CN206279453U - The number section cast-in-place support frame support bracket structure of large span rigid frame-continuous girder 0 - Google Patents

The number section cast-in-place support frame support bracket structure of large span rigid frame-continuous girder 0 Download PDF

Info

Publication number
CN206279453U
CN206279453U CN201621259207.1U CN201621259207U CN206279453U CN 206279453 U CN206279453 U CN 206279453U CN 201621259207 U CN201621259207 U CN 201621259207U CN 206279453 U CN206279453 U CN 206279453U
Authority
CN
China
Prior art keywords
bracket
number section
large span
bracket structure
continuous girder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621259207.1U
Other languages
Chinese (zh)
Inventor
宋作栋
陈俊龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 5 Engineering Group Co Ltd
Second Engineering Co Ltd of China Railway 25th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Original Assignee
China Railway No 5 Engineering Group Co Ltd
Second Engineering Co Ltd of China Railway 25th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 5 Engineering Group Co Ltd, Second Engineering Co Ltd of China Railway 25th Bureau Group Co Ltd filed Critical China Railway No 5 Engineering Group Co Ltd
Priority to CN201621259207.1U priority Critical patent/CN206279453U/en
Application granted granted Critical
Publication of CN206279453U publication Critical patent/CN206279453U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of number section cast-in-place support frame support bracket structure of large span rigid frame-continuous girder 0, using prefabricated shelf bracket(2), steel plate bracket in pre-buried pier shaft(1)And connector(3)The combined bracket structure being combined, combined bracket is used above Bailey beam(4), Bailey beam(4)On be respectively provided with the truss of box beam base plate load-bearing(5)And the I-steel distribution beam of box beam wing plate load-bearing(6);I-steel distribution beam(6)Bowl fastening type full framing is used above(7), that is, form overall structure.The utility model designs cast-in-place support frame support bracket according to the loading characteristic of the number section of continuous beam 0, segmented sequence of construction sets up support, the installation of support with remove it is convenient, solve across the territory restriction such as rivers and highway, it is necessary to timbering material negligible amounts, construction is quick, low cost.

Description

The number section cast-in-place support frame support bracket structure of large span rigid frame-continuous girder 0
Technical field
The utility model is related to a kind of large-span continuous beam cast-in-place support frame support bracket structure.
Background technology
At present, the Continuous beam design of the general large span of construction of railways is constructed using the method for hanging basket cantilever, with Across the increasing of rivers and highway continuous beam, limit carries out 0 number section construction using console.Traditional landing Requirement of the formula support to foundation bearing capacity is higher, and is limited by landform, therefore continuous bridge is applied when across rivers and highway The number section of work 0 is restricted using console, cannot often meet construction requirement.Even if being adopted in the case of conditions permit Constructed with console, it exists long in time limit, and material consumption is big, the poor shortcoming of economic benefit.
Utility model content
The technical problems to be solved in the utility model is to provide a kind of number section of large-span continuous beam 0 construction cast-in-place support branch Support bracket structure, to overcome due to being limited and cannot often increase material input and influence construction using floor stand by landform The deficiencies such as duration.
The utility model solves the technical scheme that its technical problem used:Using prefabricated shelf bracket, pre-buried pier shaft The combined bracket structure that interior steel plate bracket and connector are combined, combined bracket is used above Bailey beam, is set respectively in Bailey beam Put the truss of box beam base plate load-bearing and the I-steel distribution beam of box beam wing plate load-bearing;I-steel distribution beam is used above bowl fastening type to expire Hall support, that is, form overall structure.
Shelf bracket and steel plate bracket welding rigid connection in pre-buried pier shaft.
Connected using connector between the shelf bracket of pier shaft both sides.
Connector uses diameter phi 32mm fining twisted steels, and applies prestressing force.
Bailey beam is using truck crane integral hoisting after mono- group of 2 Pin at the scene preassembling and forms entirety.
Using the bed die system of Hanging Basket at the top of carrier structure, side form system carries out No. 0 as the bed die and side template of 0 number section box beam Section construction.
The beneficial effects of the utility model are, according to the loading characteristic rationale design of scaffolds of the number section of continuous beam 0, the peace of support Dress with remove it is convenient, solve across the territory restriction such as rivers and highway, it is necessary to timbering material negligible amounts, construction is fast Speed, low cost.
Brief description of the drawings
The utility model is further illustrated with reference to the accompanying drawings and examples.
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the side view in Fig. 1;
Fig. 3 is the top view in Fig. 1.
Specific embodiment
Embodiment of the present utility model:Across highway and the rivers section number section of continuous beam 0, using prefabricated shelf bracket 2, pre- The combined bracket structure that steel plate bracket 1 and connector 3 are combined in pier shaft is buried, combined bracket is used above Bailey beam 4, Bailey beam The truss 5 of box beam base plate load-bearing and the I-steel distribution beam 6 of box beam wing plate load-bearing are respectively provided with 4;Above I-steel distribution beam 6 Using bowl fastening type full framing 7, that is, form overall structure.
Shelf bracket 2 and the welding of steel plate bracket 1 rigid connection in pre-buried pier shaft.
Connected using connector 3 between pier shaft both sides shelf bracket 2.
Connector 3 is coupled and applies prestressing force using diameter 32mm fining twisted steels to drawing.
Bailey beam 4 is using truck crane integral hoisting after mono- group of 2 Pin at the scene preassembling and forms entirety.
Using the bed die system of Hanging Basket at the top of carrier structure, side form system carries out No. 0 as the bed die and side template of 0 number section box beam Section construction.
Construction method is described below.
First, the construction of pier shaft pre-embedded steel slab bracket and shelf bracket is prefabricated.
Anticipate as shown in Figure 1 and Figure 2, it is during pier construction that steel plate bracket 1 is pre-buried to design attitude, and ensure it is pre-buried accurately exist Weld horizontal steel plate on vertical steel plate bracket;The welding production of shelf bracket 2 is carried out in precasting yard, each position is carried out before appearance Defect detecting test ensures welding quality.
Secondly, the installation of shelf bracket.
Prefabricated shelf bracket 2 is transported into scene to be lifted, shelf bracket 2 and pier shaft pre-buried steel in place will be lifted The horizontal steel plate of plate bracket 1 carries out welding rigid connection.After calf support is installed before and after the mmPVC of pre-buried φ 50 pipes, pier near pier top Using 4 φ 32mm finish rolling deformed bars connectors, 3 pairs of drawings, and prestress application is carried out, form the major bearing structures of bracket.
The connection fining twisted steel connector 3 to shelf bracket 2 carries out tensioning applying prestressing force successively.
Finally, the Bailey beam installation of shelf bracket above section.
Bailey beam 4 uses two Pin combined hangings, and lifting ensures that its underpart is closely connected with the top surface of shelf bracket 3, and Bailey beam is installed Base plate truss principal 5 can be carried out after in place and wing plate distributes the lifting of I-steel 6, base plate truss principal 5 and wing plate distribution I-shaped Steel 6 is required to carry out horizontal connection using I-steel, to ensure lateral stability.
I-steel 6 is above is bowl fastening type full framing 7.

Claims (5)

1. the number section cast-in-place support frame support bracket structure of a kind of large span rigid frame-continuous girder 0, it is characterized in that:Using prefabricated shelf bracket (2), steel plate bracket in pre-buried pier shaft(1)And connector(3)The combined bracket structure being combined, combined bracket is used above Bei Lei Beam(4), Bailey beam(4)On be respectively provided with the truss of box beam base plate load-bearing(5)And the I-steel distribution beam of box beam wing plate load-bearing (6);I-steel distribution beam(6)Bowl fastening type full framing is used above(7), that is, form overall structure.
2. the number section cast-in-place support frame support bracket structure of large span rigid frame-continuous girder according to claim 10, its feature exists In:Shelf bracket(2)With steel plate bracket in pre-buried pier shaft(1)Welding rigid connection.
3. the number section cast-in-place support frame support bracket structure of large span rigid frame-continuous girder according to claim 10, its feature exists In:Pier shaft both sides shelf bracket(2)Between use connector(3)Connection.
4. the number section cast-in-place support frame support bracket structure of large span rigid frame-continuous girder 0 according to claim 1 or 3, its feature It is:Connector(3)Using diameter phi 32mm fining twisted steels, and apply prestressing force.
5. the number section cast-in-place support frame support bracket structure of large span rigid frame-continuous girder according to claim 10, its feature exists In:Bailey beam(4)Using truck crane integral hoisting after mono- group of 2 Pin at the scene preassembling and form entirety.
CN201621259207.1U 2016-11-23 2016-11-23 The number section cast-in-place support frame support bracket structure of large span rigid frame-continuous girder 0 Expired - Fee Related CN206279453U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621259207.1U CN206279453U (en) 2016-11-23 2016-11-23 The number section cast-in-place support frame support bracket structure of large span rigid frame-continuous girder 0

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621259207.1U CN206279453U (en) 2016-11-23 2016-11-23 The number section cast-in-place support frame support bracket structure of large span rigid frame-continuous girder 0

Publications (1)

Publication Number Publication Date
CN206279453U true CN206279453U (en) 2017-06-27

Family

ID=59083589

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621259207.1U Expired - Fee Related CN206279453U (en) 2016-11-23 2016-11-23 The number section cast-in-place support frame support bracket structure of large span rigid frame-continuous girder 0

Country Status (1)

Country Link
CN (1) CN206279453U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106758823A (en) * 2016-11-23 2017-05-31 中铁五局集团有限公司 The number section cast-in-place support frame support bracket structure of large span rigid frame-continuous girder 0
CN107476200A (en) * 2017-09-25 2017-12-15 中铁五局集团有限公司 A kind of full framing dislocation set takes structure and method
CN108589551A (en) * 2018-06-07 2018-09-28 中交路桥华南工程有限公司 Pier stud 0# beam section cast-in-place supports

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106758823A (en) * 2016-11-23 2017-05-31 中铁五局集团有限公司 The number section cast-in-place support frame support bracket structure of large span rigid frame-continuous girder 0
CN107476200A (en) * 2017-09-25 2017-12-15 中铁五局集团有限公司 A kind of full framing dislocation set takes structure and method
CN107476200B (en) * 2017-09-25 2023-03-14 中铁五局集团有限公司 Full-hall support staggered overlapping structure and method
CN108589551A (en) * 2018-06-07 2018-09-28 中交路桥华南工程有限公司 Pier stud 0# beam section cast-in-place supports

Similar Documents

Publication Publication Date Title
CN104631343B (en) From traveling rhombus keying cradle in truss type structure and suspended basket and construction method
CN105780660B (en) A kind of section assembling box girder construction technique
CN206279453U (en) The number section cast-in-place support frame support bracket structure of large span rigid frame-continuous girder 0
CN101518784B (en) Hoisting method of large mill housing under limited hoisting height
CN107905114A (en) A kind of construction method of large span Successive interference cancellation
CN105648924A (en) Construction method of multi-span simply-supported steel truss girder bridge
CN108004929A (en) A kind of H-type road-cum-rail bridge floorings hanging apparatus and hanging method
CN106854941B (en) A kind of construction method of big section Stand Inclined Beams and batter post
CN102364012A (en) Method for expanding existing large-span truss
CN203393639U (en) Diamond self-anchored hanging basket for road and bridge construction
CN114770706B (en) Light T-beam prefabrication equipment and prefabrication installation construction method
CN110453613A (en) A kind of cantilever method construction of Large span girder bridge box beam tunneling boring
CN106758872A (en) Wavelike steel webplate SCC engineering methods hang movable hanging basket and the method using its construction with car convolution
CN104727229A (en) Movable bottom formwork trolley system suitable for large concrete prefabricated component and method for prefabricating base plate of large concrete component
CN206109960U (en) Steel that can be under construction fast concrete integrated configuration bridge
CN105019357B (en) The installation method of abnormity prefabricated bridge on a kind of arch bridge uncovered lattice girder steel
CN106758823A (en) The number section cast-in-place support frame support bracket structure of large span rigid frame-continuous girder 0
CN110700119A (en) Upper traveling system of assembled Bailey beam hanging basket and design method thereof
CN207498835U (en) Needle beam combined steel plate beam bridge panel cast-in-place construction sliding form frame system
CN103806374B (en) The overall track erection supplying system of assembly type steel bridge on highway and erection push technique
CN206986750U (en) Buttress support available for Large-span Steel Box Beam construction
CN102926330B (en) Installation method of hanging basket suitable for bridge construction
CN205636521U (en) Basket is hung in construction of truss -like cantilever
CN104179123A (en) Bridge fabrication machine capable of building and assembling two bridge segments
CN106284088A (en) Prefabricated arch bar lifting method of temporarily fixing

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170627

Termination date: 20191123

CF01 Termination of patent right due to non-payment of annual fee