CN206784865U - A kind of detachable adjustable for height subway tunnel section construction operation platform - Google Patents
A kind of detachable adjustable for height subway tunnel section construction operation platform Download PDFInfo
- Publication number
- CN206784865U CN206784865U CN201720269541.3U CN201720269541U CN206784865U CN 206784865 U CN206784865 U CN 206784865U CN 201720269541 U CN201720269541 U CN 201720269541U CN 206784865 U CN206784865 U CN 206784865U
- Authority
- CN
- China
- Prior art keywords
- platform
- cat ladder
- support bar
- table support
- construction operation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses a kind of detachable adjustable for height subway tunnel section construction operation platform, include the platform structure part of two mutual corresponding matchings, be provided between two platform structure parts be spaced apart be detachably connected bar, platform structure part includes cat ladder handrail and operating platform guardrail, tunnel wall pulley assembly is installed at the front edge of operating platform guardrail, the bottom of platform cat ladder is provided with lightweight track wheel assembly, the rear of the platform cat ladder is provided with table support bar, the upper end of table support bar is arranged in the connecting rod in the middle part of platform cat ladder by bearing pin, the lower end of table support bar is provided with movable pulley.The utility model is designed using detachable, folding, adjustable height, when railcar is run into constructing tunnel by needing to avoid, can be dismantled operating platform;Whole dismounting process used time about 2 minutes during operation, and after the completion of dismounting, each component space-consuming is smaller, avoids component after having dismantled from invading limit, causes the accident.
Description
Technical field:
Subway tunnel communication construction operating platform field is the utility model is related to, relating generally to a kind of detachable height can
The subway tunnel section construction operation platform of tune.
Background technology:
At present, with the fast development of economy, urban track traffic is all being built in each main cities in the whole nation on a large scale, in city
In the construction of city's track traffic communication system, construction work amount is huge in tunnel, and construction height is higher to be applied, it is necessary to allow more units to intersect
Work, and have vehicle track running on track during construction.Its crossed construction is inconvenient for operation, low construction efficiency, and existing operation
Platform space-consuming is big, and when running into vehicle track running, it avoids not aspect, not only influences the operation of railcar, while have an effect on and apply
Work.
For constructing tunnel These characteristics, in order to improve efficiency of construction, the influence that crossed construction is brought is reduced, research is a kind of
Detachable adjustable for height subway tunnel section construction operation platform, it appears particularly important.
Utility model content:
The defects of the utility model purpose is exactly to make up prior art, there is provided one kind is detachable adjustable for heightly
Iron transit tunnel construction operation platform, ensureing that platform is firm and on the premise of meeting load-bearing requirements, alleviating operating platform
Weight, the difficulty that platform is transported to Gui Hang areas is reduced, while height adjustable allows it to deal with different construction requirements.
The utility model is achieved through the following technical solutions:
A kind of detachable adjustable for height subway tunnel section construction operation platform, it is characterised in that:Include two-phase
The platform structure part of mutual corresponding matching, the bar that is detachably connected being spaced apart is installed between the two platform structures part, it is described
Platform structure part includes cat ladder handrail and operating platform guardrail, and tunnel is provided with the front edge of the operating platform guardrail
Wall pulley assembly, the bottom of the platform cat ladder are provided with lightweight track wheel assembly, and the rear of the platform cat ladder is provided with platform
Support bar, the upper end of the table support bar are arranged in the connecting rod in the middle part of platform cat ladder by bearing pin, the platform
The lower end of bar is provided with movable pulley.
Described tunnel wall pulley assembly component includes fixed beam, and the fixed beam is fixedly mounted on operating platform guardrail
Front edge at, the both ends of the fixed beam are provided with tunnel wall pulley by anti-slip device respectively.
Described lightweight track wheel assembly includes bottom girder, and the bottom girder both ends are provided with and platform cat ladder bottom vertical bar
The sleeve pipe coordinated is set with, the pin hole fixed by latch is distributed with the platform cat ladder bottom vertical bar and sleeve pipe respectively,
The both ends of the bottom girder are provided with lightweight rail wheel by anti-slip device respectively.
Adjusting rod is provided between the lower end of described table support bar and movable pulley, the movable pulley is fixed on adjusting rod
Bottom, adjusting rod and table support bar the bottom suit coordinates, and the positioning hole fixed by latch is distributed with respectively.
In long distance tunnel, above-mentioned platform can steadily move on rail, and support bar is using with operating desk cat ladder
When form the rock-steady structure of triangle, substantially increase the stability of operating platform, while the design of packaged type also carries significantly
High constructing tunnel efficiency.Its material is being ensured that platform is firm and is being met the premise of load-bearing requirements using conventional coating steel pipe
Under, the weight of operating platform is alleviated, reduces the difficulty that platform is transported to Gui Hang areas.Using lightweight pulley as track guide wheel,
Slip damping of the pulley when being run on rail is greatly reduced, effectively raises the mobile efficiency of platform.
