CN106381813B - Space saving cradle structure and several cast-in-place cantilever hanging basket systems and construction method - Google Patents

Space saving cradle structure and several cast-in-place cantilever hanging basket systems and construction method Download PDF

Info

Publication number
CN106381813B
CN106381813B CN201610806321.XA CN201610806321A CN106381813B CN 106381813 B CN106381813 B CN 106381813B CN 201610806321 A CN201610806321 A CN 201610806321A CN 106381813 B CN106381813 B CN 106381813B
Authority
CN
China
Prior art keywords
outermost
nose girder
suspension
cradle structure
suspension bracket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610806321.XA
Other languages
Chinese (zh)
Other versions
CN106381813A (en
Inventor
邵宇平
高昇伟
李华
白代义
孔祥荣
叶青荣
张海燕
康毅
丁竞炜
姜伟军
祝兰兰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
(group) Co Ltd Is Built In Pudong New Area Shanghai
Original Assignee
(group) Co Ltd Is Built In Pudong New Area Shanghai
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (group) Co Ltd Is Built In Pudong New Area Shanghai filed Critical (group) Co Ltd Is Built In Pudong New Area Shanghai
Priority to CN201610806321.XA priority Critical patent/CN106381813B/en
Publication of CN106381813A publication Critical patent/CN106381813A/en
Application granted granted Critical
Publication of CN106381813B publication Critical patent/CN106381813B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • E01D21/10Cantilevered erection

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of space saving cradle structure, including preceding entablature, preceding sill, rear entablature and rear sill, outermost two first suspension rods are set through the hole to be provided for having completed concrete structure;Complete to be connected with walking suspension bracket in concrete structure, the nose girder that can be slided along Hanging Basket direct of travel is provided with the walking suspension bracket;Outermost first suspension rod and outermost second suspension rod are affixed with the nose girder respectively, can be synchronized with the movement with the nose girder;Connector is provided with outermost two first suspension rods, the connector is located above the nose girder.For two independent less situations of concrete structure spacing of several cantilever pourings, have enough spaces can the synchronous side by side parallel construction of two cradle structures, greatly reduce the duration.The invention also discloses a kind of Hanging Basket system and the construction method of several cantilever pourings for several cantilever pourings.

Description

Space saving cradle structure and several cast-in-place cantilever hanging basket systems and construction method
Technical field
It is espespecially a kind of space saving cradle structure, outstanding for several the present invention relates to bridge suspended pouring construction apparatus field Hanging Basket system and a kind of construction method of several cantilever pourings that arm is poured.
Background technology
Hanging Basket is a kind of load-carrying members that can be slided or roll along back, is a movable operation platform.It anchors outstanding Hang in the front end beam section constructed, the template of next beam section, reinforcing bar, prestress pipe can be carried out on Hanging Basket and is installed, is mixed The operations such as solidifying soil perfusion and prestressed stretch-draw, grouting.After the circulation for completing a stage, Hanging Basket is to move forward and fixed, under progress The outstanding filling of one section, is so recycled to cantilever pouring completion.Hanging Basket typically each has following part:It is load-carrying members, outstanding Crane system, anchor, walking system and workbench.Wherein, load-carrying members are the main bearing members of Hanging Basket, and it bears to apply Construction equipment and the total weight for newly pouring stage concrete, mainly include main longitudinal grider and preceding upper and lower crossbeam, rear upper and lower crossbeam, purlin Frame, is usually to be welded into box-type section by shaped steel or steel plate group per part.
Traditional cantilever pouring template at least needs the length between 450mm, i.e., A, B as shown in Figure 1 from cradle structure outward flange Degree need to be 450mm.This causes both sides problem:
First be design concrete structure apart from existing structure it is nearer when, can due to no sufficient space arrange cradle structure, So that can not be constructed.
Next to that when carrying out two width or even several cantilever pourings, space is smaller between two width independence concrete structures under many situations, Less than 900mm.Now due to arranging that two cradle structures carry out parallel synchronous traveling operation without sufficient space, can only misplace construction, And the cradle structure first constructed also needs to stay enough advance spaces for the cradle structure progress cantilever pouring of another width, greatly extension Duration.
The content of the invention
It is an object of the invention to provide a kind of space saving cradle structure, realize that cradle structure occupies sky under Construction State Between diminution.A kind of Hanging Basket system and a kind of construction party of several cantilever pourings for several cantilever pourings is provided again Method, realizes that cradle structure synchronous parallel is processed in several cantilever pourings.
The technical scheme that the present invention is provided is as follows:A kind of space saving cradle structure, including it is truss, preceding entablature, preceding Sill, rear entablature and rear sill, pass through some first suspension rod phases between the rear entablature and the rear sill Connection, the preceding entablature is connected with the preceding sill by some second suspension rods, and outermost two described first are hung Bar passes through the hole to be provided for having completed concrete structure to set;
Complete to be connected with walking suspension bracket in concrete structure, being provided with the walking suspension bracket can be along Hanging Basket direct of travel The nose girder of slip, it is described to lead fine strain of millet positioned at the unilateral or bilateral for having completed concrete structure;Outermost first suspension rod and most Second suspension rod in outside is affixed with the nose girder respectively, is synchronized with the movement with the nose girder;Outermost two described first Connector is provided with suspension rod, the connector is located above the nose girder.
The outermost suspension rod of cradle structure is passed through into completed concrete structure setting, in the inner side of formwork for placing, eliminated Original structure middle hanger is located at the space additionally occupied on the outside of formwork for placing.On the one hand design concrete structure can be met apart from existing The installation space problem of cradle structure when building is nearer, on the other hand for two or more independent concretes of several cantilever pourings The less situation of structure spacing, has enough spaces so that cradle structure synchronization side by side parallel construction, greatly reduces the duration.
Further, plain-barreled roll is provided with the walking suspension bracket, slides and move ahead for nose girder.The nose girder resistance of motion is small, Hanging Basket Structure operation is smooth.
Further, described to have completed to be provided with preburied component in concrete structure, the walking suspension bracket has been completed with described Concrete structure is welded to connect by the preburied component.
Further, the nose girder is Two bors d's oeuveres nose girder.
Further, positioned at outermost second suspension rod apart from formwork for placing edge 1000-2000mm.
Further, the truss of the space saving cradle structure is triangular truss.Triangular structure is stable, can There is more uniform distribution of force in cradle structure, advance reliable and stable.
The space saving cradle structure provided by the present invention, can bring following at least one beneficial effect:
1st, the Hanging Basket arrangement space when design concrete structure is nearer apart from existing structure, building structure can be solved the problems, such as Design is more flexible, various.
