CN107366298B - A kind of conversion method for supporting connected for reinforcing blower foundation - Google Patents
A kind of conversion method for supporting connected for reinforcing blower foundation Download PDFInfo
- Publication number
- CN107366298B CN107366298B CN201710650040.4A CN201710650040A CN107366298B CN 107366298 B CN107366298 B CN 107366298B CN 201710650040 A CN201710650040 A CN 201710650040A CN 107366298 B CN107366298 B CN 107366298B
- Authority
- CN
- China
- Prior art keywords
- foundation ring
- concrete
- foundation
- slit region
- conversion support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000006243 chemical reaction Methods 0.000 title claims abstract description 37
- 230000003014 reinforcing effect Effects 0.000 title claims abstract description 15
- 238000000034 method Methods 0.000 title claims abstract description 12
- 239000004567 concrete Substances 0.000 claims abstract description 43
- 239000011440 grout Substances 0.000 claims abstract description 19
- 238000005553 drilling Methods 0.000 claims abstract description 16
- 239000000463 material Substances 0.000 claims abstract description 6
- 239000008267 milk Substances 0.000 claims abstract 2
- 210000004080 milk Anatomy 0.000 claims abstract 2
- 235000013336 milk Nutrition 0.000 claims abstract 2
- 229910000831 Steel Inorganic materials 0.000 claims description 8
- 239000010959 steel Substances 0.000 claims description 8
- 239000000203 mixture Substances 0.000 claims description 2
- 230000035882 stress Effects 0.000 description 6
- 230000002929 anti-fatigue Effects 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 239000012141 concentrate Substances 0.000 description 1
- 230000008602 contraction Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000009429 distress Effects 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 230000035772 mutation Effects 0.000 description 1
- 238000009527 percussion Methods 0.000 description 1
- 238000010248 power generation Methods 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 239000002002 slurry Substances 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/42—Foundations for poles, masts or chimneys
- E02D27/425—Foundations for poles, masts or chimneys specially adapted for wind motors masts
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D37/00—Repair of damaged foundations or foundation structures
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/003—Injection of material
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0004—Synthetics
- E02D2300/0018—Cement used as binder
- E02D2300/002—Concrete
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0026—Metals
- E02D2300/0029—Steel; Iron
Abstract
The present invention provides a kind of for reinforcing the conversion method for supporting of blower foundation connection, when can be used for being completed the reinforcing for the item base ring Joint failure that puts into operation to basis connection setting conversion support, several grout holes are drilled through in the two sides that foundation ring is located at concrete stub inner part first, the grout hole is made to lead to foundation ring slit region;Then foundation ring slit region and grout hole is made to be stuffed entirely with full high-strength grouting material the pressure grouting of foundation ring slit region by grout hole;Then several vertical drillings are arranged on the outside of foundation ring, vertical foot of hole is drilled into foundation ring;Then the arrangement conversion support in vertical drilling, and the gap constructed between vertical drilling and conversion support is in the milk;Finally, arranging vertical bar planting in the top surface of concrete stub and increasing concrete.
Description
Technical field
The invention belongs to generation power foundation of wind power technical field of structures, and in particular to one kind is for reinforcing blower foundation connection
Conversion method for supporting.
Background technique
It is connect with bottom reinforcement bars concrete foundation currently, single tube is wind power generation stepped frequently with pre- in reinforced concrete foundation
Foundation ring, top tower and foundation ring is buried to realize by flanged joint.However, since foundation ring length of embedment is shallow, and be non-pre-
Stress structure connects top tower using foundation ring and base foundation has the following deficiencies: that the existing reinforcing bar of basic ring region has again
Foundation ring is reinforced, and following region only has reinforcing bar, causes to generate because of concrete hardening contraction and stress because of strength and stiffness mutation
Crack concentrates between foundation ring and bottom plate, and fracture width increases;Foundation ring isolates inside and outside concrete, due to steel and concrete
Two kinds of material property differences, thermal expansion coefficient is different, deformation cannot be coordinated, and temperature action, load work, frost heave action etc. make basis
The gap of ring and concrete is continuously increased, and deteriorates the anchorage effect of the two;Under blower reciprocating fatigue load action, foundation ring connection
Region distress in concrete, gap are continuously increased development, and then foundation ring is made to vibrate, rock in base concrete, generate to mixed
Coagulate the percussion of soil.
Basis connects the existing stress defect project problems that cause to have put into operation and gradually breaks out, and seriously affects the fortune of blower
Row quality and operational safety.
Summary of the invention
The purpose of the present invention is to provide a kind of for reinforcing the conversion method for supporting of blower foundation connection, can be used for
Build up the reinforcing for the item base ring Joint failure that puts into operation.
Proposed by the present invention a kind of for reinforcing the conversion method for supporting of blower foundation connection, the conversion method for supporting is logical
The realization of conversion support component is crossed, the conversion support component is by foundation ring 1, concrete stub 2, foundation ring slit region 3 and conversion
4 composition of support, the foundation ring 1 are inserted into concrete stub 2, and basic circumferential weld is equipped between the foundation ring 1 and concrete stub 2
Gap area 3;When connecting setting conversion support 4 to basis, the specific steps are as follows:
(1) several grout holes 5 are drilled through in the two sides that foundation ring 1 is located at 2 inner part of concrete stub, makes the grout hole 5
Lead to foundation ring slit region 3;
(2) fill out foundation ring slit region 3 and grout hole 5 all 3 pressure grouting of foundation ring slit region by grout hole 5
Full of high-strength grouting material;
(3) several vertical drillings 6 are arranged on the outside of foundation ring 1, vertical 6 bottoms that drill are drilled into foundation ring 1;Then perpendicular
The arrangement conversion support 4 into drilling 6, and the gap grouting 7 between vertical drilling 6 and conversion support 4 of constructing;Under conversion support 4
End holds out against foundation ring 1, so that foundation ring 1 is largely forced through conversion support 4 and is transferred to 2 top Elevated section concrete 9 of stub,
The stress for reducing 1 bottom of foundation ring is concentrated, and the bearing capacity and anti-fatigue performance of concrete are improved;
(4) vertical bar planting 8 is arranged in the top surface of concrete stub 2 and increase concrete 9.
In the present invention, the conversion support 4 is made of steel member 10 and the end plate 11 being welded at the top of steel member, end plate 11
Expose 2 certain altitude of concrete stub, is anchored in and increases in concrete 9.
The beneficial effects of the present invention are:
1. proposed by the present invention a kind of for reinforcing the conversion method for supporting of blower foundation connection, structure is simple, stress is closed
Reason can be used for being completed the reinforcing for the item base ring Joint failure that puts into operation.
2. when setting conversion support, making foundation ring largely be forced through conversion support and being transferred to Elevated section at the top of stub
Concrete, the stress for reducing foundation ring bottom are concentrated, and the bearing capacity and anti-fatigue performance of concrete are improved.
3. the present invention is for being completed the reinforcing for the item base ring Joint failure that puts into operation, ring beam is thickeied in conjunction with top and is arranged
It applies, the buried depth of foundation ring can be increased, improve concrete to the binding effect of foundation ring, and do not destroy original structure.
4. operation of the present invention is convenient, easy for construction.
Detailed description of the invention
Fig. 1 is that basis of the present invention connects main view.
Fig. 2 is the main view that the present invention applies.
Fig. 3 is the top view that the present invention applies.
Figure label: 1 it is basic ring, 2 is concrete stub, 3 is basic ring slit region, 4 is to convert support, 5 as grouting
Hole, 6 for vertical drilling, 7 be gap grouting, 8 be vertical bar planting, 9 for increase concrete, 10 be steel member, 11 be end plate.
Specific embodiment
The present invention is further illustrated below by embodiment combination attached drawing.
Embodiment 1:
As shown in Figure 1, between foundation ring 1 and concrete stub 2, generating foundation ring gap area when basic Joint failure
3。
When the present invention is applied to reinforce blower foundation connection, it is located at the two of 2 inner part of concrete stub in foundation ring 1 first
Sidetracking takes several grout holes 5, and the grout hole 5 is made to lead to foundation ring slit region 3;Then by grout hole 5 to foundation ring gap
3 pressure grouting of area makes foundation ring slit region 3 and grout hole 5 be stuffed entirely with full high-strength grouting material;Then the cloth on the outside of foundation ring
Several vertical drillings 6 are set, vertical 6 bottoms that drill are drilled into foundation ring 1;Then the arrangement conversion support 4 in vertical drilling 6, and
Gap grouting 7 between the vertical drilling 6 of construction and conversion support 4;Finally, arranging vertical bar planting 8 in the top surface of concrete stub 2
And increase concrete 9.The conversion support 4 is made of steel member 10 and the end plate 11 being welded at the top of steel member, and end plate 11 reveals
2 certain altitude of concrete stub out is anchored in and increases in concrete 9.
Implementation steps are as follows:
(1) 1 liang of sidetracking grout hole 5 of foundation ring, injection pressure water or pressure-air cleaning and dry-basis in two sides grout hole 5
The foundation ring gap area 3 of 1 two sides of ring;
(2) foundation ring gap area 3 is filled along grout hole 5 with slip casing by pressure material;
(3) several vertical drillings 6 are arranged on the outside of foundation ring, vertical 6 bottoms that drill are drilled into foundation ring 1;
(4) the arrangement conversion support 4 in vertical drilling 6, and the gap constructed between vertical drilling 6 and conversion support 4 fills
Slurry 7;
(5) vertical bar planting 8 is arranged in the top surface of concrete stub 2 and increase concrete 9.
Claims (2)
1. a kind of for reinforcing the conversion method for supporting of blower foundation connection, it is characterised in that the conversion method for supporting is by turning
Support component realization is changed, the conversion support component is by foundation ring (1), concrete stub (2), foundation ring slit region (3) and turns
Support (4) composition is changed, the foundation ring (1) is inserted into concrete stub (2), between the foundation ring (1) and concrete stub (2)
Equipped with foundation ring slit region (3);When connecting setting conversion support (4) to basis, the specific steps are as follows:
(1) several grout holes (5) are drilled through in the two sides that foundation ring (1) is located at concrete stub (2) inner part, makes the grout hole
(5) lead to foundation ring slit region (3);
(2) keep foundation ring slit region (3) and grout hole (5) full foundation ring slit region (3) pressure grouting by grout hole (5)
Fill full high-strength grouting material in portion;
(3) several vertical drillings (6) of arrangement on the outside of foundation ring (1), vertical (6) bottom that drills are drilled into foundation ring (1);Then
The arrangement conversion support (4) in vertically drilling (6), and the gap constructed between vertical drilling (6) and conversion support (4) is in the milk
(7);Conversion support (4) lower end holds out against foundation ring (1), so that foundation ring (1) is largely forced through conversion support (4) and is transferred to column
Elevated section concrete (9) at the top of pier (2), the stress for reducing foundation ring (1) bottom are concentrated, and are improved the bearing capacity of concrete and are resisted
Fatigue behaviour;
(4) vertical bar planting (8) is arranged in the top surface of concrete stub (2) and increase concrete (9).
2. according to claim 1 a kind of for reinforcing the conversion method for supporting of blower foundation connection, it is characterised in that institute
It states conversion support (4) to be made of steel member (10) and the end plate (11) being welded at the top of steel member, end plate (11) exposes concrete
Stub (2) certain altitude, is anchored in and increases in concrete (9).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710650040.4A CN107366298B (en) | 2017-08-02 | 2017-08-02 | A kind of conversion method for supporting connected for reinforcing blower foundation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710650040.4A CN107366298B (en) | 2017-08-02 | 2017-08-02 | A kind of conversion method for supporting connected for reinforcing blower foundation |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107366298A CN107366298A (en) | 2017-11-21 |
CN107366298B true CN107366298B (en) | 2019-04-12 |
Family
ID=60309317
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710650040.4A Expired - Fee Related CN107366298B (en) | 2017-08-02 | 2017-08-02 | A kind of conversion method for supporting connected for reinforcing blower foundation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107366298B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110241777A (en) * | 2019-04-18 | 2019-09-17 | 天津津港基础设施养护运营工程管理有限公司 | The repairing and reinforcement structure of one plants case cylinder breakwater |
CN110700334B (en) * | 2019-09-25 | 2021-04-27 | 江苏筑岩建设有限公司 | Rapid repairing method for fan foundation |
CN113026796B (en) * | 2021-03-17 | 2023-12-15 | 上海久坚加固科技股份有限公司 | Wind power generation tower foundation ring foundation reinforcing structure and method |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2009035884A (en) * | 2007-07-31 | 2009-02-19 | Tokyo Electric Power Co Inc:The | Lift-up method for steel tower |
CN202500373U (en) * | 2011-12-13 | 2012-10-24 | 河南省电力勘测设计院 | Annular rod column base joint reinforcement mechanism |
CN202787296U (en) * | 2012-03-27 | 2013-03-13 | 辽宁电力勘测设计院 | Foundation structure of anchor pole blower fan |
CN204690778U (en) * | 2015-04-30 | 2015-10-07 | 湖南科技大学 | A kind of foundation ring of wind generating set of stressed good overturn-preventing |
CN105888356A (en) * | 2016-05-11 | 2016-08-24 | 成都市东方电力线路构件厂 | Iron tower with foundation structure reinforced |
CN106193141B (en) * | 2016-07-20 | 2018-08-10 | 天津大学 | A kind of impaired pier footing method for reinforcing of earthquake |
-
2017
- 2017-08-02 CN CN201710650040.4A patent/CN107366298B/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN107366298A (en) | 2017-11-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107366298B (en) | A kind of conversion method for supporting connected for reinforcing blower foundation | |
CN100567659C (en) | The base configuration of iron tower | |
CN206396816U (en) | A kind of blower foundation various dimensions ruggedized construction | |
CN102864943B (en) | Shock isolating pedestal brick is mixed fixing structure and installs support and change method | |
CN107100192A (en) | A kind of foundation ring of wind generating set local stiffening device and reinforcement means | |
CN104727318A (en) | Foundation ditch composite concrete nail supporting structure and method | |
CN107288138B (en) | The control structure and construction method of the rock side slope containing weak intercalated layer | |
CN108643602A (en) | A kind of outsourcing anchor steel ruggedized construction suitable for concrete beam and column node | |
CN105736017A (en) | Asymmetric unit forwardly-reversely arranged arch structure for primary supporting of tunnel | |
CN204626396U (en) | A kind of foundation ditch composite soil nailed wall | |
CN109944269B (en) | Anti-freeze drawing device and construction method thereof | |
CN205444968U (en) | Bar planting anchor structure | |
CN105040726B (en) | A kind of method for applying ring orientation prestress is connected to blower foundation ring | |
CN105317381A (en) | Drill bit for constructing cast-in-situ bored pile and hole forming method using same | |
CN205688834U (en) | A kind of reinforced concrete frame column add-story reconstruction structure | |
CN104372793A (en) | Anti-floating method used for existing basement by adopting pre-stressed anchor cables in jet grouting pile method | |
CN207277360U (en) | A kind of conversion support component for being used to reinforce blower foundation connection | |
CN209323531U (en) | A kind of double-row type foundation pit supporting construction | |
CN207794067U (en) | Compound mini pile is perfused in concrete filled steel tube borehole | |
CN206942196U (en) | The structure of attached assembling type node power consumption frame strengthening outside a kind of existing framework | |
CN207092118U (en) | A kind of top carries the caisson composite foundation of oblique anchor pole | |
CN102286971A (en) | Concrete-filled steel tube core column socketed pile | |
CN101349059A (en) | New technique of long screw driller for press pouring reinforced concrete | |
CN208472721U (en) | A kind of anchor pole constructed in loose media stratum using hand air drill | |
CN110593922B (en) | Construction method for reinforcing roadway roof by embedded FRP (fiber reinforced Plastic) reinforcements |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190412 |
|
CF01 | Termination of patent right due to non-payment of annual fee |