The utility model has the advantages that:
The utility model is designed using detachable, folding, adjustable height, runs into railcar in constructing tunnel
During by needing to avoid, operating platform can be dismantled;Whole dismounting process used time about 2 minutes during operation, and dismantle and complete
Afterwards, each component space-consuming is smaller, avoids component after having dismantled from invading limit, causes the accident.
Brief description of the drawings:
Fig. 1 is overall structure figure of the present utility model.
Fig. 2 is side view of the present utility model.
Fig. 3 is front view of the present utility model.
Fig. 4 is configuration schematic diagram of the present utility model.
Embodiment:
Referring to accompanying drawing.
A kind of detachable, collapsible, adjustable for height subway tunnel section construction operation platform, including be horizontally placed on rail
Side is for mobile lightweight rail wheel (containing anti-slip device) 1, the platform structure part 9 comprising operating platform guardrail 6 and cat ladder handrail 8,
Connected between the platform structure part by connecting rod 11, the platform branch comprising table support bar 3 and movable pulley (containing anti-slip device) 2
Strut 10, it is placed in the platform for being used for mobile tunnel wall pulley 5 on shield tunnel wall and being completed using coating steel pipe and climbs
Ladder 4 and operating platform 7.
The tunnel wall pulley 5 is arranged on the both ends of fixed beam 12, and the fixed beam 12 is fixedly mounted on operating platform shield
At the front edge on column.
The lightweight rail wheel 1 is arranged on the both ends of bottom girder 13, and the both ends of bottom girder 13 are provided with and platform cat ladder bottom
Vertical bar is set with the sleeve pipe 14 coordinated, is distributed with the platform cat ladder bottom vertical bar and sleeve pipe 14 and is fixed by latch respectively
Pin hole.
Adjusting rod 15 is provided between the lower end of described table support bar 10 and movable pulley 2, the movable pulley 2 is fixed on
The bottom of adjusting rod 15, the adjusting rod 15 and table support bar bottom suit coordinate, and are distributed with pass through latch respectively
Fixed positioning hole.
Platform is assembled using preceding, the platform structure part of operating platform guardrail 6 and cat ladder handrail 8 will be included first
9 as the coating steel pipe of platform cat ladder 4 and operating platform 7 with being attached, and by lightweight rail wheel (containing anti-slip device) 1 and tunnel
Road wall pulley 5 is separately mounted to the head and the tail section of platform structure part 9 as shown in Figure 1, and is fastened with latch.After the completion of by platform
Bar 10 is arranged on platform cat ladder 4, is fixed after adjusting angle with latch, completes installation.The upper berth of operating platform 7 after installation
Upper plank.In actual use, the latch fixture on support bar can be adjusted according to live actual demand, to realize operation
The regulation of podium level, adapt to different construction environment requirements.Carried out when disassembling by above-mentioned reverse procedure.The present invention is through reality
Operation experiments prove that single assembling (or dismounting) the process used time was at 2 minutes or so.
What to sum up it can be relatively simple assemble, and support can be adjusted flexibly according to the concrete structure of shield tunnel
The angle and height of bar, the scope of application are wider.In the design phase, in order to improve the firmness of integral platform, structural member is being made
When making by the way of welding, installation fastening is carried out using spigot-and-socket when each part is installed.The present invention is rolled using lightweight
Wheel is used as movable pulley, reduces resistance during platform movement, improves the mobile efficiency of platform, reduce the people in practice of construction
The frequency of lower platform, improves efficiency of construction on member.In addition, the present invention has installed anti-slip dress additional on rail wheel and movable pulley
Put, it is ensured that platform consolidates on rail level in work progress, is not subjected to displacement.Simple in construction, easy left-hand seat of the invention, structure jail
Gu and use detachable design.During onsite application, platform truck movement is steady, easy to use, suitable for circular shield tunnel
The tunnel structures such as road, Rectangular Tunnel, assembling (dismounting) is relatively simple, and area occupied is smaller.Section efficiency of construction can be greatly improved,
Reduce the risk for avoiding railcar.
Claims (4)
- A kind of 1. detachable adjustable for height subway tunnel section construction operation platform, it is characterised in that:It is mutual to include two The platform structure part of corresponding matching, the bar that is detachably connected being spaced apart is installed between the two platform structures part, it is described flat Platform structural member includes cat ladder handrail and operating platform guardrail, and tunnel wall is provided with the front edge of the operating platform guardrail Pulley assembly, the bottom of the platform cat ladder are provided with lightweight track wheel assembly, and the rear of the platform cat ladder is provided with platform branch Strut, the upper end of the table support bar are arranged in the connecting rod in the middle part of platform cat ladder by bearing pin, the table support bar Lower end movable pulley is installed.
