CN209686833U - Operating platform support frame and operating platform - Google Patents

Operating platform support frame and operating platform Download PDF

Info

Publication number
CN209686833U
CN209686833U CN201920081483.0U CN201920081483U CN209686833U CN 209686833 U CN209686833 U CN 209686833U CN 201920081483 U CN201920081483 U CN 201920081483U CN 209686833 U CN209686833 U CN 209686833U
Authority
CN
China
Prior art keywords
bracket
card slot
operating platform
support
support frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920081483.0U
Other languages
Chinese (zh)
Inventor
周斌斌
余伟华
舒泽斌
杜帆
陈任
高翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Science And Industry Co ltd
Original Assignee
China Construction Steel Structure Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Steel Structure Corp Ltd filed Critical China Construction Steel Structure Corp Ltd
Priority to CN201920081483.0U priority Critical patent/CN209686833U/en
Application granted granted Critical
Publication of CN209686833U publication Critical patent/CN209686833U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a kind of operating platform support frame and operating platforms, are related to technical field of building construction.A kind of operating platform support frame, including bracket component and card slot part.The quantity of card slot part be it is multiple, multiple card slot parts are used to be provided at circumferentially spaced around steel column, and the quantity of bracket component is multiple, and correspond with card slot part, and bracket component and card slot part are clamped, and the support platform for being used to support springboard is collectively formed.This operating platform support frame using bracket component and card slot part by being clamped, to build the support platform for installing springboard, it ensure that the installation of operating platform support frame and the flexibility removed, and it can be recycled, improve operating platform sets up efficiency, requires the staff of installing and dismounting lower.

Description

操作平台支撑架及操作平台Operating platform support frame and operating platform

技术领域technical field

本实用新型涉及建筑施工技术领域,具体而言,涉及一种操作平台支撑架及操作平台。The utility model relates to the technical field of building construction, in particular to an operating platform support frame and an operating platform.

背景技术Background technique

高层建筑工地现场钢构件主要采用“搭积木”的施工安装方式,通过专业施工人员使用起重设备将钢构件吊装就位、高空原位逐层装配完成。根据钢结构的特性,作为主要竖向受力钢柱截面和重量大、安装危险程度大、耗用时间长,施工过程中应提前搭设施工操作平台,提供钢柱就位校正、对接焊接、混凝土浇筑的人员活动平台。The on-site steel components of high-rise construction sites mainly adopt the construction and installation method of "building blocks". Professional construction personnel use lifting equipment to hoist the steel components in place and assemble them layer by layer in situ at high altitude. According to the characteristics of the steel structure, as the main vertical force-bearing steel column has a large cross-section and weight, the installation is dangerous and takes a long time, the construction operation platform should be set up in advance during the construction process, and the steel column in-place correction, butt welding, concrete Poured personnel activity platform.

与此同时,考虑本工程下部结构钢柱截面和重量大,结合塔吊吊装工况,钢柱普遍分为3m一段,无钢牛腿(或者牛腿太短)架设定型化操作平台,传统钢柱操作平台在施工现场的不足逐渐显露:操作平台搭设时间长、耗用人员多、可周转程度底等短板,严重影响现场文明施工的整体提升。At the same time, considering the large cross-section and weight of the steel column of the lower structure of the project, combined with the hoisting conditions of the tower crane, the steel column is generally divided into 3m sections. The shortcomings of the operation platform at the construction site are gradually revealed: the operation platform takes a long time to set up, consumes a lot of personnel, and has low turnover, which seriously affects the overall improvement of on-site civilized construction.

实用新型内容Utility model content

本实用新型的目的在于提供一种操作平台支撑架,能够方便操作平台的搭建,而且可周转程度高。The purpose of the utility model is to provide an operation platform support frame, which can facilitate the construction of the operation platform and has a high degree of turnover.

本实用新型的另一目的在于提供一种操作平台,利用上述的操作平台支撑架进行操作平台的搭建。Another object of the present utility model is to provide an operation platform, which can be constructed by using the above-mentioned support frame of the operation platform.

本实用新型的实施例是这样实现的:Embodiments of the utility model are achieved in that:

一种操作平台支撑架,包括支架组件和卡槽件,所述卡槽件的数量为多个,多个卡槽件用于围绕钢柱的周向间隔设置;A support frame for an operating platform, comprising a bracket assembly and a slot piece, the number of the slot pieces is multiple, and the multiple slot pieces are arranged at intervals around the circumference of the steel column;

所述支架组件的数量为多个,且与所述卡槽件一一对应,所述支架组件与所述卡槽件卡接,且共同形成用于支撑跳板的支撑平台。The number of the bracket components is multiple, and correspond to the slot pieces one by one, the bracket components are snapped into the slot pieces, and jointly form a support platform for supporting the springboard.

