CN203022409U - Iron tower support assembly - Google Patents

Iron tower support assembly Download PDF

Info

Publication number
CN203022409U
CN203022409U CN 201220742499 CN201220742499U CN203022409U CN 203022409 U CN203022409 U CN 203022409U CN 201220742499 CN201220742499 CN 201220742499 CN 201220742499 U CN201220742499 U CN 201220742499U CN 203022409 U CN203022409 U CN 203022409U
Authority
CN
China
Prior art keywords
steel tower
steel
supporting component
component according
spandrel girder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220742499
Other languages
Chinese (zh)
Inventor
崔润生
刘祥立
赵永清
陈金保
王文文
何立果
刘鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Shenhua Energy Co Ltd
Shenhua Shendong Coal Group Co Ltd
Original Assignee
China Shenhua Energy Co Ltd
Shenhua Shendong Coal Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=48646402&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=CN203022409(U) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by China Shenhua Energy Co Ltd, Shenhua Shendong Coal Group Co Ltd filed Critical China Shenhua Energy Co Ltd
Priority to CN 201220742499 priority Critical patent/CN203022409U/en
Application granted granted Critical
Publication of CN203022409U publication Critical patent/CN203022409U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The utility model provides an iron tower support assembly. The iron tower support assembly comprises four upright posts and further comprises a bearing beam and a supporting beam, wherein the bearing beam and the supporting beam are horizontally arranged; the upright posts are used for supporting the bearing beam; a jack support plate is arranged between the bearing beam and the supporting beam; and the supporting beam is provided with foundation bolts. The iron tower support assembly disclosed by the utility model can be used for aligning and straightening the iron tower at any time by regulating the supporting beam; the bearing beam is used to improve the bending strength of the iron tower so as to prevent collapse and breakage of the iron tower; and the upright posts are used for supporting the whole iron tower.

Description

A kind of steel tower supporting component
Technical field
The utility model relates to a kind of steel tower supporting component.
Background technology
Along with the development of coal undertaking, the coal mining instrument upgrades year by year, and coal mining output is growing, and the goaf area constantly enlarges.For example: adopt the sky area and extend with 70-80 square kilometre of speed every year the Yulin Prefecture, above ground structure is constituted a threat to, and the various overhead wires that frame is good are worked the mischief, ground constantly sink and ruptures, the inhomogeneous sinking of subsiding of iron tower foundation, the directionless inclination of steel tower, the serious bend fracture of tower material, main material gross distortion, the not first-class problem of wire degree of speeding degree of tightness.Directly affect steel tower service life, have at any time accident potential, might cause great serious accident and power failure, and relate to the All other routes security of operation.In order to guarantee the normal electricity consumption in colliery, be necessary because of tower suiting measures to different conditions, to take corresponding measure according to circuit each side factor.
But, China's existing goaf steel tower processing mode is all for the exploitation of ground building building, be generally geological foundation reinforcing, tunnel backfill, again build building, when running into when affecting the line security operation problem, general processing mode is for building new steel tower or again building line route, this mode power off time is long, undertakes to have a big risk, and total economic loss is high.
The utility model content
The purpose of this utility model is to overcome the deficiencies in the prior art, and a kind of collapse of iron tower fracture that prevents is provided, and aligns at any time the steel tower supporting component of alignment steel tower.
The technical solution of the utility model provides a kind of steel tower supporting component, comprise four root posts, described steel tower supporting component also comprises horizontally disposed spandrel girder and brace summer, described column is used for supporting described spandrel girder, be provided with very heavy support plate between described spandrel girder and described brace summer, described brace summer is provided with stone bolt.
Preferably, described spandrel girder is that two rectangular frame structure lap splices form, and the bottom surface of the infall of described two rectangular frame structure is the Support Position of described column.
Preferably, described brace summer is that four steel beam structure tranposition towers connect and form, and is provided with described very heavy support plate between the end face of the infall of the bottom surface of the infall of described four steel beam structures and described two rectangular frame structure.
Preferably, the two ends of described four steel beam structures are equipped with anchor (bolt) hole.
Preferably, also be tiltedly installed with the steel plate of putting more energy between described spandrel girder and described column.
Preferably, the bottom surface of described spandrel girder also is provided with anti-settling steel plate.
Preferably, have water hole or water seam on described very heavy support plate.
Preferably, a plurality of jigs are installed also on the bottom of described steel tower, described jig is connected by high-strength bolt with described steel tower, is welded with a reinforcement angle steel between every two described jigs.
Preferably, described column comprises the more piece back-up block, connects by anchor ear between described back-up block.
After adopting technique scheme, have following beneficial effect: the utility model utilization adjustment brace summer is aligned at any time, the alignment steel tower; Spandrel girder prevents the collapse of iron tower fracture for increasing the flexural strength of steel tower; Column is used for supporting whole steel tower.
Description of drawings
Fig. 1 is the structural representation of steel tower supporting component in the utility model one embodiment;
Fig. 2 is the structural representation of spandrel girder in the utility model one embodiment;
Fig. 3 is the structural representation of brace summer in the utility model one embodiment;
Fig. 4 is the structural representation of steel tower in the utility model one embodiment.
The Reference numeral table of comparisons:
1---column 2---spandrel girder 3---brace summer
4---very heavy support plate 5---steel tower 6---steel plates of putting more energy into
7---anti-settling steel plate 8---jig 9---reinforcement angle steel
11---anchor ear 31---stone bolt 32---anchor (bolt) holes
The specific embodiment
Further illustrate the specific embodiment of the present utility model below in conjunction with accompanying drawing.
As shown in Figure 1, the steel tower supporting component comprises four root posts 1, also comprises horizontally disposed spandrel girder 2 and brace summer 3, and column 1 is used for supporting spandrel girder 2, be provided with very heavy support plate 4 between spandrel girder 2 and brace summer 3, brace summer 3 is provided with the stone bolt 31 for levelling, alignment steel tower 5.
The utility model is aligned at any time by adjusting stone bolt 31 on brace summer 3, the alignment steel tower; Spandrel girder 2 is for increasing the flexural strength of steel tower 5, prevents steel tower 5 fracture of collapsing; Column 1 is used for supporting whole steel tower 5.Solved the subsidence area steel tower and easily be out of shape fracture, application life shakiness a difficult problem, and to causing Iron tower incline, along with constantly subsiding, can align at any time alignment, guarantee that the both sides wire tension is even, be unlikely to so produce broken string, draw the appearance of the accidents such as bad steel tower; This technology is simple safe and reliable, reaches economical rationality, construction period, can not cause the generation of power failure and other accidents, and reduce investment outlay, the reduction of erection time.
In the present embodiment, as shown in Figure 2, spandrel girder 2 is that two rectangular frame structure lap splices form, and the bottom surface of the infall of two rectangular frame structure is the Support Position of column 1.As shown in Figure 3, brace summer 3 is that four steel beam structure tranposition towers connect and form, and is provided with very heavy support plate 4 between the end face of the infall of the bottom surface of the infall of four steel beam structures and two rectangular frame structure.Article four, the two ends of steel beam structure are equipped with anchor (bolt) hole 32.Regulate the orientation of steel tower 5 by eight anchor (bolt) holes 32, simple to operation.
Preferably, spandrel girder 2 and brace summer 3 also can be other shapes, support and adjust steel tower as long as can be used in, and all belong to protection domain of the present utility model.
Preferably, as shown in Figure 1, go back tiltable between spandrel girder 2 and column 1 and be provided with the steel plate 6 of putting more energy into, to reach the effect of flexural strength.
Preferably, as shown in Figure 1, the bottom surface of spandrel girder 2 also can be provided with anti-settling steel plate 7.
Preferably, have water hole or water seam (not shown) on very heavy support plate 4, in order to avoid the ponding that rains causes iron plate getting rusty.
Preferably, as shown in Figure 4, a plurality of jigs 8 are installed also on the bottom of steel tower 5, jig 8 is connected by the high-strength bolt (not shown) with steel tower 5, is welded with a reinforcement angle steel 9 between every two jigs 8.When jig 8 is installed, must be adjacent to steel tower 5 and installs, high-strength bolt can guarantee that jig 8 is adjacent to steel tower 5.Jig 8 and reinforcement angle steel 9 are used for reinforcing steel tower 5.
Preferably, column 1 comprises more piece back-up block (not shown), connects by anchor ear 11 between back-up block.
Above-described is only principle of the present utility model and preferred embodiment.Should be pointed out that for the person of ordinary skill of the art, on the basis of the utility model principle, can also make some other modification, also should be considered as protection domain of the present utility model.

