CN107604936A - A kind of means to save the situation of steel column foot crab-bolt dislocation - Google Patents
A kind of means to save the situation of steel column foot crab-bolt dislocation Download PDFInfo
- Publication number
- CN107604936A CN107604936A CN201710771043.3A CN201710771043A CN107604936A CN 107604936 A CN107604936 A CN 107604936A CN 201710771043 A CN201710771043 A CN 201710771043A CN 107604936 A CN107604936 A CN 107604936A
- Authority
- CN
- China
- Prior art keywords
- crab
- bolt
- slab
- hole
- anchor slab
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Abstract
The invention discloses a kind of means to save the situation of steel column foot crab-bolt dislocation, by setting anchor slab between concrete foundation and steel column, and the surface in concrete foundation at crab-bolt position is subjected to dabbing processing, depression is formed after making concrete surface dabbing, during dabbing, the reinforcing bar in concrete foundation must not be injured, pressure grouting then will be carried out in described depression, grouting material is CGM high-strength grouts.The present invention fully can use the crab-bolt of dislocation, weaken very little to steel column foot bearing capacity, avoid the trouble of redrilling, borehole cleaning, bar planting, and which weakens very little to steel column foot bearing capacity, not only economic but also safety.
Description
Technical field
The invention belongs to steel building field, more particularly to a kind of means to save the situation of steel column foot crab-bolt dislocation.
Background technology
With the fast development of China's assembled architecture, steel structural form is more and more applied to industrial building and civilian
Building.Steel column foot is attached fixation, but the embedding often dislocation of live crab-bolt using crab-bolt more, causes steel column not install.
Traditional treatment method is:Former crab-bolt is cut off, and redrilling bar planting, carries out live pull-out test.Due to reinforcement foundation and former crab-bolt
Presence, cause drilling, borehole cleaning trouble, rebar-planting quality tends not to ensure, it is difficult to reach the requirement of design bearing capacity, so this
The use of kind suspension column rectification mode is limited by increasing.
The content of the invention
In order to solve problems of the prior art, it is an object of the invention to provide one kind can be easy to construction, and can
Ensure the means to save the situation of the steel column foot crab-bolt dislocation of construction quality.
In order to realize foregoing invention purpose, the present invention uses technical scheme as described below:
A kind of means to save the situation of steel column foot crab-bolt dislocation, including steel column and concrete foundation, the side of being welded with the suspension column of steel column
The heel slab of shape, the edge on heel slab are provided with some suspension column preformed holes, are provided with concrete foundation and institute
The crab-bolt of the identical quantity of suspension column preformed hole is stated, all crab-bolts are dislocation with all suspension column preformed holes, wherein, the anchor in left side
Bolt A corresponds to inside steel column, and the crab-bolt B on right side is located at outside steel column, and crab-bolt C and the suspension column on heel slab of upper and lower side are reserved
Hole sequence;Described means to save the situation specifically includes following steps:
1. setting a square anchor slab in the crab-bolt in concrete foundation, the area of anchor slab is more than the area of heel slab, in anchor
The through hole passed through for all crab-bolt A, crab-bolt B and crab-bolt C is opened up on plate, the crab-bolt A in left side, the crab-bolt B on right side are passed through on anchor slab
Corresponding through hole, and part crab-bolt A and crab-bolt B ultrasound gone out after anchor slab is cut off, the crab-bolt C of upper and lower sides is corresponding through anchor slab
On through hole;
2. the heel slab is correspondingly arranged on anchor slab, the suspension column hole corresponding with crab-bolt C is opened up on heel slab, upper and lower sides
Passed through after crab-bolt C is corresponded to through the through hole on anchor slab and out of suspension column hole, crab-bolt C installs pad after passing through suspension column hole on crab-bolt C
Piece and clamp nut, two clamp nuts are set on each crab-bolt C;
3. plug welding is carried out with heel slab to anchor slab to connect, so that anchor slab and heel slab are fastenedly connected and are integrated, and anchor slab and post
The plug welding of sole connects in two kinds of situation, is specially:
A, when suspension column plate thickness is not more than 20mm, the suspension column preformed hole of dislocation corresponding with crab-bolt A, crab-bolt B on heel slab is entered
Suspension column is simultaneously reserved eyelet welding and expired by row plug welding;
B, when suspension column plate thickness is more than 20mm, the suspension column preformed hole of dislocation corresponding with crab-bolt A, crab-bolt B on heel slab is carried out
Open 300Slope is spread, to ensure welding quality;
4. carrying out plug welding to crab-bolt A, crab-bolt B and anchor slab to connect, through hole corresponding with crab-bolt A, crab-bolt B on anchor slab is expanded
Slope, crab-bolt A, crab-bolt B upper ends are located in the through hole of ramped shaped and carry out plug welding to through hole, through hole welded full;
5. the pad and heel slab are carried out into weld all around, heel slab surrounding and anchor slab are subjected to weld all around at the scene;
6. surface at crab-bolt position in concrete foundation is carried out into dabbing processing, make to be formed after concrete surface dabbing recessed
Fall into, during dabbing, the reinforcing bar in concrete foundation must not be injured, pressure grouting then will be carried out in described depression, fill
Slurry is CGM high-strength grouts, and anchor slab bottom is realized into high intensity is connected with concrete foundation.
