CN204252023U - Installation mold assisted by a kind of bearing - Google Patents
Installation mold assisted by a kind of bearing Download PDFInfo
- Publication number
- CN204252023U CN204252023U CN201420698773.7U CN201420698773U CN204252023U CN 204252023 U CN204252023 U CN 204252023U CN 201420698773 U CN201420698773 U CN 201420698773U CN 204252023 U CN204252023 U CN 204252023U
- Authority
- CN
- China
- Prior art keywords
- bolt
- bearing
- installation mold
- die plate
- auxiliary die
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
Installation mold assisted by a kind of bearing.It comprises auxiliary die plate, polylith timber wedge, multiple anchor bolt, many built-in pipes and multiple bolt sleeve; Many built-in pipes are vertically set on the inside, top of pier stud removably apart, for the formation of prepared screw-bolt hole; A bolt sleeve is installed in each prepared screw-bolt hole; Auxiliary die plate is horizontally set on the top of multiple prepared screw-bolt hole, it is formed with multiple bolt positioning hole; Polylith timber wedge is apart arranged between the end face of pier stud and the bottom surface of auxiliary die plate; The lower end of each anchor bolt is connected to bolt sleeve inside through bolt positioning hole rear thread.Whether the utility model solves bearing and installs to put in place and to contact whether closely connected void-free problem with pinner.This auxiliary installation mold lighter in weight in practice of construction, the plan-position of convenient adjustment bolt and elevation, and this auxiliary installation mold is simple for production, easy accessibility, and mounting method is easily understood and is conducive to site operation use.
Description
Technical field
The utility model belongs to bridge construction technical field of auxiliary equipment, particularly relates to a kind of bearing and assists installation mold.
Technical background
Bridge pad is the load transfer device being arranged on bridge span structure and bridge pier or abutment supporting place, it is the middle tie vehicular load on top and structural load being delivered to infrastructure, and should ensure that bridge span structure can produce certain displacement, therefore bearing will have more rational mode of transfer force, to make power transmission clear and coherent, the excessive stress of unlikely generation is concentrated.Correctness installed by bearing has direct impact to the force-bearing situation of bearing and application life, and its degree of reliability directly will affect degree of safety and the durability of bridge construction.If out-of-flatness laid by bearing or not closely connected between bearing and pinner, just likely cause bearing partial pressing, therefore in live loading undersetting just likely stress concentrations and being damaged.Once bearing destroys, change difficulty, and expense is high.Therefore, except guaranteeing bearing quality and meeting the technical standards, correct construction and installation is bearing application success whether key point.But still lack the special equipment that bearing is installed at present.
Summary of the invention
In order to solve the problem, the purpose of this utility model is to provide a kind of and makes simple and easy, easy to use, and installation mold assisted by the high bearing of precision.
In order to achieve the above object, the bearing that the utility model provides assists installation mold to comprise auxiliary die plate, polylith timber wedge, multiple anchor bolt, many built-in pipes and multiple bolt sleeve; Wherein to be vertically set on the top of pier stud removably apart inner for many built-in pipes, for the formation of prepared screw-bolt hole; A bolt sleeve is installed in each prepared screw-bolt hole; Auxiliary die plate is horizontally set on the top of multiple prepared screw-bolt hole, and it is formed with multiple bolt positioning hole corresponding with multiple bolt sleeve position respectively; Polylith timber wedge is apart arranged between the end face of pier stud and the bottom surface of auxiliary die plate; The lower end of each anchor bolt is connected to the inside of a bolt sleeve from the top down through a bolt positioning hole rear thread.
The height of described timber wedge is identical with the thickness of bearing pad stone, and has plurality of specifications.
Described auxiliary die plate is made up of one block of steel plate measure-alike with the lower support plate on bearing, and has plurality of specifications.
Described built-in pipe is pvc pipe.
Whether the bearing that the utility model provides is assisted installation mold to solve bearing and is installed to put in place and to contact whether closely connected void-free problem with pinner.This auxiliary installation mold lighter in weight in practice of construction, and the plan-position of convenient adjustment bolt and elevation.This bearing assists installation mold simple for production, easy accessibility, and mounting method is easily understood, and is conducive to site operation and uses.