- 2. detachable adjustable for height subway tunnel section construction operation platform according to claim 1, its feature exist In:Described tunnel wall pulley assembly component includes fixed beam, before the fixed beam is fixedly mounted on operating platform guardrail At end margin, the both ends of the fixed beam are provided with tunnel wall pulley by anti-slip device respectively.
- 3. detachable adjustable for height subway tunnel section construction operation platform according to claim 1, its feature exist In:Described lightweight track wheel assembly includes bottom girder, and the bottom girder both ends are provided with to be set with platform cat ladder bottom vertical bar The sleeve pipe of cooperation, the pin hole fixed by latch is distributed with the platform cat ladder bottom vertical bar and sleeve pipe respectively, it is described The both ends of bottom girder are provided with lightweight rail wheel by anti-slip device respectively.
- 4. detachable adjustable for height subway tunnel section construction operation platform according to claim 1, its feature exist In:Adjusting rod is provided between the lower end of described table support bar and movable pulley, the movable pulley is fixed on the bottom of adjusting rod Portion, adjusting rod and table support bar the bottom suit coordinates, and the positioning hole fixed by latch is distributed with respectively.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720269541.3U CN206784865U (en) | 2017-03-20 | 2017-03-20 | A kind of detachable adjustable for height subway tunnel section construction operation platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720269541.3U CN206784865U (en) | 2017-03-20 | 2017-03-20 | A kind of detachable adjustable for height subway tunnel section construction operation platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206784865U true CN206784865U (en) | 2017-12-22 |
Family
ID=60705483
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720269541.3U Expired - Fee Related CN206784865U (en) | 2017-03-20 | 2017-03-20 | A kind of detachable adjustable for height subway tunnel section construction operation platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206784865U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110202300A (en) * | 2019-06-24 | 2019-09-06 | 中国水电四局(阳江)海工装备有限公司 | Wind power tower door frame welding platform |
CN113585811A (en) * | 2021-08-19 | 2021-11-02 | 中铁十四局集团大盾构工程有限公司 | Assembled movable crawling ladder for large-diameter shield tunnel |
-
2017
- 2017-03-20 CN CN201720269541.3U patent/CN206784865U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110202300A (en) * | 2019-06-24 | 2019-09-06 | 中国水电四局(阳江)海工装备有限公司 | Wind power tower door frame welding platform |
CN113585811A (en) * | 2021-08-19 | 2021-11-02 | 中铁十四局集团大盾构工程有限公司 | Assembled movable crawling ladder for large-diameter shield tunnel |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109208478A (en) | A kind of prefabricated assembled bridge integration rapid constructing method | |
CN102296971A (en) | Lining method for tunnel emergency turnout strips and tunnel-lining trolley | |
CN104499434A (en) | Movable formwork for casting of wide-body box girder and construction method | |
CN107630709B (en) | A kind of construction method of the mobile trolley of bored tunnel construction | |
CN102230381B (en) | Hollow needle beam lining trolley | |
CN103243649B (en) | The system and method for a kind of cable saddle Fast Installation, location | |
CN204899948U (en) | Cable groove formworking jumbo | |
CN202544854U (en) | Lining trolley for subway station | |
CN206784865U (en) | A kind of detachable adjustable for height subway tunnel section construction operation platform | |
CN105952133A (en) | Suspended large-span reinforced concrete structure construction steel platform and construction method | |
CN202705927U (en) | Temporary support structure for plane turning construction of bridge across existing line | |
CN106837383B (en) | For main hole and the urgent lining trolley and its construction method for keeping away vehicle band of constructing | |
CN210561749U (en) | Multi-frame juxtaposed double-cantilever bridge girder erection machine | |
CN208151861U (en) | The traversing supporting leg of Bridge Erector | |
CN207538522U (en) | A kind of safety-type platform canopy station | |
CN205532638U (en) | A platform truck for ligature of tunnel lining framework of steel reinforcement | |
CN204626932U (en) | A kind of mobile measure support for arc curtain wall construction | |
CN105648908A (en) | Decorating trolley used for crossing existing lines or crossing bridges and construction method | |
CN207453859U (en) | A kind of constructing tunnel foldable lifting Operation Van | |
CN203834370U (en) | Arch ring steel formwork trolley for circular arch culvert | |
CN202577921U (en) | Extension wing type work platform | |
CN214196315U (en) | Slotting and maintenance trolley for arc-shaped expansion joint of tunnel wall | |
CN205135656U (en) | Modular two lining platform trucks of multipurpose | |
CN205206841U (en) | Big headroom modularization lining cutting platform truck in tunnel | |
CN205557290U (en) | Monolithic purlin formula annular passenger footbridge |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171222 |