Preferably, the thickness of the anchor slab is 40mm.
Preferably, the material of grouting is CGM high-strength grouts.
Due to there is following superiority using above-mentioned technical proposal, the present invention:
The present invention fully can use the crab-bolt of dislocation, weaken very little to steel column foot bearing capacity, avoid and bore again
Hole, borehole cleaning, the trouble of bar planting, and which weaken very little to steel column foot bearing capacity, not only economic but also safety.
Brief description of the drawings
Fig. 1 is the structural representation of the present invention;
Fig. 2 is Fig. 1 top view;
Fig. 3 is a kind of structural representation of the plug welding of anchor slab and heel slab;
Fig. 4 is another structural representation of the plug welding of anchor slab and heel slab;
Fig. 5 is crab-bolt A, crab-bolt B and anchor slab plug welding structural representation;
In figure:1st, steel column;2nd, concrete foundation;3rd, heel slab;31st, suspension column preformed hole;4th, anchor slab;5th, CGM high-strength grouts;6、
Crab-bolt A;7th, crab-bolt B;8th, crab-bolt C;9th, clamp nut;10th, pad.
Embodiment
Below in conjunction with the accompanying drawings and embodiment is described in further detail to technical scheme.
A kind of means to save the situation of steel column foot crab-bolt dislocation of the present invention, including steel column 1 and concrete foundation 2, steel
Square heel slab 3 is welded with the suspension column of post 1, the edge on heel slab 3 is provided with some suspension column preformed holes 31,
The crab-bolt with the 31 identical quantity of suspension column preformed hole is provided with concrete foundation 2, all crab-bolts and all suspension columns are pre-
It is dislocation to box out, wherein, the crab-bolt A6 in left side corresponds to inside steel column 1, and the crab-bolt B7 on right side is located at outside steel column 1, very aobvious
Right crab-bolt A6, crab-bolt B7 can not be used, and the crab-bolt C8 of upper and lower side and the sequence of suspension column preformed hole 31 on heel slab.
In the present embodiment, described crab-bolt A6 is four, and crab-bolt B7 is four, and described crab-bolt C8 is four, described
Means to save the situation specifically include following steps:As shown in Figure 1, 2,
1. setting a square anchor slab 4 in the crab-bolt in concrete foundation 2, the thickness of anchor slab 4 is 40mm, and the area of anchor slab 4 is big
In the area of heel slab 3, all crab-bolt A6 of confession are opened up on anchor slab 4, the through hole that crab-bolt B7 and crab-bolt C8 are passed through, four of left side
Crab-bolt A, four crab-bolt B on right side are through corresponding through hole on anchor slab, and part crab-bolt A and crab-bolt B ultrasound gone out after anchor slab is entered
Row is cut off, and the crab-bolt C of upper and lower sides is corresponding through the through hole on anchor slab;
2. the heel slab 3 is correspondingly arranged on anchor slab 4, the suspension column hole corresponding with crab-bolt C8 is opened up on heel slab 3, up and down
The crab-bolt C8 of side is corresponding to be passed through through after the through hole on anchor slab 4 and out of suspension column hole, and crab-bolt C is passed through behind suspension column hole on crab-bolt C
Pad and clamp nut are installed, two clamp nuts 9 are set on each crab-bolt C8;
3. to anchor slab 4 and heel slab 3 plug welding is carried out to connect so that anchor slab and heel slab are fastenedly connected and are integrated, and anchor slab and
Heel slab connects in two kinds of situation, is specially:
A, as shown in figure 3, when the thickness of heel slab 3 is not more than 20mm, by dislocation corresponding with crab-bolt A6, crab-bolt B7 on heel slab
Suspension column preformed hole 31 carries out plug welding and suspension column is reserved into eyelet welding expired;
B, will be corresponding with four crab-bolt A, four crab-bolt B wrong on heel slab as shown in figure 4, when the thickness of heel slab 3 is more than 20mm
The suspension column preformed hole 31 of position carries out out 300Slope is spread, to ensure welding quality;
4. as shown in figure 5, to four crab-bolt A6, four crab-bolt B7 and anchor slab 4 carry out plug welding connect, by anchor slab 4 with crab-bolt A6,
Through hole corresponding crab-bolt B7 carries out expansion slope, and crab-bolt A, crab-bolt B upper ends are located in the through hole of ramped shaped and through hole filled in
Weldering, through hole is welded completely, to ensure welding quality;
5. the pad 10 and heel slab 3 are carried out into weld all around, the surrounding of heel slab 3 and anchor slab 4 are subjected to weld all around at the scene;
6. the surface in concrete foundation 2 at crab-bolt position is carried out into dabbing processing, formed after making concrete surface dabbing
Depression, during dabbing, must not injure the reinforcing bar in concrete foundation, then will carry out pressure grouting in described depression,
Grouting material is CGM high-strength grouts 5, it is ensured that fills real, the bottom of anchor slab 4 is realized into high intensity is connected with concrete foundation 2.
The present invention is by setting grout blanket, it is ensured that anchor slab 4 can reliably be transmitted to pressure concrete foundation 2.
In the present invention, the upper and lower sides suspension column preformed hole opened up in advance on heel slab 3, which can retain, not to be had to, or can also be straight
Connect and plug welding is carried out to it.
The present invention need not carry out steel planting to former concrete foundation, and and can enough makes full use of the crab-bolt of embedding dislocation,
Suspension column bearing capacity is set to disclosure satisfy that design requirement.
Claims (3)
1. a kind of means to save the situation of steel column foot crab-bolt dislocation, including steel column and concrete foundation, it is welded with the suspension column of steel column
Square heel slab, the edge on heel slab are provided with some suspension column preformed holes, be provided with concrete foundation with
The crab-bolt of the identical quantity of the suspension column preformed hole, all crab-bolts are dislocation with all suspension column preformed holes, wherein, left side
Crab-bolt A corresponds to inside steel column, and the crab-bolt B on right side is located at outside steel column, and the crab-bolt C and the suspension column on heel slab of upper and lower side are pre-
Box out sequence;It is characterized in that:Described means to save the situation specifically includes following steps:
1. setting a square anchor slab in the crab-bolt in concrete foundation, the area of anchor slab is more than the area of heel slab, in anchor
The through hole passed through for all crab-bolt A, crab-bolt B and crab-bolt C is opened up on plate, the crab-bolt A in left side, the crab-bolt B on right side are passed through on anchor slab
Corresponding through hole, and part crab-bolt A and crab-bolt B ultrasound gone out after anchor slab is cut off, the crab-bolt C of upper and lower sides is corresponding through anchor slab
On through hole;
2. the heel slab is correspondingly arranged on anchor slab, the suspension column hole corresponding with crab-bolt C is opened up on heel slab, upper and lower sides
Passed through after crab-bolt C is corresponded to through the through hole on anchor slab and out of suspension column hole, crab-bolt C installs pad after passing through suspension column hole on crab-bolt C
Piece and clamp nut, two clamp nuts are set on each crab-bolt C;
3. plug welding is carried out with heel slab to anchor slab to connect, so that anchor slab and heel slab are fastenedly connected and are integrated, and anchor slab and post
The plug welding of sole connects in two kinds of situation, is specially:
A, when suspension column plate thickness is not more than 20mm, the suspension column preformed hole of dislocation corresponding with crab-bolt A, crab-bolt B on heel slab is entered
Suspension column is simultaneously reserved eyelet welding and expired by row plug welding;
B, when suspension column plate thickness is more than 20mm, the suspension column preformed hole of dislocation corresponding with crab-bolt A, crab-bolt B on heel slab is carried out
Open 300Slope is spread, to ensure welding quality;
4. carrying out plug welding to crab-bolt A, crab-bolt B and anchor slab to connect, through hole corresponding with crab-bolt A, crab-bolt B on anchor slab is expanded
Slope, crab-bolt A, crab-bolt B upper ends are located in the through hole of ramped shaped and carry out plug welding to through hole, through hole welded full;
5. the pad and heel slab are carried out into weld all around, heel slab surrounding and anchor slab are subjected to weld all around at the scene;
6. surface at crab-bolt position in concrete foundation is carried out into dabbing processing, make to be formed after concrete surface dabbing recessed
Fall into, during dabbing, the reinforcing bar in concrete foundation must not be injured, pressure grouting then will be carried out in described depression, fill
Slurry is CGM high-strength grouts, and anchor slab bottom is realized into high intensity is connected with concrete foundation.
2. the means to save the situation of steel column foot crab-bolt dislocation according to claim 1, it is characterised in that the thickness of the anchor slab
For 40mm.
3. the means to save the situation of steel column foot crab-bolt according to claim 1 dislocation, it is characterised in that the material of grouting is
CGM high-strength grouts.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710771043.3A CN107604936A (en) | 2017-08-31 | 2017-08-31 | A kind of means to save the situation of steel column foot crab-bolt dislocation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710771043.3A CN107604936A (en) | 2017-08-31 | 2017-08-31 | A kind of means to save the situation of steel column foot crab-bolt dislocation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107604936A true CN107604936A (en) | 2018-01-19 |
Family
ID=61056982
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710771043.3A Pending CN107604936A (en) | 2017-08-31 | 2017-08-31 | A kind of means to save the situation of steel column foot crab-bolt dislocation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107604936A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109440948A (en) * | 2018-12-28 | 2019-03-08 | 上海建工七建集团有限公司 | The connection structure and method of project to be continued steel construction and main structure |
CN111779132A (en) * | 2020-07-15 | 2020-10-16 | 东营鸿圣绿建装配式建筑科技有限公司 | Steel structure assembly type building assembly and manufacturing process thereof |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003155781A (en) * | 2001-11-22 | 2003-05-30 | Iida Sangyo:Kk | Joining device of column and horizontal member |
CN102296813A (en) * | 2010-06-25 | 2011-12-28 | 贵阳铝镁设计研究院有限公司 | Construction method for steel column base and steel column base structure thereof |
CN104120733A (en) * | 2014-06-25 | 2014-10-29 | 国家电网公司 | Deviation compensation component for power transmission line iron tower foundation sinking |
-
2017
- 2017-08-31 CN CN201710771043.3A patent/CN107604936A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003155781A (en) * | 2001-11-22 | 2003-05-30 | Iida Sangyo:Kk | Joining device of column and horizontal member |
CN102296813A (en) * | 2010-06-25 | 2011-12-28 | 贵阳铝镁设计研究院有限公司 | Construction method for steel column base and steel column base structure thereof |
CN104120733A (en) * | 2014-06-25 | 2014-10-29 | 国家电网公司 | Deviation compensation component for power transmission line iron tower foundation sinking |
Non-Patent Citations (2)
Title |
---|
刘金英等: "解决预埋螺栓、套筒常见问题的几种方法", 《建筑工人》 * |
陈振: "浅谈钢结构柱脚锚栓施工重点及问题", 《福建建材》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109440948A (en) * | 2018-12-28 | 2019-03-08 | 上海建工七建集团有限公司 | The connection structure and method of project to be continued steel construction and main structure |
CN111779132A (en) * | 2020-07-15 | 2020-10-16 | 东营鸿圣绿建装配式建筑科技有限公司 | Steel structure assembly type building assembly and manufacturing process thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103669598B (en) | A kind of multi-layer concrete frame construction top add a layer construction method for steel frame foot joint | |
CN102691365B (en) | Connecting structure for assembly type concrete shear wall edge member | |
CN101649678B (en) | Structure for strengthening node of beam column by section increase method and construction method thereof | |
CN106988551A (en) | Attached frame reinforcing structure and method outside the full assembled of Bolted angle connection | |
CN202627325U (en) | Concrete column with angle irons welded on corners and reinforcing cage and multi-cavity steel pipe arranged in cavity | |
CN102535749A (en) | Double-function multi-cavity steel tube concrete column provided with soft steel sleeve at bottom, and manufacturing method thereof | |
CN107604936A (en) | A kind of means to save the situation of steel column foot crab-bolt dislocation | |
CN201539106U (en) | Beam-column joint reinforced structure adopting enlarging section method | |
CN107366298B (en) | A kind of conversion method for supporting connected for reinforcing blower foundation | |
CN202611012U (en) | Assembly type concrete shear wall edge member connection structure | |
CN108643602A (en) | A kind of outsourcing anchor steel ruggedized construction suitable for concrete beam and column node | |
CN102535747A (en) | Multi-cavity concrete-filled steel tube column with angle bars bonded and welded at corners and reinforcing cages arranged in cavities and construction method of multi-cavity concrete-filled steel tube column | |
CN109972627A (en) | A kind of fashioned iron assembled foundation pit enclosure structure and its construction method | |
CN205444968U (en) | Bar planting anchor structure | |
CN109610654A (en) | Prefabricated assembled double steel plate concrete shear force wall connection component and its application method | |
CN212295340U (en) | Elastic concrete column base node | |
CN206562792U (en) | Overlapping for existing structure strengthening reconstruction changes antitorque structure | |
CN108589983A (en) | A kind of U-shaped energy consumption connecting key and assembled composite wall structure and its construction method based on it | |
CN207376488U (en) | A kind of road and bridge crack bracing means | |
CN206942196U (en) | The structure of attached assembling type node power consumption frame strengthening outside a kind of existing framework | |
CN202881986U (en) | Single-pile vertical static test pile head steel bar connection node | |
CN205604283U (en) | Building bar planting concrete column | |
CN207331394U (en) | The embedded prefabricated roads plate in safe edge angle | |
CN208347058U (en) | U-shaped energy consumption connecting key and the assembled composite wall structure based on it | |
CN206859208U (en) | Novel building concrete solid pile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180119 |
|
RJ01 | Rejection of invention patent application after publication |