Accompanying drawing explanation
Fig. 1 assists installation mold plan view for the bearing that the utility model provides.
Fig. 2 assists installation mold using state elevation for the bearing that the utility model provides.
Detailed description of the invention
Installation mold is assisted to be described in detail below in conjunction with the drawings and specific embodiments to the bearing that the utility model provides.
Now be described for certain subway viaduct engineering: the bearing that this subway viaduct engineering adopts is pot rubber bearing, bearing model comprises 2000-GD, 2000-ZX-50mm, 2500-ZX-50mm, 3000-GD, 3000-ZX-100mm, 3000-ZX-50mm, 3500-GD etc. 24 kinds, totally 480.Bearing install whether put in place, it contacts whether closely connected tight with pinner, and whether prepared screw-bolt hole fills up tamping, all directly can affect the application life of bearing and the safety of bridge construction, will be very harmful to the safe operation of subway if there are quality problems.In order to ensure the installation quality of bearing, the bearing that this project selects the utility model to provide assists installation mold to carry out bearing installation, this installation mold lighter in weight, the plan-position of convenient adjustment bolt and elevation.After Bolt to position, pinner concreting and bearing are installed and are carried out simultaneously, both ensure that bearing installation site accurately in turn ensure that closely connected tight between pinner concrete and bearing.
As Figure 1-Figure 2, the bearing that the utility model provides assists installation mold to comprise auxiliary die plate 1, polylith timber wedge 3, multiple anchor bolt 4, many built-in pipes 5 and multiple bolt sleeve 8; Wherein to be vertically set on the top of pier stud 7 removably apart inner for many built-in pipes 5, for the formation of prepared screw-bolt hole 9; A bolt sleeve 8 is installed in each prepared screw-bolt hole 9; Auxiliary die plate 1 is horizontally set on the top of multiple prepared screw-bolt hole 9, and it is formed with multiple bolt positioning hole 2 corresponding with multiple bolt sleeve 8 position respectively; Polylith timber wedge 3 is arranged between the end face of pier stud 7 and the bottom surface of auxiliary die plate 1 apart; The lower end of each anchor bolt 4 is connected to the inside of a bolt sleeve 8 from the top down through bolt positioning hole 2 rear thread.
The height of described timber wedge 3 is identical with the thickness of bearing pad stone, and has plurality of specifications.
Described auxiliary die plate 1 is made up of one block of steel plate measure-alike with the lower support plate on bearing, and has plurality of specifications.
Described built-in pipe 5 is pvc pipe.
The construction method that the bearing now utilizing the utility model to provide assists installation mold to install bridge pad is described below:
1) before utilizing concreting pier stud 7, first accurately set many piece built-in pipes 5 at the position, top of pier stud 7 according to the relative position relation of multiple bolt sleeve 8 by staff, in this engineering, built-in pipe 5 is
pvc pipe, the pre-buried degree of depth is 50cm, and then concreting is to Dun Ding to make pier stud 7, extracts built-in pipe 5 after above-mentioned concrete initial set, forms multiple prepared screw-bolt hole 9 thus;
2) adopt total powerstation on the end face of pier stud 7, survey the center extension line coordinate setting out each anchor bolt 4 according to designing requirement, then the line of ink marker is used to be linked to be straight line on end face, check that whether the position of each prepared screw-bolt hole 9 is correct, water drilling is then adopted to carry out reaming, till meeting installation requirement as error is comparatively large;
3) adopt total powerstation to survey on the end face of pier stud 7 according to designing requirement and set out bearing pad stone four angular coordinate and bearing right-angled intersection position of center line, and adopt the line of ink marker on end face, eject the plan-position of bearing pad stone and bearing right-angled intersection center line, pinner corner location will mark clear, number and varnish with lacquer, more eye-catching like this and firmly, then measure pinner elevation with level gauge, select the timber wedge 3 of corresponding height afterwards according to pinner thickness;
