CN107366298B - A kind of conversion method for supporting connected for reinforcing blower foundation - Google Patents

A kind of conversion method for supporting connected for reinforcing blower foundation Download PDF

Info

Publication number
CN107366298B
CN107366298B CN201710650040.4A CN201710650040A CN107366298B CN 107366298 B CN107366298 B CN 107366298B CN 201710650040 A CN201710650040 A CN 201710650040A CN 107366298 B CN107366298 B CN 107366298B
Authority
CN
China
Prior art keywords
foundation ring
concrete
foundation
slit region
conversion support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201710650040.4A
Other languages
Chinese (zh)
Other versions
CN107366298A (en
Inventor
冯又全
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Fengchang Civil Engineering Technology Co Ltd
Original Assignee
Shanghai Fengchang Civil Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Fengchang Civil Engineering Technology Co Ltd filed Critical Shanghai Fengchang Civil Engineering Technology Co Ltd
Priority to CN201710650040.4A priority Critical patent/CN107366298B/en
Publication of CN107366298A publication Critical patent/CN107366298A/en
Application granted granted Critical
Publication of CN107366298B publication Critical patent/CN107366298B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • E02D27/425Foundations for poles, masts or chimneys specially adapted for wind motors masts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D37/00Repair of damaged foundations or foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/003Injection of material
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/002Concrete
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron

Abstract

The present invention provides a kind of for reinforcing the conversion method for supporting of blower foundation connection, when can be used for being completed the reinforcing for the item base ring Joint failure that puts into operation to basis connection setting conversion support, several grout holes are drilled through in the two sides that foundation ring is located at concrete stub inner part first, the grout hole is made to lead to foundation ring slit region;Then foundation ring slit region and grout hole is made to be stuffed entirely with full high-strength grouting material the pressure grouting of foundation ring slit region by grout hole;Then several vertical drillings are arranged on the outside of foundation ring, vertical foot of hole is drilled into foundation ring;Then the arrangement conversion support in vertical drilling, and the gap constructed between vertical drilling and conversion support is in the milk;Finally, arranging vertical bar planting in the top surface of concrete stub and increasing concrete.

Description

A kind of conversion method for supporting connected for reinforcing blower foundation
Technical field
The invention belongs to generation power foundation of wind power technical field of structures, and in particular to one kind is for reinforcing blower foundation connection Conversion method for supporting.
Background technique
It is connect with bottom reinforcement bars concrete foundation currently, single tube is wind power generation stepped frequently with pre- in reinforced concrete foundation Foundation ring, top tower and foundation ring is buried to realize by flanged joint.However, since foundation ring length of embedment is shallow, and be non-pre- Stress structure connects top tower using foundation ring and base foundation has the following deficiencies: that the existing reinforcing bar of basic ring region has again Foundation ring is reinforced, and following region only has reinforcing bar, causes to generate because of concrete hardening contraction and stress because of strength and stiffness mutation Crack concentrates between foundation ring and bottom plate, and fracture width increases;Foundation ring isolates inside and outside concrete, due to steel and concrete Two kinds of material property differences, thermal expansion coefficient is different, deformation cannot be coordinated, and temperature action, load work, frost heave action etc. make basis The gap of ring and concrete is continuously increased, and deteriorates the anchorage effect of the two;Under blower reciprocating fatigue load action, foundation ring connection Region distress in concrete, gap are continuously increased development, and then foundation ring is made to vibrate, rock in base concrete, generate to mixed Coagulate the percussion of soil.
Basis connects the existing stress defect project problems that cause to have put into operation and gradually breaks out, and seriously affects the fortune of blower Row quality and operational safety.
Summary of the invention
The purpose of the present invention is to provide a kind of for reinforcing the conversion method for supporting of blower foundation connection, can be used for Build up the reinforcing for the item base ring Joint failure that puts into operation.
Proposed by the present invention a kind of for reinforcing the conversion method for supporting of blower foundation connection, the conversion method for supporting is logical The realization of conversion support component is crossed, the conversion support component is by foundation ring 1, concrete stub 2, foundation ring slit region 3 and conversion 4 composition of support, the foundation ring 1 are inserted into concrete stub 2, and basic circumferential weld is equipped between the foundation ring 1 and concrete stub 2 Gap area 3;When connecting setting conversion support 4 to basis, the specific steps are as follows:
(1) several grout holes 5 are drilled through in the two sides that foundation ring 1 is located at 2 inner part of concrete stub, makes the grout hole 5 Lead to foundation ring slit region 3;
(2) fill out foundation ring slit region 3 and grout hole 5 all 3 pressure grouting of foundation ring slit region by grout hole 5 Full of high-strength grouting material;
(3) several vertical drillings 6 are arranged on the outside of foundation ring 1, vertical 6 bottoms that drill are drilled into foundation ring 1;Then perpendicular The arrangement conversion support 4 into drilling 6, and the gap grouting 7 between vertical drilling 6 and conversion support 4 of constructing;Under conversion support 4 End holds out against foundation ring 1, so that foundation ring 1 is largely forced through conversion support 4 and is transferred to 2 top Elevated section concrete 9 of stub, The stress for reducing 1 bottom of foundation ring is concentrated, and the bearing capacity and anti-fatigue performance of concrete are improved;
(4) vertical bar planting 8 is arranged in the top surface of concrete stub 2 and increase concrete 9.
In the present invention, the conversion support 4 is made of steel member 10 and the end plate 11 being welded at the top of steel member, end plate 11 Expose 2 certain altitude of concrete stub, is anchored in and increases in concrete 9.
The beneficial effects of the present invention are:
1. proposed by the present invention a kind of for reinforcing the conversion method for supporting of blower foundation connection, structure is simple, stress is closed Reason can be used for being completed the reinforcing for the item base ring Joint failure that puts into operation.
2. when setting conversion support, making foundation ring largely be forced through conversion support and being transferred to Elevated section at the top of stub Concrete, the stress for reducing foundation ring bottom are concentrated, and the bearing capacity and anti-fatigue performance of concrete are improved.
3. the present invention is for being completed the reinforcing for the item base ring Joint failure that puts into operation, ring beam is thickeied in conjunction with top and is arranged It applies, the buried depth of foundation ring can be increased, improve concrete to the binding effect of foundation ring, and do not destroy original structure.
4. operation of the present invention is convenient, easy for construction.
Detailed description of the invention
Fig. 1 is that basis of the present invention connects main view.
Fig. 2 is the main view that the present invention applies.
Fig. 3 is the top view that the present invention applies.
Figure label: 1 it is basic ring, 2 is concrete stub, 3 is basic ring slit region, 4 is to convert support, 5 as grouting Hole, 6 for vertical drilling, 7 be gap grouting, 8 be vertical bar planting, 9 for increase concrete, 10 be steel member, 11 be end plate.
Specific embodiment
The present invention is further illustrated below by embodiment combination attached drawing.
Embodiment 1:
As shown in Figure 1, between foundation ring 1 and concrete stub 2, generating foundation ring gap area when basic Joint failure 3。
When the present invention is applied to reinforce blower foundation connection, it is located at the two of 2 inner part of concrete stub in foundation ring 1 first Sidetracking takes several grout holes 5, and the grout hole 5 is made to lead to foundation ring slit region 3;Then by grout hole 5 to foundation ring gap 3 pressure grouting of area makes foundation ring slit region 3 and grout hole 5 be stuffed entirely with full high-strength grouting material;Then the cloth on the outside of foundation ring Several vertical drillings 6 are set, vertical 6 bottoms that drill are drilled into foundation ring 1;Then the arrangement conversion support 4 in vertical drilling 6, and Gap grouting 7 between the vertical drilling 6 of construction and conversion support 4;Finally, arranging vertical bar planting 8 in the top surface of concrete stub 2 And increase concrete 9.The conversion support 4 is made of steel member 10 and the end plate 11 being welded at the top of steel member, and end plate 11 reveals 2 certain altitude of concrete stub out is anchored in and increases in concrete 9.
Implementation steps are as follows:
(1) 1 liang of sidetracking grout hole 5 of foundation ring, injection pressure water or pressure-air cleaning and dry-basis in two sides grout hole 5 The foundation ring gap area 3 of 1 two sides of ring;
(2) foundation ring gap area 3 is filled along grout hole 5 with slip casing by pressure material;
(3) several vertical drillings 6 are arranged on the outside of foundation ring, vertical 6 bottoms that drill are drilled into foundation ring 1;
(4) the arrangement conversion support 4 in vertical drilling 6, and the gap constructed between vertical drilling 6 and conversion support 4 fills Slurry 7;
(5) vertical bar planting 8 is arranged in the top surface of concrete stub 2 and increase concrete 9.

Claims (2)

1. a kind of for reinforcing the conversion method for supporting of blower foundation connection, it is characterised in that the conversion method for supporting is by turning Support component realization is changed, the conversion support component is by foundation ring (1), concrete stub (2), foundation ring slit region (3) and turns Support (4) composition is changed, the foundation ring (1) is inserted into concrete stub (2), between the foundation ring (1) and concrete stub (2) Equipped with foundation ring slit region (3);When connecting setting conversion support (4) to basis, the specific steps are as follows:
(1) several grout holes (5) are drilled through in the two sides that foundation ring (1) is located at concrete stub (2) inner part, makes the grout hole (5) lead to foundation ring slit region (3);
(2) keep foundation ring slit region (3) and grout hole (5) full foundation ring slit region (3) pressure grouting by grout hole (5) Fill full high-strength grouting material in portion;
(3) several vertical drillings (6) of arrangement on the outside of foundation ring (1), vertical (6) bottom that drills are drilled into foundation ring (1);Then The arrangement conversion support (4) in vertically drilling (6), and the gap constructed between vertical drilling (6) and conversion support (4) is in the milk (7);Conversion support (4) lower end holds out against foundation ring (1), so that foundation ring (1) is largely forced through conversion support (4) and is transferred to column Elevated section concrete (9) at the top of pier (2), the stress for reducing foundation ring (1) bottom are concentrated, and are improved the bearing capacity of concrete and are resisted Fatigue behaviour;
(4) vertical bar planting (8) is arranged in the top surface of concrete stub (2) and increase concrete (9).
2. according to claim 1 a kind of for reinforcing the conversion method for supporting of blower foundation connection, it is characterised in that institute It states conversion support (4) to be made of steel member (10) and the end plate (11) being welded at the top of steel member, end plate (11) exposes concrete Stub (2) certain altitude, is anchored in and increases in concrete (9).
CN201710650040.4A 2017-08-02 2017-08-02 A kind of conversion method for supporting connected for reinforcing blower foundation Expired - Fee Related CN107366298B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710650040.4A CN107366298B (en) 2017-08-02 2017-08-02 A kind of conversion method for supporting connected for reinforcing blower foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710650040.4A CN107366298B (en) 2017-08-02 2017-08-02 A kind of conversion method for supporting connected for reinforcing blower foundation