Claims (9)

1. steel tower supporting component, comprise four root posts, it is characterized in that, described steel tower supporting component also comprises horizontally disposed spandrel girder and regulates brace summer, described column is used for supporting described spandrel girder, be provided with very heavy support plate between described spandrel girder and described brace summer, described brace summer is provided with stone bolt.
2. steel tower supporting component according to claim 1, is characterized in that, described spandrel girder is that two rectangular frame structure lap splices form, and the bottom surface of the infall of described two rectangular frame structure is the Support Position of described column.
3. steel tower supporting component according to claim 2, it is characterized in that, described brace summer is that four steel beam structure tranposition towers connect and form, and is provided with described very heavy support plate between the end face of the infall of the bottom surface of the infall of described four steel beam structures and described two rectangular frame structure.
4. steel tower supporting component according to claim 3, is characterized in that, the two ends of described four steel beam structures are equipped with anchor (bolt) hole.
5. steel tower supporting component according to claim 1, is characterized in that, also is tiltedly installed with the steel plate of putting more energy between described spandrel girder and described column.
6. steel tower supporting component according to claim 1, is characterized in that, the bottom surface of described spandrel girder also is provided with anti-settling steel plate.
7. steel tower supporting component according to claim 1, is characterized in that, has water hole or water seam on described very heavy support plate.
8. steel tower supporting component according to claim 1, is characterized in that, a plurality of jigs also are installed on the bottom of described steel tower, and described jig is connected by high-strength bolt with described steel tower, is welded with a reinforcement angle steel between every two described jigs.
9. steel tower supporting component according to claim 1, is characterized in that, described column comprises the more piece back-up block, connects by anchor ear between described back-up block.
CN 201220742499 2012-12-28 2012-12-28 Iron tower support assembly Expired - Lifetime CN203022409U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220742499 CN203022409U (en) 2012-12-28 2012-12-28 Iron tower support assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220742499 CN203022409U (en) 2012-12-28 2012-12-28 Iron tower support assembly

Publications (1)

Publication Number Publication Date
CN203022409U true CN203022409U (en) 2013-06-26

Family

ID=48646402

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220742499 Expired - Lifetime CN203022409U (en) 2012-12-28 2012-12-28 Iron tower support assembly

Country Status (1)

Country Link
CN (1) CN203022409U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104120733A (en) * 2014-06-25 2014-10-29 国家电网公司 Deviation compensation component for power transmission line iron tower foundation sinking
CN107687266A (en) * 2017-09-30 2018-02-13 广东电网有限责任公司电力科学研究院 A kind of oblique material bracing means of power transmission tower angle steel
CN107687561A (en) * 2017-09-14 2018-02-13 南京艺成教育科技发展有限公司 A kind of blinds box bracket

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104120733A (en) * 2014-06-25 2014-10-29 国家电网公司 Deviation compensation component for power transmission line iron tower foundation sinking
CN107687561A (en) * 2017-09-14 2018-02-13 南京艺成教育科技发展有限公司 A kind of blinds box bracket
CN107687266A (en) * 2017-09-30 2018-02-13 广东电网有限责任公司电力科学研究院 A kind of oblique material bracing means of power transmission tower angle steel

Similar Documents

Publication Publication Date Title
CN103614970B (en) Steel truss girder assembling construction longitudinal pull and lateral pushing sliding system
CN103614969B (en) Steel truss girder assembling, erecting and construction process
CN103388408B (en) A kind of building structure external prestressing muscle reinforces steering block
CN205205635U (en) Stride footpath bailey frame steel suspension bridge structure greatly
CN103290784B (en) Arched girder conjugative bridge construction method for hanging
CN103821075B (en) Long span oblique pull assembly type steel bridge on highway
CN102061742B (en) Shockproof reinforced concrete pseudo-classic building structural system
CN104005338A (en) Three-directional temporary tower and girder consolidation structure of large-span cable-stayed bridge
CN204851302U (en) Underground mine large -span chamber crane beam stock fixed structure
CN203546728U (en) Improved installation fixing device of top-down steel pipe column
CN205806684U (en) A kind of across base pit engineering conduit wiring suspension structure
CN203022409U (en) Iron tower support assembly
CN102777050B (en) Assembly type jig frame for longspan pipe truss roof girder
CN204530425U (en) Prestressed steel truss bridge
CN204385629U (en) A kind of support for the construction of suspension bridge king-tower top rail
CN203716044U (en) Low bearing or middle bearing cable arch combined structural bridge
CN203866711U (en) Large span cable-stayed bridge tower beam three-way temporary consolidation structure
CN203684102U (en) Supporting system for precast beam formed by connecting span erection of ramp bridge and main line bridge
CN103882808A (en) Ramp bridge and main bridge connecting and erecting prefabricated beam supply system and construction method thereof
CN204126297U (en) A kind of temporary support of steel truss roof
CN203821248U (en) Steel pipe arch main arch assembling supporting system
CN202689029U (en) Anchor rod foundation of photovoltaic module support
CN202482767U (en) Steel tube bailey beam column type support
CN101775876A (en) Spacial steel roof truss
CN205296173U (en) Utilize structure of foundation ditch support system bearing tower crane

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20130626