2nd, for the multiple independent less situations of concrete structure spacing of several cantilever pourings, enough spaces are hung with multiple Basket structure synchronization side by side parallel is constructed, and greatly reduces the duration.
3rd, a Guide beam structure is additionally increased, structure design is simple, cost economy, and can reach that traditional cantilever pouring is same Equal strength and rigidity.
The invention also discloses a kind of Hanging Basket system for several cantilever pourings, it includes:The multiple institutes being arranged side by side Space saving cradle structure is stated, the number of the space saving cradle structure is identical with the number of cantilever width, it is each described Space saving cradle structure processes a width cantilever respectively.
Two or more independent less situations of concrete structure spacing for several cantilever pourings, because space saving is hung The outermost suspension rod of basket structure is worked as between the construction of cradle structure side by side parallel, formwork for placing inside formwork for placing Limited away from not taken up space by Hanging Basket.The space saving Hanging Basket knot described in side by side two or more so can be achieved Structure synchronous processing, greatly reduces the duration.
The invention also discloses a kind of construction method of several cantilever pourings, comprise the following steps:
S10, the one group of 0# block construction for completing several cantilevers;
S20,0# blocks described in one group connect respectively setting walking suspension bracket, and walking suspension bracket on set and can be advanced along Hanging Basket The nose girder that direction is slided;
S30, it will be connected between rear entablature and rear sill by some first suspension rods, preceding entablature and rear entablature It is connected by some second suspension rods, wherein the hole to be provided of outermost two first suspension rods through the 0# blocks is set; Connector is provided with corresponding outermost two first suspension rods of 0# blocks, the connector is located on the nose girder Side, forms the cradle structure of the two rows parallel arrangement of back-to-back arrangement, often arranges the number of the cradle structure with the width of cantilever Number is equal;
It is S40, outermost first suspension rod and outermost second suspension rod is affixed with the nose girder respectively, with The nose girder is synchronized with the movement;
S50, the walking suspension bracket held out against, and the connector is disconnected;Now, cradle structure is advanced, and is proceeded to down One work station, and connector is closed, complete to pour;
S60, reconnect setting walking suspension bracket and supporting setting nose girder on concrete structure has been completed;
S70, the working cycles for carrying out S40-S60, complete pouring for concrete structure paragraph by paragraph.
Further, in the step S20, preburied component is set on the 0# blocks, by it is described walking suspension bracket with it is described 0# blocks are welded to connect by the preburied component.In the step S60, complete to set preburied component in concrete structure described, The walking suspension bracket is welded to connect with the concrete structure that completed by the preburied component.
Brief description of the drawings
Below by clearly understandable mode, preferred embodiment is described with reference to the drawings, to a kind of space saving Hanging Basket Above-mentioned characteristic, technical characteristic, advantage and its implementation of structure are further described.
Fig. 1 is the Facad structure figure of traditional cradle structure.
Fig. 2 is the schematic diagram that walking suspension bracket is set.
Fig. 3 is the construction profile of space saving cradle structure.
Fig. 4 is the Facad structure figure of the Hanging Basket system for several cantilever pourings.
Drawing reference numeral explanation:100th, column, 110, oblique pull band, 120, completed concrete structure, 200, preceding entablature, 210, after Entablature, 220, preceding sill, 230, rear sill, 240, main longitudinal grider, the 250, first suspension rod, the 260, second suspension rod, 300, OK Walk suspension bracket, 310, plain-barreled roll, 320, connector, 330, nose girder.
Embodiment
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, control is illustrated below The embodiment of the present invention.It should be evident that drawings in the following description are only some embodiments of the present invention, for For those of ordinary skill in the art, on the premise of not paying creative work, other can also be obtained according to these accompanying drawings Accompanying drawing, and obtain other embodiments.
To make only to schematically show part related to the present invention in simplified form, each figure, they are not represented Its as product practical structures.In addition, so that simplified form is readily appreciated, there is identical structure or function in some figures Part, only symbolically depicts one of those, or has only marked one of those.Herein, " one " is not only represented " only this ", can also represent the situation of " more than one ".
Herein, the limitation on the mathematics and/or geometry meaning of " vertical " etc. and non-critical, also comprising this area skill Art personnel may be appreciated and manufacture or the error for the permission such as using.
As shown in Figure 2, Figure 3, Figure 4, embodiment of the invention discloses that a kind of space saving cradle structure, including purlin Frame, preceding entablature 200, preceding sill 220, rear entablature 210, rear sill 230 and main longitudinal grider 240.The He of entablature 210 afterwards It is connected afterwards between sill 230 by some first suspension rods 250, preceding entablature 200 passes through some second with preceding sill 220 Suspension rod 260 is connected.Outermost two the first suspension rods 250 pass through the hole to be provided for having completed concrete structure 120 to set, i.e. outermost The first suspension rod be located at and completed the inner side of concrete structure 120, to set through concrete structure 120 has been completed.
