CN104120733A - Deviation compensation component for power transmission line iron tower foundation sinking - Google Patents

Deviation compensation component for power transmission line iron tower foundation sinking Download PDF

Info

Publication number
CN104120733A
CN104120733A CN201410287238.7A CN201410287238A CN104120733A CN 104120733 A CN104120733 A CN 104120733A CN 201410287238 A CN201410287238 A CN 201410287238A CN 104120733 A CN104120733 A CN 104120733A
Authority
CN
China
Prior art keywords
supporting plate
transmission line
making
difference
power transmission
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410287238.7A
Other languages
Chinese (zh)
Other versions
CN104120733B (en
Inventor
要粮安
任海平
陆经照
方守盛
谢强
侯志锋
雷丽萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Jinzhong Power Supply Co of State Grid Shanxi Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Jinzhong Power Supply Co of State Grid Shanxi Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Jinzhong Power Supply Co of State Grid Shanxi Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201410287238.7A priority Critical patent/CN104120733B/en
Publication of CN104120733A publication Critical patent/CN104120733A/en
Application granted granted Critical
Publication of CN104120733B publication Critical patent/CN104120733B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention relates to a deviation compensation structure for power transmission line iron tower foundation sinking. The deviation compensation structure comprises a deviation compensation component provided with a cavity structure defined by an upper supporting plate, a lower supporting plate and side face supporting plates. The upper supporting plate is provided with foundation bolt holes and concrete pouring holes. The lower supporting plate is provided with foundation bolt holes. An inverted-V-shaped supporting framework is fixed in the cavity structure of the deviation compensation component. The lower supporting plate of the deviation compensation component is connected and fixed to foundation stand columns through foundation bolts. The upper supporting plate is connected and fixed to an iron tower through foundation bolts. The deviation compensation structure for power transmission line iron tower foundation sinking is convenient to install, can correct iron tower foundation sinking in time, and guarantees safety of a power transmission line. Besides, the deviation compensation structure is low in manufacturing cost and construction cost.

