CN203603264U - Externally-wrapped pillar base - Google Patents

Externally-wrapped pillar base Download PDF

Info

Publication number
CN203603264U
CN203603264U CN201320414455.9U CN201320414455U CN203603264U CN 203603264 U CN203603264 U CN 203603264U CN 201320414455 U CN201320414455 U CN 201320414455U CN 203603264 U CN203603264 U CN 203603264U
Authority
CN
China
Prior art keywords
pillar base
bottom plate
base plate
steel structure
bolts
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320414455.9U
Other languages
Chinese (zh)
Inventor
毛立贤
张林林
齐骥
臧永久
刘浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
China Construction Eighth Engineering Division Co Ltd Dalian Branch
Original Assignee
China Construction Eighth Engineering Division Co Ltd
China Construction Eighth Engineering Division Co Ltd Dalian Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd, China Construction Eighth Engineering Division Co Ltd Dalian Branch filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201320414455.9U priority Critical patent/CN203603264U/en
Application granted granted Critical
Publication of CN203603264U publication Critical patent/CN203603264U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model relates to the field of building, in particular to a pre-buried structure pre-buried with steel ribs of stiffness structure. An externally-wrapped pillar base comprises a steel structure pillar base bottom plate, wherein the steel structure pillar base bottom plate is fixedly connected with bolts, and two sides of the steel structure pillar base bottom plate on the bolts are respectively provided with elevation adjusting nuts and fixing nuts. The externally-wrapped pillar base is characterized in that the bolts are fixedly connected with a supporting frame, and the supporting frame is fixed on reinforcing steel bars under the bottom plate. The upper surface of the steel structure pillar base bottom plate and a floor structure are elevated on the same horizontal plane. The supporting frame in the externally-wrapped pillar base is provided with a through hole for fixedly connecting the bolts, the positioning is more accurate, the installation of the pre-buried bolts and the steel structure pillar base bottom plate are carried out simultaneously, the construction difficulty of secondary lifting the pillar base is reduced, and the potential quality hazard of deviation of the pre-buried bolts caused by secondary grouting can be avoided. The integral single-stage grouting is adopted for replacing the bottom plate grouting and secondary grouting of the steel structure pillar base, the difficulty of construction is reduced, the technical interval waiting time of solidification is shortened, and the construction period is quickened.

Description

Outer-enwraped type suspension column
Technical field
The utility model relates to building field, particularly the pre-buried a kind of pre-buried structure of stiffness structure reinforcing bar.
Background technology
Along with the fast development of society modernization, emerge in large numbers like the mushrooms after rain the life periphery people take large-scale shopping plaza, museum etc. as superelevation, the ultra-large type building structure of representative.Meanwhile, stiffness structure possesses steel work and concrete structure advantage simultaneously, compared with steel work, and can saving steel, increase the rigidity of member, building, compared with concrete structure, can reduce cross section and weight, increase the ductility of member, there is higher intensity, improved the shock resistance of building, be widely used in already in engineering entity, for building superelevation, super across and the realization of complex model established architecture basics.
Strengthening concrete combining structure is widely used in all kinds of building structure, substantially adopts outer-enwraped type suspension column and two kinds of modes of flush type suspension column for stiffened steel structure suspension column.The utility model technology is mainly puted forth effort the stiffness structure steel column pin construction method that Research foundation raft plate is taken root.
As shown in Figure 1, the former outer-enwraped type suspension column that is designed to of this project, pre-embedded bolt when construction of bottom plates, bolt needs temporary fixed and accurately locates, and allowable variation is 2mm, after underplate concrete has been built, more than suspension column is installed on to crab-bolt, suspension column absolute altitude regulates by post lower nut, allowable variation ± 2mm, the high reserved 50mm of suspension column base plate and structure base slab top mark.Re-use C60 microdilatancy pea gravel concreten space is tamped, finally complete steel column pin and install.
There is defect in construction in this way: 1, need to accurately locate pre-embedded bolt, and reinforce firm, in order to avoid cause bolt off normal while building underplate concrete; 2, treat that underplate concrete intensity meets designing requirement, can carry out suspension column installation, operation latent period is longer; 3, need coupled columns sole back-grouting, narrow space, difficult quality guarantee; 4, grouting meets after designing requirement with concrete strength, can carry out saving under rigid steel pile the lifting work of steel column, waits for longer cycle for the second time.
Summary of the invention
For addressing the above problem, the utility model provides a kind of outer-enwraped type suspension column, pre-embedded bolt accurate positioning, and underplate concrete meets designing requirement, and quality can be guaranteed, and whole work progress waits for that the concrete formation time is short.
For achieving the above object, the utility model provides a kind of outer-enwraped type suspension column, its steel structure column sole is fixedly connected with bolt, steel structure column sole both sides installed height mark adjusting nut and hold-down nut respectively on bolt, it is characterized in that: bolt is fixedly connected with bracing frame, bracing frame is fixed on base plate hypodermis reinforcing bar.
Described steel structure column sole upper surface and floor slab structure absolute altitude are in same level.
Between described base plate hypodermis reinforcing bar and base plate, be fixedly installed concrete pad, between support frame as described above and base plate, be fixedly installed concrete pad.
Between described base plate hypodermis reinforcing bar and bracing frame, be fixedly connected with reinforcing rib.
Described reinforcing rib and base plate hypodermis reinforcing bar single-sided welding 10d, reinforcing rib and bracing frame single-sided welding 10d.
Described reinforcing rib bending angle is 30 °-60 °.
Use the utility model effect remarkable: bracing frame is provided with the through hole that is fixedly connected with bolt, it is more accurate to locate, pre-embedded bolt and the installation of steel work suspension column are carried out simultaneously, reduce the difficulty of construction of secondary lifting suspension column, avoid back-grouting to cause the hidden danger of quality of pre-embedded bolt off normal, the utility model adopts one piece grouting to replace base plate grouting and steel work suspension column grouting back-grouting, reduces difficulty of construction simultaneously, shorten the technology intermission stand-by period of solidifying simultaneously, accelerate the duration.
Accompanying drawing explanation
Fig. 1 is the former project organization schematic diagram of outer-enwraped type suspension column.
Fig. 2 is outer-enwraped type suspension column structural representation.
Fig. 3 is outer-enwraped type suspension column concrete pad position view.
Fig. 4 is outer-enwraped type suspension column reinforcing rib structure schematic diagram.
1-steel work suspension column in figure, 2-bolt, 3-bracing frame, 4-concrete pad, 5-reinforcing rib, 6-base plate hypodermis reinforcing bar, 7-absolute altitude adjusting nut, 8-clamp nut, 9-pre-embedded bolt.
The specific embodiment
embodiment 1
As shown in Figure 2, the utility model provides a kind of outer-enwraped type suspension column, its steel work suspension column 1 base plate is fixedly connected with bolt 2, steel work suspension column 1 base plate both sides installed height mark adjusting nut 7 and hold-down nut 8 respectively on bolt 2, bolt 2 is fixedly connected with bracing frame 3, and bracing frame 3 is fixed on base plate hypodermis reinforcing bar 6.
First make bracing frame 3, bracing frame 3 technical data design height and non-deformability as required, on bracing frame 3, with bolt 2 weld bolt connecting hole positions, junction, the bracing frame 3 completing is welded and fixed and is connected with base plate hypodermis reinforcing bar 6, completes bracing frame 3 is installed.Then welded and installed bolt 2, according to design height installed height mark adjusting nut 7, then lifts steel work suspension column 1 after completing, and steel work suspension column 1 is fixing by clamp nut 8.Can make steel work suspension column 1 plate upper surface and floor slab structure absolute altitude in same level according to designing requirement.Build underplate concrete, while building, built by steel work suspension column 1 one side direction opposite sides, strengthen vibrating, guarantee that steel column foot bottom concrete is closely knit, guarantee the loading characteristic of hinged joint in structural calculation model simultaneously, form packet mode suspension column embedded structure.
Guaranteeing in structure stress situation, we improve former design outer-enwraped type stiffness structure steel column pin form of construction work, more than maintenance suspension column position is positioned at concrete floor, adopt the advantage of a construction molding of flush type suspension column, by steel column foot bottom shrouding Transducers Embedded in Concrete base plate, guarantee tight between suspension column bottom shrouding and concrete, complete a concreting moulding, avoid numerous and diverse operation of back-grouting, also avoid locating the problems such as inaccurate and back-grouting leakiness because cast-in fixing bolt 9 deviations cause steel work suspension column 1 simultaneously, reach the requirement of outer-enwraped type suspension column hinged joint.
embodiment 2
The utility model basic structure and preparation method are identical with embodiment 1.
As shown in Figure 3, in embodiment 1 basic structure, be to guarantee base plate waterproof quality, adopt between base plate and base plate hypodermis reinforcing bar 6, concrete pad 4 be set between base plate and bracing frame 3.Concrete pad thickness 40mm between base plate and base plate hypodermis reinforcing bar 6, between base plate and bracing frame 3, concrete pad profile specification is 100mmX100mmX200mm.
As shown in Figure 4, for preventing bracing frame 3 displacements in filling process, in this structure, adopt and between base plate hypodermis reinforcing bar 6 and bracing frame 3, adopt the fixing method of reinforcing rib 5, reinforcing rib 5 adopts HRB400 level 25 reinforcing bars, bracing frame 3 sidewalls and base plate hypodermis reinforcing bar 6 are welded respectively in reinforcing rib 5 two ends, single-sided welding 10d, 45 ° of reinforcing rib bending place bending angles.