Complete to be connected with walking suspension bracket 300 in concrete structure 120, being provided with walking suspension bracket 300 can be along Hanging Basket row Enter the nose girder 330 of direction slip, it is described to lead fine strain of millet 330 positioned at the unilateral or bilateral for having completed concrete structure 120;;It is outermost First suspension rod 250 and outermost second suspension rod 260 are affixed with nose girder 330 respectively, are synchronized with the movement with nose girder 330;It is outermost Connector 320 is provided with two the first suspension rods 250, connector 320 is located at the top of nose girder 330.Walking suspension bracket 300 and lead fine strain of millet 330 can be arranged on the one side or both sides for having completed concrete structure.
Disconnect device 320, hold out against walking suspension bracket 310, when main longitudinal grider 240 and forward truss, pass through preceding entablature 200 Sill 220 and the forward movement of nose girder 330 before driving, sill 230 is moved after then driving.
In further embodiment of the present invention, plain-barreled roll 310 is provided with walking suspension bracket 300, slides and moves ahead for nose girder 330.
In further embodiment of the present invention, complete to be provided with preburied component in concrete structure 120, suspension bracket 300 of walking It is welded to connect with having completed concrete structure 120 by preburied component.
In further embodiment of the present invention, nose girder 330 is Two bors d's oeuveres nose girder 330.
In further embodiment of the present invention, positioned at outermost second suspension rod 260 apart from formwork for placing edge 1000- 2000mm。
As shown in figure 3, in further embodiment of the present invention, the truss of space saving cradle structure is triangle purlin Frame.It is spliced to form by the oblique pull band 110 of pillar 100 and its both sides.
As shown in figure 4, the invention also discloses a kind of embodiment for the Hanging Basket system for being used for two width cantilever pourings, it is wrapped Include:The multiple space saving cradle structures being arranged side by side, the number of the space saving cradle structure is with the individual of cantilever width Number is identical, and each space saving cradle structure processes a width cantilever respectively.Suspension bracket 300 of being walked in this figure is located at Hanging Basket knot The both sides of structure.The spacing completed between concrete structure 120 of two space saving cradle structures is not by the first suspension rod of outermost 250 Limitation.
The invention also discloses a kind of embodiment of the construction method of several cantilever pourings, comprise the following steps:
S10, the 0# blocks construction for completing several cantilevers, the group number of 0# blocks are identical with the number of the width of cantilever;One group of 0# block is 2 or more 0# blocks being adjacently positioned on same width;
S20, the connection setting walking suspension bracket 300, and set and can be advanced along Hanging Basket on walking suspension bracket 300 respectively on 0# blocks The nose girder 330 that direction is slided, it is described to lead the unilateral or bilateral that fine strain of millet 330 is located at 0#;;One group of 0# block of two width cantilevers generally comprises 4 Individual 0# blocks, one group of 0# block of three width cantilevers generally comprises 6 0# blocks.
S30, it will be connected between rear entablature 210 and rear sill 230 by some first suspension rods 250, preceding entablature 200 are connected with rear entablature 210 by some second suspension rods 260, wherein outermost two the first suspension rods 250 pass through 0# blocks Hole to be provided set;Connector 320 is provided with outermost two the first suspension rods 250, connector 320 is located at nose girder 330 Top, forms the cradle structure of the two rows parallel arrangement of back-to-back arrangement, often arranges width of the number with cantilever of the cradle structure Number it is equal;
S40, by outermost first suspension rod 250 of each cradle structure and outermost second suspension rod 260 respectively with nose girder 330 is affixed, is synchronized with the movement with nose girder 330;
S50, walking suspension bracket 300 held out against, and the connector 320 on the first suspension rod 250 is disconnected;Now, cradle structure Advance, proceed to subsequent work station, and connector is closed, complete to pour;
S60, reconnect setting walking suspension bracket 300 and supporting setting nose girder 330 on concrete structure 120 has been completed;
S70, the working cycles for carrying out S40-S60, complete pouring for concrete structure paragraph by paragraph.
In further embodiment of the present invention, in step S20, preburied component is set on 0# blocks, will walking suspension bracket 300 with 0# blocks are welded to connect by preburied component.In step S60, preburied component is set on concrete structure 120 has been completed, by suspension bracket of walking 300 are welded to connect with having completed concrete structure 120 by preburied component.
It should be noted that above-described embodiment can independent assortment as needed.Described above is only the preferred of the present invention Embodiment, it is noted that for those skilled in the art, is not departing from the premise of the principle of the invention Under, some improvements and modifications can also be made, these improvements and modifications also should be regarded as protection scope of the present invention.