4) auxiliary die plate 1 measure-alike with its lower support plate is selected according to bearing model, then bearing right-angled intersection center line 6 is accurately depicted at the surface line of ink marker of auxiliary die plate 1, again according to the perforate and form multiple bolt positioning hole 2 on auxiliary die plate 1 of the layout of multiple anchor bolt 4, then the lower end of multiple anchor bolt 4 is each passed through from the top down the inside that bolt positioning hole 2 rear thread is connected to a bolt sleeve 8, finally multiple bolt sleeve 8 is inserted in multiple prepared screw-bolt hole 9 simultaneously;
5) four pieces of timber wedges 3 are placed on respectively auxiliary die plate 1 below near the position of bearing right-angled intersection center line 6, then auxiliary die plate 1 is repeatedly moved, till making above-mentioned two bearing right-angled intersection center lines coincide with the upper and lower with reference to the bearing right-angled intersection position of center line on auxiliary die plate 1 upper bracket right-angled intersection center line 6 and pier stud 7 end face;
6) use level gauge to measure the end face absolute altitude of anchor bolt 4, repeatedly move timber wedge 3 till its end face absolute altitude reaches requirement;
7) in prepared screw-bolt hole 9, pour into a mould grouting agent from the side bolt sleeve 8 is fixed, after grouting agent final set, remove all anchor bolts 4, auxiliary die plate 1 and timber wedge 3, and anchor bolt 4 is inserted in the corresponding screw in the lower support plate of bearing to be installed;
8) dabbing process is carried out to the concrete of pinner placement on pier stud 7 end face, after digging out the new stubble of concrete, quarrel will be floated and remove clean, and then carry out pinner reinforcing bar binding, and make pinner template; Carry out pinner concreting afterwards and make pinner, before building, needing the upper end of bolt sleeve 8 to adopt non-woven fabrics to carry out shutoff, to avoid concrete to enter, more above-mentioned non-woven fabrics to be removed after building and by bolt sleeve 8 wiped clean;
9) crane gear is adopted bearing to be winched to the top face of pier stud 7, and slowly put down after the multiple anchor bolts 4 on it are aimed to corresponding bolt sleeve 8 multiple on Dun Ding respectively, until the lower end of anchor bolt 4 is inserted in bolt sleeve 8, tightens after anchor bolt 4 makes bearing slowly sink down into design elevation position and be fixed; Immediately bearing elevation of top surface and the corner discrepancy in elevation are tested, adjusted in time when error exceeds standard, until qualified; By pinner superelevation part concrete extrusion, can guarantee that rest base slurry is full closely knit, completes the installation process of whole bearing thus like this during settling of supports.
Claims (4)
1. an installation mold assisted by bearing, it is characterized in that: described bearing assists installation mold to comprise auxiliary die plate (1), polylith timber wedge (3), multiple anchor bolt (4), many built-in pipes (5) and multiple bolt sleeve (8); Wherein many built-in pipes (5) to be vertically set on the top of pier stud (7) removably apart inner, for the formation of prepared screw-bolt hole (9); A bolt sleeve (8) is installed in each prepared screw-bolt hole (9); Auxiliary die plate (1) is horizontally set on the top of multiple prepared screw-bolt hole (9), and it is formed with multiple bolt positioning hole (2) corresponding with multiple bolt sleeve (8) position respectively; Polylith timber wedge (3) is arranged between the end face of pier stud (7) and the bottom surface of auxiliary die plate (1) apart; The lower end of each anchor bolt (4) is connected to the inside of a bolt sleeve (8) from the top down through bolt positioning hole (2) rear thread.
2. installation mold assisted by bearing according to claim 1, it is characterized in that: the height of described timber wedge (3) is identical with the thickness of bearing pad stone, and has plurality of specifications.
3. installation mold assisted by bearing according to claim 1, it is characterized in that: described auxiliary die plate (1) is made up of one block of steel plate measure-alike with the lower support plate on bearing, and has plurality of specifications.