Publications (2)

Publication Number Publication Date
CN107366298A CN107366298A (en) 2017-11-21
CN107366298B true CN107366298B (en) 2019-04-12

Family

ID=60309317

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710650040.4A Expired - Fee Related CN107366298B (en) 2017-08-02 2017-08-02 A kind of conversion method for supporting connected for reinforcing blower foundation

Country Status (1)

Country Link
CN (1) CN107366298B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110241777A (en) * 2019-04-18 2019-09-17 天津津港基础设施养护运营工程管理有限公司 The repairing and reinforcement structure of one plants case cylinder breakwater
CN110700334B (en) * 2019-09-25 2021-04-27 江苏筑岩建设有限公司 Rapid repairing method for fan foundation
CN113026796B (en) * 2021-03-17 2023-12-15 上海久坚加固科技股份有限公司 Wind power generation tower foundation ring foundation reinforcing structure and method

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009035884A (en) * 2007-07-31 2009-02-19 Tokyo Electric Power Co Inc:The Lift-up method for steel tower
CN202500373U (en) * 2011-12-13 2012-10-24 河南省电力勘测设计院 Annular rod column base joint reinforcement mechanism
CN202787296U (en) * 2012-03-27 2013-03-13 辽宁电力勘测设计院 Foundation structure of anchor pole blower fan
CN204690778U (en) * 2015-04-30 2015-10-07 湖南科技大学 A kind of foundation ring of wind generating set of stressed good overturn-preventing
CN105888356A (en) * 2016-05-11 2016-08-24 成都市东方电力线路构件厂 Iron tower with foundation structure reinforced
CN106193141B (en) * 2016-07-20 2018-08-10 天津大学 A kind of impaired pier footing method for reinforcing of earthquake

Also Published As

Publication number Publication date
CN107366298A (en) 2017-11-21

Similar Documents

Publication Publication Date Title
CN107366298B (en) A kind of conversion method for supporting connected for reinforcing blower foundation
CN100567659C (en) The base configuration of iron tower
CN206396816U (en) A kind of blower foundation various dimensions ruggedized construction
CN102864943B (en) Shock isolating pedestal brick is mixed fixing structure and installs support and change method
CN107100192A (en) A kind of foundation ring of wind generating set local stiffening device and reinforcement means
CN104727318A (en) Foundation ditch composite concrete nail supporting structure and method
CN107288138B (en) The control structure and construction method of the rock side slope containing weak intercalated layer
CN108643602A (en) A kind of outsourcing anchor steel ruggedized construction suitable for concrete beam and column node
CN105736017A (en) Asymmetric unit forwardly-reversely arranged arch structure for primary supporting of tunnel
CN204626396U (en) A kind of foundation ditch composite soil nailed wall
CN109944269B (en) Anti-freeze drawing device and construction method thereof
CN205444968U (en) Bar planting anchor structure
CN105040726B (en) A kind of method for applying ring orientation prestress is connected to blower foundation ring
CN105317381A (en) Drill bit for constructing cast-in-situ bored pile and hole forming method using same
CN205688834U (en) A kind of reinforced concrete frame column add-story reconstruction structure
CN104372793A (en) Anti-floating method used for existing basement by adopting pre-stressed anchor cables in jet grouting pile method
CN207277360U (en) A kind of conversion support component for being used to reinforce blower foundation connection
CN209323531U (en) A kind of double-row type foundation pit supporting construction
CN207794067U (en) Compound mini pile is perfused in concrete filled steel tube borehole
CN206942196U (en) The structure of attached assembling type node power consumption frame strengthening outside a kind of existing framework
CN207092118U (en) A kind of top carries the caisson composite foundation of oblique anchor pole
CN102286971A (en) Concrete-filled steel tube core column socketed pile
CN101349059A (en) New technique of long screw driller for press pouring reinforced concrete
CN208472721U (en) A kind of anchor pole constructed in loose media stratum using hand air drill
CN110593922B (en) Construction method for reinforcing roadway roof by embedded FRP (fiber reinforced Plastic) reinforcements

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190412

CF01 Termination of patent right due to non-payment of annual fee