Claims (9)

1. a kind of space saving cradle structure, including truss, preceding entablature, preceding sill, rear entablature and rear sill, It is connected between the rear entablature and the rear sill by some first suspension rods, the preceding entablature and the front lower horizontal stroke Beam is connected by some second suspension rods, it is characterised in that:Outermost two first suspension rods pass through and have completed concrete structure Hole to be provided set;
Complete to be connected with walking suspension bracket in concrete structure, being provided with the walking suspension bracket can slide along Hanging Basket direct of travel Nose girder;Outermost first suspension rod and outermost second suspension rod are affixed with the nose girder respectively, are led with described Beam is synchronized with the movement;
Connector is provided with outermost two first suspension rods, the connector is located above the nose girder;The row Walk suspension bracket to hold out against and disconnect the connector, the space saving cradle structure is advanced.
2. saving cradle structure in space according to claim 1, it is characterised in that:It is provided with the walking suspension bracket flat Roller, slides for the nose girder and moves ahead.
3. saving cradle structure in space according to claim 1, it is characterised in that:It is described to have completed to set in concrete structure Preburied component is equipped with, the walking suspension bracket is welded to connect with the concrete structure that completed by the preburied component.
4. saving cradle structure in space according to claim 1, it is characterised in that:The nose girder is Two bors d's oeuveres nose girder.
5. saving cradle structure in space according to claim 1, it is characterised in that:Hung positioned at outermost described second Bar is apart from formwork for placing edge 1000-2000mm.
6. according to any described space saving cradle structure of claim 1, it is characterised in that:The truss is triangle purlin Frame.
7. a kind of Hanging Basket system for several cantilever pourings, it is characterised in that including:Be arranged side by side it is multiple according to right will The space saving cradle structure described in 1-6 is sought, the number of the space saving cradle structure is identical with the number of cantilever width, Each space saving cradle structure processes a width cantilever respectively.
8. a kind of construction method of several cantilever pourings, it is characterised in that comprise the following steps:
S10, complete several cantilevers 0# blocks construction, the group number of 0# blocks is identical with the number of the width of cantilever;
S20, the connection setting walking suspension bracket, and set and can be slided along Hanging Basket direct of travel on walking suspension bracket respectively on the 0# blocks Dynamic nose girder;
S30, it will be connected between rear entablature and rear sill by some first suspension rods, preceding entablature passes through with rear entablature Some second suspension rods are connected, wherein the hole to be provided of outermost two first suspension rods through the 0# blocks is set;In 0# Connector is provided with corresponding outermost two first suspension rods of block, the connector is located above the nose girder, shape The cradle structure being arranged in parallel into two rows of back-to-back arrangement, often arranges number phase of the number with the width of cantilever of the cradle structure Deng;
S40, outermost first suspension rod of each cradle structure and outermost second suspension rod led with described respectively Beam is affixed, is synchronized with the movement with the nose girder;
S50, the walking suspension bracket held out against, and the connector is disconnected;Now, cradle structure is advanced, and proceeds to next work Make station, and connector is closed, complete to pour;
S60, reconnect setting walking suspension bracket and supporting setting nose girder on concrete structure has been completed;
S70, the working cycles for carrying out S40-S60, complete pouring for concrete structure paragraph by paragraph.
9. the construction method of several a kind of cantilever pourings according to claim 8, it is characterised in that in the step S20, Preburied component is set on the 0# blocks, the walking suspension bracket is welded to connect with the 0# blocks by the preburied component;
In the step S60, complete to set preburied component in concrete structure described, the walking suspension bracket has been completed with described Concrete structure is welded to connect by the preburied component.
CN201610806321.XA 2016-09-07 2016-09-07 Space saving cradle structure and several cast-in-place cantilever hanging basket systems and construction method Active CN106381813B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610806321.XA CN106381813B (en) 2016-09-07 2016-09-07 Space saving cradle structure and several cast-in-place cantilever hanging basket systems and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610806321.XA CN106381813B (en) 2016-09-07 2016-09-07 Space saving cradle structure and several cast-in-place cantilever hanging basket systems and construction method

