CN106381813A - Space saving type hanging basket structure, hanging basket system for multi-piece cantilever casting, as well as construction method - Google Patents

Space saving type hanging basket structure, hanging basket system for multi-piece cantilever casting, as well as construction method Download PDF

Info

Publication number
CN106381813A
CN106381813A CN201610806321.XA CN201610806321A CN106381813A CN 106381813 A CN106381813 A CN 106381813A CN 201610806321 A CN201610806321 A CN 201610806321A CN 106381813 A CN106381813 A CN 106381813A
Authority
CN
China
Prior art keywords
hanging basket
outermost
nose girder
suspension
cradle structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610806321.XA
Other languages
Chinese (zh)
Other versions
CN106381813B (en
Inventor
邵宇平
高昇伟
李华
白代义
孔祥荣
叶青荣
张海燕
康毅
丁竞炜
姜伟军
祝兰兰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
(group) Co Ltd Is Built In Pudong New Area Shanghai
Original Assignee
(group) Co Ltd Is Built In Pudong New Area Shanghai
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (group) Co Ltd Is Built In Pudong New Area Shanghai filed Critical (group) Co Ltd Is Built In Pudong New Area Shanghai
Priority to CN201610806321.XA priority Critical patent/CN106381813B/en
Publication of CN106381813A publication Critical patent/CN106381813A/en
Application granted granted Critical
Publication of CN106381813B publication Critical patent/CN106381813B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • E01D21/10Cantilevered erection

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a space saving type hanging basket structure. The space saving type hanging basket structure comprises a front upper crossbeam, a front lower crossbeam, a rear upper crossbeam and a rear lower crossbeam, wherein two first suspension rods on the most outer side penetrate through reserved holes formed in a completed concrete structure; a walking hanger frame is arranged on the completed concrete structure in a connecting manner; a guiding beam which can slide in an advancing direction of a hanging basket is arranged on the walking hanger frame; the first suspension rods on the most outer side and second suspension rods on the most outer side are separately and fixedly connected with the guiding beam, and can synchronously move with the guiding beam; and a connector is arranged on the two first suspension rods on the most outer side, and is located above the guiding beam. Through the adoption of the space saving type hanging basket structure disclosed by the invention, under the situation that the spacing between the two independent concrete structures for the multi-piece cantilever casting is low, enough space enabling the two hanging basket structures to synchronously and parallelly construct side by side is generated, and the construction period is greatly shortened. The invention also discloses a hanging basket system for the multi-piece cantilever casting and a construction method for the multi-piece cantilever casting.

Description

Space saving cradle structure and several cast-in-place cantilever hanging basket systems and construction method
Technical field
The present invention relates to bridge suspended pouring construction apparatus field, espespecially a kind of space saving cradle structure, hang for several Hanging Basket system and a kind of construction method of several cantilever pourings that arm pours.
Background technology
Hanging Basket is a kind of load-carrying members that can slide along back or roll, and is a movable operation platform.Its anchoring is outstanding Hang in the front end beam section of construction, the template of next beam section, reinforcing bar, the installing of prestress pipe can be carried out on Hanging Basket, mix Solidifying soil perfusion and the operation such as prestressed stretch-draw, grouting.After completing the circulation in a stage, Hanging Basket moves forward and fixing, under carrying out The outstanding filling of one sections, is so recycled to cantilever pouring and completes.Hanging Basket typically each has following ingredient:Load-carrying members, outstanding Crane system, anchor, walking system and work platformses.Wherein, load-carrying members are the main bearing member of Hanging Basket, and it bears and applies Construction equipment and the total weight newly pouring stage concrete, main inclusion main longitudinal grider and front upper and lower crossbeam, rear upper and lower crossbeam, purlin Frame, every part is usually and is welded into box-type section by shaped steel or steel plate group.
Traditional cantilever pouring template at least needs 450mm from cradle structure outward flange, i.e. length between A, B as shown in Figure 1 Degree need to be 450mm.This causes both sides problem:
First be design concrete structure apart from existing structure nearer when, can due to do not have sufficient space arrangement cradle structure, So that cannot be carried out constructing.
When next is by two width or even several cantilever pourings, under a lot of situations, between two width independence concrete structures, space is less, Less than 900mm.Now because no sufficient space arranges that two cradle structure carry out parallel synchronous traveling operation, can only misplace construction, And the cradle structure first constructed also needs the cradle structure for another width to carry out cantilever pouring stays enough advance spaces, greatly extend Duration.
Content of the invention
It is an object of the invention to provide a kind of space saving cradle structure, realize cradle structure under Construction State and occupy sky Between reduce.Provide a kind of Hanging Basket system for several cantilever pourings and a kind of construction party of several cantilever pourings again Method, realizes cradle structure synchronous parallel processing in several cantilever pourings.
The technical scheme that the present invention provides is as follows:A kind of space saving cradle structure, including truss, front entablature, front Sill, rear entablature and rear sill, by some first suspension rod phases between described rear entablature and described rear sill Connect, described front entablature is connected by some second suspension rods with described front sill, and outermost two described first are hung Bar passes through the hole to be provided setting having completed concrete structure;
Complete to be connected with walking suspension bracket in concrete structure, described walking suspension bracket is provided with can be along Hanging Basket direct of travel Slide nose girder, described lead fine strain of millet be located at the described unilateral or bilateral having completed concrete structure;Outermost described first suspension rod and Described second suspension rod in outside is affixed with described nose girder respectively, is synchronized with the movement with described nose girder;Outermost two described first It is provided with adapter, described adapter is located above described nose girder on suspension rod.
Outermost for cradle structure suspension rod is passed through completed concrete structure setting, in the inner side of formwork for placing, eliminates Original structure middle hanger is located at the space additionally occupying outside formwork for placing.On the one hand design concrete structure can be met apart from existing The installation space problem of cradle structure when building is nearer, on the other hand for two or more independent concretes of several cantilever pourings The less situation of structure pitch, has enough spaces to make cradle structure synchronization side by side parallel construction, greatly reduces the duration.
Further, described walking suspension bracket is provided with plain-barreled roll, moves ahead for nose girder sliding.The nose girder resistance of motion is little, Hanging Basket Structure is run smooth.
Further, described completed to be provided with preburied component in concrete structure, described walking suspension bracket is completed with described Concrete structure is welded to connect by described preburied component.
Further, described nose girder is Two bors d's oeuveres nose girder.
Further, positioned at outermost described second suspension rod apart from formwork for placing edge 1000-2000mm.
Further, the truss of described space saving cradle structure is triangular truss.Triangular structure is stable, can There is more uniform distribution of force in cradle structure, advance reliable and stable.
The space saving cradle structure being provided by the present invention, can bring following at least one beneficial effect:
1st, can solve the problems, such as when design concrete structure Hanging Basket arrangement space when nearer, building structure apart from existing structure Design is more flexible, various.
2nd, the less situation for the multiple independent concrete structure pitch of several cantilever pourings, has enough spaces can multiple hang Basket structure synchronization side by side parallel is constructed, and greatly reduces the duration.
3rd, additionally increase a Guide beam structure, structure design is simple, cost economy, and it is same to reach traditional cantilever pouring Equal strength and rigidity.
The invention also discloses a kind of Hanging Basket system for several cantilever pourings, it includes:The multiple institutes being arranged side by side State space saving cradle structure, the number of described space saving cradle structure is identical with the number of cantilever width, described in each Space saving cradle structure processes a width cantilever respectively.
The less situation of two or more independent concrete structure pitch for several cantilever pourings, because space saving is hung The outermost suspension rod of basket structure is within formwork for placing, therefore when the construction of cradle structure side by side parallel, between formwork for placing Limited away from not taking up space by Hanging Basket.So can achieve two or more described space saving Hanging Basket knots side by side Structure synchronous processing, greatly reduces the duration.
The invention also discloses a kind of construction method of several cantilever pourings, comprise the following steps:
S10, complete one group of 0# block construction of several cantilevers;
S20, in the respectively connect setting walking suspension bracket of 0# block described in a group, and arrange and can advance along Hanging Basket on walking suspension bracket The nose girder sliding in direction;
S30, will be connected by some first suspension rods between rear entablature and rear sill, front entablature and rear entablature It is connected by some second suspension rods, wherein outermost two described first suspension rods pass through the hole to be provided setting of described 0# block; Corresponding outermost two described first suspension rods of 0# block are provided with adapter, described adapter is located on described nose girder Side, forms the cradle structure that two rows of back-to-back arrangement are arranged in parallel, the number often arranging described cradle structure is with the width of cantilever Number is equal;
S40, will be affixed with described nose girder respectively to outermost described first suspension rod and outermost described second suspension rod, with Described nose girder is synchronized with the movement;
S50, described walking suspension bracket hold out against, and by described adapter disconnect;Now, cradle structure is advanced, and proceeds to down One work station, and adapter is closed, complete to pour;
S60, reconnect setting walking suspension bracket supporting setting nose girder on completing concrete structure;
S70, carry out the cycle of operation of S40-S60, complete pouring of concrete structure paragraph by paragraph.
Further, in described step S20, on described 0# block arrange preburied component, by described walking suspension bracket with described 0# block is welded to connect by described preburied component.In described step S60, complete to arrange preburied component in concrete structure described, Described walking suspension bracket is welded to connect by described preburied component with the described concrete structure that completed.
Brief description
Below by the way of clearly understandable, preferred implementation is described with reference to the drawings, to a kind of space saving Hanging Basket The above-mentioned characteristic of structure, technical characteristic, advantage and its implementation are further described.
Fig. 1 is the Facad structure figure of traditional cradle structure.
Fig. 2 is the schematic diagram of walking suspension bracket setting.
Fig. 3 is the construction profile of space saving cradle structure.
Fig. 4 is the Facad structure figure of the Hanging Basket system for several cantilever pourings.
Drawing reference numeral explanation:100th, column, 110, oblique pull band, 120, completed concrete structure, 200, front entablature, 210, after Entablature, 220, front sill, 230, rear sill, 240, main longitudinal grider, the 250, first suspension rod, the 260, second suspension rod, 300, OK Walk suspension bracket, 310, plain-barreled roll, 320, adapter, 330, nose girder.
Specific embodiment
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, brief description will be compareed below The specific embodiment of the present invention.It should be evident that drawings in the following description are only some embodiments of the present invention, for For those of ordinary skill in the art, on the premise of not paying creative work, other can also be obtained according to these accompanying drawings Accompanying drawing, and obtain other embodiments.
For making simplified form, each in figure only schematically show part related to the present invention, and they do not represent It is as the practical structures of product.In addition, so that simplified form readily appreciates, there is identical structure or function in some in figures Part, only symbolically depicts one of, or has only marked one of.Herein, " one " not only represents " only this " is it is also possible to represent the situation of " more than one ".
Herein, the restriction in the mathematics of " vertical " etc. non-critical and/or geometry meaning, also comprises this area skill Art personnel may be appreciated and manufacture or using etc. permission error.
As shown in Figure 2, Figure 3, Figure 4, embodiment of the invention discloses that a kind of space saving cradle structure, including purlin Frame, front entablature 200, front sill 220, rear entablature 210, rear sill 230 and main longitudinal grider 240.Entablature 210 He afterwards It is connected by some first suspension rods 250 between sill 230 afterwards, front entablature 200 and front sill 220 pass through some second Suspension rod 260 is connected.Outermost two the first suspension rods 250 pass through the hole to be provided setting having completed concrete structure 120, i.e. outermost The first suspension rod be located at and completed the inner side of concrete structure 120, arrange through completing concrete structure 120.
Complete walking suspension bracket 300 is connected with concrete structure 120, walking suspension bracket 300 is provided with can be along Hanging Basket row Enter direction slip nose girder 330, described lead fine strain of millet 330 be located at the described unilateral or bilateral having completed concrete structure 120;;Outermost First suspension rod 250 and outermost second suspension rod 260 are affixed with nose girder 330 respectively, are synchronized with the movement with nose girder 330;Outermost It is provided with adapter 320, adapter 320 is located above nose girder 330 on two the first suspension rods 250.Walking suspension bracket 300 and lead fine strain of millet 330 can be arranged on the one side having completed concrete structure or both sides.
Disconnect device 320, hold out against walking suspension bracket 310, when main longitudinal grider 240 and truss move ahead, by front entablature 200 Sill 220 and nose girder 330 forward movement before drive, after then driving, sill 230 moves.
In further embodiment of the present invention, walking suspension bracket 300 is provided with plain-barreled roll 310, moves ahead for nose girder 330 sliding.
In further embodiment of the present invention, complete to be provided with preburied component in concrete structure 120, suspension bracket 300 of walking It is welded to connect by preburied component with completing concrete structure 120.
In further embodiment of the present invention, nose girder 330 is Two bors d's oeuveres nose girder 330.
In further embodiment of the present invention, positioned at outermost second suspension rod 260 apart from formwork for placing edge 1000- 2000mm.
As shown in figure 3, in further embodiment of the present invention, the truss of space saving cradle structure is triangle purlin Frame.It is spliced to form by the oblique pull band 110 of pillar 100 and its both sides.
As shown in figure 4, the invention also discloses a kind of embodiment of the Hanging Basket system for two width cantilever pourings, its bag Include:The multiple spaces saving cradle structure being arranged side by side, the number of described space saving cradle structure is individual with cantilever width Number is identical, and each described space saving cradle structure processes a width cantilever respectively.This in figure walking suspension bracket 300 is located at Hanging Basket and ties The both sides of structure.The spacing completing between concrete structure 120 of two space saving cradle structure is not subject to outermost the first suspension rod 250 Restriction.
The invention also discloses a kind of embodiment of the construction method of several cantilever pourings, comprise the following steps:
S10, complete several cantilevers 0# block construction, 0# block group number identical with the number of the width of cantilever;One group of 0# block is Adjacently positioned 2 or more 0# blocks on same width;
S20, on 0# block respectively connect setting walking suspension bracket 300, and arrange and can advance along Hanging Basket on walking suspension bracket 300 Direction slide nose girder 330, described lead fine strain of millet 330 be located at 0# unilateral or bilateral;;One group of 0# block of two width cantilevers generally comprises 4 Individual 0# block, one group of 0# block of three width cantilevers generally comprises 6 0# blocks.
S30, will be connected by some first suspension rods 250 between rear entablature 210 and rear sill 230, front entablature 200 are connected by some second suspension rods 260 with rear entablature 210, and wherein outermost two the first suspension rods 250 pass through 0# block Hole to be provided setting;Outermost two the first suspension rods 250 are provided with adapter 320, adapter 320 is located at nose girder 330 Top, forms the cradle structure that two rows of back-to-back arrangement are arranged in parallel, often arranges the width with cantilever for the number of described cradle structure Number equal;
S40, by outermost for each cradle structure the first suspension rod 250 and outermost second suspension rod 260 respectively with nose girder 330 is affixed, is synchronized with the movement with nose girder 330;
S50, walking suspension bracket 300 is held out against, and the adapter 320 on the first suspension rod 250 is disconnected;Now, cradle structure Advance, proceed to subsequent work station, and adapter is closed, complete to pour;
S60, on completing concrete structure 120 reconnect setting walking suspension bracket 300 and supporting setting nose girder 330;
S70, carry out the cycle of operation of S40-S60, complete pouring of concrete structure paragraph by paragraph.
In further embodiment of the present invention, in step S20,0# block arranges preburied component, will walk suspension bracket 300 and 0# block is welded to connect by preburied component.In step S60, preburied component, suspension bracket of walking are set on completing concrete structure 120 300 are welded to connect by preburied component with completing concrete structure 120.
It should be noted that above-described embodiment all can independent assortment as needed.The above is only the preferred of the present invention Embodiment it is noted that for those skilled in the art, in the premise without departing from the principle of the invention Under, some improvements and modifications can also be made, these improvements and modifications also should be regarded as protection scope of the present invention.

Claims (9)

1. a kind of space saving cradle structure, including truss, front entablature, front sill, rear entablature and rear sill, It is connected by some first suspension rods between described rear entablature and described rear sill, described front entablature and described front lower horizontal stroke Beam be connected by some second suspension rods it is characterised in that:Outermost two described first suspension rods pass through and have completed concrete structure Hole to be provided setting;
Complete to be connected with walking suspension bracket in concrete structure, described walking suspension bracket has been provided with and can slide along Hanging Basket direct of travel Nose girder;Outermost described first suspension rod and outermost described second suspension rod are affixed with described nose girder respectively, lead with described Beam is synchronized with the movement;It is provided with adapter, described adapter is located above described nose girder on outermost two described first suspension rods.
2. space according to claim 1 saving cradle structure it is characterised in that:It is provided with flat on described walking suspension bracket Roller, moves ahead for described nose girder sliding.
3. space according to claim 1 saving cradle structure it is characterised in that:Described complete to set in concrete structure It is equipped with preburied component, described walking suspension bracket is welded to connect by described preburied component with the described concrete structure that completed.
4. space according to claim 1 saving cradle structure it is characterised in that:Described nose girder is Two bors d's oeuveres nose girder.
5. space according to claim 1 saving cradle structure it is characterised in that:Hang positioned at outermost described second Bar is apart from formwork for placing edge 1000-2000mm.
6. according to the arbitrary described space saving cradle structure of claim 1 it is characterised in that:Described truss is triangle purlin Frame.
7. a kind of Hanging Basket system for several cantilever pourings is it is characterised in that include:Be arranged side by side multiple according to right will Seek the space saving cradle structure described in 1-6, the number of described space saving cradle structure is identical with the number of cantilever width, Each described space saving cradle structure processes a width cantilever respectively.
8. a kind of construction method of several cantilever pourings is it is characterised in that comprise the following steps:
S10, complete several cantilevers 0# block construction, 0# block group number identical with the number of the width of cantilever;
S20, on described 0# block respectively connect setting walking suspension bracket, and arrange and can slide along Hanging Basket direct of travel on walking suspension bracket Dynamic nose girder;
S30, will be connected by some first suspension rods between rear entablature and rear sill, front entablature is passed through with rear entablature Some second suspension rods are connected, and wherein outermost two described first suspension rods pass through the hole to be provided setting of described 0# block;In 0# It is provided with adapter, described adapter is located above described nose girder, shape on corresponding outermost two described first suspension rods of block The cradle structure becoming two rows of back-to-back arrangement to be arranged in parallel, often arranges the number phase with the width of cantilever for the number of described cradle structure Deng;
S40, outermost for each cradle structure described first suspension rod and outermost described second suspension rod are led with described respectively Beam is affixed, is synchronized with the movement with described nose girder;
S50, described walking suspension bracket hold out against, and by described adapter disconnect;Now, cradle structure is advanced, and proceeds to next work Make station, and adapter is closed, complete to pour;
S60, reconnect setting walking suspension bracket supporting setting nose girder on completing concrete structure;
S70, carry out the cycle of operation of S40-S60, complete pouring of concrete structure paragraph by paragraph.
9. a kind of construction method of several cantilever pourings according to claim 8 is it is characterised in that in described step S20, Preburied component is arranged on described 0# block, described walking suspension bracket is welded to connect by described preburied component with described 0# block;
In described step S60, complete to arrange preburied component in concrete structure described, described walking suspension bracket has been completed with described Concrete structure is welded to connect by described preburied component.
CN201610806321.XA 2016-09-07 2016-09-07 Space saving cradle structure and several cast-in-place cantilever hanging basket systems and construction method Active CN106381813B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610806321.XA CN106381813B (en) 2016-09-07 2016-09-07 Space saving cradle structure and several cast-in-place cantilever hanging basket systems and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610806321.XA CN106381813B (en) 2016-09-07 2016-09-07 Space saving cradle structure and several cast-in-place cantilever hanging basket systems and construction method

Publications (2)

Publication Number Publication Date
CN106381813A true CN106381813A (en) 2017-02-08
CN106381813B CN106381813B (en) 2017-08-22

Family

ID=57938024

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610806321.XA Active CN106381813B (en) 2016-09-07 2016-09-07 Space saving cradle structure and several cast-in-place cantilever hanging basket systems and construction method

Country Status (1)

Country Link
CN (1) CN106381813B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109487684A (en) * 2018-12-12 2019-03-19 中建港务建设有限公司 A kind of construction method of bridge wind resisting structure

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101725111A (en) * 2008-10-22 2010-06-09 中铁大桥局集团第一工程有限公司 Totally enclosed cradle and construction method for suspending cast of concrete by using same
JP4519368B2 (en) * 2001-07-11 2010-08-04 日本コンクリート工業株式会社 Concrete structure and construction method thereof
CN202099747U (en) * 2011-06-08 2012-01-04 湖南中铁五新钢模有限责任公司 Main girder suspension device for downlink-type hanging basket and downlink-type hanging basket adopting same
CN203361021U (en) * 2013-07-08 2013-12-25 中国水利水电第十三工程局有限公司 Double-spliced type truss hanging basket
CN104120659A (en) * 2014-08-15 2014-10-29 山东省路桥集团有限公司 Descending type suspended scaffold
CN204325944U (en) * 2014-12-20 2015-05-13 佛山市三水中德路桥材料有限公司 Intercity track cable stayed bridge Diamond-Shape Form Traveler
CN104631343A (en) * 2015-02-15 2015-05-20 河海大学 Self-travelling diamond-shaped pin-connected truss-type form traveler structure and form traveler travelling and constructing method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4519368B2 (en) * 2001-07-11 2010-08-04 日本コンクリート工業株式会社 Concrete structure and construction method thereof
CN101725111A (en) * 2008-10-22 2010-06-09 中铁大桥局集团第一工程有限公司 Totally enclosed cradle and construction method for suspending cast of concrete by using same
CN202099747U (en) * 2011-06-08 2012-01-04 湖南中铁五新钢模有限责任公司 Main girder suspension device for downlink-type hanging basket and downlink-type hanging basket adopting same
CN203361021U (en) * 2013-07-08 2013-12-25 中国水利水电第十三工程局有限公司 Double-spliced type truss hanging basket
CN104120659A (en) * 2014-08-15 2014-10-29 山东省路桥集团有限公司 Descending type suspended scaffold
CN204325944U (en) * 2014-12-20 2015-05-13 佛山市三水中德路桥材料有限公司 Intercity track cable stayed bridge Diamond-Shape Form Traveler
CN104631343A (en) * 2015-02-15 2015-05-20 河海大学 Self-travelling diamond-shaped pin-connected truss-type form traveler structure and form traveler travelling and constructing method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109487684A (en) * 2018-12-12 2019-03-19 中建港务建设有限公司 A kind of construction method of bridge wind resisting structure

Also Published As

Publication number Publication date
CN106381813B (en) 2017-08-22

Similar Documents

Publication Publication Date Title
CN104631343B (en) From traveling rhombus keying cradle in truss type structure and suspended basket and construction method
CN104594918B (en) Split integrated underground passage steel mold plate trolley and construction method thereof
CN101250856B (en) Echelon cradle as well as construction method thereof
CN104695337B (en) Self-lifting sliding and turnover construction system and construction method
CN102094392B (en) Lower supported hanging basket in bridge construction and application thereof
CN105568870B (en) For the triangle hanging basket method cantilever device and its construction method of cross-line bridge construction
CN105155428B (en) Across railway in operation large-scale prefabricated PC concrete continuous T beam construction method
CN103556578A (en) Straight-line section and side span closure section casting mold system for continuous beam and erection method for casting mold system
CN107905124B (en) A kind of symmetrical expression rigid frame-continuous girder construction technology
CN107905114A (en) A kind of construction method of large span Successive interference cancellation
CN102230313A (en) Bridge thin-wall hollow-pier chain block hoisting operation platform and construction method thereof
CN110700105B (en) Synchronous construction method for high pier column and tie beam and template used in same
CN102605717A (en) Pier-top longitudinal support scaffolding method
CN102134832B (en) Movable support and movable support assisted method for erecting steel box beams through non-variable amplitude frame beam crane
CN109989330A (en) Continous way track and its erection method
CN102587293B (en) System and method for cradle cantilever construction of variable-width section concrete girder
CN103572707A (en) Box girder steel outer template and construction method thereof
CN103194982B (en) Construction method for short cantilever support at bridge side span cast-in-situ segment
CN205242278U (en) A triangle string basket method is hanged and is watered device for deck bridge construction
CN207987749U (en) Ride cable-styled erection crane
CN106381813B (en) Space saving cradle structure and several cast-in-place cantilever hanging basket systems and construction method
CN206887771U (en) A kind of small across footpath plate-beam construction platform structure
CN108086168A (en) Ride cable-styled erection crane
CN205382425U (en) Railway T type bridge adds builds sound barrier beam mold plate girder unwheeling
CN103835238A (en) High-pier cable-stayed bridge zero-number block non-bracket construction method and structure in construction process

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant