CN105422138A - Large-clearance tunnel lining trolley framework supporting system - Google Patents

Large-clearance tunnel lining trolley framework supporting system Download PDF

Info

Publication number
CN105422138A
CN105422138A CN201510941218.1A CN201510941218A CN105422138A CN 105422138 A CN105422138 A CN 105422138A CN 201510941218 A CN201510941218 A CN 201510941218A CN 105422138 A CN105422138 A CN 105422138A
Authority
CN
China
Prior art keywords
template
side wall
truss
rod
framework
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510941218.1A
Other languages
Chinese (zh)
Inventor
赵自静
孙昆鹏
汪庆兵
王安会
苏玉宝
阮立峰
芮世财
崔军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Engineering Co Ltd of CTCE Group
Original Assignee
First Engineering Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Engineering Co Ltd of CTCE Group filed Critical First Engineering Co Ltd of CTCE Group
Priority to CN201510941218.1A priority Critical patent/CN105422138A/en
Publication of CN105422138A publication Critical patent/CN105422138A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a large-clearance tunnel lining trolley framework supporting system which is characterized in that each of bilateral half-range frameworks of an adjustable tunnel lining trolley framework is composed of an upper arch framework and a side wall framework; a framework supporting structure stretches across between the bilateral half-range frameworks in a supported manner by taking a truss as a top horizontal support, the truss is shaped like an inverted Chinese character Min, wing rods extends out of two ends of the top of the truss prop against a top longitudinal beam of a trolley, adjustable connecting rods are arranged at the ends of the wing rods, and the front ends of the adjustable connecting rods are connected to dorsal ribs at the bottom ends of the upper arch frameworks; inclined dowel bars are arranged between each of two ends of the truss and each of the dorsal ribs on the middle section of each side wall framework; and vertical supporting rods are arranged between each truss and each upper arch frameowrk, and a large-clearance structure shaped like a Chinese character Xue is formed wholly. According to the large-clearance tunnel lining trolley framework supporting system, the upper stress is transferred to the bottoms of the dorsal ribs of each framework through the horizontal support, so that the clearance under the trolley is effectively increased, and the tunnel construction efficiency is increased.

Description

Large headroom tunnel lining trolley formwork bracing system
Technical field
The present invention relates to a kind of large headroom tunnel lining trolley formwork bracing system, be applied in Tunnel Second Lining Construction lining trolley, especially have the lining trolley in the Tunnel Second Lining Construction of the conversion of widening, adding maximum section of passenger flow of general section and Widening on Curve section and general anchor section.
Background technology
Tradition lining trolley formwork bracing system is generally made up of door frame, cross bar and dowel bar.Country rock suffered by template and concrete pressure pass to back of the body rib, back of the body rib reaches door frame by dowel bar, born by door frame, thus door frame size all designs more roomy, occupy larger chassis headroom, under door frame headroom and clear span less, vehicle and machinery by being greatly affected, also there is very large potential safety hazard, efficiency of construction is lower.
Summary of the invention
The present invention is for avoiding and improving the weak point existing for above-mentioned prior art, provides a kind of large headroom tunnel lining trolley formwork bracing system, by changing the force way of trolley formwork, cancel door frame, headroom under increase chassis, reduces security risk, improves constructing tunnel efficiency.
The present invention is that technical solution problem adopts following technical scheme:
The present invention's large headroom tunnel lining trolley formwork bracing system, its feature is:
The form of structure arranging tunnel lining trolley adjustable formwork is: on the tunnel cross-section of arching, with vertical center line for symmetrical centre, lining shuttering split is set to symmetrical half range template, described half range template is made up of arch template and side wall template, described arch template and side wall template are carried out hinged with meta bolt, and at the connecting portion of meta bolt, between described arch template and side wall template, rod-adjurstable is set, described rod-adjurstable and described meta bolt are that triangle is arranged, can adjust by regulating the length of described rod-adjurstable and actuate degree between described arch template and side wall template, be connected by regulating block between the arch template of described symmetrical half range template, the regulating block changing different in width can adjust the width of described lining shuttering,
Arranging formwork support structure is: support across being supported between symmetrical half range template using truss as top cross, described truss is in falling " ware " font, the wing bar that two ends, truss top are stretched out is supported in the top longitudinal beam of chassis, the end of described wing bar is provided with adjustable connecting-rod, described adjustable connecting-rod is along adjustable length on the bearing of trend of wing bar, and the front end of described adjustable connecting-rod is connected on the bottom back of the body rib of the arch template of corresponding side; Carry on the back between rib with the stage casing of the side wall template of corresponding side at the two ends of described truss and oblique dowel bar is set; Vertical shore is set between described truss and arch template, overall " cave " character form structure forming large headroom.
The present invention's large headroom tunnel lining trolley formwork bracing system, its feature is also:
Between the epimere back of the body rib and the rod end of wing bar of described side wall template, hound is set;
Between the hypomere back of the body rib and tunnel ground of described side wall template, lower hound is set;
Waist strut is set between the waist and side wall template of described oblique dowel bar and forms trivet.
Compared with the prior art, beneficial effect of the present invention is embodied in:
1, template split is set to symmetrical half range template by the present invention, eliminate chassis inner upright mounting, unnecessary stress is born as top cross support by truss, and provide top operational space, overall " cave " character form structure forming large headroom, effectively increase headroom under chassis, reduce security risk, improve constructing tunnel efficiency.
2, sound construction of the present invention, is convenient to dismounting and adjustment.
Accompanying drawing explanation
fig. 1for structural representation of the present invention figure;
fig. 2for the syndeton signal between template and side wall template that arches up in the present invention figure;
fig. 3for regulating block mounting structure signal in the present embodiment figure;
in figurelabel: 31 arch templates, 32 side wall templates, 33 meta bolts, 34 rod-adjurstables, 35 regulating blocks, 41 oblique dowel bars, 42 vertical shores, hound on 43,44 times hounds, 45 waist struts.
Detailed description of the invention:
See fig. 1, in the present embodiment, the form of structure of tunnel lining trolley adjustable formwork is: on the tunnel cross-section of arching, with vertical center line for symmetrical centre, lining shuttering split is set to symmetrical half range template, half range template is made up of arch template 31 and side wall template 32, arch template 31 and side wall template 32 are carried out hinged with meta bolt 33, and at the connecting portion of meta bolt 33, between arch template 31 and side wall template 32, rod-adjurstable 34 is set, rod-adjurstable 34 is arranged in triangle with meta bolt 33, can adjust by regulating the length of rod-adjurstable 34 and actuate degree between arch template 31 and side wall template 32, be connected by regulating block 35 between the arch template 31 of symmetrical half range template, the regulating block 35 changing different in width can adjust the width of lining shuttering.
as Fig. 1shown in, arranging formwork support structure in the present embodiment is: support across being supported between symmetrical half range template using truss 21 as top cross, truss 21 is in falling " ware " font, the wing bar 21a that two ends, truss 21 top are stretched out is supported in the top longitudinal beam 12 of chassis, the end of wing bar 21a is provided with adjustable connecting-rod 21b, adjustable connecting-rod 21b is adjustable length on the bearing of trend along wing bar 21a, and the front end of adjustable connecting-rod 21b is connected on the bottom back of the body rib of the arch template 31 of corresponding side; Carry on the back between rib in the two ends of truss 21 and the stage casing of the side wall template 32 of corresponding side and oblique dowel bar 41 is set; Vertical shore 42 is set between truss 21 and arch template 31, overall " cave " character form structure forming large headroom.
fig. 1shown in, in the present embodiment, large headroom tunnel lining trolley formwork bracing system comprises:
Between the epimere back of the body rib and the rod end of wing bar 21a of side wall template 32, hound 43 is set; Lower hound 44 is set between the hypomere back of the body rib and tunnel ground of side wall template 32, conducts oneself with dignity for support system; Waist strut 45 is set between the waist and side wall template 32 of oblique dowel bar 41 and forms trivet, improve the stability of system.
In concrete enforcement, as Fig. 2shown in, bolt is adopted to be connected with the back of the body rib of arch template 31 and side wall template 32 respectively at the two ends of rod-adjurstable 34, rod-adjurstable 34 is set for hydraulic supporting strut, suitably can increase the intensity of the back of the body rib of lining shuttering, to increase the bulk strength of lining shuttering, back of the body rib is utilized to share flexural stress; as Fig. 3shown in, be adopt bolt to be connected between regulating block 35 with arch template 31, this type of attachment is easy to implement.When needing at transition section place, tunnel to regulate chassis section, first remove regulating block 35, elongate or shorten the length of hydraulic supporting strut, make the section angle that arch template 31 and side wall template 32 reach predetermined; Select the width regulating block 35 of fitting mutually according to tunnel cross-section again and utilize bolt to be fixed installation between arch template 31 and regulating block 35, realizing the adjustment of lining shuttering.

Claims (2)

1. a large headroom tunnel lining trolley formwork bracing system, is characterized in that:
The form of structure arranging tunnel lining trolley adjustable formwork is: on the tunnel cross-section of arching, with vertical center line for symmetrical centre, lining shuttering split is set to symmetrical half range template, described half range template is made up of arch template (31) and side wall template (31), described arch template (31) and side wall template (32) are carried out hinged with meta bolt (33), and the connecting portion in meta bolt (33), between described arch template (31) and side wall template (32), rod-adjurstable (34) is set, described rod-adjurstable (34) and described meta bolt (33) are arranged in triangle, can adjust by regulating the length of described rod-adjurstable (34) and actuate degree between described arch template (31) and side wall template (32), be connected by regulating block (35) between the arch template (31) of described symmetrical half range template, the regulating block (35) changing different in width can adjust the width of described lining shuttering,
Arranging formwork support structure is: support across being supported between symmetrical two half range templates using truss (21) as top cross, described truss (21) is in falling " ware " font, the wing bar (21a) that truss (21) two ends, top are stretched out is supported in the top longitudinal beam (12) of chassis, the end of described wing bar (21a) is provided with adjustable connecting-rod (21b), described adjustable connecting-rod (21b) adjustable length on the bearing of trend along wing bar (21a), the front end of described adjustable connecting-rod (21b) is connected on the bottom back of the body rib of the arch template (31) of corresponding side, carry on the back between rib with the stage casing of the side wall template (32) of corresponding side at the two ends of described truss (21) and oblique dowel bar (41) is set, vertical shore (42) is set between described truss (21) and arch template (31), overall " cave " character form structure forming large headroom.
2. large headroom tunnel lining trolley formwork bracing system according to claim 1, is characterized in that:
Between the epimere back of the body rib and the rod end of wing bar (21a) of described side wall template (32), upper hound (43) is set;
Between the hypomere back of the body rib and tunnel ground of described side wall template (32), lower hound (44) is set;
Waist strut (45) is set between the waist and side wall template (32) of described oblique dowel bar (41) and forms trivet.
CN201510941218.1A 2015-12-14 2015-12-14 Large-clearance tunnel lining trolley framework supporting system Pending CN105422138A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510941218.1A CN105422138A (en) 2015-12-14 2015-12-14 Large-clearance tunnel lining trolley framework supporting system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510941218.1A CN105422138A (en) 2015-12-14 2015-12-14 Large-clearance tunnel lining trolley framework supporting system

Publications (1)

Publication Number Publication Date
CN105422138A true CN105422138A (en) 2016-03-23

Family

ID=55500631

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510941218.1A Pending CN105422138A (en) 2015-12-14 2015-12-14 Large-clearance tunnel lining trolley framework supporting system

Country Status (1)

Country Link
CN (1) CN105422138A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106050270A (en) * 2016-08-16 2016-10-26 北京康港工程技术有限公司 Open cut tunnel forming construction device
CN107060823A (en) * 2017-04-11 2017-08-18 中铁二十局集团第三工程有限公司 Tunnel anchorage section two serves as a contrast concrete construction without dismounting chassis
CN110486045A (en) * 2019-08-06 2019-11-22 中铁五局集团第五工程有限责任公司 Arch bridge type tunnel lining trolley

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20130106199A (en) * 2012-03-19 2013-09-27 선산철강공업(주) Steel form for tunnel construction under linning board and tunnel construction method using it
CN204041080U (en) * 2014-06-26 2014-12-24 湖南五新重型装备有限公司 General formula needle beam lining trolley in a kind of
CN104358577A (en) * 2014-10-29 2015-02-18 湖南五新重型装备有限公司 Tunnel lining trolley
CN104405416A (en) * 2014-12-18 2015-03-11 北京铁五院工程机械有限公司 Whole-section, large-headroom and rapid lining trolley
CN104948204A (en) * 2015-05-14 2015-09-30 湖南五新重型装备有限公司 Subway tunnel lining trolley
CN205172597U (en) * 2015-12-14 2016-04-20 中铁四局集团第一工程有限公司 Big headroom tunnel lining platform truck formwork support system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20130106199A (en) * 2012-03-19 2013-09-27 선산철강공업(주) Steel form for tunnel construction under linning board and tunnel construction method using it
CN204041080U (en) * 2014-06-26 2014-12-24 湖南五新重型装备有限公司 General formula needle beam lining trolley in a kind of
CN104358577A (en) * 2014-10-29 2015-02-18 湖南五新重型装备有限公司 Tunnel lining trolley
CN104405416A (en) * 2014-12-18 2015-03-11 北京铁五院工程机械有限公司 Whole-section, large-headroom and rapid lining trolley
CN104948204A (en) * 2015-05-14 2015-09-30 湖南五新重型装备有限公司 Subway tunnel lining trolley
CN205172597U (en) * 2015-12-14 2016-04-20 中铁四局集团第一工程有限公司 Big headroom tunnel lining platform truck formwork support system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106050270A (en) * 2016-08-16 2016-10-26 北京康港工程技术有限公司 Open cut tunnel forming construction device
CN107060823A (en) * 2017-04-11 2017-08-18 中铁二十局集团第三工程有限公司 Tunnel anchorage section two serves as a contrast concrete construction without dismounting chassis
CN107060823B (en) * 2017-04-11 2024-05-14 中铁二十一局集团第三工程有限公司 Non-dismantling trolley for tunnel anchor section secondary lining concrete construction
CN110486045A (en) * 2019-08-06 2019-11-22 中铁五局集团第五工程有限责任公司 Arch bridge type tunnel lining trolley

Similar Documents

Publication Publication Date Title
CN103882798B (en) The reinforced concrete arch bridge of the powerful skeleton of a kind of concrete filled steel tube and construction method thereof
CN203923914U (en) Solely stub bent cap support
CN205934750U (en) Bridge girder reinforcing device
CN105422138A (en) Large-clearance tunnel lining trolley framework supporting system
CN107630709B (en) A kind of construction method of the mobile trolley of bored tunnel construction
CN103321156B (en) Foldable through-tunnel bridge girder erection machine rear support leg and application thereof
CN105422137B (en) The big headroom modularization lining trolley in tunnel
CN104131515A (en) Method for constructing cast-in-place box beam by means of movable formwork
CN206972267U (en) A kind of deep tunnel supporting new concrete support
CN205116715U (en) Cast -in -situ box girder template bracing device
CN209686443U (en) One kind can formwork composed bogie in early demoulding gallery
CN103628416A (en) Stiffening girder counter-straining near-pier bracket of suspension bridge
CN205172597U (en) Big headroom tunnel lining platform truck formwork support system
CN204997807U (en) Prefabricated little case roof beam centre form device
CN204849595U (en) Frame bridge crane landing leg suitable for set up precast beam under heavy grade circumstances
CN202380390U (en) Flexible arch support frame with vault pushing steel truss girder
CN206070343U (en) The pier prefabricated K supports of reinforced on a kind of tubular arch bridge arch
CN105332718A (en) Trolley for construction of large-span multi-section tunnel
CN208563351U (en) A kind of roadbed side slope arched framework ruggedized construction
CN204356663U (en) The rear support leg of novel large-tonnage Bridge Erector
CN204151695U (en) Be applicable to the combination Hanging Basket system of continuous rigid frame bridge or the full beam section construction of continuous girder bridge
CN207890943U (en) The combined attachment device of tower crane
CN203361021U (en) Double-spliced type truss hanging basket
CN205206841U (en) Big headroom modularization lining cutting platform truck in tunnel
CN109098472A (en) A kind of building girder steel and steel-pipe pile integral supporting structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160323

WD01 Invention patent application deemed withdrawn after publication