CN203361021U - Double-spliced type truss hanging basket - Google Patents

Double-spliced type truss hanging basket Download PDF

Info

Publication number
CN203361021U
CN203361021U CN 201320403623 CN201320403623U CN203361021U CN 203361021 U CN203361021 U CN 203361021U CN 201320403623 CN201320403623 CN 201320403623 CN 201320403623 U CN201320403623 U CN 201320403623U CN 203361021 U CN203361021 U CN 203361021U
Authority
CN
China
Prior art keywords
truss
framework
upper frame
hanging basket
afterframe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320403623
Other languages
Chinese (zh)
Inventor
徐建亭
温建明
刘建平
郭世波
黄云刚
谷兆普
张道波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Stecol Corp
Original Assignee
Sinohydro Tianjin Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Tianjin Engineering Co Ltd filed Critical Sinohydro Tianjin Engineering Co Ltd
Priority to CN 201320403623 priority Critical patent/CN203361021U/en
Application granted granted Critical
Publication of CN203361021U publication Critical patent/CN203361021U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

The utility model relates to a double-spliced type truss hanging basket which is composed of two sets of truss hanging basket bodies. Each set of truss hanging basket body comprises a main truss, a walking mechanism, an anchoring mechanism, an inner guide beam and an outer guide beam, wherein the main truss is connected with a formwork which comprises an inner formwork, an outer side formwork and a framed bent; the main truss is formed by connecting a front framework, a rear framework, an upper framework and a lower framework to form a parallelogram; a connection system is arranged between the upper framework and the lower framework; a front lower cross beam is hung at the intersected position between the upper framework and the front framework through a hanging belt; a rear lower cross beam is hung at the intersected position between the upper framework and the rear framework through a hanging rod; a plurality of lower longitudinal beams are hinged between the front lower cross beam and the rear lower cross beam; double sliding ways are correspondingly arranged at the bottom of the walking mechanism; walking hanging brackets matched with the inner guide beam and the outer guide beam are arranged on the sliding ways on the two sides; the inner formwork is connected to the upper portion of the inner guide beam; the framed bent is provided with adjustable opposite-pulling pins. The two sets of truss hanging basket bodies are connected through the adjustable opposite-pulling pins. The independence of the single-box hanging basket bodies is achieved by double splicing, operation is easy, and higher walking synchronism is achieved.

Description

A kind of double combined truss hang kep
Technical field
The utility model belongs to the novel bridge technical field in the fields such as railway, highway, municipal public use, particularly a kind of double combined truss hang kep that is applied to four lines or multi-thread continuous beam.
Background technology
Along with rapid development of economy, requirement to the communications and transportation road is more and more higher, certainly will have the appearance of large quantities of wide cut prestressed continuous beams, traditional wide cut Construction of continuous beam all adopts the monolithic Hanging Basket to be constructed, this class Hanging Basket general structure is complicated, larger, the assembled difficulty of deadweight is high, walking requires synchronism higher, the practical operation difficulty.
Summary of the invention
The utility model provides a kind of convenience simple in structure, assembled, reasonable stress, the double combined truss hang kep easily of walking for solving the technical problem existed in known technology.
The technical scheme that the utility model is taked for the technical problem existed in the solution known technology is:
A kind of double combined truss hang kep, by two groups of cradle in truss type, formed, every group of cradle in truss type comprises the walking mechanism arranged on main couple and main couple, anchor device, interior nose girder and outer nose girder, described main couple is connected with template, described template comprises internal mold, outer side mold and framed bent, described main couple is by front baffle, afterframe, upper frame and underframe connect to form parallelogram, described upper frame, be provided with between underframe and connect system, the intersection location of described upper frame and front baffle is hung with front lower transverse beam by length-adjustable suspender belt, the intersection location of described upper frame and afterframe is hung with rear lower transverse beam by suspension rod, be hinged with some lower longerons between described front lower transverse beam and rear lower transverse beam, the bottom correspondence of described walking mechanism is provided with two slideway structures, the both sides installation of slide track has the walking suspension bracket matched with interior nose girder and outer nose girder, internal mold is connected in the top of interior nose girder, on described row, be provided with adjustable to drawing pin, two groups of cradle in truss type by adjustable to drawing pin to connect.
The angular range of described afterframe and upper frame is 102~145 °.
The angular range of described afterframe and upper frame is 106~145 °.
Described internal mold is the Split form be comprised of some templates, between adjacent two templates, connects in hinged way.
The intersection location of described afterframe and underframe is provided with cross section and is the pedestal that " H " shape and slideway top match, and the bottom of described pedestal is provided with the half slide block that the main body both sides with slideway are slidably connected.
Advantage and the good effect that the utlity model has are:
1. the utility model Two bors d's oeuveres Hanging Basket adopts the diamond shaped cradle in truss type structure, solve in the wide cut bridge construction problems such as cradle structure complicatedly, stressed is owed rationally, the Hanging Basket own wt is excessive, realized that by Two bors d's oeuveres single case Hanging Basket is independent, simple to operate, overcome with respect to whole Hanging Basket walking and required the problem that synchronism is higher.
2. the utility model Hanging Basket all can be constructed and move forward during with leeward running into 6 grades, safe and reliable, if run into the bridge longitudinal gradient when excessive, only need arrange that anti-skid device is fixing to be got final product, sound construction.
The accompanying drawing explanation
Fig. 1 is the utility model perspective view;
Fig. 2 is Figure 1A-A, B-B sectional structure schematic diagram.
In Fig. 1 and Fig. 2,1. main couple, 1-1. front baffle, 1-2. afterframe, 1-. upper frame, 1-4. underframe, 2. walking mechanism, 3. anchor device, 4. interior nose girder, 5. outer nose girder, 6. internal mold, 7. outer side mold, 8. framed bent, 9. connect system, 10. front lower transverse beam, 11. rear lower transverse beam, 12. times longerons, 13. slideways, 14. the walking suspension bracket, 15. pedestals, 16. is adjustable to drawing pin.
The specific embodiment:
For further understanding utility model content of the present utility model, Characteristic, hereby exemplify following examples, and coordinate accompanying drawing to be described in detail as follows:
Refer to Fig. 1 and Fig. 2, a kind of double combined truss hang kep, by two groups of cradle in truss type, formed, every group of cradle in truss type comprises walking mechanism 2, anchor device 3, interior nose girder 4 and the outer nose girder 5 arranged on main couple 1 and main couple 1, main couple 1 mainly contains the parallelogram sturcutre connected to form by front baffle 1-1, afterframe 1-2, upper frame 1-3 and underframe 1-4, and the angular range of afterframe 1-2 and upper frame 1-3 is 102~145 °; Be provided with between upper frame 1-3, underframe 1-4 that to connect be 9, this connections be comprise the mesh-supported formed by some rod members and be connected in rod member and main couple 1 between bearing.The intersection location of upper frame 1-3 and front baffle 1-1 is hung with front lower transverse beam 10 by length-adjustable suspender belt, the intersection location of upper frame 1-3 and afterframe 1-2 is hung with rear lower transverse beam 11 by suspension rod, is hinged with some lower longerons 12 between front lower transverse beam 10 and rear lower transverse beam 11; The intersection location of afterframe 1-2 and underframe 1-4 is provided with cross section and is the pedestal 15 that " H " shape and slideway 13 tops match, and the bottom of this pedestal 15 is provided with the half slide block 17 that the main body both sides with slideway 13 are slidably connected.The bottom correspondence of walking mechanism 2 is provided with two slideway structures, the difference in height of two side slideways is controlled within 1 millimeter with mortar levelling by the beam face, slideway 13 cross sections are " work " font, two side slideways 13 are provided with the walking suspension bracket 14 matched with interior nose girder 4 and outer nose girder 5, internal mold 6 is connected in the top of interior nose girder 4, internal mold 6, outer side mold 7 and framed bent 8 are ingredients of template, template is connected on main couple 1, internal mold 6 is the Split form be comprised of some templates, between adjacent two templates, connect in hinged way, can be according to width and the height of web thickness and altitude conversion template.On frame row 8, be provided with adjustablely to drawing pin 16, every two cradle in truss type can, by adjustable to drawing pin 16 to be connected, form the double combined truss hang kep.Adjustable to drawing pin 16 to be arranged at the centre position of two Hanging Baskets, after putting in place, two Hanging Baskets walkings locked, and anchor device 3 is arranged between the underframe 1-4 and slideway 13 of main couple 1.
The angular range of afterframe 1-2 and upper frame 1-3 can be 106 °.
The angular range of afterframe 1-2 and upper frame 1-3 can be 130 °, best results.
The utility model Two bors d's oeuveres Hanging Basket adopts the diamond shaped cradle in truss type structure, the problems such as cradle structure complicatedly, stressed is owed rationally, the Hanging Basket own wt is excessive have been solved in the wide cut bridge construction, realized that by Two bors d's oeuveres single case Hanging Basket is independent, simple to operate, overcome with respect to whole Hanging Basket walking and required the problem that synchronism is higher.
Above embodiment only is not intended to limit in order to the technical scheme that the utility model Two bors d's oeuveres Hanging Basket is described, those of ordinary skill in the field should be appreciated that still and can modify or the part technical characterictic is equal to replacement the specific embodiment of utility model Two bors d's oeuveres Hanging Basket; And not breaking away from the spirit of the utility model double combined technical scheme, it all should be encompassed in the technology that the utility model Two bors d's oeuveres Hanging Basket is asked for protection.

Claims (5)

1. a double combined truss hang kep, by two groups of cradle in truss type, formed, every group of cradle in truss type comprises main couple (1) and the upper walking mechanism (2) arranged of main couple (1), anchor device (3), interior nose girder (4) and outer nose girder (5), described main couple (1) is connected with template, described template comprises internal mold (6), outer side mold (7) and framed bent (8), described main couple (1) is by front baffle (1-1), afterframe (1-2), upper frame (1-3) and underframe (1-4) connect to form parallelogram, described upper frame (1-3), be provided with between underframe (1-4) and connect system (9, ) intersection location of described upper frame (1-3) and front baffle (1-1) is hung with front lower transverse beam (10) by length-adjustable suspender belt, described upper frame (1-3) is hung with rear lower transverse beam (11) with the intersection location of afterframe (1-2) by suspension rod, be hinged with some lower longerons (12) between described front lower transverse beam (10) and rear lower transverse beam (11), the bottom correspondence of described walking mechanism (2) is provided with two slideway structures, two side slideways (13) are provided with the walking suspension bracket (14) matched with interior nose girder (4) and outer nose girder (5), internal mold (6) is connected in the top of interior nose girder (4), it is characterized in that, on described row (8), be provided with adjustable to drawing pin (16), two groups of cradle in truss type by adjustable to drawing pin (16) to connect.
2. a kind of double combined truss hang kep according to claim 1, is characterized in that, described afterframe (1-2) is 102~145 ° with the angular range of upper frame (1-3).
3. a kind of double combined truss hang kep according to claim 2, is characterized in that, described afterframe (1-2) is 106~145 ° with the angular range of upper frame (1-3).
4. a kind of double combined truss hang kep according to claim 1, is characterized in that, described internal mold (6) is the Split form be comprised of some templates, between adjacent two templates, connects in hinged way.
5. a kind of double combined truss hang kep according to claim 1, it is characterized in that, the intersection location of described afterframe (1-2) and underframe (1-4) is provided with cross section and is the pedestal (15) that " H " shape and slideway (13) top match, and the bottom of described pedestal (15) is provided with the half slide block (17) that the main body both sides with slideway (13) are slidably connected.
CN 201320403623 2013-07-08 2013-07-08 Double-spliced type truss hanging basket Expired - Fee Related CN203361021U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320403623 CN203361021U (en) 2013-07-08 2013-07-08 Double-spliced type truss hanging basket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320403623 CN203361021U (en) 2013-07-08 2013-07-08 Double-spliced type truss hanging basket

Publications (1)

Publication Number Publication Date
CN203361021U true CN203361021U (en) 2013-12-25

Family

ID=49808809

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320403623 Expired - Fee Related CN203361021U (en) 2013-07-08 2013-07-08 Double-spliced type truss hanging basket

Country Status (1)

Country Link
CN (1) CN203361021U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105113419A (en) * 2015-09-16 2015-12-02 中国葛洲坝集团第二工程有限公司 Method for manufacturing prestress concrete box girder with sightseeing slidewalk through hanging basket mold plate
CN106381813A (en) * 2016-09-07 2017-02-08 上海市浦东新区建设(集团)有限公司 Space saving type hanging basket structure, hanging basket system for multi-piece cantilever casting, as well as construction method
CN108360395A (en) * 2018-04-27 2018-08-03 中交武汉港湾工程设计研究院有限公司 A kind of bridge is grown up section box girder construction hanging basket, the concrete box girder construction structure of Hanging Basket, the steel box girder construction structure of Hanging Basket

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105113419A (en) * 2015-09-16 2015-12-02 中国葛洲坝集团第二工程有限公司 Method for manufacturing prestress concrete box girder with sightseeing slidewalk through hanging basket mold plate
CN106381813A (en) * 2016-09-07 2017-02-08 上海市浦东新区建设(集团)有限公司 Space saving type hanging basket structure, hanging basket system for multi-piece cantilever casting, as well as construction method
CN108360395A (en) * 2018-04-27 2018-08-03 中交武汉港湾工程设计研究院有限公司 A kind of bridge is grown up section box girder construction hanging basket, the concrete box girder construction structure of Hanging Basket, the steel box girder construction structure of Hanging Basket

Similar Documents

Publication Publication Date Title
CN202688888U (en) Deck type reversely hung template hanging frame
CN103074854B (en) Rear supporting point triangular bracket hanging basket and bridge construction method using same
CN103572708B (en) Large-span concrete continuous girder bridge side span folding device and method
CN207608836U (en) A kind of Successive interference cancellation cantilever pouring construction Diamond-Shape Form Traveler
CN203361021U (en) Double-spliced type truss hanging basket
CN109868755A (en) A kind of cradle construction method of Rhombic Truss Hanging Basket and cantilever beam
CN110512523A (en) A kind of construction method of large span gate-type upper beam Split type supporting stand
CN109468941A (en) A kind of curve tower abnormity cable-stayed bridge and its construction method
CN105926464A (en) Inverted hanging type trapezoid inclined climbing form traveler
CN109736206A (en) Wavelike steel webplate continuous bridge end bay closes up cast-in-place support structure and construction method
CN101864731A (en) Mobile framework equipment
CN209686443U (en) One kind can formwork composed bogie in early demoulding gallery
CN203546599U (en) Pier-side bracket
CN106978783B (en) Hanging basket for pouring inclined web type continuous beam cantilever
CN201574360U (en) Truss type hanging basket
CN203755127U (en) Pre-stress high-performance concrete continuous box girder bridge
CN101831872B (en) Front and rear fulcrum combined cradle
CN207121823U (en) A kind of ecad Segmental assembling bridge-erecting machine extensively
CN203530864U (en) Large-span concrete continuous beam bridge side span folding device
CN207700074U (en) The double limb triangle hanging baskets of continuous rigid frame bridge cantilever beam section construction
CN206189848U (en) Early tear horizontal mold sheet composition bearing structure open
CN206784865U (en) A kind of detachable adjustable for height subway tunnel section construction operation platform
CN105422138A (en) Large-clearance tunnel lining trolley framework supporting system
CN204780558U (en) Curved surface roof beam hoist and mount view bridge
CN209468703U (en) Beams of concrete and steel box-girder general-purpose construction device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20131225

CU01 Correction of utility model
CU01 Correction of utility model

Correction item: Termination upon expiration of patent

Correct: Revocation of Patent Expiration and Termination

False: On July 25, 2023, the expiration and termination of the 39-volume 3001 patent

Number: 30-01

Volume: 39

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131225