可选地,所述卡槽件开设有卡接口,所述支架组件设置有卡接件,所述卡接件插入所述卡接口。Optionally, the card slot is provided with a card interface, and the bracket assembly is provided with a card connector, and the card connector is inserted into the card interface.

可选地,所述支架组件还包括支架,所述卡接件包括连接部和插接部,所述连接部与所述支架固定连接,所述插接部插入所述卡接口,且所述连接部能够抵持于所述卡槽件。Optionally, the bracket assembly further includes a bracket, the clip includes a connection part and an insertion part, the connection part is fixedly connected to the bracket, the insertion part is inserted into the card interface, and the The connecting part can resist against the slot part.

可选地,所述卡接件呈L型结构,且所述插接部与所述支架之间具有插接间隙,所述卡槽件包括固定部和配合部,所述固定部用于与所述钢柱固定连接,所述配合部嵌设于所述插接间隙且能够抵持于所述连接部。Optionally, the clip has an L-shaped structure, and there is an insertion gap between the insertion part and the bracket, and the slot part includes a fixing part and a matching part, and the fixing part is used for The steel column is fixedly connected, and the matching part is embedded in the insertion gap and can be supported against the connecting part.

可选地,所述支架组件包括支架,所述支架包括第一支架、第二支架和第三支架,所述第一支架、所述第二支架和所述第三支架首尾连接且形成三角型结构,所述卡接件固定连接于所述第一支架和所述第二支架的连接处。Optionally, the bracket assembly includes a bracket, and the bracket includes a first bracket, a second bracket and a third bracket, and the first bracket, the second bracket and the third bracket are connected end to end and form a triangle structure, the clamping member is fixedly connected to the junction of the first bracket and the second bracket.

可选地,所述第一支架和所述第二支架垂直。Optionally, the first bracket and the second bracket are vertical.

可选地,每个支架组件与两个所述卡槽件配合,且两个所述卡槽件分别为第一卡槽和第二卡槽,每个支架组件中的所述卡接件的数量为两个,两个所述卡接件设置于所述第二支架的两端,两个所述卡接件分别与所述第一卡槽和所述第二卡槽卡接。Optionally, each bracket assembly is matched with two said slot parts, and the two said slot parts are respectively a first slot and a second slot, and the snap parts in each bracket assembly The quantity is two, and the two clamping parts are arranged at both ends of the second bracket, and the two clamping parts are respectively engaged with the first clamping slot and the second clamping slot.

可选地,所有的所述支架中的所述第一支架均位于同一水平面,且用于支撑跳板。Optionally, the first brackets among all the brackets are located on the same horizontal plane, and are used to support the springboard.

可选地,所述支架组件还包括立杆,所述立杆固定设置于所述支架远离所述卡槽件的一端,所述立杆上开设有用于穿设钢丝绳的通孔。Optionally, the bracket assembly further includes a vertical rod, the vertical rod is fixedly arranged at an end of the bracket away from the slot member, and the vertical rod is provided with a through hole for passing the wire rope.

一种操作平台,包括跳板和上述的操作平台支撑架,所述跳板固定设置于所述支撑平台。An operation platform includes a springboard and the above-mentioned support frame of the operation platform, and the springboard is fixedly arranged on the support platform.

与现有技术相比,本实用新型实施例的有益效果包括,例如:Compared with the prior art, the beneficial effects of the embodiments of the present invention include, for example:

本操作平台支撑架通过利用支架组件和卡槽件卡接,来搭建用于安装跳板的支撑平台,保证了操作平台支撑架安装和拆除的灵活性,并且可循环使用,提高了操作平台的搭设效率,对安装拆卸的工作人员要求较低。The support frame of the operating platform builds the support platform for installing the springboard by using the bracket assembly and the card slot to clamp, which ensures the flexibility of installation and removal of the support frame of the operating platform, and can be recycled, which improves the erection of the operating platform. Efficiency, lower requirements for installation and disassembly staff.

本操作平台由于利用上述操作平台支撑架进行操作平台的搭建,具有上述所有的技术效果。The operation platform has all the above-mentioned technical effects due to the use of the above-mentioned operation platform support frame to construct the operation platform.

附图说明Description of drawings

为了更清楚地说明本实用新型实施例的技术方案,下面将对实施例中所需要使用的附图作简单地介绍,应当理解,以下附图仅示出了本实用新型的某些实施例,因此不应被看作是对范围的限定,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他相关的附图。In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following drawings will be briefly introduced in the embodiments. It should be understood that the following drawings only show some embodiments of the present invention. Therefore, it should not be regarded as a limitation on the scope. For those skilled in the art, other related drawings can also be obtained according to these drawings without creative work.

图1为本实用新型实施例1提供的操作平台支撑架应用场景的结构示意图;Fig. 1 is a schematic structural diagram of the application scene of the operating platform support frame provided by Embodiment 1 of the present utility model;

图2为图1中的I处的局部放大示意图;Fig. 2 is the partially enlarged schematic view of I place in Fig. 1;

图3为图1中卡槽件的结构示意图;Fig. 3 is a structural schematic diagram of the slot part in Fig. 1;

图4为图1中支架组件的结构示意图;Fig. 4 is a schematic structural view of the bracket assembly in Fig. 1;

图5为本实用新型实施例2提供的操作平台的结构示意图。Fig. 5 is a schematic structural diagram of the operating platform provided by Embodiment 2 of the present invention.

图标:100-操作平台支撑架;10-支架组件;11-卡接件;111-连接部;112-插接部;113-插接间隙;12-支架;121-第一支架;122-第二支架;123-第三支架;13-立杆;20-卡槽件;21-卡接口;22-固定部;23-配合部;24-第一卡槽;25-第二卡槽;30-钢丝绳;200-操作平台;201-跳板;300-钢柱。Icons: 100-operating platform support frame; 10-bracket assembly; 11-clamping piece; 111-connection part; 112-socket part; 113-socketing gap; Two brackets; 123-third bracket; 13-vertical rod; 20-card slot; 21-card interface; 22-fixed part; 23-cooperating part; - steel wire rope; 200 - operating platform; 201 - springboard; 300 - steel column.

具体实施方式Detailed ways

为使本实用新型实施例的目的、技术方案和优点更加清楚,下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例是本实用新型一部分实施例,而不是全部的实施例。通常在此处附图中描述和示出的本实用新型实施例的组件可以以各种不同的配置来布置和设计。In order to make the purpose, technical solutions and advantages of the embodiments of the utility model more clear, the technical solutions in the embodiments of the utility model will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the utility model. Obviously, the described The embodiments are some embodiments of the present utility model, but not all embodiments. The components of the embodiments of the invention generally described and illustrated in the figures herein may be arranged and designed in a variety of different configurations.

因此,以下对在附图中提供的本实用新型的实施例的详细描述并非旨在限制要求保护的本实用新型的范围,而是仅仅表示本实用新型的选定实施例。基于本实用新型中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the claimed invention, but merely represents selected embodiments of the present invention. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.

应注意到:相似的标号和字母在下面的附图中表示类似项,因此,一旦某一项在一个附图中被定义,则在随后的附图中不需要对其进行进一步定义和解释。It should be noted that like numerals and letters denote similar items in the following figures, therefore, once an item is defined in one figure, it does not require further definition and explanation in subsequent figures.

在本实用新型的描述中,需要说明的是,若出现术语“中心”、“上”、“下”、“左”、“右”、“竖直”、“水平”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,或者是该实用新型产品使用时惯常摆放的方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型的限制。In the description of the present utility model, it should be noted that if the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", " The orientation or positional relationship indicated by "outside" is based on the orientation or positional relationship shown in the drawings, or the orientation or positional relationship that is usually placed when the product of the utility model is used. It is only for the convenience of describing the utility model and simplifying the description. It does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore should not be construed as limiting the present invention.

此外,若出现术语“第一”、“第二”、“第三”等仅用于区分描述,而不能理解为指示或暗示相对重要性。In addition, the terms "first", "second", "third" and so on are only used for distinguishing descriptions, and should not be understood as indicating or implying relative importance.

此外,若出现术语“水平”、“竖直”、“悬垂”等术语并不表示要求部件绝对水平或悬垂,而是可以稍微倾斜。如“水平”仅仅是指其方向相对“竖直”而言更加水平,并不是表示该结构一定要完全水平,而是可以稍微倾斜。In addition, the appearance of the terms "horizontal", "vertical", "overhanging" etc. does not mean that the parts are absolutely horizontal or overhanging, but may be slightly inclined. For example, "horizontal" only means that its direction is more horizontal than "vertical", and it does not mean that the structure must be completely horizontal, but can be slightly inclined.

在本实用新型的描述中,还需要说明的是,除非另有明确的规定和限定,若出现术语“设置”、“安装”、“相连”、“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以具体情况理解上述术语在本实用新型中的具体含义。In the description of the present utility model, it should also be noted that, unless otherwise specified and limited, if the terms "setting", "installation", "connection" and "connection" appear, they should be understood in a broad sense, for example, it can be A fixed connection can also be a detachable connection or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediary, and it can be the internal communication of two components. Those of ordinary skill in the art can understand the specific meanings of the above terms in the present utility model in specific situations.

实施例1Example 1

图1为本实用新型实施例1提供的操作平台支撑架100应用场景的结构示意图,图2为图1中的局部放大示意图。FIG. 1 is a schematic structural diagram of the application scene of the operating platform support frame 100 provided by Embodiment 1 of the present invention, and FIG. 2 is a partially enlarged schematic diagram of FIG. 1 .

一种操作平台支撑架100,包括支架组件10和卡槽件20。卡槽件20的数量为多个,多个卡槽件20用于围绕钢柱300的周向间隔设置。可以理解的是,若是方形钢柱300,钢柱300周向的每个侧壁均设置有卡槽件20,用于为支架组件10的连接提供连接支撑点。An operating platform support frame 100 includes a frame assembly 10 and a slot part 20 . There are multiple snap-in slots 20 , and the multiple snap-in slots 20 are arranged at intervals around the steel column 300 in the circumferential direction. It can be understood that, if it is a square steel column 300 , each circumferential side wall of the steel column 300 is provided with a groove 20 for providing a connection support point for the connection of the bracket assembly 10 .

支架组件10的数量为多个,且与卡槽件20一一对应。支架组件10与卡槽件20卡接,且共同形成用于支撑跳板201的支撑平台。支架组件10通过与固定连接于钢柱300上的卡槽件20的卡接,实现了对支架组件10的固定,多个支架组件10共同形成支撑平台,支撑平台能够实现对跳板201的支撑。There are multiple bracket assemblies 10 , which correspond to the slot members 20 one by one. The bracket assembly 10 is clamped with the slot member 20 , and jointly forms a support platform for supporting the springboard 201 . The support assembly 10 is fixed to the support assembly 10 by clamping with the slot member 20 fixedly connected to the steel column 300 , and multiple support assemblies 10 together form a support platform, which can support the springboard 201 .

本实施例中的操作平台支撑架100通过利用支架组件10和卡槽件20卡接,来搭建用于安装跳板201的支撑平台,保证了操作平台支撑架100安装和拆除的灵活性,并且可循环使用,提高了操作平台200的搭设效率,对安装拆卸的工作人员要求较低。The operating platform support frame 100 in this embodiment is used to build a support platform for installing the springboard 201 by using the bracket assembly 10 and the slot part 20 to clamp, which ensures the flexibility of installation and removal of the operating platform support frame 100, and can Recycling improves the erection efficiency of the operating platform 200 and requires less staff for installation and disassembly.

图3为图1中卡槽件20的结构示意图,在本实施例中的一种实施方式中,例如但不限于,卡槽件20大致为带有卡接口21的槽型结构,卡接口21为通孔。卡接口21用于与支撑组件配合。Fig. 3 is a schematic diagram of the structure of the card slot 20 in Fig. 1. In one embodiment of this embodiment, for example but not limited to, the card slot 20 is roughly a groove structure with a card interface 21, and the card interface 21 for through holes. The card interface 21 is used to cooperate with the support assembly.

卡槽件20包括固定部22和配合部23,固定部22用于与钢柱300固定连接。固定部22的数量为两个,两个固定部22相对设置且分别连接于配合部23的两侧。The slot member 20 includes a fixing portion 22 and a matching portion 23 , the fixing portion 22 is used for fixed connection with the steel column 300 . There are two fixing parts 22 , and the two fixing parts 22 are oppositely arranged and respectively connected to two sides of the mating part 23 .

在实际安装时,将两个固定部22的端部分别固定连接于钢柱300的侧壁上。固定连接可以是焊接,也可以是螺栓连接的形式。During actual installation, the ends of the two fixing parts 22 are respectively fixedly connected to the side walls of the steel column 300 . Fixed connections can be welded or bolted.

可以理解的是,在其他实施方式中,卡槽件20还可以是其他的结构形式,例如可以是,带有卡接口21的圆柱形、半圆柱形、梯形等规则形状,也可以是带有卡接口21的不规则形状。It can be understood that, in other embodiments, the slot member 20 can also be in other structural forms, for example, it can be a regular shape such as a cylinder, a semi-cylindrical, and a trapezoid with a slot 21, or it can be a regular shape with a slot 21. The irregular shape of the card interface 21.

图4为图1中支架组件10的结构示意图,请参考图4。FIG. 4 is a schematic structural diagram of the bracket assembly 10 in FIG. 1 , please refer to FIG. 4 .

在本实施例中,支架组件10包括支架12、卡接件11和立杆13。支架组件10用于卡接于卡槽件20,实现对跳板201的支撑作用。In this embodiment, the bracket assembly 10 includes a bracket 12 , a clip 11 and a pole 13 . The bracket assembly 10 is used to be clamped to the slot member 20 to support the springboard 201 .

在本实施例的一种实施方式中,支架12包括第一支架121、第二支架122和第三支架123。第一支架121、第二支架122和第三支架123首尾连接且形成三角型结构。利用三角形结构的稳定性特性,能够保证支架12的结构稳固不容易变形,从而能够保证作业人员的施工安全,而且结构轻便,便于安装和拆卸。In an implementation manner of this embodiment, the bracket 12 includes a first bracket 121 , a second bracket 122 and a third bracket 123 . The first bracket 121 , the second bracket 122 and the third bracket 123 are connected end to end and form a triangular structure. Utilizing the stability characteristics of the triangular structure can ensure that the structure of the bracket 12 is stable and not easily deformed, thereby ensuring the construction safety of workers, and the structure is light and easy to install and disassemble.

任选地,第一支架121和第二支架122垂直。在实际安装时,支架组件10与卡槽件20卡接后,第二支架122能够贴合于钢柱300的侧壁,由于第一支架121和第二支架122垂直,进而能够使第一支架121保持水平状态,便于第一支架121对跳板201的支撑。Optionally, the first bracket 121 and the second bracket 122 are vertical. In actual installation, after the bracket assembly 10 is clamped with the slot member 20, the second bracket 122 can be attached to the side wall of the steel column 300. Since the first bracket 121 and the second bracket 122 are vertical, the first bracket can be made 121 maintains a horizontal state, which is convenient for the first support 121 to support the springboard 201 .

任选地,第一支架121的长度等于或者小于第二支架122的长度。这样,第二支架122可以抵持于钢柱300的侧壁,对第一支架121产生支撑力矩,能够实现对第一支架121的稳固支撑。Optionally, the length of the first bracket 121 is equal to or less than the length of the second bracket 122 . In this way, the second bracket 122 can be supported against the side wall of the steel column 300 to generate a supporting moment for the first bracket 121 , so as to achieve stable support for the first bracket 121 .

任选地,第一支架121、第二支架122和第三支架123可以选取L50*50角钢作为材料,焊接形成支架12结构。或,第一支架121和第二支架122可以一体成型,然后将第三支架123连接于第一支架121和第二支架122之间。Optionally, the first bracket 121 , the second bracket 122 and the third bracket 123 can be made of L50*50 angle steel, and welded to form the bracket 12 structure. Alternatively, the first bracket 121 and the second bracket 122 can be integrally formed, and then the third bracket 123 is connected between the first bracket 121 and the second bracket 122 .

可以理解的是,在其他实施方式中,支架12可以为四边形结构,或者,五边形结构,六边形结构等,只要能够与卡槽件20连接实现对跳板201的支撑即可。It can be understood that, in other embodiments, the bracket 12 may be a quadrilateral structure, or a pentagonal structure, a hexagonal structure, etc., as long as it can be connected with the slot member 20 to support the springboard 201 .

请参考图4和图2。卡接件11用于连接支架12与卡槽件20。在本实施例的一种实施方式中,卡接件11固定连接于第一支架121和第二支架122的连接处。卡接件11包括连接部111和插接部112。连接部111与支架12固定连接,插接部112插入卡槽件20的卡接口21。且连接部111能够抵持于卡槽件20,限制了支架组件10竖直向下的位移。Please refer to Figure 4 and Figure 2. The clamping member 11 is used to connect the bracket 12 and the slotting member 20 . In an implementation manner of this embodiment, the clamping member 11 is fixedly connected to the junction of the first bracket 121 and the second bracket 122 . The clip 11 includes a connecting portion 111 and an inserting portion 112 . The connecting portion 111 is fixedly connected to the bracket 12 , and the inserting portion 112 is inserted into the card interface 21 of the card slot member 20 . In addition, the connecting portion 111 can be held against the slot member 20 to limit the vertical downward displacement of the bracket assembly 10 .

进一步地,卡接件11呈L型结构,连接部111的延伸方向与第一支架121的延伸方向一致,连接部111焊接于第一支架121的端部,插接部112的延伸方向与第二支架122的延伸方向一致,且插接部112与支架12之间具有插接间隙113。Furthermore, the clip 11 has an L-shaped structure, the extending direction of the connecting part 111 is consistent with the extending direction of the first bracket 121, the connecting part 111 is welded to the end of the first bracket 121, and the extending direction of the inserting part 112 is consistent with the extending direction of the first bracket 121. The extension directions of the two brackets 122 are consistent, and there is an insertion gap 113 between the insertion portion 112 and the bracket 12 .

插接间隙113用于容纳卡槽件20的配合部23。配合部23嵌设于插接间隙113,连接部111抵持于配合部23的上端。The insertion gap 113 is used to accommodate the matching portion 23 of the slot member 20 . The mating portion 23 is embedded in the insertion gap 113 , and the connecting portion 111 abuts against an upper end of the mating portion 23 .

在实际安装时,仅需要将支架组件10中的卡接件11的插接部112插入卡槽件20的卡接口21,并使连接部111抵持于配合部23的上端,即可实现支架组件10和卡槽件20的连接。安装方便,也能实现对支架组件10的固定。During actual installation, it is only necessary to insert the insertion part 112 of the clamping part 11 in the bracket assembly 10 into the card interface 21 of the slot part 20, and make the connecting part 111 bear against the upper end of the mating part 23 to realize the bracket. The connection between the component 10 and the slot part 20 . The installation is convenient, and the fixing of the bracket assembly 10 can also be realized.

请再次参考图1,在本实施例的一种实施方式中,每个支架组件10与两个卡槽件20配合,且两个卡槽件20分别为第一卡槽24和第二卡槽25。每个支架组件10中的卡接件11的数量为两个,两个卡接件11设置于第二支架122的两端,两个卡接件11分别与第一卡槽24和第二卡槽25卡接。Please refer to FIG. 1 again. In an implementation of this embodiment, each bracket assembly 10 is fitted with two slots 20, and the two slots 20 are respectively the first slot 24 and the second slot. 25. The number of clips 11 in each bracket assembly 10 is two, and the two clips 11 are arranged at both ends of the second bracket 122, and the two clips 11 are connected with the first slot 24 and the second clip respectively. Slot 25 snaps in.

可以理解的是,在实际安装时,第一卡槽24和第二卡槽25在竖直方向上是相互对齐的,这样可以保证支架12上的卡接件11同时与第一卡槽24和第二卡槽25卡接时,保持竖直状态。It can be understood that, during actual installation, the first card slot 24 and the second card slot 25 are aligned with each other in the vertical direction, so as to ensure that the clip 11 on the bracket 12 is simultaneously aligned with the first card slot 24 and the second card slot 25. When the second card slot 25 is engaged, it maintains a vertical state.

而且,通过对同一个支架组件10的上下端均利用了卡槽件20进行了固定,能够增加支架组件10和卡槽件20连接配合的稳定性,支架组件10不会容易发生歪斜,也提高了本操作平台支撑架100的安全性。Moreover, the upper and lower ends of the same bracket assembly 10 are fixed by the groove piece 20, which can increase the stability of the connection and cooperation between the bracket assembly 10 and the groove piece 20, the bracket assembly 10 will not be prone to skewing, and also improve The safety of this operating platform support frame 100 is ensured.

在实际安装时,可以通过控制卡槽件20的位置,使钢柱300上不同侧壁上的第一卡槽24均位于同一水平面,并且钢柱300上不同侧壁上的第二卡槽25也位于同一水平面。这样能够保证支架12与卡槽件20配合后,第一支架121均位于同一水平面。然后,将跳板201铺设于第一支架121共同形成的支撑平台上,从而能够保证跳板201均处于同一水平面上。In actual installation, by controlling the position of the groove member 20, the first grooves 24 on different side walls on the steel column 300 are all located on the same horizontal plane, and the second grooves 25 on different side walls on the steel column 300 also on the same level. This can ensure that the first brackets 121 are all located on the same horizontal plane after the bracket 12 is matched with the groove member 20 . Then, the springboard 201 is laid on the supporting platform jointly formed by the first brackets 121, so as to ensure that the springboards 201 are all on the same level.

请再次参考图1,任选地,支架组件10还包括立杆13。立杆13固定设置于支架12远离卡槽件20的一端。立杆13上开设有用于穿设钢丝绳30的通孔。采用双道钢丝绳30进行安全防护,钢丝绳30穿过立杆13形成封闭回路,保证操作人员安全。Please refer to FIG. 1 again, optionally, the bracket assembly 10 further includes a pole 13 . The upright rod 13 is fixedly disposed on an end of the bracket 12 away from the slot member 20 . The pole 13 is provided with a through hole for passing the wire rope 30 . Double-track steel wire ropes 30 are used for safety protection, and the steel wire ropes 30 pass through the vertical pole 13 to form a closed loop to ensure the safety of operators.

实施例2Example 2

图5为本实用新型实施例2提供的操作平台200的结构示意图,请参考图5。FIG. 5 is a schematic structural diagram of the operating platform 200 provided by Embodiment 2 of the present invention, please refer to FIG. 5 .

在本实施例中提供了一种操作平台200,利用上述的操作平台支撑架100进行操作平台200的搭建。In this embodiment, an operation platform 200 is provided, and the above operation platform support frame 100 is used to construct the operation platform 200 .

以方管型钢柱300为例。在钢柱300的每个侧面均设置有至少两组支撑组件,每组支撑组件与上下两个卡槽件20卡接配合,然后在每个侧面处的支架12上铺设跳板201,通过铁丝与支撑架板扎牢靠确保跳板201不会自由移动,然后采用钢丝绳30依次穿过所有立杆13上的通孔,形成封闭回路的围栏,保证操作人员安全。Take square tubular steel column 300 as an example. Each side of the steel column 300 is provided with at least two sets of support assemblies, each set of support assemblies is clamped and fitted with the upper and lower two slot members 20, and then a springboard 201 is laid on the bracket 12 at each side, and the iron wire and The bracing frame board is firmly secured to ensure that the springboard 201 will not move freely, and then steel wire ropes 30 are used to pass through the through holes on all the vertical poles 13 in turn to form a closed loop fence to ensure the safety of operators.

在一个钢柱300的施工完成以后,仅需要拆卸跳板201和钢丝绳30,从卡槽件20中拔出支架组件10,即可方便地将支架组件10转移到另一个钢柱300处进行施工平台的搭建。本实施例中的操作平台200提高了平台的搭设效率,降低了对操作人员技术要求,方便安装和拆卸,方便周转使用,提高了材料的重复利用率。After the construction of one steel column 300 is completed, it is only necessary to disassemble the springboard 201 and the wire rope 30, and pull out the bracket assembly 10 from the slot part 20, then the bracket assembly 10 can be conveniently transferred to another steel column 300 for construction platform build. The operating platform 200 in this embodiment improves the efficiency of platform erection, reduces technical requirements for operators, facilitates installation and disassembly, facilitates turnover, and improves the recycling rate of materials.

需要说明的是,在不冲突的情况下,本实用新型中的实施例中的特征可以相互结合。It should be noted that, in the case of no conflict, the features in the embodiments of the present invention can be combined with each other.

以上所述仅为本实用新型的优选实施例而已,并不用于限制本实用新型,对于本领域的技术人员来说,本实用新型可以有各种更改和变化。凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。The above descriptions are only preferred embodiments of the utility model, and are not intended to limit the utility model. For those skilled in the art, the utility model can have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principles of the present utility model shall be included in the protection scope of the present utility model.

Claims (10)

1. a kind of operating platform support frame, which is characterized in that including bracket component and card slot part, the quantity of the card slot part is more A, multiple card slot parts are used for being provided at circumferentially spaced around steel column;
The quantity of the bracket component is multiple, and is corresponded with the card slot part, the bracket component and the card slot part Clamping, and the support platform for being used to support springboard is collectively formed.
2. operating platform support frame according to claim 1, which is characterized in that the card slot part offers card interface, institute It states bracket component and is provided with shackle member, the shackle member is inserted into the card interface.
3. operating platform support frame according to claim 2, which is characterized in that the bracket component further includes bracket, institute Stating shackle member includes interconnecting piece and plug division, and the interconnecting piece is fixedly connected with the bracket, and the card is inserted into the plug division Interface, and the interconnecting piece can be held in the card slot part.
4. operating platform support frame according to claim 3, which is characterized in that the shackle member is of an L-shaped structure, and described There is grafting gap, the card slot part includes fixed part and auxiliary section, and the fixed part is used between plug division and the bracket It is fixedly connected with the steel column, the auxiliary section is embedded at the grafting gap and can be held in the interconnecting piece.
5. operating platform support frame according to claim 2, which is characterized in that the bracket component includes bracket, described Bracket includes first support, second support and third bracket, and the first support, the second support and the third bracket are first Tail connects and forms triangular form structure, and the shackle member is fixedly connected on the connection of the first support and the second support Place.
6. operating platform support frame according to claim 5, which is characterized in that the first support and the second support Vertically.
7. operating platform support frame according to claim 5, which is characterized in that each bracket component and two card slots Part cooperation, and two card slot parts are respectively the first card slot and the second card slot, the shackle member in each bracket component Quantity is two, and two shackle members are set to the both ends of the second support, and two shackle members are respectively with described the One card slot and second card slot clamping.
8. operating platform support frame according to claim 5, which is characterized in that described first in all brackets Bracket is respectively positioned on same level, and is used to support springboard.
9. operating platform support frame according to claim 1, which is characterized in that the bracket component further includes upright bar, institute It states upright bar and is fixedly installed on the one end of the bracket far from the card slot part, offer in the upright bar for wearing wirerope Through-hole.
10. a kind of operating platform, which is characterized in that including springboard and the described in any item operating platform supports of claim 1-9 Frame, the springboard are fixedly installed on the support platform.
CN201920081483.0U 2019-01-17 2019-01-17 Operating platform support frame and operating platform Expired - Fee Related CN209686833U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920081483.0U CN209686833U (en) 2019-01-17 2019-01-17 Operating platform support frame and operating platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920081483.0U CN209686833U (en) 2019-01-17 2019-01-17 Operating platform support frame and operating platform

Publications (1)

Publication Number Publication Date
CN209686833U true CN209686833U (en) 2019-11-26

Family

ID=68599222

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920081483.0U Expired - Fee Related CN209686833U (en) 2019-01-17 2019-01-17 Operating platform support frame and operating platform

Country Status (1)

Country Link
CN (1) CN209686833U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109537863A (en) * 2019-01-17 2019-03-29 中建钢构有限公司 Operating platform support frame and operating platform
CN112176883A (en) * 2020-10-19 2021-01-05 中国二冶集团有限公司 Support frame

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109537863A (en) * 2019-01-17 2019-03-29 中建钢构有限公司 Operating platform support frame and operating platform
CN112176883A (en) * 2020-10-19 2021-01-05 中国二冶集团有限公司 Support frame
CN112176883B (en) * 2020-10-19 2025-03-25 中国二冶集团有限公司 Support frame

Similar Documents

Publication Publication Date Title
CN109537863A (en) Operating platform support frame and operating platform
CN209686833U (en) Operating platform support frame and operating platform
CN110512766B (en) Fabricated structure system of steel plate concrete shear wall and construction method thereof
CN109083395B (en) A large-span cable suspension operating platform and its erection method
CN207363238U (en) A kind of main frame of universal elevating scaffold
CN206376507U (en) Prefabrication outrigger
CN110112681B (en) A combined cable hoisting and laying auxiliary device
KR101707037B1 (en) A structure for assembled system scaffold and erecting method thereof
CN210597326U (en) Precast concrete bearing structure that can assemble
CN220412590U (en) Anchor plate hoisting and transferring tool
CN103821336B (en) A kind of fixed high-altitude long-span construction operation platform of rope and construction method thereof
CN206889844U (en) A kind of bearing part structure of derrick type suspension and support
CN203807004U (en) Lattice arms and construction machinery
CN213112298U (en) Mast
CN205617772U (en) Gallows structure under lifting foot hand rack special use
CN207686266U (en) A kind of means for fastening scaffolding of fast demountable
CN210509019U (en) Combined safety ladder stand and pier column connecting and fixing device
CN210398821U (en) Lamp mounting structure free of erecting scaffold
CN215886135U (en) Splicing structure of tower crane
CN107178658A (en) A kind of footstock structure of derrick type suspension and support
CN113512948A (en) A assembled operation platform that is used for bent cap staple bolt installation and demolishs
CN106193754A (en) A kind of straight line pole increases bar
CN219569652U (en) A life rope fixing device suitable for steel structure construction environment
CN203430007U (en) Aerial work platform
CN204983608U (en) Hanging flower basket is used in installation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 3801, 38 / F, Zhongjian science and engineering building, No. 3331, Weilan Coast Community Center Road, Yuehai street, Nanshan District, Shenzhen City, Guangdong Province

Patentee after: China Construction Science And Industry Co.,Ltd.

Address before: 518000 Guangdong city of Shenzhen province Nanshan District Guangdong streets Center Road No. 3331 steel built in 27 storey building room 2701

Patentee before: China Construction Steel Structure Corp.,Ltd.

CP03 Change of name, title or address
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191126

CF01 Termination of patent right due to non-payment of annual fee