4. installation mold assisted by bearing according to claim 1, it is characterized in that: described built-in pipe (5) is pvc pipe.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420698773.7U CN204252023U (en) | 2014-11-19 | 2014-11-19 | Installation mold assisted by a kind of bearing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420698773.7U CN204252023U (en) | 2014-11-19 | 2014-11-19 | Installation mold assisted by a kind of bearing |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204252023U true CN204252023U (en) | 2015-04-08 |
Family
ID=52956348
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420698773.7U Expired - Fee Related CN204252023U (en) | 2014-11-19 | 2014-11-19 | Installation mold assisted by a kind of bearing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204252023U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104404882A (en) * | 2014-11-19 | 2015-03-11 | 中铁六局集团有限公司 | Assistant mounting die for support and construction method thereof |
CN104846749A (en) * | 2015-06-06 | 2015-08-19 | 中铁三局集团有限公司 | Anchor bolt hole support for pier caps |
CN106931283A (en) * | 2015-12-31 | 2017-07-07 | 中机国际工程设计研究院有限责任公司 | Production line assembles island installing and fixing method |
CN108277739A (en) * | 2018-04-20 | 2018-07-13 | 镇江市建成电器有限公司 | A kind of quake-resistant safety type spherical shape crane span structure bearing |
-
2014
- 2014-11-19 CN CN201420698773.7U patent/CN204252023U/en not_active Expired - Fee Related
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104404882A (en) * | 2014-11-19 | 2015-03-11 | 中铁六局集团有限公司 | Assistant mounting die for support and construction method thereof |
CN104404882B (en) * | 2014-11-19 | 2016-06-22 | 中铁六局集团有限公司 | A kind of bearing auxiliary installation mold and construction method thereof |
CN104846749A (en) * | 2015-06-06 | 2015-08-19 | 中铁三局集团有限公司 | Anchor bolt hole support for pier caps |
CN104846749B (en) * | 2015-06-06 | 2016-05-11 | 中铁三局集团有限公司 | Pier cap anchor hole support |
CN106931283A (en) * | 2015-12-31 | 2017-07-07 | 中机国际工程设计研究院有限责任公司 | Production line assembles island installing and fixing method |
CN108277739A (en) * | 2018-04-20 | 2018-07-13 | 镇江市建成电器有限公司 | A kind of quake-resistant safety type spherical shape crane span structure bearing |
CN108277739B (en) * | 2018-04-20 | 2023-09-12 | 镇江市建成电器有限公司 | Anti-seismic safe spherical bridge support |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104404882B (en) | A kind of bearing auxiliary installation mold and construction method thereof | |
CN204252023U (en) | Installation mold assisted by a kind of bearing | |
CN103757993B (en) | High-speed railway subgrade sedimentation repair system and method | |
CN108130833B (en) | Deviation rectifying method for settlement and deviation ballastless track | |
CN108104825B (en) | A kind of shield tunnel tunnel bottom backfills assembly construction method | |
CN113802424B (en) | Sedimentation bag type grouting lifting repair method for ballastless track of high-speed railway | |
CN204385634U (en) | Railway is not stopped transport the overall jacking mechanism of cross-line box culvert | |
CN201826437U (en) | Structure for accurately embedding column pin bolts for steel structures | |
CN205012173U (en) | Ballastless track lifting deviation correcting device and system | |
CN102677569A (en) | Positioning support for dowel bars at concrete pavement joints | |
CN202117341U (en) | Template for embedding foundation bolts of steel structures of buildings | |
CN103469732B (en) | Construction method of preformed holes for foundation bolts of bridge support | |
CN107060876B (en) | Steel pipe concrete pier column gob-side entry retaining active supporting structure and construction method thereof | |
CN104047305A (en) | Fast repairing method of house sinking | |
CN204530501U (en) | The support bearing of arc rib alignment is controlled during a kind of constructability | |
CN202626787U (en) | Concrete pavement joint dowel bar positioning bracket | |
CN115058977A (en) | Construction method for prefabricated pier stud of urban bridge | |
CN206581595U (en) | A kind of big plate erecting device of new concrete | |
CN204151670U (en) | Pressure-adjusting type bridge bearing pad | |
CN203594264U (en) | Clamp special for angle steel iron tower rectification and tool for angle steel iron tower rectification | |
CN203603264U (en) | Externally-wrapped pillar base | |
CN204530479U (en) | The interim counter-force bracing or strutting arrangement of a kind of bridge jacking | |
CN102943484B (en) | Tapered-iron pulp-bedding rapid leveling method for large-size and middle-size equipment installation | |
CN202337949U (en) | Bridge jacking device | |
CN203049390U (en) | Turnout track lifting support |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150408 Termination date: 20211119 |