Claims (6)

1. an outer-enwraped type suspension column, its steel structure column sole is fixedly connected with bolt, on bolt, steel structure column sole both sides installed height mark adjusting nut and hold-down nut respectively, is characterized in that: bolt is fixedly connected with bracing frame, and bracing frame is fixed on base plate hypodermis reinforcing bar.
2. a kind of outer-enwraped type suspension column according to claim 1, is characterized in that: described steel structure column sole upper surface and floor slab structure absolute altitude are in same level.
3. a kind of outer-enwraped type suspension column according to claim 1, is characterized in that: between described base plate hypodermis reinforcing bar and base plate, be fixedly installed concrete pad, between support frame as described above and base plate, be fixedly installed concrete pad.
4. a kind of outer-enwraped type suspension column according to claim 1, is characterized in that: between described base plate hypodermis reinforcing bar and bracing frame, be fixedly connected with reinforcing rib.
5. a kind of outer-enwraped type suspension column according to claim 4, is characterized in that: described reinforcing rib and base plate hypodermis reinforcing bar single-sided welding 10d, reinforcing rib and bracing frame single-sided welding 10d.
6. a kind of outer-enwraped type suspension column according to claim 4, is characterized in that: described reinforcing rib bending angle is 30 °-60 °.
CN201320414455.9U 2013-07-12 2013-07-12 Externally-wrapped pillar base Expired - Fee Related CN203603264U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320414455.9U CN203603264U (en) 2013-07-12 2013-07-12 Externally-wrapped pillar base

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320414455.9U CN203603264U (en) 2013-07-12 2013-07-12 Externally-wrapped pillar base

Publications (1)

Publication Number Publication Date
CN203603264U true CN203603264U (en) 2014-05-21

Family

ID=50715944

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320414455.9U Expired - Fee Related CN203603264U (en) 2013-07-12 2013-07-12 Externally-wrapped pillar base

Country Status (1)

Country Link
CN (1) CN203603264U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107620429A (en) * 2017-10-27 2018-01-23 北京善筑科技股份有限公司 A kind of square steel tube combined special-shaped column and its structural system
CN108894243A (en) * 2018-06-14 2018-11-27 中国化学工程第六建设有限公司 Steel structural concrete outer-enwraped type suspension column

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107620429A (en) * 2017-10-27 2018-01-23 北京善筑科技股份有限公司 A kind of square steel tube combined special-shaped column and its structural system
CN108894243A (en) * 2018-06-14 2018-11-27 中国化学工程第六建设有限公司 Steel structural concrete outer-enwraped type suspension column

Similar Documents

Publication Publication Date Title
CN103215894B (en) Portable interim prestressed stretch-draw anchor block
CN102900024B (en) Using method for overturning die plate for large-scale concrete structure and
CN203270461U (en) Bailey beam support without buttress in soft foundation
CN103452350A (en) Fabricated electronic workshop and construction method thereof
CN209799167U (en) Pre-buried column base reinforcing system
CN203603264U (en) Externally-wrapped pillar base
CN205257790U (en) Fixed high -low leg handle portal crane
CN102808511B (en) Steel box column-concrete girder connection construction method
CN212582721U (en) Bearing platform of tower crane for vertical tower of top plate of foundation garage
CN202265906U (en) Fixing device for anchor bolts of embedded type steel tube concrete column feet
CN202266034U (en) Fixing device for anchor bolts of embedded type diamond combined steel and concrete column feet
CN201943349U (en) Steel hoop supporting device for high pier, pillar and beam template formworks
CN205421023U (en) Public road bridge roof beam strutting arrangement
CN201671063U (en) Movable steel base for construction precast beams and standard knot thereof
CN103669566B (en) construction method of steel reinforced concrete base of large-span net rack roof
CN215629452U (en) Pull rod-free mobile trolley construction device for frame bridge
CN203603542U (en) Fabricated electronic workshop
CN205296206U (en) Tower cane foundation
CN212561185U (en) Pier stud tie beam integral casting's construction template
CN205296821U (en) Oblique roofing formwork system of heavy grade cast in situ concrete
CN212249280U (en) Embedded part supporting device
CN108661301A (en) Derrick stand modularization assembling platform and application method
CN201254774Y (en) Steel frame and concrete column combination heavy frame
CN204212272U (en) A kind of concrete column and stiffened steel structure post steel split heads connected node
CN201704698U (en) Detachable tower footing

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140521

Termination date: 20190712

CF01 Termination of patent right due to non-payment of annual fee