Description

The sink member of making up the difference of power transmission line iron tower foundation
Technical field
The present invention relates to a kind of fixed installation member of iron tower of power transmission line, the sink member of making up the difference of power transmission line iron tower foundation.
Background technology
The basis of ultra-high-tension power transmission line refers to the buried part of steel tower, and its Main Function is that steel tower is firmly fixed to ground.When ordinary circumstance, between steel tower and basis, by bolt seamless link, in the time there is setting of ground, steel tower is run-off the straight with immerge, between steel tower and basis, can produce larger vertical displacement, when serious, can cause the broken string of falling tower accident.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of power transmission line iron tower foundation member that sinks to making up the difference, and adopts this member can facilitate, revise in time iron tower foundation sinking.
For solving above technical problem, the technical solution used in the present invention is:
A kind of power transmission line iron tower foundation member that sinks to making up the difference, it comprises the member of making up the difference, the member of making up the difference surrounds cavity structure by upper backup pad, lower supporting plate and lateral bolster fagging, on upper backup pad, have anchor (bolt) hole and concrete casting orifice, on lower supporting plate, have anchor (bolt) hole, in the cavity structure of the member of making up the difference, be fixed with inverted V-shaped support frame; The member lower supporting plate of making up the difference is connected and fixed by stone bolt and basic stand column, and upper backup pad is connected and fixed by stone bolt and steel tower.
When use, first open the stone bolt that connects basis and steel tower in original structure, the member of making up the difference is placed on basic stand column, tightens stone bolt; Then fluid concrete is in the cavity of the member of making up the difference; Again steel tower and the member of making up the difference are connected and fixed by stone bolt.
As the preferred scheme of one, also comprise the connection backing plate being padded between upper backup pad and steel tower, on connection backing plate, have anchor (bolt) hole and concrete casting orifice.
As the preferred scheme of another kind, also comprise the stone bolt backing plate being padded between lower supporting plate and column.
Adopt the power transmission line iron tower foundation provided by the invention member that sinks to making up the difference, easy for installation, can sink to revising to iron tower foundation in time, ensure the safety of transmission line of electricity.And cost of manufacture and construction cost are low.
Brief description of the drawings
Fig. 1 is structural representation of the present invention.
Fig. 2 is the front section view of member of making up the difference.
Fig. 3 is the structural representation of connection backing plate.
Fig. 4 is the structural representation of stone bolt backing plate.
In figure, 1-upper backup pad, 2-lower supporting plate, 3-lateral bolster fagging, 4-anchor (bolt) hole, 5-concrete casting orifice, 6-inverted V-shaped support frame, 7-stone bolt, 8-column, 9-steel tower, 10-connection backing plate, 11-stone bolt backing plate.
Detailed description of the invention
In order to make those skilled in the art better understand the present invention, below in conjunction with accompanying drawing, the present invention is done to further clear, complete explanation.
A kind of power transmission line iron tower foundation structure of sinking to making up the difference, it comprises the member of making up the difference, the member of making up the difference surrounds cavity structure by upper backup pad 1, lower supporting plate 2 and lateral bolster fagging 3, on upper backup pad 1, have anchor (bolt) hole 4 and concrete casting orifice 5, from concrete casting orifice 5 to cavity structure in fluid concrete.On lower supporting plate 2, have anchor (bolt) hole 4, in the cavity structure of the member of making up the difference, be fixed with inverted V-shaped support frame 6.The member of making up the difference is welded by steel plate and angle steel, wherein, upper backup pad 1 and lower supporting plate 2 adopt steel plate, inverted V-shaped support frame 6 adopts angle steel, one end of angle steel is welded in the inner surface of upper backup pad 1, the other end is welded in the binding site of downside gripper shoe 3 and lower supporting plate 2, and two gussets that are symmetrically welded become an inverted V-shaped support frame 6, and multiple such inverted V-shaped support frames 6 can be set.The member lower supporting plate 2 of making up the difference is connected and fixed by stone bolt 7 and basic stand column 8, and upper backup pad 1 is connected and fixed by stone bolt 7 and steel tower 9.
On the basis of above structure, also comprise the connection backing plate 10 being padded between upper backup pad 1 and steel tower 8, as shown in Figure 3, on connection backing plate 10, have anchor (bolt) hole 4 and concrete casting orifice 5, if basis sinks again, the member of can making up the difference by again superposeing above connection backing plate is rectified a deviation.
Also comprise the stone bolt backing plate 11 being padded between lower supporting plate 2 and column 7, the stability being connected with column to strengthen the member of making up the difference.As shown in Figure 4, on stone bolt backing plate 11, also have anchor (bolt) hole 4.
The scope of protection of present invention is not limited to above detailed description of the invention; to those skilled in the art; the present invention can have various deformation and change, all any amendments of doing within design of the present invention and principle, improves and is equal within replacement all should be included in protection scope of the present invention.

Claims (3)

1. the power transmission line iron tower foundation structure of sinking to making up the difference, it is characterized in that: it comprises the member of making up the difference, the member of making up the difference surrounds cavity structure by upper backup pad (1), lower supporting plate (2) and lateral bolster fagging (3), on upper backup pad (1), have anchor (bolt) hole (4) and concrete casting orifice (5), on lower supporting plate (2), have anchor (bolt) hole (4), in the cavity structure of the member of making up the difference, be fixed with inverted V-shaped support frame (6); The member lower supporting plate (2) of making up the difference is connected and fixed by stone bolt (7) and basic stand column (8), and upper backup pad (1) is connected and fixed by stone bolt (7) and steel tower (9).
2. the power transmission line iron tower foundation according to claim 1 structure of sinking to making up the difference, it is characterized in that: also comprise the connection backing plate (10) being padded between upper backup pad (1) and steel tower (9), on connection backing plate (10), have anchor (bolt) hole (4) and concrete casting orifice (5).
3. the power transmission line iron tower foundation according to claim 1 structure of sinking to making up the difference, is characterized in that: also comprise the stone bolt backing plate (11) being padded between lower supporting plate (2) and column (8).
CN201410287238.7A 2014-06-25 2014-06-25 Power transmission line iron tower foundation sinks to making up the difference component Active CN104120733B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410287238.7A CN104120733B (en) 2014-06-25 2014-06-25 Power transmission line iron tower foundation sinks to making up the difference component

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410287238.7A CN104120733B (en) 2014-06-25 2014-06-25 Power transmission line iron tower foundation sinks to making up the difference component

Publications (2)

Publication Number Publication Date
CN104120733A true CN104120733A (en) 2014-10-29
CN104120733B CN104120733B (en) 2017-11-10

Family

ID=51766350

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410287238.7A Active CN104120733B (en) 2014-06-25 2014-06-25 Power transmission line iron tower foundation sinks to making up the difference component

Country Status (1)

Country Link
CN (1) CN104120733B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107604936A (en) * 2017-08-31 2018-01-19 杭萧钢构(河南)有限公司 A kind of means to save the situation of steel column foot crab-bolt dislocation

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090084038A (en) * 2008-01-31 2009-08-05 주식회사 진웅아이티시그널 A fabric of pillar and method for executing thereof
CA2752597A1 (en) * 2011-09-09 2013-03-09 Dean R. Rosendahl Mounting a base plate on upstanding fasteners of a support
CN203022409U (en) * 2012-12-28 2013-06-26 中国神华能源股份有限公司 Iron tower support assembly
CN203096780U (en) * 2013-01-14 2013-07-31 陈佐霞 Straight-line electricity transmitting steel tower with rectification device
KR20130130279A (en) * 2012-05-22 2013-12-02 김종훈 Anchor bolt alignment module
CN204040051U (en) * 2014-06-25 2014-12-24 国家电网公司 Power transmission line iron tower foundation sinks to making up the difference component

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090084038A (en) * 2008-01-31 2009-08-05 주식회사 진웅아이티시그널 A fabric of pillar and method for executing thereof
CA2752597A1 (en) * 2011-09-09 2013-03-09 Dean R. Rosendahl Mounting a base plate on upstanding fasteners of a support
KR20130130279A (en) * 2012-05-22 2013-12-02 김종훈 Anchor bolt alignment module
CN203022409U (en) * 2012-12-28 2013-06-26 中国神华能源股份有限公司 Iron tower support assembly
CN203096780U (en) * 2013-01-14 2013-07-31 陈佐霞 Straight-line electricity transmitting steel tower with rectification device
CN204040051U (en) * 2014-06-25 2014-12-24 国家电网公司 Power transmission line iron tower foundation sinks to making up the difference component

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107604936A (en) * 2017-08-31 2018-01-19 杭萧钢构(河南)有限公司 A kind of means to save the situation of steel column foot crab-bolt dislocation

Also Published As

Publication number Publication date
CN104120733B (en) 2017-11-10

Similar Documents

Publication Publication Date Title
CN204174935U (en) A kind of outer wall of basement one side formwork supporting and protection structure
CN104404882B (en) A kind of bearing auxiliary installation mold and construction method thereof
CN102926504B (en) Construction method of steel and concrete overlapped beam combined part
CN204039921U (en) A kind of Construction Support without support bent cap
CN202117341U (en) Template for embedding foundation bolts of steel structures of buildings
CN104294816A (en) Anti-floating construction method and device for large-diameter cast-in-situ bored pile steel reinforcement cage
CN204252023U (en) Installation mold assisted by a kind of bearing
CN109184260B (en) Slippage construction technology for building with raft
CN104120733A (en) Deviation compensation component for power transmission line iron tower foundation sinking
CN202595758U (en) Batter post foundation structure for overhead transmission line
CN103835303B (en) A kind of cast-type armored concrete shearing resistance method and structure
CN204040051U (en) Power transmission line iron tower foundation sinks to making up the difference component
CN105625198A (en) Reinforced rigid-framed arch bridge
CN202324198U (en) Anti-pulling embedded fixed column base for portal-rigid frame
CN106638679B (en) A kind of precast concrete pipe gallery connection method
CN205188982U (en) Removable system of strutting of rectangle work well
CN204530510U (en) A kind of assembling tilt adjustable is from falling frame pier-side bracket
CN202559747U (en) Foot portion supporting and size control device of aluminum alloy shear wall template
CN206830201U (en) The interim inverted arch connecting structure in tunnel
CN204174936U (en) A kind of template support structure of outer wall of basement
CN206706589U (en) Steel bracket shaped steel relief arrangement
CN103255773B (en) Combined type template support and application method thereof
CN206815375U (en) A kind of casing backform
CN202849941U (en) Pier column anchor ear
CN203846405U (en) Bridge construction cast-in-place template

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant