier top lifting frame
CN203546599U (en) * 2013-09-27 2014-04-16 中铁大桥局股份有限公司 Pier-side bracket
CN203716062U (en) * 2013-11-22 2014-07-16 中交二航局第四工程有限公司 Integral type pier body decorating hanging basket
KR101491952B1 (en) * 2014-03-18 2015-02-09 주식회사 인터컨스텍 Twin-leaf Arch System and Fabrication Method for thereof
KR101703798B1 (en) * 2016-01-08 2017-02-09 (주)천마기술단 Prestressed Concrete Beam with curve implementation possible connection structure and Constructing Method thereof
CN108086169A (en) * 2017-12-13 2018-05-29 中国铁建大桥工程局集团有限公司 The installation method for improving of bridge construction mobile formwork

Similar Documents

Publication Publication Date Title
CN201240810Y (en) Novel manual hoister
CN107298371A (en) A kind of steel structure modularization house universal hanger and on-site hoisting installation method
CN106592432B (en) A kind of prefabricated bent cap shell segmentation construction method of installation of huge thin-walled
CN208869222U (en) Hanging apparatus
CN207998792U (en) A kind of Hanging Basket rack mounting structure
CN207243234U (en) A kind of steel structure modularization house universal hanger
CN109231023A (en) The installation method of high pedestal jib crane boom system
CN108677741A (en) A kind of construction method promoting high pier large-tonnage steel bearing
CN105621242B (en) A kind of mobile maintenance suspension bracket
CN206874293U (en) Subway tunnel soft oil support device
CN205676052U (en) Bench type transformer crane device
CN109537863A (en) Operating platform support frame and operating platform
CN113089493B (en) High pier T beam hogging moment tensioning device and tensioning method
CN210140393U (en) Curtain wall suspension hoisting gun carriage
CN205259573U (en) A hanging flower basket hangs mechanism for high -rise roofing transformation
CN209384617U (en) Multi-functional construction operation platform for vertical hoistway
CN209685129U (en) A kind of stator of steam turbine generator hanging apparatus
CN209686833U (en) Operating platform support frame and operating platform
CN107642049A (en) A kind of device and its installation method changed for main rope of suspension bridge cord clip
CN210342619U (en) Connecting piece of integral lifting scaffold
CN208686109U (en) Lift beam steel bar colligation support frame and beam steel bar colligation auxiliary tool
CN209957241U (en) Steel hanger
CN210480628U (en) Rotatory hoist of two-way self-balancing
CN207484304U (en) Can double width synchronous construction Segmental assembling bridge-erecting machine
CN208135765U (en) A kind of air conditioner water standpipe fixed frame hanging apparatus

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181019