Publications (2)

Publication Number Publication Date
CN106381813A CN106381813A (en) 2017-02-08
CN106381813B true CN106381813B (en) 2017-08-22

Family

ID=57938024

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610806321.XA Active CN106381813B (en) 2016-09-07 2016-09-07 Space saving cradle structure and several cast-in-place cantilever hanging basket systems and construction method

Country Status (1)

Country Link
CN (1) CN106381813B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109487684A (en) * 2018-12-12 2019-03-19 中建港务建设有限公司 A kind of construction method of bridge wind resisting structure

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4519368B2 (en) * 2001-07-11 2010-08-04 日本コンクリート工業株式会社 Concrete structure and construction method thereof
CN101725111B (en) * 2008-10-22 2013-04-03 中铁大桥局集团第一工程有限公司 Totally enclosed cradle and construction method for suspending cast of concrete by using same
CN202099747U (en) * 2011-06-08 2012-01-04 湖南中铁五新钢模有限责任公司 Main girder suspension device for downlink-type hanging basket and downlink-type hanging basket adopting same
CN203361021U (en) * 2013-07-08 2013-12-25 中国水利水电第十三工程局有限公司 Double-spliced type truss hanging basket
CN104120659B (en) * 2014-08-15 2016-03-30 山东省路桥集团有限公司 Descending hanging basket
CN204325944U (en) * 2014-12-20 2015-05-13 佛山市三水中德路桥材料有限公司 Intercity track cable stayed bridge Diamond-Shape Form Traveler
CN104631343B (en) * 2015-02-15 2016-08-24 河海大学 From traveling rhombus keying cradle in truss type structure and suspended basket and construction method

Also Published As

Publication number Publication date
CN106381813A (en) 2017-02-08

Similar Documents

Publication Publication Date Title
CN104594918B (en) Split integrated underground passage steel mold plate trolley and construction method thereof
CN104695337B (en) Self-lifting sliding and turnover construction system and construction method
CN101781878B (en) Integral lifting template of main pylon of single-pylon cable-stayed bridge without dorsal cables and lifting construction method thereof
CN103556578A (en) Straight-line section and side span closure section casting mold system for continuous beam and erection method for casting mold system
CN108265628A (en) One kind rides cable-styled erection crane lifting cable-stayed bridge girder steel and bridge floor board construction method
CN105568870B (en) For the triangle hanging basket method cantilever device and its construction method of cross-line bridge construction
CN102587293B (en) System and method for cradle cantilever construction of variable-width section concrete girder
CN106381813B (en) Space saving cradle structure and several cast-in-place cantilever hanging basket systems and construction method
CN110700105A (en) Synchronous construction method for high pier column and tie beam and template used in same
CN207987749U (en) Ride cable-styled erection crane
CN102493353B (en) Method for hoisting large equipment in bridge construction and pier top lifting frame
CN206887771U (en) A kind of small across footpath plate-beam construction platform structure
CN108086168A (en) Ride cable-styled erection crane
CN206279453U (en) The number section cast-in-place support frame support bracket structure of large span rigid frame-continuous girder 0
CN206397137U (en) A kind of framed column template bracing means
CN102587292B (en) System and method for cradle cantilever construction
CN103758343A (en) Hanging type construction method and hanging device for reinforced concrete floor
JP4880374B2 (en) How to build a bridge
CN103835238A (en) High-pier cable-stayed bridge zero-number block non-bracket construction method and structure in construction process
CN102635234A (en) Construction method for controlling thickness of upper-layer steel bar protection layer and board thickness of floorboard
CN106351123A (en) Single-cable and multi-box construction hanging basket applicable to corrugated steel web girder
CN205474871U (en) A main truss system that is used for wave form steel web continuous beam construction to hang a basket
CN208105079U (en) Cast-in-place cantilever hanging basket system applied to variable cross-section continuous beam on many supports
CN203530862U (en) Pouring die system for straight-line section and side span closing section of continuous beam
CN106758823A (en) The number section cast-in-place support frame support bracket structure of large span rigid frame-continuous girder 0

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant